HomeMy WebLinkAboutContract 53215-CO1 FORT WORTH: City of Fort Worth CSC No.53215-COl
Change Order Request
Project Namel KELLER-HASLET DRAINAGE IMPROVEMENTS City Sec# 1 53215
Client Project#(s)l 101697/101492
Project Drainage Improvements for Keller-Haslet Road
Description
Contractorl MCMAHON CONTRACTING L.P. Change Order# Date 5/12/2020
City Project Mgr.1 Mike Bennett City Inspector F Daniel Bookman
Dept. TPW Water Sewer Contract Time
Original Contract Amount $1,717,505.78 $1,Totals Totals5.78 D
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,717,505.78 $1,717,505.78
Amount of Proposed Change Order $43,463.22 $0.00 $0.00 $43,463.22 17
Revised Contract Amount $1,760,969.00 $1,760,969.00
Original Funds Available for Change Orders $86,000.00 $86,000.00
Remaining Funds Available for this CO $86,000.00 $86,000.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.531,10
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,146,882.23
PSTIFICA !PIN 4F EASONSj F4?R'rCHANGf f l2D ft
This change order is needed to provide for additional time and costs resulting from field conditions that differed from the plans and adjustment
requests made by the City.
•A moving headcut in the creek has caused the creek to shift and required the contractor to shift a manhole 15'to keep it outside the creek.
During the submittal process in construction,the City determined that the proposed gate valves needed to be set at a zero grade,which was
different than the plans.
•Temporary water services that were identified during the valve shut off tests were required.
ATT did not relocate their line prior to construction,so the contractor was delayed while working around their line.
SUN 3
°tn
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and
reporting requirements.
Contractors Company Name Coritracfor Name Contract S' Date
MCWHON CONTRACTING L.P.
Inspector/inspection Supervisor Date Project Manager/Program Manager Date
Jun 18,2020 1%;rd'aYowy Jun 18,2020
Assistant Director Dept Date : Director,Contracting De artment De t Date
Jun 19,2020 .i._...., Jun 19,2020
Assistant City Attorney Date Assistant City Manager Date
Jun 23,2020 V Jun 23,2020
- - Coumcil Action If required
M&C Number M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
IF1: WORTH,TX
Foa-- T��F11' City of Fort Worth
Change Order Additions
Project Name R-HASLET DRAINAGE IMPROVEMENTS City Sec# 53215
Client Project# 1 1016971101492
Project Description Drainage Improvements for Keller-Haslet Road
Contractor FMCMAHON CONTRACTING L.P. Change Order# I [ Date 5f1212020
City Project Mgr, I Mike Bennett City Inspector Daniel Bookman
IILM AElUITt(1N5
rn unitCosto a
Unit 2-Water /17 TEMPORARY WATER SERVICES TPW 1 LS $18,515.00 $18,515.00 d
18 STAND BY TIME FOR WATER LINE PLAN CHANGE-VALVES 7PW 1 LS $13,400.31 $13,400.31
Unit 3-Sewer
15 SANITARY SEWER PLAN CHANGE TPW 1 LS $4,757.39 $4,757.39
16 AT&T CONDUIT CONFLICT TPW 1 LS $15,894.52 $15,894.52+f
TPW 52,567.22
Water $0.00
Sewer $0.00
L795ETJal dditions
Change Order Additions Page 2 of 5
FoRRT.WOR'T_H City of Fort Worth
Change Order Deletions
Project Name KELLER-HASLET DRAINAGE IMPROVEMENTS City Sec# 53215
Client Project# MI(W1101492
Project Description Drainage Impmvements for Keller Haslet Road
Contractor I MCMAHON CONTRACTING L.P. Change order# Date 5112I2o20
City Project Mgr. Mike Bennett City Inspector Daniel Bookman
HEM UESGRIPTION t7ELl:l IONS
Unit unitCost
17 20."Gate Valve Vault TPW o
2.00 EA ,552.00 9,104,00
Change Order Deletions Page 3 of 5
TF'W 9, 04.00
Water $0.00
Sewer $0.00
hula lotal uelelions g�p4,
Change Order Deletions Page 4 of 5
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
None
Total $0.00
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Mike Bennett
/ Mike Bennett(Jun 18,202010:13 CDT)
Name of Employee/Signature
Project Manager
Title
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
ATTEST: `, ��• �.. �,
f UUP�r
Mary J.Kayser,City Secretary
• (....
LWORTHR, °TX