HomeMy WebLinkAboutContract 41351-A2AMENDMENT No . 2
TO CITY SECRETARY CONTRACT
R'HER.EA", the City of E'ort Worth (CITY) and chaffer, Inc., Inc., (ENGINEER) made and entered into City
Secretary Contract No. 41351, (the CONTRACT) which was
authorized by M&C C-24655 on the 14t' day of December, 2010
and subsequently revised by one amendment; and
R'HEREAl5, the CONTRACT involves engineering services
for the following project:
Sanitary Sewer Rehabilitation, Contract LXXXI (81).
WHEREA�i, it has become necessary to execute Amendment
No. 2 to the CONTRACT to include an increased scope of work
and revised fee.
NOR' THEREFORE, CITY and ENGINEER, acting herein by
and through their duly authorized representatives, enter into
the following agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the
additional engineering services specified in a proposal dated
November 16, 2011, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional
design services to be performed by Engineer totals $1,750.00.
2.
Article II of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that
the total fee paid by the City for all work and services
shall be an amount of $140,861.154
�FFIGII�L. RE'�OR�t
CITY SECRETARY
FT, WORTH, TX
3.
All other provisions of the Contract, which are not
expressly amended herein, shall remain in full force and
effect.
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED:
City of Fort Worth
Fernando Costa
Assistant City Manager
DATE:
S. Frank Crumb, P.E.
Director, Water Department
APPROVED AS TO FORM AND LEGALITY:
Douglas W. Black
Assistant City Attorney
ATTEST:
NYary J.�EC maser
City Secretary
ENGINEER
Neel -Schaffer, Inc.
James Amick, P".E.
Engineering Manager
C3
Date:
OFFICIAL RECORD
CITY SECRETARY
T. WORTH, TX
Page -2-
14L NEEL-SCHAFFER
= Solutions you can build upon
November 16, 2011
Mr. Robert Saucedo
City of Fort Worth, Water Department
1000 Throckmorton
Fort Worth, Texas 76102
engineers
planners
surveyors
environmental
scientists
landscape
architects
Reference: Sanitary Sewer Rehabilitation Contract LXXXI (81) Contract Amendment 2 for
Additional Services
Dear Mr. Saucedo:
Neel -Schaffer, Inc. (NSI) offers additional Professional Engineering Services for this project.
These additional services, in the form of a Permanent Sewer Facility Easement and Temporary
Construction Easement exhibit and description for 3621 Chickasaw Avenue and a Permanent
Sewer Facility Easement exhibit and description for 3617 Chickasaw Avenue are required due to
no record evidence of existing right -of --ways or easements for the existing sanitary sewer lines
traversing the common boundary line of these two parcels. Neel -Schaffer, Inc. proposes to
provide these for a lump sum total of $1,750.00. All additional services proposed will be
performed in accordance with the original contract dated January .14, 2011. A portion of this
work will be completed by Spooner & Associates our MA"E Subconsultant. Their share will
be 85.71% or $1,500.00.
This Amendment, consisting of one page, represents the entire amendment to the original
agreement between the City of Fort Worth and Neel -Schaffer, Inc. If the terms of this
Amendment are acceptable, please execute both copies and return one to our office to begin the
additional services.
Summary of Contract Fee for Contract 81
Original Contract Amount $1143511.15
Approved Amendment No. 1 $ 24,600.00
Proposed Amendment No. 2 $ 1,750.00
Revised Contract Amount $1402861015
If you have any questions or we may be of further service, please call me at 817/870-2422.
Sincerely,
NEEL-SCHAFFER, INC.
L' s
Richard E. "Rick' Simpson, RPLS
ACCEPTED: CITY OF FORT WORTH
BY:
TITLE:
DATE: