HomeMy WebLinkAboutContract 40608COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 02 WHEREAS, the undersigned "Developer" desires to make certain improvements (refer to the name of the project at the bottom of the page) an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, ahome-rule municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. Developer Information: Developer Company Name: The Southwestern Baptist Theological Authorized Signatory: Mike C. Hughes Title: Vice President for Institutional Advancement Project Name: Southwestern Baptist Theological Seminary —Chapel Addition Project Location: 4600 & 4700 Block of Stanley Avenue Additional Streets: Plat Case No.: FP-09-196 r'1 To be completed bey staff.• Received by: \..1 �� CFA: 2010-031 Plat Name: Seminary Hill Addition Council District: 9 City Project No: 01526 DOE: 6479 Date: 07-27-1 0 NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. ,Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (AIX Sewer (A4) X_, Paving (B) XStorm Drain (B4) X Street Lights & Signs (C) X . E. The Developer shall award all contracts for the construction of community facilities in accordance with Section Il, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Combined CFA fmal Sept 12, 2008 2 F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following. i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. ii1. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting, The 3 submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City - issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fiilly indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in Hart, by the alleged negligence of the City of Combined CFA final Sept 11, 2008 4 Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: L Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. 5 Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS 1. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Combined CFA final Sept 12, 2008 6 Cost Summary Sheet Project Name: Southwestern Baptist Seminary — Chapel Addition CFA No.: 2010-031 DOE No.: 6479 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights TPW Construction Cost Sub -Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspection Cost H. Street Light Materials - Pole/Arm Sub -Total for TPW Construction Fees Total Construction Fees: Finnnrial r:ua ranlcc (ln/innc chnnaa nna Developer's Cost $ 6,069.00 $ 9,954.00 $ 16,023,00 $ 131,441.79 $ 18,423.80 $ 59,395,00 $ 209,260.59 $ 225,283.59 $ 320.46 $ 320.46 $ 640.92 $ 5,994.62 $ 2,997.31 $ 23375,80 844.67 $ 12,212.41 $ 12,853.33 Choice Amm�nt (ck onel Bond = 100% $ 225,283.59 Com letion A reement = 100% /Holds Plat $ 225,283.59 Cash Escrow Water/Sanitary Sewer= 125% $ 20,028.75 Cash Escrow Paving/Storm Drain r= 125% $ 261,575.74 Letter of Credit = 125% w/2 r expiration period $ 2813604.49 x 7 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has I executed this instrument in quadruplicate, at Fort Worth, Texas this C967+day of , 20 io CITY OF FORT WORTH -Recommended by: Water Department Transportation &Public Works Department Wendy C i Babulal, EMBA, P.E. William A. Ve kest, P.E. Development Engineering Manager Approved as to Form &Legality: Amy J. Rams Assistant City Attorney ATTEST: Marty Hendrix City Secretary Director Approved by City Manager's Offrce G� Fernando Costa Assistant City Manager Southwestern Baptist Theological Seminary gnature (Print) Name: W Z C hC5 V16k P"S i d.tn+ { a✓ T�sh ru tia nay fklua� ccrn:e Combined CFA final Sept 12, 2008 8 Check items associated with the project being undertaken; checked items must be included asAttachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B : Paving Improvements ® Paving Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 0 fi E� :L , 3'09'07-N TEffr FUUZR STRM 315.00' W �W-1 ji : I E _yls3jrsr.j'__ IC(ca g�— �6 w "s rn y !TGf �:lr}I_= 4•p V�V Ci PPP��� s E E N89009407'E 1025.00' WWT HHOADD9 AVEM 1 !1 E i t SSXVWAHY DR= a a � gi I I 1} l l l ao HI-+SH o Z' n NG7 N -i rn m.