Contract No.
FORTWORTH., Date Received Jun 25,2020
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: SANITARY SEWER IMPROVEMENTS TO SERVE THE BRIDGES ADDITION
City Project No.: 100194
Improvement Type(s): Water ® Sewer
Original Contract Price: $1,402,205.00
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete: $1,402,205.00
&6w Jun 24,2020
Kathryn Kirg(Jun 24,20 15:01 CDT)
Contractor Date
Project Manager
Title
North Texas Contracting,Inc.
Company Name
Crisfabal Fuerrhos
Cristobal Fuentes(Jun 24,202015:48 CDT) Jun 24,2020
YProjeqt Inspe9tor Date
Yo sh Patel(Jun 24,2020 16:32 CDT) Jun 24,2020
Project Manager Date
LAartc -Ler—
Laurie Lewis(Jun 25,2020 07:46 CDT) Jun 25,2020
CFA Manager Date
Dana Burandaff
Dana Burghdoff run 25,202007:47 CDT) Jun 25,2020
Asst. City Manager Date
OFFICIAL RECORD
CITY SECRETARY Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name: SANITARY SEWER IMPROVEMENTS TO SERVE THE BRIDGES ADDITION
City Project No.: 100194
City's Attachments
Final Pay Estimate
Change Order(s): ❑ Yes ® N/A
Pipe Report: ® Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 135 CD Days Charged: 135
Work Start Date: 10/15/2018 Work Complete Date: 6/10/2020
Page 2of2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name SANITARY SEWER IMPROVEMENTS
Contract Limits TO SERVE THE BRIDGES ADDITION
Project Type WATER&SEWER
City Project Numbers 100194
DOE Number 0194
Estimate Number 1 Payment Number 1 For Period Ending 6/23/2020
WD
City Secretary Contract Number Contract Time 13WD
Contract Date Days Charged to Date 135
Project Manager NA Contract is 100.00 Complete
Contractor NORTH TEXAS CONTRACTING,INC.
P.O.BOX 468
KELLER, TX 76244
Inspectors DICKINSON/ FUENTES
Tuesday,June 23,2020 Page 1 of 5
City Project Numbers 100194 DOE Number 0194
Contract Name SANITARY SEWER IMPROVEMENTS Estimate Number 1
Contract Limits TO SERVE THE BRIDGES ADDITION Payment Number 1
Project Type WATER&SEWER For Period Ending 6/23/2020
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 1"WATER LINE 325 LF $20.00 $6,500.00 325 $6,500.00
2 YARD HYDRANT 1 EA $2,000.00 $2,000.00 1 $2,000.00
3 1"WATER SERVICE 1 EA $2,500.00 $2,500.00 1 $2,500.00
4 1"DOUBLE CHECK BACKFLOW PREVENTOR 1 EA $1,000.00 $1,000.00 1 $1,000.00
W/BOX
Sub-Total of Previous Unit $12,000.00 $12,000.00
SEWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 REMOVE 18"SWER LINE 440 LF $40.00 $17,600.00 440 $17,600.00
2 REMOVE 10"SEWER LINE 73 LF $30.00 $2,190.00 73 $2,190.00
3 REMOVE 4'SEWER MANHOLE 3 EA $2,000.00 $6,000.00 3 $6,000.00
4 BYPASS PUMPING 1 LS $50,000.00 $50,000.00 1 $50,000.00
5 18"SEWER PIPE 440 LF $250.00 $110,000.00 440 $110,000.00
6 10"SEWER PIPE 73 LF $130.00 $9,490.00 73 $9,490.00
7 18"PVC C905 WATER PIPE 55 LF $280.00 $15,400.00 55 $15,400.00
8 6"PVC C900 WATER PIPE 25 LF $75.00 $1,875.00 25 $1,875.00
9 TRENCH SAFETY 593 LF $1.00 $593.00 593 $593.00
10 POST CCTV INSPECTION 512 LF $1.00 $512.00 512 $512.00
11 DUCTILE IRON WATER FITTINGS 0.7 TN $20,000.00 $14,000.00 0.7 $14,000.00
W/RESTRAINT
12 5'MANHOLE 4 EA $15,000.00 $60,000.00 4 $60,000.00
13 5'EXTRA DEPTH MANHOLE 60 VF $300.00 $18,000.00 60 $18,000.00
14 CONCRETE COLLAR 6 EA $300.00 $1,800.00 6 $1,800.00
15 MANHOLE VACUUM TESTING 6 EA $200.00 $1,200.00 6 $1,200.00
16 CONNECT TO EXISTING MANHOLE 2 EA $5,000.00 $10,000.00 2 $10,000.00
17 EPDXY MANHOLE LINER 80 VF $200.00 $16,000.00 80 $16,000.00
