Loading...
HomeMy WebLinkAboutContract 41003-A1 (2)CJTV SECRETARY CONTRACT no... � 1 o n_ �- I AMFI MEN T N o . 1 TO CITY SECRETARY CONTRACT h':RE'AS, the City of Fort Worth (CITY) and Wade Trim, Inc., (ENGINEER) made and entered into City Secretary Contract No. 41003, (the CONTRACT) which was authorized by M&C C-24511 on the 5th day of October, 2010 in the amount of $70,117.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Lochwood Court Drainage Improvements, Project No. 01069; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated December 13, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $20, 027 . 00 . 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $90,144.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Page -1 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ranisnii4 Fernando Costa Assistant City Manager DATE: /Z/22 ROVAL RECOMMENDED: L-01----- 0 Doug W. Wiersig,. E . Director, Transportation ENG IE Wad 1 avi • Vice President DATE: J,9 JJ //// and Public Works Department ROVED AS TO FORM OT1 T? AND LEGALITY: Douglas W. Black Assistant City Attorney ATTEST: Ronald P. Gonzales Assistant City Secretary AY t :to 0 ft:ii 0 cog YO% VeiAm- Y. •t00o0o0 % 0 7,43 ? _0 ,i-toitetrict&F T it f /"i 1" 1 OC l� Date: OFFICIAL RECORD CITY SECRETARY Ft i W1 rr, TX Page -2 '.111•••••_ _ r-a ISO 9001:2000 Registered December 13, 2011 Mr. Michael Owen, PE Senior Professional Engineer, Transportation and Public Works City of Fort Worth 1000 Throckmorton Fort Worth, TX 76102 Re: Lochwood Court Drainage Improvements Amendment No. 01, City Project No. 01069 Dear Mr. Owen: Per our previous discussion, Wade Trim, Inc. proposes that the additional scope of services to the above mentioned project be performed by Wade Trim, Inc. and oui sub -consultants. We have identified the additional scope items necessary to complete this project. The additional work includes: • Task 10 1 - Obtain additional survey for areas now included within the project area. • Task 10.2 - Design of approximately 25 linear feet of a two (2) foot tall wall • Task 10.3 Design of approximately 210 linear feet of a two (2) foot tall berm • Task 10.4 - Design of a permanent alternate golf course tee box • Task 10.5 - Design of approximately 20,000 square feet grading plan • Task 10.6 - Coordination with golf course on construction issues and privately owned water system • Task 10.7 - Modification to specifications • Task 10.8 - Schedule, Meeting and Reports In accordance with our contract, Article V, Section K of the STANDARD AGREEMENT FOR ENGINEERING SERVICES, Wade Trim, Inc. requests an equitable adjustment to our contract to account for the additional cost and tiine required to perform the City's requested additional services. The proposed man hour breakdown for the additional services is attached. The proposed $20,027.00 fee for these services was determined based on the time estimated to complete the additional scope of services, utilizing the same hourly rates as our original contract. Wade Trim, Inc. respectfully requests an additional 60 days to complete the project. Please contact me at your earliest convenience, so we can discuss this matter and move to finalizing the project for construction. Sincerely, David Speicher, P.E. Vice President Attachments Wade Trim Inc. 920 South Main Street Grapevine, TX 76051 817.488.0050 877 533.9873 www.wadetrim.com BUILD' I N G ELATIONSHIF' F O U N D A' T I O N OF EX LENGE ISO 9001:2000 Registered ATTACHMENT "A" — Amendment No. 01 SCOPE OF SERVICES Design Services for Lochwood Court Drainage improvements City Project No. 01069 The following tasks will be performed by the ENGINEER under ATTACHMENT "A' . Work under Amendment No. 01 includes additional services under Task 1, Task 2 Task 3 and task 4 U pon receipt of notice to proceed, the ENGINEER will perform the following task: P art Al — Additional Services • Task 10.1 - • Task 10.2 - • Task 10.3 - • Task 10.4 - • Task 10.5 - • Task 10.6 - system • Task 10.7 - • Task 10.8 Obtain additional survey for areas now included within the project area. Design of approximately 25 linear feet of a two (2) foot tall wall Design of approximately 210 linear feet of a two (2) foot tall berm Design of a permanent alternate golf course tee box Design of approximately 