HomeMy WebLinkAboutContract 50436-CO1 CSC No. 50436-COl
ORT WORTH. City of Fort worth
Change Order Request
Project Namel VCWRF Miscellaneous Switchgear Improvements I City Sec# r5O436
Client Project#(s)l City Project#CO2648
Projectl Village Creek Water Redamation Facility(VCWRF)-Miscellaneous Switchgear and MCC improvements for Primary
Descripflonj TreatmentArea
Contractorl Texsun Electrical Contractors,Inc. Change Order# Date 4I812020
City Project Mgr.I Farlda Goderya,PE City Inspector Nathan Gray/Mike Hill
Dept, Water Totals Select Day Type
Original Contract Amount 10,765,692.00 10,765,692.00 548
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $10,7651-692.00- $10,765,692.00 548
Amount of Proposed Change Order 7779.68 $48,279.68 302
Revised Contract Amount 3, 7 . 10,813,9 850
Original Funds Available for Change Orders $0,00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary) $48,279.68 Jil. $48.279.68
CHANGE ORDERS to DATE(INCLUDING THIS ONEJ AS%OFORIGINAL CONTRACT I OA5°1.
MAXALLOWASLECONTI�ACTAMOUNT(ORIGINAL CONTRACT COST-25%) 3,457,15,00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
See attached sheets for various details,a summary is provided below: j
CMR#1—Replacing drilled piers at PS3 and PS4 pads with columns and rock-geogrid soil.
CMR#2— Recreate GWCP to match updated incoming power feed for existing enclosures,New submittal/drawings&update 0&M
CMR#3—Addition of Gutters and Downspouts at PEPS1 and PEPS2 canopies
CMR#4—Material required to perform cable splices
CMR#5— Changes toPEPS1 canopy
CMR#6— Change in Genius Block Interconnection cable for plants network compatibility,
CMR#7— Provide and install 20A,3 ph,480V circuit to power four splilter box gates 13,14,16 and I&
CMR#8—Provide and install 20A,120V circuit,new wire and conduit to repower sump from new panel LBS-2,
Contractor(Texsun)Letter of Delay—Time Extension Request fl
Ii
It is understood and agreed that the aoceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or Incidental to,the above Change Order.
Contractor's Company Name Contractor Name ntraot SI nalure Date
Texsun Electrical Contractors,Inc, I Steve Miller/Doug Moulder Lo IGa ,20 I,
i
Ins torAns *IIcm Supervisor Date Project Managerffl*ramiMsnager -Date.. 1
Nathan Gray/Puneet Gupta,PE(GAI) G I L 20 Farlda Goderya,PE 6-16-2020
Assistant Dlrector:D6't Date Dlreolor,C66traiclln be artment(Dept)' Date
Tony Sholola,PE TQAJ5 Chris Harder,P Jun 18 2020
Assistant C .Attom ' . _- - Date Asslstant C Manager Date
Doug Black '� un 23,2020 Dana Bur hdo r, ,, Jun 23,2020
Coundl Action If r ulred • �I
M&C Number I N/A M&C Date Approved
R�CENED i� G (,Till
rr
Change Order 01 VCWAF 5w11chgearphl imp CO2648FIna1.pdf 1 CC['/OEE08TN10HTH II„ ..)(;,;Ij I(U�, Ih I6/i120 1Ib1:19AM
CITY SECRETARY _
FORTNVORTH City of Fort Worth
Ir- - Change Order Additions
Project Name VCWRF Miscellaneous Switchgear Improvements City Sec# 50436
Client Project# City Project#CO2648
Project Description Village Creek Water Reclamation Facility(VCWRF)-Miscellaneous Switchgear and MCC improvements for Primary Treatment
Area
Contractor Texsun Electrical Contractors,Inc. Change Order# Date 4/8/2020
City Project Mgr. I Far da Goderya,PE City Inspector F Nathan Gray I Mike Hill
ADDITIONS
ry Unit Unit Cost I ota
and PS4 Plattorms ater
TV—R-ffT— round Water Panes Water 5
RCanopy Gutters Revised Water L
MRWT--SS59 Feeder Taps Water L 7 .
5 PEPS1 Canopy Modifications ater
Genius Bus Cable Water 1.00 LS $2,705.401—
7 PS3 Gates Power ater ,5
Sump Power ater 5,7 .55
Water $48,279.68
u Tota Additions 7 .
Change Order Additions Page 2 of 4
TRICAL
(ECxc
SUN
CONTRACTORS.
6/10/2020
City of Ft. Worth Water Department.
1000 Throckmorton St.
Fort Worth,TX
76102
Attn: Farida Goderya
Re: Village Creek Water Reclamation Facility Miscellaneous Switchgear Replacement
Subject: Letter of Delays
Farida,we are requesting the date for substantial completion be adjusted 302 days. The
additional days requested are based on the following list of work and environmental items that
have caused delays in the project schedule.
New substantial completion date: June 15, 2020.
Delay
1. Modifications to PS3 &PS4 platforms sub-grade
2. Installation of EMH-095.
3. Demolition of the plant's existing emergency feeder
4. Installation associated with pump 22 repairs.
5. Installation associated with pump 23 repairs.
6. PEPS2 canopy gutter additions.
7. PEPS 1 canopy structural modifications and gutter additions.
8. Rain days
9. Work adjustments due to recent Covid-19 pandemic.
Thank you,
Steve Miller
Texsun Electrical Contractors
I
I
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
T-2AL4-11
y
Signature
Grl ) C' 60Oe(-'l it
Name of Employee
Sr PCvfe ss10A,- �Aeer
Title
ATTEST: r, �F ps
Mary J. Kayser iff
City Secretary r
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX
i