18 EPDXY STRUCTURE LINER 2760 SF $15.00 $41,400.00 2760 $41,400.00
19 SANITARY SEWER METER STATION VAULT 1 LS $715,000.00 $715,000.00 1 $715,000.00
20 ELECTRICAL FACILITIES 1 LS $152,000.00 $152,000.00 1 $152,000.00
21 FURNISH/INSTALL ELEC SERV 1 EA $25,000.00 $25,000.00 1 $25,000.00
Tuesday,June 23,2020 Page 2 of 5
City Project Numbers 100194 DOE Number 0194
Contract Name SANITARY SEWER IMPROVEMENTS Estimate Number 1
Contract Limits TO SERVE THE BRIDGES ADDITION Payment Number 1
Project Type WATER&SEWER For Period Ending 6/23/2020
Project Funding
22 4"PVC SCHEDULE 40 516 LF $22.00 $11,352.00 516 $11,352.00
23 REMOVE SIDEWALK 198 SF $3.00 $594.00 198 $594.00
24 4"CONC SIDEWALK 198 SF $9.00 $1,782.00 198 $1,782.00
25 REMOVE CURB&GUTTER 24 LF $29.00 $696.00 24 $696.00
26 6"FLEXIBLE BASE 469 SY $15.00 $7,035.00 469 $7,035.00
27 6"CONCRETE DRIVEWAY 160 SF $10.00 $1,600.00 160 $1,600.00
28 10"CONC PVMT REPAIR 150 SY $150.00 $22,500.00 150 $22,500.00
29 TRAFFIC CONTROL 2 MO $1,000.00 $2,000.00 2 $2,000.00
30 8'CHAIN LINK STEEL 246 LF $40.00 $9,840.00 246 $9,840.00
31 8'GATE,STEEL 2 EA $2,000.00 $4,000.00 2 $4,000.00
32 SWPPP>1 ACRE 1 LS $6,000.00 $6,000.00 1 $6,000.00
33 SEEDING,HYDROMULCH 2373 SY $2.00 $4,746.00 2373 $4,746.00
Sub-Total of Previous Unit $1,340,205.00 $1,340,205.00
OWNER BETTERMENT
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 OWNER'S BETTERMENT 1 LS $50,000.00 $50,000.00 1 $50,000.00
--------------------------------------
Sub-Total of Previous Unit $50,000.00 $50,000.00
--------------------------------------
Tuesday,June 23,2020 Page 3 of 5
City Project Numbers 100194 DOE Number 0194
Contract Name SANITARY SEWER IMPROVEMENTS Estimate Number 1
Contract Limits TO SERVE THE BRIDGES ADDITION Payment Number 1
Project Type WATER&SEWER For Period Ending 6/23/2020
Project Funding
Contract Information Summary
Original Contract Amount $1,402,205.00
Change Orders
Total Contract Price $1,402,205.00
Total Cost of Work Completed $1,402,205.00
Less %Retained $0.00
Net Earned $1,402,205.00
Earned This Period $1,402,205.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $1,402,205.00
Tuesday,June 23,2020 Page 4 of 5
City Project Numbers 100194 DOE Number 0194
Contract Name SANITARY SEWER IMPROVEMENTS Estimate Number 1
Contract Limits TO SERVE THE BRIDGES ADDITION Payment Number 1
Project Type WATER&SEWER For Period Ending 6/23/2020
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors DICKINSON/ FUENTES Contract Date
Contractor NORTH TEXAS CONTRACTING,INC. Contract Time 135 WD
P.O.BOX 468 Days Charged to Date 135 WD
KELLER, TX 76244 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
--------------------------------------
Total Cost of Work Completed $1,402,205.00
Less %Retained $0.00
Net Earned $1,402,205.00
Earned This Period $1,402,205.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $1,402,205.00
Tuesday,June 23,2020 Page 5 of 5
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME:
PROJECT NUMBER:
DOE NUMBER:
WATER
PIPE LAID SIZE TYPE OF PIPE LF
I" I" Polyethylene 325 LF
FIRE HYDRANTS: VALVES(16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes
NEW SERVICES: 1" I"copper 7LF
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
18"PVC 18" PVC Sewer 440LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817)392-7845
I
i
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
May 13, 2020
North Texas Contracting, Inc.