=,nn HNtp2 31Arr=i <-3r� � N 0 a I 8� l I I i i 3£ II (I � S2 Q� SlS2�R���xx MO M To mm � � o ( i ymF._{ Rg N N QA JL—, 419 lf6f. 6� WAIER (t0 BE ABWWYi1 o �' pp O ro C: pgma Wgko Z d "'W� xx� S MMMA00yo+<� ffi DNF Pwm O„rrZ-Z z -Ir mmp9=1 r Gr v�rt0i v 8 �m_Zd 00 10 OZZ (AO• O Mc iyna2UZS�ZMZ wm�oCicooD 4;DZ n-imOp�m��i (j �aZ [�mwmn P�Mmr in ja C0� y 1 mm0O jg i02 O �p0 o�a�c r r _ m x 4- Awn �A N J mgc�-In CSp �c� VI Ox i �m ~ D z p < O= 4 J N All � [1• L5 � � O � O�G © Boa �mo� C7 D m z CWm Z D= o m o z < oo m m v MT ^ 4 z � Z Gl) ca �m`n g ' O m A m o A N D ojr 000 z 00 zN �N voAG)O O N mz T ym nET z g CD G)cn z 0 zD ' p m z C W L m W. SPURGEON STREET (SEE SHEET 24 FOR PAVING PLAN) i 73 v.6. {Y? IA Arc )max / r .A:uAA 3 fA A E 1 { 1 i /A I Phi 3J,:.' 0 5rT E 1 �4T i 1 i (•--� •. J � i i hz 14a f 9 '} i E c � aK, ZJ # SI P Rt_ i 2oo U_ 1 M s s Lc E t ; } D o-y } I cyDy aj FI"' I t� 1 s g r ' # I /G 4' ( ht ➢255 9 i E 3L-J f tafl- ita' I 3 744AQ A1 £ ) £ 3t P i F 51:5 I 2 t )4vL E ?j pets�tii x,n 3 i f 3 3i-'gat= ss r 1 JfL'z 4 k ;s £ IiCl } was n I / 'tf f,FiE nP 1 I jlTC %ti R Z rA� L r N Z O -1 7p O o¢ 'ri <OC7 p N r � n rt d� N fn :Sl W N � O P� mp 00 mT�FMF�FE9 0M z _ Z w "o m Zra *��. j Z A 0 n 0 y > 0 G mz r- NcA N � w � _ O r 0 Hf y�n D� O o m m O a o'i Tom%. J th f Z K 08 � P Si 9 V _ z. a N T m a U D O w cn n O -z ME cQ mA 55 Tpx-A N w �caw- N�mZ AmMm m n.z �mM oK�" M N CD o_ god cn r— �N z n z m M N 0 o 0 � x O D m 0 II N 0 A O 0 �J S FW STAEEi € t. t I � I i I 1 I - ------ t A r m G7 X X X X X X X X X X X fn (n N !n N (n N (n N (n N r CD .� ➢ O _C Z < ➢ D H S Z � ➢ ➢ � m Z � O z � ➢ m � m S rzi m p O O r � m � PEN /gym» ƒ 2 : \n wee 9 A& %d2OD 2k 0 � w�toG) %a0WMo w«om;� 0 z } /\\\c\ r; . . mavt/ 2 § ) \ \ / ' \¥{ ,. 2 §»{ \� / ©©!;® *) e., .,. =M,MomQ `/§\j\ƒ\ � 9����§ PART B — PROPOSAL DEVELOPER AWARDED CONTRACTS This proposal must not be removed from this book of Contract Documents. TO: (Southwestern Baptist Theological Seminary, c/o Mr. Kevin Ensley) PROPOSAL FOR: Paving, Drainage, Water &Sanitary Sewer Improvements to Serve Southwestern Baptist Theological Seminary -Chapel Addition WATER PROJECT NO. P265-609150152683 SEWER PROJECT NO, P275-709130152683 FILE NO. W-2125 X NO. X-21294 CITY PROJECT NO. 01526 Includes the furnishing of all materials, except materials specified to be furnished by the City, equipment and labor for the installation of (Water, Sanitary Sewer, Storm Drainage and Paving Improvements) and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: Southwestern Baptist Theological Seminar�pel Addition Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, the General Contract Documents and General Specifications for Water Department Projects, the General Contract Documents and General specifications for Transportation and Public works Projects, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the Department of Engineering of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: B-1 UNIT I: WATER ITEM APPROX. DESCRIPTION OF ITEMS WITH NO. QUANTITY BID PRICES WRITTEN IN WORDS UNIT TOTAL PRICE AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions:) Item Approx Unit Item Description Unit Price Total No. Quantity Measure "D" Item reference Amount ment 1 1 EA Relocate Exist. Fire Hydrant(INCL 6" GV) $ 13779000 $ 1,779.00 (One thousand seven hundred seventy-nine dollars and no cents) 2 5 EA Cut and Plug Existing Water