HomeMy WebLinkAboutContract 41003-A1 (2)CJTV SECRETARY
CONTRACT no... � 1 o n_ �- I
AMFI MEN T N o . 1
TO CITY SECRETARY CONTRACT
h':RE'AS, the City of Fort Worth (CITY) and Wade Trim, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 41003, (the
CONTRACT) which was authorized by M&C C-24511 on the 5th day of October,
2010 in the amount of $70,117.00; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Lochwood Court Drainage Improvements, Project No. 01069; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated December 13, 2011, a
copy of which is attached hereto and incorporated herein. The cost to
City for the additional design services to be performed by Engineer totals
$20, 027 . 00 .
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $90,144.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
Page -1
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
EXECUTED and EFFECTIVE as of the date last written by a signatory, below.
APPROVED:
City of Fort Worth
ranisnii4
Fernando Costa
Assistant City Manager
DATE: /Z/22
ROVAL RECOMMENDED:
L-01----- 0
Doug W. Wiersig,. E .
Director, Transportation
ENG IE
Wad
1
avi
•
Vice President
DATE: J,9 JJ ////
and Public Works Department
ROVED AS TO FORM
OT1 T? AND LEGALITY:
Douglas W. Black
Assistant City Attorney
ATTEST:
Ronald
P. Gonzales
Assistant City Secretary
AY
t :to
0 ft:ii
0
cog
YO%
VeiAm-
Y. •t00o0o0
% 0
7,43
? _0
,i-toitetrict&F
T it f /"i
1" 1 OC l�
Date:
OFFICIAL RECORD
CITY SECRETARY
Ft i W1 rr, TX
Page -2
'.111•••••_ _ r-a
ISO 9001:2000 Registered
December 13, 2011
Mr. Michael Owen, PE
Senior Professional Engineer,
Transportation and Public Works
City of Fort Worth
1000 Throckmorton
Fort Worth, TX 76102
Re: Lochwood Court Drainage Improvements Amendment No. 01, City Project No. 01069
Dear Mr. Owen:
Per our previous discussion, Wade Trim, Inc. proposes that the additional scope of services to the above mentioned
project be performed by Wade Trim, Inc. and oui sub -consultants. We have identified the additional scope items
necessary to complete this project. The additional work includes:
• Task 10 1 - Obtain additional survey for areas now included within the project area.
• Task 10.2 - Design of approximately 25 linear feet of a two (2) foot tall wall
• Task 10.3 Design of approximately 210 linear feet of a two (2) foot tall berm
• Task 10.4 - Design of a permanent alternate golf course tee box
• Task 10.5 - Design of approximately 20,000 square feet grading plan
• Task 10.6 - Coordination with golf course on construction issues and privately owned water system
• Task 10.7 - Modification to specifications
• Task 10.8 - Schedule, Meeting and Reports
In accordance with our contract, Article V, Section K of the STANDARD AGREEMENT FOR ENGINEERING
SERVICES, Wade Trim, Inc. requests an equitable adjustment to our contract to account for the additional cost and tiine
required to perform the City's requested additional services.
The proposed man hour breakdown for the additional services is attached. The proposed $20,027.00 fee for these services
was determined based on the time estimated to complete the additional scope of services, utilizing the same hourly rates
as our original contract. Wade Trim, Inc. respectfully requests an additional 60 days to complete the project.
Please contact me at your earliest convenience, so we can discuss this matter and move to finalizing the project for
construction.
Sincerely,
David Speicher, P.E.
Vice President
Attachments
Wade Trim Inc.
920 South Main Street
Grapevine, TX 76051
817.488.0050
877 533.9873
www.wadetrim.com
BUILD'
I N G
ELATIONSHIF'
F O U N D A' T I O N OF EX
LENGE
ISO 9001:2000 Registered
ATTACHMENT "A" — Amendment No. 01
SCOPE OF SERVICES
Design Services for
Lochwood Court Drainage improvements
City Project No. 01069
The following tasks will be performed by the ENGINEER under ATTACHMENT "A' . Work under
Amendment No. 01 includes additional services under Task 1, Task 2 Task 3 and task 4
U pon receipt of notice to proceed, the ENGINEER will perform the following task:
P art Al — Additional Services
• Task 10.1 -
• Task 10.2 -
• Task 10.3 -
• Task 10.4 -
• Task 10.5 -
• Task 10.6 -
system
• Task 10.7 -
• Task 10.8
Obtain additional survey for areas now included within the project area.
Design of approximately 25 linear feet of a two (2) foot tall wall
Design of approximately 210 linear feet of a two (2) foot tall berm
Design of a permanent alternate golf course tee box
Design of approximately 20,000 square feet grading plan
Coordination with golf course on construction issues and privately owned water
Modification to specifications
- Schedule, Meeting and Reports
ASSUMPTIONS
• The current schedule will be amended to allow 60 additional days of duration.