4999 Keller Haslet Rd
Keller,Texas 76144
RE: Acceptance Letter
Project Name:Sanitary Sewer Improvements To Serve The Bridges Addition.
Project Type: Sewer
City Project No.: 100194
To Whom It May Concern:
On May 13, 2020 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on June 10, 2020. The final inspection and
the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is
therefore accepted by the City. The warranty period will start on June 10, 2020,which is the date of the
punch list completion and will extend of two (2)years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-2373.
Sincerely,
y h kd
Yoggsh Patel(Jun 24,202016:32 CDT)
Yogesh Patel, Project Manager
Cc: Cristobal Fuentes, Inspector
Doug Dickinson, Inspection Supervisor
Randy Horton,Senior Inspector
Victor Tornero, Program Manager
Teaguen Nall & Perkins, Consultant
NorthTexas Contracting, Inc, Contractor
Crowley Independent School District, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev.8/20/19
,*� NORTH TEXAS
IF
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state and county
aforesaid, on this day personally appeared Zach Fusilier, Vice President Of North Texas
Contracting, known to me to be a credible person, who being by me duly sworn, upon his
oath deposed and said;
That all persons, firms, associations, corporations, or other organizations
furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth has
been paid in full;
That there are no claims pending for personal injury and/or property damages;
On Contract described as;
Public Sanitary Sewer Improvements to Serve
The Bridges Addition
City Project No. 100194
BY
Zach Fusilier, Vice President
Subscribed and sworn before me on this date 24th of June, 2020.
` %%1111111111
`l N M ki 0'�
Q, ,...
_ Notary P lic
Tarrant County, Texas
�09r01F< o.
4999 Keller-Haslet Road Keller,Texas 76248 Phone(817)430-9500 Fax(817)430-9207
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT ❑
TO FINAL PAYMENT SURETY CONTRACTOR ❑❑
Conforms with the American Institute of OTHER
Architects,AIA Document G707
Bond No SU1151538
PROJECT:
(name, addreSS)Bridges Addition
Fort Worth,TX
TO (Owner)
CITY OF FORT WORTH AND CROWLEY ARCHITECT'S PROJECT NO: CFA#2017-188
INDEPENDENT SCHOOL DISTRICT CONTRACT FOR:
512 Peach Street Sanitary Sewer Improvements to serve the Bridges Addition
Crowley TX 76036 CONTRACT DATE:
CONTRACTOR:NORTH TEXAS CONTRACTING, INC.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
there insert name and address of Surety Company)
ARCH INSURANCE COMPANY
Harborside 3,210 Hudson Street,Suite 300
Jersey City NJ 07311-1107 , SURETY COMPANY
on bond of there insert name and address of Contractor)
NORTH TEXAS CONTRACTING, INC.
4999 Keller Haslet Rd. , CONTRACTOR,
Keller TX 76248
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
CITY OF FORT WORTH AND CROWLEY INDEPENDENT SCHOOL DISTRICT
512 Peach Street
Crowley TX 76036 , OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS,WHEREOF,
the Surety Company has hereunto set its hand this 23rd day of June,2020
ARCH INSURANCE COMPANY
Surety Company
Attest:
(Seal); Signature of Authorized Representative
Robbi Morales Attorney-in-Fact
Title
NOTE; This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
ONE PAGE
.• AIC 0000313329
This Power of Attorney limits the acts of those named herein,and they have no authority to bind the Company except in the manner and to the extent herein stated
Not valid far Note,Loan,Letter of Credit,Currency Rate,Interest Rate or Residential Value Guarantees.
POWER OF ATTORNEY
Know All Persons By These Presents:
That the Arch Insurance Company,a corporation organized and existing under the laws of the State of Missouri,having its principal administrative office in Jersey City,
New Jersey(hereinafter referred to as the"Company")does hereby appoint:
Don E.Cornell,Joshua Saunders,Kelly A.Westbrook,Ricardo J.Reyna,Robbi Morales,Sophinie Hunter,Tina McEwan and Tonie Petranek of Dallas,TX
(EACH)
its true and lawful Attomey(s)in-Fact,to make,execute,seal,and deliver from the date of issuance of this power for and on its behalf as surety,and as its act and deed:
Any and all bonds,undertakings,recognizances and other surety obligations,in the penal sum not exceeding Ninety Million Dollars 00.000.000.001.
