HomeMy WebLinkAboutContract 41351-A1 (2)AMENDMENT NO. 1
STATE OF TEXAS S CITY SECRETARY CONTRACT NO. 41361"Al
(M&C Not Required)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and Neel -Schaffer,
Inc., (Engineer) made and entered into City Secretary Contract No.
41351, (the Contract) which was authorized by the City Council by
M&C C-24655 on the 14th day of December, 2010,and
WHEREAS, the Contract involves engineering services for the
following project.
Sanitary Sewer Rehabilitation Contract LXXXI (81).
WHEREAS, it has become necessary to execute Amendment No. 1
to the said Contract to include an increased scope of work and
revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
Following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated April 11, 2011, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer total $24,600.00.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $139,112.00.
FT WORTH, TX
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
on this the &LLC 'day of y(Y\
Tarrant County, Texas. ,
ATTEST:
Marty Hendrix
City Secretary
REQUIRED
o/
S. Frank Crumb, P.E.
Director, Water Department
NEEL-SCRAPPER, INC.
ENGINEER �-
By:
Name:James P. Amick, P.E.
Engineering Manager
512 Main Street, Suite 415
Fort Worth TX 76102
AS TO FORM AND LEGALITY:
Assistant City Attorney
-2-
2011, in Fort Worth,
APPROVED:
Fernando Costa
Assistant City Manager
IOL NEEL-wSCHAFFER
t�
Solution: you can build upon
April 11, 2011
Mr. Robert Saucedo
City of Fort Worth, Water Department
1000 Throckmorton
Fort Worth, Texas 76102
engineers
planners
surveyors
environmental
scientists
landscape
architects
Reference: Sanitary Sewer Rehabilitation Contract LXXXI (81) Contract Amendment 1 for
Additional Services
Dear Mr. Saucedo:
Neel -Schaffer, Inc. (NSI) offers additional Professional Engineering Services for this project.
These additional services are required due to the need to separate existing water and sewer mains
along Erath Street from Howard Street to Martin Street and to extend the sewer replacement of
L-3608 on Collins Street easterly to Miller Street as discussed most recently on April 8, 2011.
This Engineering Services Contract Amendment includes a detailed scope of additional services
attached to this letter. NSI proposes to provide the attached scope of additional services for the
lump sum of $24,600.00. All additional services proposed will be performed in accordance with
the original contract dated January 14, 2011. A portion of this work will be completed by
Spooner & Associates our M/WBE Subconsultant. Their share will be 18.33% or $4,510.00.
This Amendment, consisting of one page; and the attached Additional Scope of Services,
consisting of one page, represent the entire amendment to the original agreement between the
City of Fort Worth and Neel -Schaffer, Inc. If the terms of this Amendment are acceptable, please
execute both copies and return one to our office to begin the additional services.
If you have any questions or we may be of further service, please call me at 817/909-2807.
Sincerely,
NEEL-SCHAFFER, INC.
James P. Amick, P.E.
Engineer Manager
Attachment
Original Contract Amount: $ 114,511.15
Amendment No. 1: $ 24,600.00
Revised Contract Amount, $ 13991 I L15
512 Main Street, Suite 415, Fort Worth, 7X 76102, 817.870.2422, Fax 817.870.2489