20,000 square feet grading plan Coordination with golf course on construction issues and privately owned water Modification to specifications - Schedule, Meeting and Reports ASSUMPTIONS • The current schedule will be amended to allow 60 additional days of duration. DELIVERABLES • Meeting summaries with action items • Amendment No. 1 Preliminary and Final design submittals Wade Trim Inc. 920 South Main Street Grapevine, TX 76051 817.488.0050 877 533.9873 www.wadetrim.com BUILDING RELATION; A FOUND N 0 F ISO 9001:2000 Registered ATTACHMENT B - Amendment No. 01 COMPENSATION AND SCHEDULE Design Services for Lochwood Court Drainage improvements City Project No. 01069 Compensation a. The ENGINEER shall be compensated a total lump sum fee of $20 027.00 as summarized in Exhibit "B-2" Payment of the total lump sum fee shall be considered full compensation for the services described in Attachment A for all labor materials, supplies, and equipment necessary to complete the project. b. The ENGINEER shall be paid monthly payments as described in Exhibit B-1 Section 1 - Method of Payment. 2. Schedule The schedule will be modified to allow an additional 60 day to complete the design services. Wade Trim Inc. 920 South Main Street Grapevine, TX 76051 817.488.0050 877.533.9873 www.wadetrim.com R El A TIOI.SN'1.. ISO 9001:2000 Registered ATTACHMENT B-1 - Amendment No. 01 METHOD OF PAYMENT (Supplement to Attachment B) Design Services for Lochwood Court Drainage Improvements City Project No. 01069 Method of Payment P artial payment shall be made to the ENGINEER monthly upon City s approval of an invoice from the ENGINEER outlining the estimated current percent complete of the total project. The aggregate of such monthly partial fee payments shall not exceed the following: Until satisfactory completion of Conceptual Engineering plan submittal and approval by the City, a sum not to exceed 30 percent of the total lump sum fee less surveying and construction services. U ntil satisfactory completion of Preliminary Construction Plan submittal and approval by the City a sum not to exceed 60 percent of the total lump sum fee, less previous payments and less surveying and construction services. U ntil satisfactory completion of Final Construction plan submittal and approval by the City, a sum not to exceed 90 percent of the total lump sum fee, less previous payments and less surveying and construction services. The balance of the earnings, less previous payments and less surveying and construction services, shall be payable after Bid opening for the Project has been conducted. S urveying and construction services shall be paid after services are rendered. II. Progress Reports The ENGINEER shall submit to the designated representative of the Director of the Department of Transportation and Public Works monthly progress reports covering all phases of design in the format required by the City. Wade Trim Inc. 920 South Main Street Grapevine, TX 76051 817.488,0050 877 533.9873 www.wadetrim.com BU1L0ING RELATIONS}11PSON A FOUNDATION OF EXCEL! Task No. Task Description 10 Admenment#1 10.1 Additional Survey 10.2 (Design of two foot tall wall 10.3 Design of two foot tall berm 10.4 -Design of Golf Course Tee Box 10.5 Design of 20,000 SF Grading Plan 10.6 Coordination with Golf Course 10.7 Modification to Specifications 10.8 Scheduling, Meetings and Reports Senior Professional /PM Rate $170 0 1 1 2 2 2 1 2 TASK/HOUR BREAKDOWN AMENDMENT # 01 Design Services for Lochwood Court Drainage Improvements City Project No. 01069 Labor (hours) Admin. Project Engineer III Supervisor Administrator II III $150 $113 $100 0 2 4 2 2 2 1 1 Totals 11 14 Engineer I Administrative Total Labor Cost Subconsultant Expense $95 $47 MWBE Non-MWBE $0.00 0 2 $190.00 $3,800 6 16 $2,668.00 10 16 $3,420.00 6 14 $2,648.00 6 16 $2,838.00 $640.00 81 2 $1,414.00 $6 00 381 2 68 3 $15,065.001 $0.60 $4, NO1f0 $0.00 Total Expense Task Sub Total Travel Reproduction . Cost $3,800 $122, $722 $122.001 $4,522.001 Project Summary Total Hours Total Labor Total Expense MWBE Subconsultant Non-MWBE Subconsultant 10% Subconsultant Markup MWBE Participation Total Project Cost! $0 $3,990 $2,668 : $3,420 . $2,648 ! $2,836 $640 $1,414 $1)961 $19,587.00 1 136 $15,065 $4,522'' $0' $4,400 $440 0.0% $20,027!