STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES
This AGREEMENT is
corporation situated in Tarrant,
Jacobs Engineering Group Inc.,
Apron C Expansion.
DE
Scope of Services
tween the City of Fort Worth, a home -rule municipal
®enton, Parker and Wise Counties, Texas (the "CITY"), and
(the "ENGINEER"), for a PROJECT generally described as:
Article I
A. The Scope of Services is set forth in Attachment A.
Article II
Compensation
A. The ENGINEER's compensation is set forth in Attachment B.
Article III
Terms of Payment
Payments to the ENGINEER will be made as follows:
A. Invoice and Payment
(1) The Engineer shall provide the City sufficient documentation, including but not
limited to meeting the requirements set forth in Attachment D to this
AGREEMENT, to reasonably substantiate the invoices.
(2) The ENGINEER will issue monthly invoices for all work performed under this
AGREEMENT. Invoices are due and payable within 30 days of receipt.
(3) Upon completion of services enumerated in Article I, the final payment of any
balance will be due within 30 days of receipt of the final invoice.
(4) In the event of a disputed or contested billing, only that portion so contested
will be withheld from payment, and the undisputed portion will be paid. The
CITY will exercise reasonableness in contesting any bill or portion thereof. No
interest will accrue on any contested portion of the billing until mutually
resolved.
(5) If the CITY fails to make payment in full to ENGINEER for billings contested in
good faith within 60 days of the amount due, the ENGINEER may, after giving
Cityof Fort Wonh, Texas
Standard Agreement for Engineering Related Design Services
6.30.09
Page 1 of 15
CITY SECRETARY
FT. WORTH, TX
7 days' written notice to CITY, suspend services under this AGREEMENT until
paid in full. In the event of suspension of services, the ENGINEER shall have
no liability to CITY for delays or damages caused the CITY because of such
suspension of services.
Article IV
Obligations %J the Engineer
Amendments to Article IV, if any, are included in Attachment C.
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services incidental thereto.
B. Standard of Care
The standard of care applicable to the ENGINEER's services will be the
degree of skill and diligence normally employed in the State of Texas by
professional engineers or consultants performing the same or similar services
at the time such services are performed.
C. Subsurtace Investigations
(1) The ENGINEER shall advise the CITY with regard to the necessity for
subcontract work such as special surveys, tests, test borings, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise the
CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise specified
in Attachment A.
(2) In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between successive test
points and sample intervals and at locations other than where
observations, exploration, and investigations have been made. Because
of the inherent uncertainties in subsurface evaluations, changed or
unanticipated underground conditions may occur that could affect the
total PROJECT cost and/or execution. These conditions and
cost/execution effects are not the responsibility of the ENGINEER.
City of Fori Worth, Texas
Standard Agreement for Engineering Related Design Services
6.30.09
Page 2 of I
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of all plans in ink
on reproducible mylar sheets and electronic files in .pdf format, or as otherwise
approved by CITY, which shall become the property of the CITY. CITY may
use such drawings in any manner it desires; provided, however, that the
ENGINEER shall not be liable for the use of such drawings for any project
other than the PROJECT described herein.
E. Engineer's Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on -site representatives or otherwise, do not make the ENGINEER
or its personnel in any way responsible for those duties that belong to the
CITY and/or the CITY's construction contractors or other entities, and do not
relieve the construction contractors or any other entity of their obligations,
duties, and responsibilities, including, but not limited to, all construction
methods, means, techniques, sequences, and procedures necessary for
coordinating and completing all portions of the construction work in
accordance with the Contract Documents and any health or safety precautions
required by such construction work. The ENGINEER and its personnel have
no authority to exercise any control over any construction contractor or other
entity or their employees in connection with their work or any health or safety
precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGINEER or its personnel shall have no obligation or
responsibility to visit the construction site to become familiar with the progress
or quality of the completed work on the PROJECT or to determine, in general,
if the work on the PROJECT is being performed in a manner indicating that the
PROJECT, when completed, will be in accordance with the Contract
Documents, nor shall anything in the Contract Documents or the agreement
between CITY and ENGINEER be construed as requiring ENGINEER to make
exhaustive or continuous on -site inspections to discover latent defects in the
work or otherwise check the quality or quantity of the work on the PROJECT.
If the ENGINEER makes on -site observation(s) of a deviation from the
Contract Documents, the ENGINEER shall inform the CITY.
(3) When professional certification of performance or characteristics of materials,
systems or equipment is reasonably required to perform the services set forth
in the Scope of Services, the ENGINEER shall be entitled to rely upon such
certification to establish materials, systems or equipment and performance
criteria to be required in the Contract Documents.
F. Opinions of Probable Cost, Financial Considerations, and Schedules
{1 } The ENGINEER shall provide opinions of probable costs based on the
City of Fort Worth. Texas
Standard Agreement for Engineering Related Design Services
8.30.09
Page 3 of 15
current available information at the time of preparation, in accordance
with Attachment A.
(2} In providing opinions of cost, financial analyses, economic feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or structures that may affect operation or
maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties; quality, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate PROJECT
cost or schedule. Therefore, the ENGINEER makes no warranty that the
CITY's actual PROJECT costs, financial aspects, economic feasibility, or
schedules will not vary from the ENGINEER's opinions, analyses,
projections, or estimates.
