Loading...
HomeMy WebLinkAboutContract 41351-A3 (2)CITY MCKOTAKY ,2 _ AMENDMENT No. 3 CONTRACT NO. 1�a TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Neel -Schaffer, Inc., (ENGINEER) made and entered into City Secretary Contract No. 41351, (the CONTRACT) which was authorized by M&C C-24655 on the 14th day of December, 2010 in the amount of $114,512.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $24,600.00 which was administratively authorized on May 26, 2011 and Amendment Number 2 in the amount of $1,750.00 which was administratively authorized on February 151 2012; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation, Contract 81; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services speced in a proposal dated April 15, 2012, a copy of which is attached hereto and I ncorporated herein. The cost to City for the additional design services to be performed by Engineer totals $5,890.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $146,751,15, OFFICIAL RECORD CITY SECRETARY FT. (NORTH, TX Page -1- 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: 8 3 /Z APPROVAL RE MENDED Frank Crumb, P. Director, Water De ment APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney ATTEST: Kayser ty Secretary Page -2- 5 ENGINEER Neel -Schaffer, Inc. Jaynes Amick, P.E. Engineers Manager DATE: N/A Date: N/A OFFICIAL RECOR® CITY SECRETARY FT. WORTH, TX AL NEEI—SCHAFFER + � Cheatham & Associates Apri125, 2012 Mr. Robert Sauceda City of Fort Worth, Water Department 1000 Throckmorton Fort Worth, Texas 76102 Reference: Sanitary Sewer Rehabilitation Contract LXXXI (81) Contract Amendment 3 for Additional Services Dear Mr. Sauceda: Neel -Schaffer, Inc. (NSI) offers additional Professional Engineering Services for this project. These additional services are required due to the need to make requested changes to the water and sewer locations in Erath Street as discussed April 17, 2012. This Engineering Services Contract Amendment includes a detailed scope of additional services attached to this letter. Neel - Schaffer, Inc. proposes to provide the attached scope of additional services for the lump sum total of $5,890.00, All additional services proposed will be performed in accordance with the original contract dated January 14, 2011. This Amendment, consisting of one page; and the attached Additional Scope of Services, consisting of one page, represent the entire amendment to the original agreement between the City of Fort Worth and Neel -Schaffer, Inc. If the terms of this Amendment are acceptable, please indicate by acknowledging acceptance of the terms of this document. Summary of Contract Fee for Contract 81 Original Contract Amount $1149511.15 Approved Amendment No. 1 $ 24,600.00 Approved Amendment No. 2 $ 1,750.00 Proposed Amendment No. 3 $ 5,890.00 Revised Contract Amount $146,751.15 If you have any questions or we maybe of further service, please call me at 817/870-2422. Sincerely, NEEL-SCHAFFER, INC. James P. Amick, P.E. Engineer Manager ARt.3NG'€ON • DAi_1.AS > Ft�RT WQRTH • F!E?UST�iN engineers • p}atlnsrs • surveyers • enviranmeniaf scientists •emergency rnanagernent 512 Main Sireef. Suit�� 41� Doti V1h�t[h. T'X 7�1Ci2 • ,nhane 8'17-870-'?422 •fax 9}�-870-�,;gr �v+,vW.nBel-s�;ila#f�r.cOm Additional Scope of Services Amendment 3 Sanitary Sewer Rehabilitation Contract LXXXI (81) Additional work is necessary for the sewer rehabilitation of the Erath Street sanitary sewer lateral (11-3613) and the replacement of the water line in Erath Street from Howard Street to Knox Street. The additional work will require revisions to two double view plan sheets for the waterline and revisions to four plan and profile sheets for the sewer line. Upon receipt of an executed amendment, the Engineer will perform the following tasks: • Switch the location of the proposed sewer line with the location of the proposed water line and make revisions as required. • Switch the location of the proposed water line with the location of the proposed sewer line and make connection revisions as required. 4/25/2012 O;Uobs\8421 - FW Sanitary Sewer Rehabilitation\Admin\ConlractlAmendment 3\Additionat Scope for Amendment 3.doc Page 1 of 1