Line $ 858.00 $ 4,290.00 (Eight hundred fifty-eight dollars and no cents) TOTAL AMOUNT BID WATER $ 6,069.00 B-2 UNIT IL• SEWER ITEM APPROX. NO. QUANTITY DESCRIPTION OF ITEMS WITH UNIT TOTAL BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install, including all appurtenant work, complete ilip a%Ae, the following items) (D-No. refers to related items in the Part D Special Conditions:) Item Approx. Unit Item Description No. Quantity Measure "D" Item reference ment 1 2 2 1 EA 4' Diam. Manhole w/ Concrete Collar Constr. Over Existing Sewer Line LS Traffic Control TOTAL AMOUNT BID SEWER $ 9,954.00 Unit Price $ 4,384.00 (Four thousand, four hundred eighty-four dollars and no cents) $ 1,186,00 (One thousand, one hundred eighty-six dollars and no cents) Total Amount $ 8,768.00 $ 1,186.00 UNIT III: STORM DRAIN ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) Item Approx. Unit Item Description Unit Price Total No. Quantity Measure Amount ment 1 34 L.F. 21" RCP (Class III) 2 IS L.F. 30" RCP (Class III) 3 5 EA Curb Penetration 4 114 S.Y. Pavement Repair 5 49 L.F. Trench Safety System 6 1 L.S. Traffic Control 7 1 EA Connect to Existing 30" RCP TOTAL AMOUNT BID STORM DRAIN $ 18,423.80 $ 51.20 (Fifty-one dollars and twenty cents) $ 117.15 (One hundred seventeen dollars and fifteen cents) $ 42.00 (Forty-two dollars and no cents) $ 108.00 (One hundred eight dollars and no cents) $ 3.75 (Three dollars and seventy-five cents) $ 1,740.80 $ 1,757.25 $ 210.00 $ 12,312.00 $ 2012.00 $ 2012.00 (Two thousand hvelve dollars and no cents) $ 208.00 $ 208.00 (Two hundred eight dollars and no cents} UNIT IV: PAVING IMPROVEMENTS ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) UNIT IV: PAVING IMPROVEMENTS ITEM APPROX. DESCRIPTION OF ITEMS WITH Item Approx. Unit Item Description No. Quantity Measure ment II 2 3 C! 5 0 7 E:3 E 10 UNIT TOTAL Unit Price Total Amount 720 L.F. Sawcut, Remove &Dispose of $ 4.00 $ 2,880.00 Existing Curb & Gutter (Four dollars and no cents) 2,166 S.Y. Sawcut, Remove and Dispose of $ 4.25 $ 9,205.50 Existing Asphalt Pavement (Four Dollars and twenty-five cents) 1,040 S.Y. Sawcut, Remove & Dispose of $ 3.11 $ 3,234.44 Existing Sidewalk (Three dollars and eleven cents) 1,090 S.Y. Cold Plane 1.5" Exist. Stanley 7,303.00 Asphalt Pavement (six dollars and seventy cents) 1,090 S.Y. 1.5" Type D Surface Course $ 7.05 $ 7,684.50 (Seven Dollars and five cents) 560 S.Y. 6" Thick, 3500 psi Reinforced $ 27.00 $ 15,120.00 Concrete Driveway Pavement (Twenty-seven dollars and no cents) 1,285 S.Y. 7" Thick, Asphalt Paving (2.5" Type $ 20.65 $ 26)535.25 D Surface Course and 4.5" Type B (Twenty Dollars Base Course) (W. Spurgeon Ave.) and sixty-five cents) 1,391 S.Y. 6" Thick, Lime Stabilized Subgrade $ 2.00 $ 23782.00 (36#/S.Y.) (Two Dollars and no cents) 25 TON Hydrated Lime $ 220.00 $ 5,500.00 (Two hundred twenty dollars and no cents) 1,440 L.F. Standard 7" Curb w/ 18" Gutter $ 19.00 $ 273360.00 (Nineteen dollars and no cents) B-5 NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) Item Approx. Unit Item Description Unit Price Total Amount No. Quantity Measure ment 11 69 L.F. 12" Reinforced Concrete Ribbon $ 15.00 $ 1,035.00 Curb (Fifteen dollars and no cents) 12 15232 S.F. 4" 3000 psi (4' & 5' wide) $ 4.25 $ 5,236.00 Reinforced Concrete Sidewalk (Four dollars and twenty-five cents) 13 15232 S.F. 4" 3000 psi (6' wide) $ 4.25 $ 5,236.00 Reinforced Concrete Sidewalk (Four dollars and twenty-five cents) 14 360 S.F. 4" 3000 psi (10' wide) $ 3.00 $ 1,080.00 Reinforced Concrete Sidewalk (Three dollars and no cents) 15 2 EA Relocate Existing Sign $ 250.00 $ 500.00 (Two Hundred fifty dollars and no cents) 16 945 S.F. 13' Architectural Concrete $ 8.00 $ 73560.00 