Loading...
HomeMy WebLinkAboutContract 40440-A1 (2)AMENDMENT NUMBER 1 STATE OF TEXAS S CITY SECRETARY CONTRACT N0.4644Z)-Ak COUNTY OF TARRANT 8 WHEREAS, the City of Fort Worth (CITY) and AECOM USA Group, Inc., (CONSULTANT) made and entered into City Secretary Contract No. 40440, (the CONTRACT) which was authorized by the City Council by M&C C-24201 on the 4th day of May, 2010; WHEREAS, the Contract involves engineering services for the following project: Alliance Pavement Rehab Phase 7 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in the proposal letter dated July 22,2010, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by CONSULTANT total $36,843.31. 2. Article II of the Contract is amended to change the project number from 1400 to 1588 and to provide for an increase in the fee to be paid to CONSULTANT for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $181,709.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. `��'�ICIAL RECORD Page -1 CITY SECRETARY FT: WORTH, TX EXECUTED Fort Worth, ATTEST: on this the I a'v� Tarrant County, Marty HendriU� City Secretary Kenneth L. Penney, Aviation Department Director S n o Vice President AECOM USA Group, Inc. ENGINEER Texas. APPROVED AS TO FORM AND LEGALITY: Amy Ramsey � Assistant City Attorney day of2010 in Page -2- Fernando Costa Assistant City Manager AECOM 1200 Summit Avenue, Suite 600, Fort Worth, TX 76102-4409 T 817,698.6800 F 718.698.6802 www.aecom.com Mr. Kenneth L. Penny, A.A.E. Director, City of Fort Worth Airport Systems 4201 North Main Street Suite 200 Fort Worth, Texas 76106 July 22, 2010 Re: City of Fort Worth Contract 40440 Alliance Pavement Rehabilitation, Phase 7 Dear Mr. Penny, At the request of Mr. Tim Ward, President Alliance Air Services for Alliance Airport, the scope of services for the above reference contract will be expanded to incorporate the rehabilitation of the existing Precision Approach Path Indicator (PAPI) system on Runway 16R/34L at Alliance Airport. Equipment failure and continued maintenance has necessitated the replacement of the existing PAPI system. AECOM is requesting an amendment to our existing Contract, City Secretary Contract No. 40440, for the expanded scope of work. The engineering fee for the expanded scope of work is $36,843.31. The estimated construction cost for the PAPI replacement is approximately $284,453.00 Attached please find back up information associated with this Request for Contract Amendment. Should you have any questions, please do not hesitate to give us a call. Yours sincerely, Larry L. Gaines Project Manager, Transportation LLG:IIg C.c. File Tim Ward, Alliance Air/Aviation Services Attachment AECOM Transportation From. Ward, Tim LTiIII* cl @hillwood.comj Sent: Tuesday, July 13, 2010 9:31 AM To: Johnson, Ruseena Cc: Gaines, Larry; Kirschbaum, Jim; Ealy, Aya; Queen, Lacey; Ash, Chris Subject: FW: FW: Alliance PAPI's Rehabilitation Attachments: Addition of PAPI (2).pdf Ruseena, Please see email trail below. One of the PAPI's on Runway 16L/34R has recently failed. I requested FAA to approve an amendment to Phase 2 of the 2010 grant (Grant 41) for the design and construction of new PAPI's. Enclosed is AECOM's fee proposal for the design of this additional work. Construction is estimated at $247,610. I have asked Larry Gaines to contact you regarding processing an amendment to their Phase 7 contract, which was approved by Council on May 4, 2010. Please let me know, if you need anything more from me. Tim -----Original Message---- - From: Rooney.ClarkCsfaa.gov Lmailto:Rodney.Clark@faa.gov] Sent: Tuesday, July 13, 2010 6052 AM To: Ward, Tim Cc: Ash, Chris Subject: Re: FW: Alliance PAPI's Rehabilitation We can provide funding for the PAPI and do a Phase 2 for the pavement your entitlement for the year. The total amount of funding you are to loaded