G. Construction Progress Payments
Recommendations by the ENGINEER to the CITY for periodic construction
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling and
observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the Contract
Documents; that the final work will be acceptable in all respects; that the
ENGINEER has made an examination to ascertain how or for what purpose
the construction contractor has used the moneys paid; that title to any of the
work, materials, or equipment has passed to the CITY free and clear of liens,
claims, security interests, or encumbrances; or that there are not other matters
at issue between the CITY and the construction contractor that affect the
amount that should be paid.
H. Record Drawings
Record drawings, if required, will be prepared, in part, on the basis of
information compiled and furnished by others, and may not always represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not responsible for any
errors or omissions in the information from others that is incorporated into the
record drawings.
!. Minority and Woman Business Enterprise (MIVNBE) Participation
In accord with City of Fort Worth Ordinance No. 15530, the City has goals for
the participation of minority business enterprises and woman business
City of Fort Warth. Texas
Standard Agreement for Engineering Related Design Services
8.30.09
Page 4 of 15
enterprises in City contracts. Engineer acknowledges the M/WBE goal
established for this contract and its commitment to meet that goal. Any
misrepresentation of facts (other than a negligent misrepresentation) and/or
the commission of fraud by the Engineer may result in the termination of this
agreement and debarment from participating in City contracts for a period of
time of not less than three (3) years.
J. Right to Audit
(1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers and
records, of the ENGINEER involving transactions relating to this contract.
ENGINEER agrees that the CITY shall have access during normal working
hours to all necessary ENGINEER facilities and shall be provided adequate
and appropriate work space in order to conduct audits in compliance with the
provisions of this section. The CITY shall give ENGINEER reasonable
advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconsultant agreements
hereunder a provision to the effect that the subconsultant agrees that the CITY
shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that the
CITY shall have access during normal working hours to all subconsultant
facilities, and shall be provided adequate and appropriate work space, in order
to conduct audits in compliance with the provisions of this article together with
subsection (3) hereof. CITY shall give subconsultant reasonable advance
notice of intended audits.
(3) ENGINEER and subconsultant agree to photocopy such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for the
cost of copies at the rate published in the Texas Administrative Code in effect
as of the time copying is performed.
K. INSURANCE
(1) ENGINEER'S INSURANCE
a. Commercial General Liability —the ENGINEER shall maintain commercial
general liability (CGL) and, if necessary, commercial umbrella insurance
with a limit of not less than $1,000,000.00 per each occurrence with a
$2,000,000.00 aggregate. If such Commercial General Liability insurance
contains a general aggregate limit, it shall apply separately to this
PROJECT or location.
City o! Fort Worth, Texas
Standard Agreement for Engineering Related Design Services
8.30.09
Page 5 0! t 5
The CITY shall be included as an insured under the CGL, using ISO
additional insured endorsement or a substitute providing equivalent
coverage, and under the commercial umbrella, if any. This
insurance shall apply as primary insurance with respect to any other
insurance or self-insurance programs afforded to the CITY. The
Commercial General Liability insurance policy shall have no
exclusions by endorsements that would alter or nullify:
premises/operations, products/completed operations, contractual,
personal injury, or advertizing injury, which are normally contained
within the policy, unless the CITY approves such exclusions in
writing.
ii. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the commercial general
liability or commercial umbrella liability insurance maintained in
accordance with this agreement.
b. Business Auto —the ENGINEER shall maintain business auto liability and,
if necessary, commercial umbrella liability insurance with a limit of not less
than $1,000,000 each accident. Such insurance shall cover liability arising
out of "any auto' , including owned, hired, and non -owned autos, when said
vehicle is used in the course of the PROJECT. If the engineer owns no
vehicles, coverage for hired or non -owned is acceptable.
i. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the business auto liability or
commercial umbrella liability insurance obtained by ENGINEER
pursuant to this agreement or under any applicable auto physical
damage coverage.
c. Workers' Compensation —ENGINEER shall maintain workers
compensation and employers liability insurance and, if Jr
commercial umbrella liability insurance with a limit of not less than
$100,000.00 each accident for bodily injury by accident or $100,000.00
each employee for bodily injury by disease, with $500,000.00 policy limit.
i. ENGINEER waives all rights against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by workers compensation and
employer's liability or commercial umbrella insurance obtained by
ENGINEER pursuant to this agreement.
d. Professional Liability the ENGINEER shall maintain professional liability,
a claims -made policy, with a minimum of $1,000,000.00 per claim and
aggregate. The policy shall contain a retroactive date prior to the date of
City of Fort WoM, Texas
Standard Agreement !or Engineering Related Design Services
8.30.138
Page a 0f 10
the contract or the first date of services to be performed, whichever is
earlier. Coverage shall be maintained for a period of 5 years following the
completion of the contract. An annual certificate of insurance specifically
referencing this project shall be submitted to the CITY for each year
following completion of the contract.
(2} GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that the ENGINEER has obtained all
required insurance shall be delivered to the CITY prior to ENGINEER
proceeding with the PROJECT.
b. Applicable policies shall be endorsed to name the CITY an Additional
Insured thereon, as its interests may appear. The term CITY shall include
its employees, officers, officials, agents, and volunteers as respects the
contracted services.
c. Certificate(s) of insurance shall document that insurance coverage
specified in this agreement are provided under applicable policies
documented thereon.
d. Any failure on part of the CITY to request required insurance
documentation shall not constitute a waiver of the insurance requirements.
e. A minimum of thirty (30) days notice of cancellation or material change in
coverage shall be provided to the CITY. A ten (10) days notice shall be
acceptable in the event of non-payment of premium. Such terms shall be
endorsed onto ENGINEER's insurance policies. Notice shall be sent to the
respective Department Director (by name), City of Fort Worth, 1000
Throckmorton, Fort Worth, Texas 76102.
f. Insurers for all policies must be authorized to do business in the State of
Texas and have a minimum rating of A:V or greater, in the current A.M.