This authority does not permit the same obligation to be split into two or more bonds In order to bring each such bond within the dollar limit of authority as set forth
herein.
The execution of such bonds,undertakings,recognizances and other surety obligations in pursuance of these presents shall be as binding upon the said Company as fully
and amply to all intents and purposes,as if the same had been duly executed and acknowledged by its regularly elected officers at its principal administrative office in
Jersey City,New Jersey.
This Power of Attorney is executed by authority of resolutions adopted by unanimous consent of the Board of Directors of the Company on September 15,2011,true and
accurate copies of which are hereinafter set forth and are hereby certified to by the undersigned Secretary as being in full force and effect:
"VOTED,That the Chairman of the Board,the President,or the Executive Vice President,or any Senior Vice President,of the Surety Business Division,or their
appointees designated in writing and filed with the Secretary,or the Secretary shall have the power and authority to appoint agents and attorneys-in-fact,and to authorize
them subject to the limitations set forth in their respective powers of attorney,to execute on behalf of the Company,and attach the seal of the Company thereto,bonds,
undertakings,recognizances and other surety obligations obligatory in the nature thereof,and any such officers of the Company may appoint agents for acceptance of
process."
This Power of Attorney is signed,scaled and certified by facsimile under and by authority of the following resolution adopted by the unanimous consent of the Board of
Directors of the Company on September 15,2011:
VOTED,That the signature of the Chairman of the Board,the President,or the Executive Vice President,or any Senior Vice President,of the Surety Business Division,
or their appointees designated in writing and filed with the Secretary,and the signature of the Secretary,the seal of the Company,and certifications by the Secretary,may
be affixed by facsimile on any power of attorney or bond executed pursuant to the resolution adopted by the Board of Directors on September 15,2011,and any such
power so executed,sealed and certified with respect to any bond or undertaking to which it is attached,shall continue to be valid and binding upon the Company. In
Testimony Whereof,the Company has caused this instrument to be signed and its corporate seal to be affixed by their authorized officers,this 18th day of Mav,22020
Attested and Certified � � `�C Arch Insurance Company
SEAL,
Patrick K.Nails,Secretary 1971 David M.Finkelstein,Executive Vice President
STATE OF PENNSYLVANIA SS
COUNTY OF PHILADELPHIA SS y�SfOlit�
I,Michele Tripod!,a Notary Public,do hereby certify that Patrick K.Nails and David M.Finkelstein personally known to me to be the same persons whose names are
respectively as Secretary and Executive Vice President of the Arch Insurance Company,a Corporation organized and existing under the laws of the State of Missouri,
subscribed to the foregoing instrument,appeared before me this day in person and severally acknowledged that they being thereunto duly authorized signed,sealed with
the corporate seal and delivered the said instrument as the free and voluntary act of said corporation and as their own free and voluntary acts for the uses and purposes
therein set forth.
COWAONMaiALTM OF va AYI4V Mv►
mewu TItl M,Koury PJAbt
city of ",M'la• Cow" Michele Tripodi,Notary Public
MII[ama1Won Expires JWy 31,3t121
CERTIFICATION My commission expires 07/31/2021
1,Patrick K.Nails,Secretary of the Arch Insurance Company,do hereby certify that the attached Power of Attorney dated Mac 18.2020 on behalf of the person(s)
as listed above is a true and correct copy and that the same has been in full force and effect since the date thereof and is in fWi force and effect on the date of this
certificate;and I do further certify that the said David M.Finkelstein,who executed the Power of Attorney as Executive Vice President,was on the date of execution of
the attached Power of Attorney the duly elected Executive Vice President of the Arch Insurance Company.
IN TESTIMONY WHEREOF,I have hereunto subscribed my name and affixed the corporate seal of the Arch Insurance Company on this23rd day of June ,
2020 . W
Patrick K.Nails,Secretary
This Power of Attorney limits the acts of those named therein to the bonds and undertakings specifically named therein and they have no authority to bind the Company
except in the manner and to the extent herein stated.owslp
PLEASE SEND ALL CLAIM INQUIRIES RELATING TO THIS BOND TO THE FOLLOWING ADDRESS:
Arch Insurance—Surety Division 3 Parkway,Suite 1500 Philadelphia,PA 19102
To verify the authenticity of this Power of Attorney,please contact Arch Insurance Company at Su retyAuthentic@archinsurance.com
Please refer to the above named Attorney-in-Fact and the details of the bond to which the power is attached.
AICPOA040120 Printed in U.S.A.