HomeMy WebLinkAboutContract 40551-A1AMENDMENT NUMBER 1
STATE OF TEXAS 8 CITY SECRETARY CONTRACT NO. OS51-AI
COUNTY OF TARRANT 8
WHEREAS, the City of Fort Worth (City) and Jacobs Engineering Group, Inc. (Engineer) made and
entered into City Secretary Contract No. 40551, (the Contract) which did not require Council Approval; and
WHEREAS, the Contract involves engineering services for the following project:
Apron C Improvements, Project No. 1573
WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include
an increased scope of work and revised maximum fee for construction management phase
services;
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized
representatives, enter into the following agreement, which amends the Contract:
1.
Article I of the Contract is amended to include the additional engineering services specified in
the proposal letter dated April 15, 2011, a copy of which is attached hereto and incorporated
herein. The cost to City for the additional services to be performed by ENGINEER shall not exceed
$5,0002140
2.
Article II of the Contract is amended to provide for an increase in the fee to be paid to
ENGINEER for all work and services performed under the Contract, as amended, so that the total
fee paid by the City for all work and services shall not exceed the sum of $14,059.28.
C1
3.
Page -1-
All other provisions of the Contract, which are not expressly amended herein, shall remain in full
force and effect.
EXECUTED on this the day of , 20+9 in Fort Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED:
Kenneth L. Penney, Jr., A.A.E.
Aviation Director
Jacobs Engineering Group, Inc.
Engine
By: !
Name: BMA Dd Is
Title: eDbua*ico s
APPROVED AS TO FORM AND LEGALITY:
Doug Black
Assistant City Attorney
FTs WORTH; TX
APPROVED:
Fernando Costa
Assistant City Manager
Authorization:
Date: IJ
Page -2-
d,.irI III-;.,
April 15, 2011
Ms. Ruseena Johnson
AVIATION DEPARTMENT
Fort Worth Meacham International Airport
City of Fort Worth
4201 North Main Street, Suite 200
Fork Worth, Texas 76106=2749
Re: Scope or Work and fee Proposal for Construction Phase Services Apron C Expansion
City Contract No. 01573
Airfield Improvements, Meacham International Airport
Dear Ruseena:
Per your request on March 31, 2011, we are providing scope of Work, fee proposal, not to
exceed, for limited review of BFI's, shop drawings and site visits. Assumptions and summary of
required contractors submittals and tests are included for the above referenced project. This
contract is a cost plus contract with rates as shown below.
Th® ®nclosed scope and fee shows a not to exceed $5,000.14 with hourly rates of;
Project manager $190.14 / Hour
Senior Engineer 177.51/ Hour
Design Engineers 140.18/ Hour
Clerical 64.06 / Hour
Cost for reproduction and trip expenses are a reimbursable at cost.
The cost for mylars that were delivered on February 8, 2011 is $250.00 and is included in this
fee proposal.
Thank you for your consideration.
Jeffery L. Peterman, P.E.
Prciject Manager
Jacobs Engineering Group Inc.
JLPI
Jaccbs Engineering Group Inc.
cc: Bill Welstead, City of Fort Worth
Correspondence
Jacobs Engb�esrirrg Group Ine.
Project APRON C EXPANSION
City Project Number 1573
Airport: Meacham International Airport
Project Manager: Ruseena Johnson
Consultant: Jacobs Engineering Inc
HOURLY RATES Project Senior
Manager Enoineer
Design
Enoineer EIT
SUMMARY SHEET
4/4/2011
CADD Clerical
$74.21 $69.28 $54.71 $45.00 $32.07 $25.00
Consultant's G&A 1.228 Consultant's Profit 15.00 Consultant's Multiplier 2.5622
LABOR HOURS BY PHASE Project Senior Design
Manager Engineer Engineer EIT CADD Clerical
Preliminary Design 0.0 0.0 0.0 0.0 0.0 0.0
Final Design 0.0 0.0 0.0 0.0 0.0 0.0
Bidding 0.0 0.0 0.0 0.0 0.0 0.0
Construction 22.0 0.0 0.0 0.0 0.0 8.0
Total Hours
TOTAL PAYROLL COSTS
TOTAL MISC. EXPENSES
TOTAL BASIC SERVICES
CONTRACT COSTS
TOTAL SUBCONSULTANT
Geotechnical
Survey
Subcontract Coord. 10.00/
Total Subcontract Services
TOTAL ENGINEERING COST
22.0
$4,695.54
$304.60
$5,000.14
$0.00
$0.00
$0.00
$0.00
$5,000.14
0.0 0.0 0.0 0.0 8.0
CSJ No 0502MECH Page 1 of 3 4/15/2011
FEE PROPOSAL
Project
TxDOT Project No
Airport:
Project Manager:
Consultant:
APRON C EXPANSION
0
Meacham International Airport
Ruseena Johnson
Jacobs Engineering Inc
Estimated Personnel Hrs
CONSTRUCTION PHASE
21.5 weeks
Project Senior Design
Anticipated Task Manager Engineer Engineer EIT CADD Clerical
Preconst. Conf. (1 total)
Meetings (2 meetings)
Site Visits (Outside of mtgs. 3 total)
Pre -activity Meetings (1 total)
Final Inspection (1 total)
Address Submittals (3@2hr/ea),
Coordination with Agent, Contractor
Testing review(4@0.1hr)
Pay Estimates (6 total)
Estimated Hours
Subtotal Labor
Subtotal labor
MISCELLANEOUS COSTS
Reproduction
Travel (2 trips total)
Misc. - Mail, etc.
Total Miscellaneous Costs
SUBCONSULTANT COSTS
Geotechnical
Survey
L!
$4,183.10
$4,695.54
270.00
30.60
4.00
$304.60
Subcontract Coord.$0.00
Total Subconsultant Costs $0.00
TOTAL COSTS THIS PHASE $5,000.14
$0.00 $0.00 $0.00 $0.00 $512.44
$20.00 copying cost plus $250.00 for mylar reproduction.
$5,000.14
CB No. 014304 2 of 3 4/15/2011