Best Key Rating Guide or have reasonably equivalent financial strength
and solvency to the satisfaction of Risk Management.
g. Any deductible or self insured retention in excess of $25,000.00 that would
change or alter the requirements herein is subject to approval by the CITY
in writing, if coverage is not provided on a first -dollar basis. The CITY, at it
sole discretion, may consent to alternative coverage maintained through
insurance pools or risk retention groups. Dedicated financial resources or
letters of credit may also be acceptable to the CITY.
h. Applicable policies shall each be endorsed with a waiver of subrogation in
favor of the CITY as respects the PROJECT.
The CITY shall be entitled, upon its request and without incurring expense,
City of Fort Warth, Texas
Standard Agreement for Engineering Related Design Services
8.30.09
Page 7 0f 15
to review the ENGINEER's insurance policies including endorsements
thereto and, at the CITY's discretion; the ENGINEER may be required to
provide proof of insurance premium payments.
j. Lines of coverage, other than Professional Liability, underwritten on a
claims -made basis, shall contain a retroactive date coincident with or prior
to the date of the contractual agreement. The certificate of insurance shall
state both the retroactive date and that the coverage is claims -made.
k. Coverages, whether written on an occurrence or claims -made basis, shall
be maintained without interruption nor restrictive modification or changes
from date of commencement of the PROJECT until final payment and
termination of any coverage required to be maintained after final payments.
I. The CITY shall not be responsible for the direct payment of any insurance
premiums required by this agreement.
m. Sub consultants and subcontractors to/of the ENGINEER shall be required
by the ENGINEER to maintain the same or reasonably equivalent
insurance coverage as required for the ENGINEER. When sub
consultants/subcontractors maintain insurance coverage, ENGINEER shall
provide CITY with documentation thereof on a certificate of insurance.
L. Independent Consultant
The ENGINEER agrees to perform all services as an independent consul#ant
and not as a subcontractor, agent, or employee of the CITY.
M. Disclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure in
writing of any existing conflicts of interest or potential conflicts of interest,
including personal financial interest, direct or indirect, in property abutting the
proposed PROJECT and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing of
any conflicts of interest that develop subsequent to the signing of this contract
and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions of
the PROJECT to permit testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY may
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediation activities of the PROJECT.
Cityot FOR Worth, Texas
Standard Agreement for Enc,ineering Related Design Services
8.30.08
Page 8 of 75
O. Permitting Authorities -Design Changes
If permitting authorities require design changes so as to comply with published
design criteria and/or current engineering practice standards which the
ENGINEER should have been aware of at the time this Agreement was
executed, the ENGINEER shall revise plans and specifications, as required, at
its own cost and expense. However, if design changes are required due to the
changes in the permitting authorities' published design criteria and/or practice
standards criteria which are published after the date of this Agreement which
the ENGINEER could not have been reasonably aware of, the ENGINEER
shall notify the CITY of such changes and an adjustment in compensation will
be made through an amendment to this AGREEMENT.
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the schedule
developed per Attachment D to this AGREEMENT.
Article V
Obligations of the City
Amendments to Article V, if any, are included in Attachment C.
A. City -Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of the
information provided by the CITY.
B. Access to Facilities and Property
The CITY will make its facilities accessible to the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITY's facilities as may be required in connection
with the ENGINEER's services. The CITY will be responsible for all acts of the
CITY's personnel.
C. Advertisements, Permits, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for a!I advertisements for bids; permits and licenses required
by local, state, or federal authorities, and land, easements, rights -of -way, and
access necessary for the ENGINEER's services or PROJECT construction.
city of Fart Worth, Texas
Standard Agreement for Engineering Related Design Services
8.30.d9
Page g of IV
D. Timely Review
The CITY will examine the ENGINEER's studies, reports, sketches, drawings,
specifications, proposals, and other documents; obtain advice of an attorney,
insurance counselor, accountant, auditor, bond and financial advisors, and
other consultants as the CITY deems appropriate; and render in writing
decisions required by the CITY in a timely manner in accordance with the
project schedule prepared in accordance with Attachment D.
E. Prompt Notice
The CITY will give prompt written notice to the ENGINEER whenever CITY
observes or becomes aware of any development that affects the scope or
timing of the ENGINEER's services or of any defect in the work of the
ENGINEER or construction contractors.
F. Asbestos or Hazardous Substances Release.
{1) CITY acknowledges ENGINEER will perform part of the work at CITY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior role
in the generation, treatment, storage, or disposition of such materials. In
consideration of the associated risks that may give rise to claims by third
parties or employees of City, City hereby releases ENGINEER from any
damage or liability related to the presence of such materials.
