HomeMy WebLinkAboutContract 41003-A2 (2)RaRbPr
o „
• MI AL SIM•La• 11 e Y4e
CONTRACT NO0
AMENDMEW `-V No o 2
TO CITY SECRETARY CONTRACT ,CT No 0 41003
WHEREAS, the City of Fort Worth (CITY) and Wade Trim,
(ENGINEER) made and entered into City Secretary Contract No. 41003, (the
CONTRACT) which was authorized by M&C C-24511 on the 5th day of October
2010 in the amount of $ 70,117.00; and
WHEREAS, the CONTRACT was subsequently revised by Amendment 1 in the
amount of $20,027.00 which was administratively authorized on December 23,
2011; and
HERIAS, the CONTRACT involves engineering services for the following
project:
Lochwood Court Drainage Improvements, Project No. 010 6 9 ; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated June 19, 2013, a copy
of which is attached hereto and incorporated herein. The cost to City for
the additional design services to be performed by Engineer totals
$1,300.00. (See Attached Funding Breakdown Sheet, Page -3-)
2
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $91,444.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 1 of 3
OFFICIAL RECORD
CITY SECRETARYbi-1 E C E p v E u ftJL
17.
G
2013
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of
te
4).rnando
Assistant
Fort Worth
DATE:
trw
os a
City Manager
II tc5
AP VAL RECOMMENDED:
Douglas W. Wiersig, P.
Director, Transportati
ENGINEER
Wide Trim,
y
joi / /7/v L'Utru
Davlcl T r-Sp0cher,
Vice Presio4nt
DATE: f9/0c I /
and Public Works Department
APPROVED AS TO FORM AND LEGALITY:
Douglas W. Black
Assistant City Attorney
ATTEST:
i�ar�y J. ACIse7
City Sec�e ary
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page2of3
�i
,4 4 FQRte;`
�itu AAA onor dios
nast
s_ 0
rag
049°001'
Siits1111
o� � pp
cboOss
2
A
a 1"
et
0 1"
M&C•
Date:
•
Michael A. Owen, P.E.
Senior Professional Engineer
Transportation and Public Works
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102
Ref: Lochwood Court Drainage Improvements 2nd Amendment
Dear Mr. Owen
June 19, 2013
Lochwood Court construction project will require a change order to acquire an additional
permanent easement. Our sub -consultant, Gorrondona & Associates Inc , will provide the
necessary documents for a fee of $800. Wade Trim Inc. respectfully requests a fee of $500 to
assist in processing the change order, revising the plans and managing the sub -consultant. I am
available to discuss with you any questions regarding our fees.
Gorrondona and Associates, Inc.
One permanent easement - $800.00
Wade Trim, Inc.
Change Order, Plan Revision and Project Management - $500
Total requested - $1,300
Feel free to contact me if you have any questions.
Sincerely,
David Speicher, P E
Wade Trim, Inc.
Wade Trim, Inc.
105 C North Oak Street
Roanoke, TX 76262
682 237.7718 Direct
877.533.9873
682.237.7719 Fax
www.wadetrim.com