Crosswalks (Eight dollars and no cents) 17 1 EA Type "WI-T" Warning Sign $ 250.00 $ 250.00 (Two hundred dollars and no cents) 18 326 L.F. 4" Wide White Thermoplastic $ 1.35 $ 440.10 Striping (One dollar and thirty-five cents) 19 1 L.S. Traffic Control $ 2500.00 $ 2500.00 (Two thousand, five hundred dollars and no cents) TOTAL AMOUNT BID PAVING $ 131,441.79 B-6 UNIT V: STREET LIGHTING IMPROVEMENTS ITEM APPROX. DESCRIPTION OF ITEMS WITH NO. QUANTITY BID PRICES WRITTEN IN WORDS UNIT TOTAL PRICE AMOUNT (Furnish and install, including all appurtenant work, complete in place, the following items) Item Approx. Unit Item Description Unit Price Total Amount No. Quantity Measure ment 1 2 EA Remove Existing Street Light & $ 350.00 $ 700.00 Conductor (Three hundred fifty dollars and no cents) 2 1 EA Relocate Existing Type 11 Street $ 650.00 $ 650.00 Light (Six hundred fifty dollar and no cents) 3 I EA Type 11 Pole and Arm — Purchased $ 40 50.00 $ 45150.00 (Four thousand, From City One hundred fifty dollars and no cents) 4 2 EA $ 4,400.00 Type 1 Concrete Foundation $ 2>200.00 (Two thousand, two hundred dollars and no cents) 5 1 EA Electrical Service Type A $ 2,230.00 $ 2,230.00 (Two thousand, two hundred thirty dollars and no cents) 6 1 EA Electric Ground Box w/ Concrete $ 1,520.00 $ 1,520.00 Apron (One thousand, five hundred twenty dollars and no cents) 7 735 L.F. 2" Conduit w/ 2 Num. 10 & 1 Num $ 62.00 $ 45,570.00 1 OG — SCH 40 (sixty-two dollars and no cents) 8 1 EA Connect to Existing Circuit $ 175.00 $ 175 (One hundred seventy-five dollars and no cents) TOTAL AMOUNT BID STREET LIGHTING $ 59,395.00 B-7 TOTAL AMOUNT BID WATER TOTAL AMOUNT BID SEWER TOTAL AMOUNT BID STORM DRAIN TOTAL AMOUNT BID PAVING TOTAL AMOUNT BID STREET LIGHTING GRAND TOTAL AMOUNT BID $ 6,069.00 $ 9,954.00 $ 18,423.80 $ 131,441.79 $ 59,395.00 $ 225,283.59 PART B - PROPOSAL (Cont.) After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security, if required is to become the property of the Developer. The undersigned bidder certified that he has obtained at least one set %J the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes. 1. The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department. 2. The Standard Specifications for Street and Storm Drain Construction which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within thirty (30ea) calendar days after issue of the work order, and to complete the contract within ninety (90ea) working days after beginning construction as set forth in the written work order to be furnished by the Owner. (Complete A or B below, as applicable:) The principal place of business of our company is in the State of Nonresident bidders in the State of ,our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of ,our principal place of business, are not required to underbid resident bidders. The principal place of business of our company or our parent company or majority owner is in the State of Texas. B-9 I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Not Issued Addendum No. 3 (Initials) Not Issued Addendum No. 2 (Initials) Not Issued Addendum No. 4 (Initials) Not Issued (Seal) Date: Respectfully submitted, By: Robert E. Bowen Title Executive Vice President Address Manhattan Construction Company 6300 North Central Expressway Dallas, Texas 75206 Telephone: 214.3 5 7.7400 5/12/2008 I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Not Issued Addendum No. 3 (Initials) Not issued Addendum No. 2 (Inals) Not Issued Addendum No. 4 (Initials) Not Issued (Seal) Respectfully submitted, By: Robert E. Bowen Title Executive Vice President Address Manhattan Construction Company 6300 North Central Expressway Dallas. Texas 75206 Telephone: 214.3 57.7400 5/12/2008