(2) The release required above shall not apply in the event the discharge,
release or escape of hazardous substances, contaminants, or asbestos is
a result of ENGINEER Is negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnification and Claims
The CITY agrees to include in all construction contracts the provisions of
Article IV.E. regarding the ENGINEER's Personnel at Construction Site, and
provisions providing contractor indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third -Party Beneficiaries
(1) The CITY agrees to include the following clause in all contracts with
construction contractors and equipment or materials suppliers:
"Contractors, subcontractors and equipment and materials
suppliers on the PROJECT, or their sureties, shall maintain no
direct action against the ENGINEER, its officers, employees,
and subcontractors, for any claim arising out of, in connection
Ciry of Fort WoM, Texas
Standard Agreement tar Engineering Related Design Services
8.30.09
Page 10 of m
with, or resulting from the engineering services performed.
Only the CITY will be the beneficiary of any undertaking by
the ENGINEER"
{2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the ENGINEER and there are no third -party beneficiaries.
(3) The CITY will include in each agreement it enters into with any other entity or
person regarding the PROJECT a provision that such entity or person shall
have no third -party beneficiary rights under this Agreement.
(4) Nothing contained in this section V.H. shall be construed as a waiver of any
right the CITY has to bring a claim against ENGINEER.
I. CITY's Insurance
(1) The CITY may maintain property insurance on certain pre-existing structures
associated with the PROJECT.
(2) The CITY will ensure that Builders RisWlnstallation insurance is maintained at
the replacement cost value of the PROJECT. The CITY may provide
ENGINEER a copy of the policy or documentation of such on a certificate of
insurance.
(3) The CITY will specify that the Builders RisWlnstallation insurance shall be
comprehensive in coverage appropriate to the PROJECT risks.
J. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the parties.
K. Changes
The CITY may make or approve changes within the general Scope of Services
in this AGREEMENT. If such changes affect the ENGINEER's cost of or time
required for performance of the services, an equitable adjustment will be made
through an amendment to this AGREEMENT with appropriate CITY approval.
City of Fon Worth, Texas
Standard Agreement lw Engineering Related Oesign Services
8.30.09
Page 11 01 10
Article VI
General legal Provisions
Amendments to At VI, if any, are included in Attachment C.
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. Reuse of Project Documents
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments of
service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of the ENGINEER will be at the CITY's sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
The ENGINEER is not responsible for damages or delay in performance
used by acts of God, strikes, lockouts, accidents, or other events beyond the
control of the ENGINEER that prevent ENGINEER's performance of its
obligations hereunder.
D. Termination
(1) This AGREEMENT may be terminated only by the City for convenience on
30 days' written notice. This AGREEMENT may be terminated by either the
CITY or the ENGINEER for cause if either party fails substantially to perform
through no fault of the other and does not commence correction of such
nonperformance with in 5 days of written notice and diligently complete the
correction thereafter.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Cost of reproduction of partial or complete studies, plans, specifications
or other forms of ENGINEER'S work product;
b.) Out-of-pocket expenses for purchasing electronic data files and other
data storage supplies or services;
c.) The time requirements for the ENGINEER'S personnel to document the
City of Fort Wonh, Texas
Standard Agreement for Engineering Related Design Services
8.30.09
Page 12 of 15
work underway at the time of the CITY'S termination for convenience so
that the work effort is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will submit to the
CITY an itemized statement of all termination expenses. The CITY'S approval
will be obtained in writing prior to proceeding with termination services.
E. Suspension, Delayr or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER for
the convenience of the CITY. In the event of such suspension, delay, or
interruption, an equitable adjustment in the PROJECT's schedule,
commitment and cost of the ENGINEER's personnel and subcontractors, and
ENGINEER's compensation will be made.
F. Indemnification
In accordance with Texas Local Government Code Section 271.904, the
ENGINEER shall indemnify, hold harmless, and defend the CITY against
liability for any damage caused by or resulting from an act of negligence,
intentional tort, intellectual property infringement, or failure to pay a
subcontractor or supplier committed by the ENGINEER or ENGINEER's
agent, consultant under contract, or another entity over which the ENGINEER
exercises control.
G. Assignment
Neither party shall assign all or any part of this AGREEMENT without the prior
written consent of the other party.
H. Interpretation
Limitations on liability and indemnities in this AGREEMENT are business
understandings between the parties and shall apply to all the different theories
of recovery, including breach of contract or warranty, tort including negligence,
strict or statutory liability, or any other cause of action, except for willful
misconduct or gross negligence for limitations of liability and sole negligence
for indemnification. Parties mean the CITY and the ENGINEER, and their
officers, employees, agents, and subcontractors.
I. Jurisdiction
The law of the State of Texas shall govern the validity of this AGREEMENT, its
interpretation and performance, and any other claims related to it. The venue
for any litigation related to this AGREEMENT shall be Tarrant County, Texas.
City of Fart Worth. Texas
Standard Agreement for Engineering Related Design Serv(ces
8.30.09
Page 13 of 15
J. Severability and Survival
If any of the provisions contained in this AGREEMENT are held for any reason
to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality,
or unenforceability will not affect any other provision, and this AGREEMENT
shall be construed as if such invalid, illegal, or unenforceable provision had
never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I.
shall survive termination of this AGREEMENT for any cause.
K. Observe and Comply
ENGINEER shall at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which in any
way affect this AGREEMENT and the work hereunder, and shall observe and
comply with all orders, laws ordinances and regulations which may exist or
may be enacted later by governing bodies having jurisdiction or authority for
such enactment. No plea of misunderstanding or ignorance thereof shall be
considered. ENGINEER agrees to defend, indemnify and hold harmless CITY
and all of its officers, agents and employees from and against all claims or
liability arising out of the violation of any such order, law, ordinance, or
regulation, whether it be by itself or its employees.
