HomeMy WebLinkAboutContract 50436-CO1 CSC No. 50436-COl ORT WORTH. City of Fort worth Change Order Request Project Namel VCWRF Miscellaneous Switchgear Improvements I City Sec# r5O436 Client Project#(s)l City Project#CO2648 Projectl Village Creek Water Redamation Facility(VCWRF)-Miscellaneous Switchgear and MCC improvements for Primary Descripflonj TreatmentArea Contractorl Texsun Electrical Contractors,Inc. Change Order# Date 4I812020 City Project Mgr.I Farlda Goderya,PE City Inspector Nathan Gray/Mike Hill Dept, Water Totals Select Day Type Original Contract Amount 10,765,692.00 10,765,692.00 548 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $10,7651-692.00- $10,765,692.00 548 Amount of Proposed Change Order 7779.68 $48,279.68 302 Revised Contract Amount 3, 7 . 10,813,9 850 Original Funds Available for Change Orders $0,00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $48,279.68 Jil. $48.279.68 CHANGE ORDERS to DATE(INCLUDING THIS ONEJ AS%OFORIGINAL CONTRACT I OA5°1. MAXALLOWASLECONTI�ACTAMOUNT(ORIGINAL CONTRACT COST-25%) 3,457,15,00 JUSTIFICATION(REASONS)FOR CHANGE ORDER See attached sheets for various details,a summary is provided below: j CMR#1—Replacing drilled piers at PS3 and PS4 pads with columns and rock-geogrid soil. CMR#2— Recreate GWCP to match updated incoming power feed for existing enclosures,New submittal/drawings&update 0&M CMR#3—Addition of Gutters and Downspouts at PEPS1 and PEPS2 canopies CMR#4—Material required to perform cable splices CMR#5— Changes toPEPS1 canopy CMR#6— Change in Genius Block Interconnection cable for plants network compatibility, CMR#7— Provide and install 20A,3 ph,480V circuit to power four splilter box gates 13,14,16 and I& CMR#8—Provide and install 20A,120V circuit,new wire and conduit to repower sump from new panel LBS-2, Contractor(Texsun)Letter of Delay—Time Extension Request fl Ii It is understood and agreed that the aoceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or Incidental to,the above Change Order. Contractor's Company Name Contractor Name ntraot SI nalure Date Texsun Electrical Contractors,Inc, I Steve Miller/Doug Moulder Lo IGa ,20 I, i Ins torAns *IIcm Supervisor Date Project Managerffl*ramiMsnager -Date.. 1 Nathan Gray/Puneet Gupta,PE(GAI) G I L 20 Farlda Goderya,PE 6-16-2020 Assistant Dlrector:D6't Date Dlreolor,C66traiclln be artment(Dept)' Date Tony Sholola,PE TQAJ5 Chris Harder,P Jun 18 2020 Assistant C .Attom ' . _- - Date Asslstant C Manager Date Doug Black '� un 23,2020 Dana Bur hdo r, ,, Jun 23,2020 Coundl Action If r ulred • �I M&C Number I N/A M&C Date Approved R�CENED i� G (,Till rr Change Order 01 VCWAF 5w11chgearphl imp CO2648FIna1.pdf 1 CC['/OEE08TN10HTH II„ ..)(;,;Ij I(U�, Ih I6/i120 1Ib1:19AM CITY SECRETARY _ FORTNVORTH City of Fort Worth Ir- - Change Order Additions Project Name VCWRF Miscellaneous Switchgear Improvements City Sec# 50436 Client Project# City Project#CO2648 Project Description Village Creek Water Reclamation Facility(VCWRF)-Miscellaneous Switchgear and MCC improvements for Primary Treatment Area Contractor Texsun Electrical Contractors,Inc. Change Order# Date 4/8/2020 City Project Mgr. I Far da Goderya,PE City Inspector F Nathan Gray I Mike Hill ADDITIONS ry Unit Unit Cost I ota and PS4 Plattorms ater TV—R-ffT— round Water Panes Water 5 RCanopy Gutters Revised Water L MRWT--SS59 Feeder Taps Water L 7 . 5 PEPS1 Canopy Modifications ater Genius Bus Cable Water 1.00 LS $2,705.401— 7 PS3 Gates Power ater ,5 Sump Power ater 5,7 .55 Water $48,279.68 u Tota Additions 7 . Change Order Additions Page 2 of 4 TRICAL (ECxc SUN CONTRACTORS. 6/10/2020 City of Ft. Worth Water Department. 1000 Throckmorton St. Fort Worth,TX 76102 Attn: Farida Goderya Re: Village Creek Water Reclamation Facility Miscellaneous Switchgear Replacement Subject: Letter of Delays Farida,we are requesting the date for substantial completion be adjusted 302 days. The additional days requested are based on the following list of work and environmental items that have caused delays in the project schedule. New substantial completion date: June 15, 2020. Delay 1. Modifications to PS3 &PS4 platforms sub-grade 2. Installation of EMH-095. 3. Demolition of the plant's existing emergency feeder 4. Installation associated with pump 22 repairs. 5. Installation associated with pump 23 repairs. 6. PEPS2 canopy gutter additions. 7. PEPS 1 canopy structural modifications and gutter additions. 8. Rain days 9. Work adjustments due to recent Covid-19 pandemic. Thank you, Steve Miller Texsun Electrical Contractors I I Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. T-2AL4-11 y Signature Grl ) C' 60Oe(-'l it Name of Employee Sr PCvfe ss10A,- �Aeer Title ATTEST: r, �F ps Mary J. Kayser iff City Secretary r OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX i l