DELIVERABLES
• Meeting summaries with action items
• Amendment No. 1 Preliminary and Final design submittals
Wade Trim Inc.
920 South Main Street
Grapevine, TX 76051
817.488.0050
877 533.9873
www.wadetrim.com
BUILDING
RELATION;
A FOUND
N 0 F
ISO 9001:2000 Registered
ATTACHMENT B - Amendment No. 01
COMPENSATION AND SCHEDULE
Design Services for
Lochwood Court Drainage improvements
City Project No. 01069
Compensation
a. The ENGINEER shall be compensated a total lump sum fee of $20 027.00 as
summarized in Exhibit "B-2" Payment of the total lump sum fee shall be considered
full compensation for the services described in Attachment A for all labor materials,
supplies, and equipment necessary to complete the project.
b. The ENGINEER shall be paid monthly payments as described in Exhibit B-1 Section
1 - Method of Payment.
2. Schedule
The schedule will be modified to allow an additional 60 day to complete the design
services.
Wade Trim Inc.
920 South Main Street
Grapevine, TX 76051
817.488.0050
877.533.9873
www.wadetrim.com
R El A
TIOI.SN'1..
ISO 9001:2000 Registered
ATTACHMENT B-1 - Amendment No. 01
METHOD OF PAYMENT
(Supplement to Attachment B)
Design Services for
Lochwood Court Drainage Improvements
City Project No. 01069
Method of Payment
P artial payment shall be made to the ENGINEER monthly upon City s approval of an invoice
from the ENGINEER outlining the estimated current percent complete of the total project.
The aggregate of such monthly partial fee payments shall not exceed the following: Until
satisfactory completion of Conceptual Engineering plan submittal and approval by the City, a
sum not to exceed 30 percent of the total lump sum fee less surveying and construction
services.
U ntil satisfactory completion of Preliminary Construction Plan submittal and approval by the
City a sum not to exceed 60 percent of the total lump sum fee, less previous payments and
less surveying and construction services.
U ntil satisfactory completion of Final Construction plan submittal and approval by the City, a
sum not to exceed 90 percent of the total lump sum fee, less previous payments and less
surveying and construction services.
The balance of the earnings, less previous payments and less surveying and construction
services, shall be payable after Bid opening for the Project has been conducted.
S urveying and construction services shall be paid after services are rendered.
II. Progress Reports
The ENGINEER shall submit to the designated representative of the Director of the
Department of Transportation and Public Works monthly progress reports covering all phases
of design in the format required by the City.
Wade Trim Inc.
920 South Main Street
Grapevine, TX 76051
817.488,0050
877 533.9873
www.wadetrim.com
BU1L0ING RELATIONS}11PSON A
FOUNDATION OF EXCEL!
Task No.
Task Description
10 Admenment#1
10.1 Additional Survey
10.2 (Design of two foot tall wall
10.3 Design of two foot tall berm
10.4 -Design of Golf Course Tee Box
10.5 Design of 20,000 SF Grading Plan
10.6 Coordination with Golf Course
10.7 Modification to Specifications
10.8 Scheduling, Meetings and Reports
Senior
Professional
/PM
Rate $170
0
1
1
2
2
2
1
2
TASK/HOUR BREAKDOWN
AMENDMENT # 01
Design Services for
Lochwood Court Drainage Improvements
City Project No. 01069
Labor (hours)
Admin. Project
Engineer III Supervisor Administrator
II III
$150 $113 $100
0
2
4
2
2
2
1
1
Totals 11 14
Engineer I Administrative
Total Labor
Cost
Subconsultant
Expense
$95 $47 MWBE Non-MWBE
$0.00
0 2 $190.00 $3,800
6 16 $2,668.00
10 16 $3,420.00
6 14 $2,648.00
6 16 $2,838.00
$640.00
81
2 $1,414.00
$6 00
381 2 68 3 $15,065.001 $0.60 $4, NO1f0 $0.00
Total Expense Task Sub Total
Travel Reproduction . Cost
$3,800
$122, $722
$122.001 $4,522.001
Project Summary
Total Hours
Total Labor
Total Expense
MWBE Subconsultant
Non-MWBE Subconsultant
10% Subconsultant Markup
MWBE Participation
Total Project Cost!
$0
$3,990
$2,668 :
$3,420 .
$2,648 !
$2,836
$640
$1,414
$1)961
$19,587.00 1
136
$15,065
$4,522''
$0'
$4,400
$440
0.0%
$20,027!