City of Fori Worth. Texas
Standard Agreement for Engineering Related l3es(gn Services
8.30.09
Page w of ,
Article i/III
Attachments, Schedules, and Signatures
This AGREEMENT, including its attachments and schedules, constitutes the entire
AGREEMENT, supersedes all prior written or oral understandings, and may only be
changed by a written amendment executed by both parties. The following attachments and
schedules are hereby made a part of this AGREEMENT:
Attachment A e Scope of Services
Attachment S — Compensation
Attachment C - Amendments to Standard Agreement for Engineering Services
Attachment D ® Project Schedule
Attachment E - Location Map
Executed this they day of , 20 Io.
ATTEST:
Marty Hendrix
City Secretary
APPROVED
Assistant C
ATTEST:
FORM
ey
` o0W n W
CITY OF FORT WORTH
�'¢ Assistant City Manager
ROYAL RECOMMENDED
Director, Aviation Department
LEGALITY Jacobs Engineering Group Inc
city or Fort worm, texas
Standard Agreornent for Engineering Related Design Services
8.30.09
Page 15 of 15
Kevin P. Nelson
Vice President
By:
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
ATTACHMENT A
PROJECT SCOPE
SCOPE OF WORK
APRON C EXPANSION
MEACHAM INTERNATIONAL AIRPORT
The City of Fort Worth has requested Bid Documents to be prepared by Jacobs
Engineers Group Inc. (JEG), for the Improvement at Meacham International
Airport. The services provided by JEG are;
A. BIDDING PHASE
1. Jacobs Engineering Group (JEG) will provide plans and specifications for City
of Fort Worth's use.
2. Jacobs Engineering Group (JEG) will provide the City with a CD of PDF's of
the plans and specifications. Jacobs will post this project to Buzz Saw
account provided by the City.
3. JEG will assist with the pre -bid to answer questions. The City is developing
and running the meeting, including required advertisements and
announcements.
4. JEG will attend the open bids. Bids will be opened and read by the City. JEG
will be tabulated and a recommendation the lowest qualified.
C. SERVICES DURING CONSTRUCTION
City will be responsible for construction administration and management
activities. This includes all Quality Assurance, Quality control, shop drawings and
RFI's.
D. CLOSEOUT PHASE
No as-builts or closing documents will be provided by Jacobs.
E. DESIGN SCHEDULE
See attached schedule.
F. COMPENSATION AND EXPENSES
JEG will provide the Engineering Services as described above and in the
assumptions below for a fee of $ 9,059.14
1
G. CONSTRUCTION DOCUMENTS
1. Final Design Phase
1. Design
2. Subcontracts and Expenses
3. Total
2. Bid Phase
1. Design
2. Subcontracts and Expenses
3. Total
3. Total Phase
H. ASSUMPTIONS
$ 7,711.19
$ 205.00
$ 7,916A9
$ 1,122.95
$ 20.00
$ 1,142.95
$ 9059.14
1. City will place advertisements.
I City will print and distribute plans and specifications
3. City will be responsible for construction administration and management activities. This
includes all Quality Assurance, Quality Control, shop drawings and RFI's.
4. Jacobs will revise plans and specifications from being included in the perimeter Road Package to
a separate package.
5. Jacobs will provide the City with a CD of PDF's fo the plans and specifications. Jacobs will post
this project to Buzz Saw account provided by the City.
6. Jacobs will provide and Engineer's estimate of probable construction cost
7. Jacobs will attend the Prebid meeting to answer questions. The meeting will be run by the City
8. Jacobs will assist with the bid opening and recommendation of lower bidder. The City will run
the meeting.
9. No as-builts will be provided by Jacobs
Attachment B —Compensation
FEE PROPOSAL
Airport:
Project.
Consultant:
HOURLY RATES
Meacham International Airport
APRON C EXPANSION
JACOBS ENGINEERING INC
Project Senior Design
Manager Engineer Engineer EIT
SUMMARY SHEET
CADD Clerical
$66.61 051.15 $40.22 0%29.29 $27.94 I $19.48
Consultant's G&A 1.2685 Consultant's Profit 0.15 Consultant's Multiplierl 2.6088
LABOR HOURS BY PHASE Project Senior Design
Manager Engineer Engineer EIT CADD Clerical
Preliminary Design
Final Design 11 10 9 1 29.5 5
Bidding 5 0 0 0 0 5
Construction
Buzz CD 2 0 0 1.5 8 0
Total Hours 18 10 9 2.5 37.5 10
$1,198.98 $511050 $361.98 $73.23 $1,047.75 $194.80
TOTAL PAYROLL COSTS $8,839.14
RPR Cost 0.00
TOTAL MISC. EXPENSES $0.00
SUBCONTRACT SERVICES
0.00
Reproduction $180.00
Travel $20.00
Mail $0.00
Subcontract Coord. $20.00
Total Subcontract Services $220900
TOTAL BASIC SERVICES
CONTRACT COSTS $9,059.14
ADDITIONAL SERVICES
Total Additional Services $0.00
TOTAL ENGINEERING COST $9,059.14
5/12/2010
FEE PROPOSAL
Airport:
Project,
Consultant.