into the checkbook yet, so it may be a few more days before I Washington for clearance. Rodney Clark Senior Program Manager Texas Airports Development 2601 Meacham Boulevard Fort Worth, TX 76137-0650 Phone. (817) 222-5659 Fax. (817) 222-5989 Fromm: Office/FAA ["�tard, Tim" <TiRe.Ward�illa�rood.com> Rehab to finish off receive has not been an send the project to t ( To. -------------------------------------------------------- IRodney Clark/ASW/FAA@FAA ( (------------> ( Cc: (------------> ("Ash, Chris" <chris.ash@hiI1wood.com> Date: 107/1212010 03:34 PM ( ( Subject: [FW: Alliance PAPI's Rehabilitation ( Rodney, Enclosed are estimates of design and construction for the replacement of the PAPI system that failed. Total estimate is $284,453. If you approve atttending our second half 2818 grant, ore mill hid our pavement repairs as base bid and alternates to provide funding for the PAPI. Let re know, if you need anything wre at this time. From: Gaines, Carry[m�ilto:Carry.taaines�aecon�.comj Sent: Mbnday, July 12, 2810 3:24 P!'� To: Bard, Tina; Ash, Chris Cc: Kirschbaum, Jin 2 Subject: Alliance PAPI's Rehabilitation Tim, Attached please find an estimate for the additional engineering fee required to incorporate the PAPI Rehabilitation work into the Phase 7 Guard Light Project. Also included is an estimated cost for construction. If you have any questions, please give us a call. Regards Larry L. Gaines Project Manager - Southwest/Mountain Region Transportation D 817.698.6825 C 817.797.8448 larry.gaines@aecom.com AECOM 1200 Summit Ave., Suite 600 Fort Worth, Texas 76102-4409 www.aecom.com [attachment "PAPI Est Const Cost.pdf" deleted by Rodney Clark/ASW/FAA] of PAPI.pdf" deleted by Rodney Clark/ASW/FAA] 3 [attachment "Addition Fort Worth Alliance Airport Runway Guard Light Rehabilitation (PAPI Addition) Fee Estimate and Man-hour Summary Date: July 12, 2010 DMJM Aviation DBE Summa of Costs Total 1. Direct Labor: Civil Design $30153.50 2. Labor and General Administration Overhead ((150%) x Item 1 - Direct Labor Cost) $4,730.25 3. Subtotal of Direct Labor and Overhead (Total of items 1 & 2) $7,883.75 4. Profit Item 3 - Direct Labor and Overhead x.15 $15182.56 Labor Total items 3 & 4 $9,066.31 5. Expenses: DMJM See Attached $317.00 AECOM Surveying $2r000A0 6. Subconsuitants Al( Subconsultants are MWBE Qualified Electrical Design (Ferguson Consulting) Guard Lights $23,460.00 Construction CIA Testing (MasJek Engineering) $2,000.00 7. Lump Sum Fee Estimate (Items 3, 41 5, and 6) Total Design and CPS $36,843.31 Participation Total $25,460.00 QBE Percentage 63.1°l0 ATTACHMENT B COMPENSATION Design Services for Phase 7 Runway Design and Taxiway Rehabilitation, Runway Guard Light Rehabilitation Design City Project No. 01588 I. Compensation A. The ENGINEER shall be compensated a total lump sum fee of $181,709.15 as summarized in Exhibit 13-1 — Engineer Invoice and Section IV — Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor, materials, supplies, and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit 13-1, Progress Reports as required in Item III of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this contract by an officer of the ENGINEER. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Director of the Department of Aviation monthly progress reports covering all phases of design in the format required by the City. B-1 EXHIBIT "B-2" ENGINEER INVOICE (Supplement to Attachment B) Design Services for Phase 7 Runway Design and Taxiway Rehabilitation, Runway Guard Light Rehabilitation Design City Project No. 01588 SUMMARY OF TOTAL PROJECT FEES Project Number and Name Total Fee MWBE Fee M/WBE 01588, Phase 7 Runway Design and Taxiway $181,709.15 $128,985.00 70.9 Rehabilitation, Runway Guard Light Rehabilitation Design City M/WBE Goal = _% Consultant Committed Goal = 25% B-2