Meacham International Airport
APRON C EXPANSION
JACOBS ENGINEERING INC
Estimated Person Hours
FINAL DESIGN PHASE
Project Senior Design
Anticipated Task Manager Engineer Engineer EIT CADD Clerical
Drawings (from attachment)
Subconsultant Coordination
Bid Proposal
Technical Specifications
Opinion of Probable Cost
Construction Mgmt. Plan
Final Design Review Meeting
FAA Form 7460
Estimated Hours
Subtotal Labor
65.5
$6,670.92
MISCELLANEOUS COSTS
Reproduction
Travel
Mail
Total Miscellaneous Costs
SUBCONTRACT SERVICES
SWPPP
Total Subcontract Services
TOTAL COSTS THIS PHASE
8
3
5
1
26.5
0
1
2
4
0
4
4
1
3
3
11
$1,911.48
$200.00
$6,870.92
10 9 1 29.5
$1,334.39 $944.32 $76.41 $2,150.23
5 Sets of plans to City
5
$254.09
5112/2010
FEE PROPOSAL
Airport:
Project,
Consultant:
Meacham International Airport
APRON C EXPANSION
JACOBS ENGINEERING INC
BIDDING PHASE
LABOR
Project Senior Design
Anticipated Task Manager Engineer Engineer EIT CADD Clerical
Prebid Conference
Issue Addenda
Bid Opening
Tabulate Bids
Coordination
Bid Recommendation
Estimated Hours
Subtotal Labor
10
$1,122.95
MISCELLANEOUS COSTS
Reproduction
Travel (2 trips total)
Misc. - Mail, etc.
Total Miscellaneous Costs
SUBCONTRACT SERVICES
Total Subcontract Services
TOTAL COSTS THIS PHASE
20.00
$20.00
$0.00
$1,142.95
$0.00 $0.00 $0.00 $254.09
5/12/2010
FEE PROPOSAL
BUZZ SAW ! CD
Airport:
Project:
Consultant:
Meacham Internatlonal Airport
APRON C EXPANSION
JACOSS ENGINEERING INC
LABOR
Project Senior Design
Anticipated Task Manager Engineer Engineer EIT CADD Clerical
Record Drawings
Warranty Inspection
Assist Agent
PDF/CD
Dev. Buzz Saw
0.5
2
2
1
6
Estimated Hours
11.5
2
0
0
1.5 8
0
11.5
Subtotal Labor
$1,045.27
$347,54
$0.00
$0.00
$114962 $583.11
$0.00
$90.89 1HR
MISCELLANEOUS COSTS
Reproduction 5.00
Travel (1 trip total)
Misc. - Mail, etc.
Total Miscellaneous Costs $5.00
SUCONTRACT SERVICES
0.00
0.00
Total Subcontract Services $0.0D
TOTAL COSTS THIS PHASE $1,050.27
Mylar prints of plans! DVD
5/12/2010
FEE PROPOSAL
Airport:
Project:
Consultant:
Meacham International Airport
APRON C EXPANSION
JACOBS ENGINEERING INC
Estimated Person Hours
FINAL DESIGN DRAWINGS
No. of
Project
Senior
Design
Drawing Sheets
Scale Manager
Engineer
Engineer EIT
CADD
Clerical
Cover Sheet
Index of drawings / Abreviations
General Notes
Site Control Plan / Key Plan
Erosion Control Plan- Apron
Erosion Control Plan -Ramp
Demolition Plan -Apron
Demolition Plan -Ramp
Layout Plan•Apron
layout Plan - Ramp
Jointing Plan -Apron
Jointing Plan -Ramp
Striping Plan -Apron
Striping Plan -Ramp
Grading and Drainage -Apron
Grading and Drainage -Ramp
Storm Drain Plan/Profile
Paving Details
Jointing Details
Drainage Details
Drainage Details
Drainage Details
Striping Plans
Erosion Control Details
Q/C Plans
Total
1
NIA
0
0
1
0
1
1
N/A
0
0
2
0
2
1
N/A
1
0
0
1
1
1
1:500
1
0
1
0
2
1
NIA
0
0
0
0
0.5
1
NIA
0
0
0
0
0.5
1
1:50
0
0
0
0
0.5
1
1:50
0
0
0
0
0.5
1
1:50
0
0
0
0
0.5
1
1:50
0
0
0
0
0.5
1
NIA
0
0
0
0
0.5
1
N/A
0
0
0
0
0.5
1
N/A
0
0
0
0
0.5
1
NIA
0
0
0
0
0.5
1
N/A
0
0
0
0
0.5
1
N/A
0
0
0
0
0.5
1
1:50
0
0
0
0
0.5
1
N/A
0
0
1
0
1
1
N/A
0
0
0
0
1
1
N/A
0
1
0
0
3
1
N/A
0
1
0
0
2
1
N/A
0
1
0
0
2
1
1:50
0
0
0
0
0.5
1
N/A
0
0
0
0
0.5
0
0
0
0
0
0
0
0
0
6
0
0
0
4
24 8 3 5 1 26.5
5/12/2010
FEE PROPOSAL
Airport:
Project:
Consultant:
Meacham International Airport
APRON C EXPANSION
JACOSS ENGINEERING INC
FINAL. DESIGN DRAWINGS
Estimated Personnel Hours
LABOR
No. of Project Senior Design
Drawing Sheets Scale Manager Engineer Engineer EIT CADD Clerical
Cover Sheet 1 NIA
Index of drawings / Abreviations 1 NIA
General Notes 1 N/A
Site Control Plan / Key Plan 1 1:500
Erosion Control Plano Apron 1 N/A
Erosion Control Plan -Ramp 1 N/A
Demolition Plan -Apron 1 1:50
Demolition Plan -Ramp 1 1:50
Layout Plan -Apron 1 1:50
layout Plano Ramp 1 1:50
Jointing Plan -Apron 1 WA
Jointing Plan -Ramp 1 N/A
Striping Plan -Apron 1 N/A
Striping Plan -Ramp 1 N/A
Grading and Drainage -Apron 1 N/A
Grading and Drainage -Ramp 1 WA
Storm Drain Plan/Profile 1 1:50
Paving Details 1 WA
Jointing Details 1 N/A
Drainage Details 1 N/A
Drainage Details 1 N/A
Drainage Details 1 N/A
Striping Plans 1 1:50
Erosion Control Details 1 N/A
WC
Plans
1
1
2
2
1
1
1
1
1
2
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
1
1
1
1
3
2
1
MWE1
2
0.5
0.5
61
4
ASSUMPTIONS
Airport. Meacham International Airport
Project: APRON C EXPANSION
Consultant: JACOBS ENGINEERING INC
1. City will place advertisements.
2. City will print and distribute plans and specifications
3. City will be responsible for construction administration and management activities. This
includes all Quality Assurance, Quality Control, shop drawings and RFI's.
4. Jacobs will revise plans and specifications from being included in the perimeter Road Package to
a separate package.
5. Jacobs will provide the City with a CD of PDF's fo the plans and specifications. Jacobs will post
this project to Buzz Saw account provided by the City.
6. Jacobs will provide and Engineer's estimate of probable construction cost
7. Jacobs will attend the Prebid meeting to answer questions. The meeting will be run by the City
8. Jacobs will assist with the bid opening and recommendation of lower bidder. The City will run
the meeting.
9. No as-builts will be provided by Jacobs
EXHIBIT "B-U!'
(Supplement to Attachment B)
COMPENSATION AND SCHEDULE
Design Services for
Apron C Expansion at Meacham Airport
City Project No. 116`i
1. Compensation
A. The ENGINEER shall be compensated a total lump sum fee of $ 9,059.14 as
summarized in Exhibit "13-3" Payment of the total lump sum fee shall be
considered full compensation for the services described in Attachment A, for all
labor materials, supplies, and equipment necessary to complete the project.
B. The ENGINEER shall be paid monthly payments as described in Exhibit "B-1"
Section 1 - Method of Payment — Lump Sum
Each invoice is to be verified as to its accuracy and compliance with the terms of
this contract by an officer of the ENGINEER.
ll. Schedule
Final Plans and Contract Documents for bid advertisement shall be submitted within 95
calendar days after the Notice to Proceed" letter is issued.
A. Final Engineering Plans and Contract Documents - 45 calendar days.
B. Final Plans and Contract Documents for Bid Advertisement — 50 calendar days.
AttacLment C —Amendments to Standard Agreement for Engineering Services
ATTACHMENT C
APRON CEXPANSION — MEACHAM
AMENDMENTS
A. Article IV, Paragraph G: The ENGINEER shall not be responsible for
recommending construction progress payments.
B. Article IV, Paragraph H: The ENGINEER shall not prepare Record
Drawings.
C. Article IV, Paragraph I: The CITY has not established a disadvantaged
business enterprise (DBE) goal for this contract.
D. Article IV, Paragraph K (1) (a): Delete: "If such Commercial General
Liability insurance contains a general aggregate limit, it shall apply
separately to this PROJECT of location."
E. Article IV, Paragraph K (1) (a) (ii): Delete: "ENGINEER waives all rights
against the CITY and its agents, officers, directors and employees for
recovery of damages to the extent these damages are covered by the
commercial general liability or commercial umbrella liability insurance
maintained in accordance with this agreement."
F. Article IV, Paragraph K (1) (b) (i): Delete: "ENGINEER waives all rights
against the CITY and its agents, officers, directors and employees for
recovery of damages to the extent these damages are covered by the
business auto liability or commercial umbrella liability insurance obtained by
ENGINEER pursuant to this agreement or under any applicable auto
physical damage coverage."
G. Article IV, Paragraph K (1) (c) (i): Delete: "ENGINEER waives all rights
against the CITY and its agents, officers, directors and employees for
recovery of damages to the extent these damages are covered by workers
compensation and employers liability or commercial umbrella insurance
obtained by ENGINEER pursuant to this agreement."
H. Article IV, Paragraph K (2) (b): The CITY will not be named as
"additional insured" on the ENGINEER'S professional liability and
worker's compensation policies.
I. Article IV, Paragraph K (2) (i): Jacobs considers its insurance policies
to be proprietary and therefore any such review of the applicable policies
must be conducted at Jacobs' offices and subject to a confidentiality
agreement.
J. Article IV, Paragraph O: Permits not expressly scoped in Attachment A,
Scope of Services, shall not be the responsibility of the ENGINEER.
K. Article VI, Paragraph B: The ENGINEER shall not be liable for any use
of such design documents on any other project.
SPECIAL PROVISIONS
A. Changes of Work: The ENGINEER shall make such revisions in the
work included in this contract which has been completed as are
necessary to correct errors appearing therein when required to do so by
the City without undue delays and without additional cost to the CITY.
If the CITY finds it necessary to request changes to previously
satisfactorily completed work or parts thereof, the ENGINEER shall make
such revisions if requested and as directed by the CITY. This will be
considered as additional work and paid for as specified under Additional
Work.
B. Additional Work: Work not specifically described under "Scope of
Services" must be approved by supplemental agreement to this contract
by the CITY before it is undertaken by the ENGINEER. If the ENGINEER
is of the opinion that any work he has been directed to perform is beyond
the scope of this agreement and constitutes extra work, he shall promptly
notify the CITY in writing. In the event the CITY finds that such work does
constitute extra work, then the CITY shall so advise the ENGINEER, in
writing, and shall provide extra compensation to the ENGINEER for doing
this work on the same basis as covered under Compensation and as
provided under a supplemental agreement. The lump sum fee shall be
adjusted if additional work is approved by supplemental agreement and
performed by the ENGINEER.
C. Consequential Damages: Notwithstanding any other provision of this
Agreement to the contrary, the parties hereto mutually agree that neither
party shall be liable to the other for any indirect, incidental, consequential,
exemplary, punitive or special damages or loss of income, profit or
savings of any party, including third parties, arising directly or indirectly
from the parties' relationship under this Agreement or applicable law.
D. Limit Use to Hard Copies: As a component of the Services provided
under this Agreement, Engineer may deliver electronic copies of certain
documents or data (the "Electronic Files") in addition to printed copies
(the "Hard Copies") for the convenience of the Owner. Owner and its
consultants, contractors and subcontractors may only rely on the Hard
Copies furnished by Engineer to Owner. If there is any discrepancy
between any Electronic File and the corresponding Hard Copy, the Hard
Copy controls.
E. Acceptance Procedure: Owner acknowledges that Electronic Files can
be altered or modified without Engineer's authorization, can become
corrupted and that errors can occur in the transmission of such Electronic
Files. Owner agrees that it will institute procedures to preserve the
integrity of the Electronic Files received from Engineer until acceptance.
Owner further agrees that it will review the Electronic Files immediately
upon receipt and conduct acceptance tests within thirty (30) days, after
which period Owner shall be deemed to have accepted the Electronic
Files as received. Engineer will undertake commercially reasonable
efforts to correct any errors in the Electronic Files detected within the 30-
day acceptance period. Engineer shall not be responsible to maintain the
Electronic Files after acceptance by Owner.
F. Warranty of Compatibility: Engineer does warrant or represent that the
Electronic Files will be compatible with or useable or readable by systems
used by Owner or its consultants, contractors and subcontractors.
Engineer is not responsible for any problems in the interaction of the
Electronic Files with other software used by Owner or its consultants,
contractors and subcontractors.
Attachment D —Project Schedule
r
0
3
L r
r p
O (y
O
LL U
O
_T Ot
C
U y
3 L O a
W
r = > a
3 E d
r E N c
LL � = N
a
`o n E c
a
= u E
cn
W L) a LL O O
ci ❑ o
❑ N � 9 O
m C pa m V
U = 3 c a m M
a a w E
o` c
cW > E 0 u
a a c
N _ a " ►!l
a m 3
_
LL (l
a
Z
40
= n
C ¢'
o_ o_ o o_ o 0 o_ o o_ o_ o_ o_ o_ o_
( i M Q a M N M O) N ul CO 4D (P Oi [V Ln O) (D _0
r N N N N L0 M t0 N N N n n r n (V o0 m `_' M
ro C C = C C C 'O (D LDW W C 7 O (� (` n C s C Ol 0)
to O O O O O O a •- •C O C a LLO .0 t O .c O O L O O
2 2Y IL(. 1-- ~ h LL H F- h
O \ 0 0 `� O O n O O 6 D `� c p
00 O C d M 0 M� O 0O O O O O O O (w)O O O O O O O 0 O O
a 0
V E
G O
a U;
N ✓+ N T N 0 N N 0 0 N N N N N N 0 T 0 0 N 0 N 0 �
T T T ro T T T >T T T T T T T T ro T
C q Mo po � 'O a 'Op a io a 'O U 'o b 'U 0 0 -0 a a a a
'� Coo p) N N N cp . rLn O V O (h p O O O M N N O 001
N In
0 s
j O
i C
LLL O 0 L
O r O 3
?� w y % r
� G o
0 o w s' E U t° LL
0
}} C N Ol `O L
U> O
UO C y C O
ro E ❑ ❑ .N o LL
', Z U C U u• a c•J N � a U U U O
rn O U = c Cll c
a m` O -N QC_1 C IL' vG ❑m D Cc
O a a
•y� UE
N c rny we
Omro 70
'
p•NN NCUO.m O Ca> O
° n aa: EN ¢
O w Fp=O`
Lira
j
U Z LL0 C U e (n (L (n O d O w Q w C) r
E 0 pa M ❑ d C
� ;O
a z E iLM M z (.)
x a
Fro z
❑ C%l co V 1n 10 h C! i ( (D 0 N M 41 u) � t0 !� w O) O �N Co O
,N N N N
E
E
N
ro
E
m
C
ro
c
Cl
a
-
O
M
O
ro
cq w
a
C7
0
N
a
O
d
t6
a
N
-
O
O
h
U
(1
a
a
a
a
n
a
a
¢
cr
N
Q)
0
N
a`
E
y
�
m
ro
ro
a
O
H
F-
c
n-
fy
f0
O
s
s
U
U
m
Attachment E --Project Location Map
JACOBS
Carter Burgess
Meacham International Airport
City of Fort Worth
IJ
ADDITIONAL AAFA FIGUrE h
AREA IN CONTRACT 5OUIIi IE WO ARLA
lUfSfNT �AwOOP FEHAEIMTATK0%,