Loading...
HomeMy WebLinkAboutContract 51148-A1 CSC No.51148-A1 AMENDMENT No. 1 TO CITY SECRETARY CONTRACT No. 51148 WHEREAS, the City of Fort Worth (CITY) and Multatech Engineering, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 51148, (the CONTRACT) which was authorized by M&C C-28764 on the 26 day of June, 2018 in the amount of $ 339,878. 00; and WHEREAS, the CONTRACT involves engineering services for the following project: MCCART AVE & ALTAMESA BLVD; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $24,864. 00. (See Attached Funding Breakdown Sheet, Page -4-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $364, 742. 00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth -`— Professional Services Agreement Amendment Template OFFICIAL RECORD Revised:March 9, OFFICIAL 2020 Page 1 of CITY SECRETARY FT WORTH,TX City of Fort Worth ENGINEER Multatech Engineering, Inc. mw Dana Burghdoff(J 6,202014: 1 CDT) Dana Burghdoff, AICP Eric A. Canales, P.E. Assistant City Manager Vice President DATE: Jul 6, 2020 DATE: 06/26/2020 APPROVAL RECOMMENDED: William M. Johnson Director, Transportation & Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance /and reporting requirements. Derek A.White,PhD,PE(Ju16,202010:52 CDT) Derek A. White, PhD, PE Senior Project Manager 101 1C1�C City of Fort Worth r F 0 9AE RF Professional Services Agreement Amendment Template C0'PA?2-ECREI(bA R,Y Revised: arch 9,2020 Page 2 of 4 U, WORT , �X WORT APPROVED AS TO FORM AND LEGALITY: M&C: Date: Jul 6, 2020 291f/-e/.tDfD Delack(Jul6,202014:13 CDT) Douglas W. Black Assistant City Attorney ATTEST: 1 l Mary J. Kayser City Secretary . OFFICIAL RECORD City of Fort Worth Professional Services Agreement Amendment Template CITY SECRETARY Revised:March 9,2020 Page 3 of 4 FT.WORTH,TX FUNDING BREAKDOWN SHEET City Secretary No. 51148 Amendment No. 1 Department Fund-Account-Center Amount TPW 34018-0200431-5330500-101572-003930-9999- $24, 864 . 00 18010203 Total : $24, 864 . 00 City of Fort Worth Professional Services Agreement Amendment Template Revised:March 9,2020 Page 4 of 4 3AE ■ M U LTAT E C H ■ ARCMITECTS@ENGIIVEERS 2821 West 7th Street.Suite 4GO. Fort Worth.Texas 75107-22191 Phone 817-877-5571•Fax:817-877-4245• www.multatech.com April 30, 2020 Lissette Acevedo City of Fort Worth, Transportation and Public Works 200 Texas Street Fort Worth, Texas 76102 Re: 2018 Bond Intersection Project- MCCART AVE &ALTAMESA BLVD Amendment#1 — Scope Modification Services City Secretary Contract No. 51148 CPN 101572 PO FW020-0000000080 CSJ 0902-90-119 Dear Ms. Acevedo, We appreciate the opportunity to present this Change Order for the scope modifications identified below for the 2018 Bond Intersection Project — MCCART AVE & ALTAMESA BLVD. These modifications were at the request of the City of Fort Worth Traffic Management. SCOPE MODIFICATIONS 1. PLAN MODIFICATIONS A. Revise base files to remove the bulb-outs on Altamesa Blvd. in the northwest and northeast corners of the intersections. B. Redesign the existing ramps in the northwest and northeast corner to make ADA compliant C. On northbound McCart Ave, modify existing lane widths and reduce existing median to add a second left-turn lane. All lanes (3-through and 2-left) will be 11' width. This modification will require adding additional sheets to the plans. 2. TRAFFIC MODIFICATIONS A. Prepare VISSIM model to accommodate wied-median offset left-turn lanes. B. Modify ped pole locations in the northeast and northwest corners. C. Revise westbound Altamesa Blvd. signals to accommodate three through lanes (the previous design was for two through lanes). D. Modify signal plans to add a second left-turn lane on northbound McCart Ave. 3. TxDOT COORDINATION A. Prepare exhibits of scope modifications for TxDOT review and approval B. Revise PIF, ERR and Scope documents C. Revise Cost Estimate D. Create secondary PIF for the addition of left-turn lane 3AE ■ M U LTAT E C H ■ ARCMITECTS@ENGIIVEERS 2821 West 7th Street.Suite 4GO. Fort Worth.Texas 75107-22191 Phone 817-877-5571•Fax:817-877-4245• www.multatech.com 4. SCHEDULE A. TxDOT Coordination and approval — 7 days B. Prepare Intermediate 60% Plans— 14 days C. CFW Review— 14 days D. TxDOT Review—28 days COMPENSATION The work effort outlined in Scope Modifications and the attached Level of Effort will be accomplished an hourly, not-to-exceed fee of$24,864.00 We appreciate the opportunity to submit this proposal for Change Order#1 and look forward to assisting you for the remainder of this project. Please call if you have any questions. Sincerely, J Eric A. Canales, P.E., PMP Vice President/ Project Manager `a 0 0 0 0 0 0 0 0 0 0 0 0 o n o 0 o rn m o 0 0 0 0 o n m o n o n n m Nv t� m mmmmmm N Qm V n N N N N N Nvl n"N�00 m v m m m m m m N N c! at N m m N N N rN rN rN N N N N O ~ N N �N NmN SON mN V N IV N n � N rN rN rN m Y N W r I O o 0 0 0 0 0 0 0 0 0 0 o n o 0 o m m O O O O o o n W a o W C C c C N N NNN N NNNNNN N �N NN�� N N N N N N� E G C��`� o E 2 J W>> W d V p N tlJ a a� Clf LLI 0 F S V W~~ N a,22 mm wa aww co = o 0 0 0 0 0 0 0 0 o m m*mo o O N N N N N N N N N N N m w F cco o y 2 N N N N N N N N N O d W C ~ W luO O n m m O O O O O ON n 0 +R C N 'p 2 m y w N N N N N N N N N O d E (Q O O O 0 000000 O 0 0000 O O O O m Nvmmwoo N O O O N N� sae aW+� a mN mN mN 'N'N'N mN mN mN P N N W V � N NN NmN N Z f ?r a N O O O O O O O O O O O woo p U r CL z�� o E v)a Z zw �m d to-2 O�U) U D O= N O O O O O O O O 0 0 W D pl'p O w w oxLU d C N N N O V m y O O O O O O m N O W Z N N PJ �a 0f o v m r o Q� G so O O N m O O O O O O O c a � o w W N a a N O O O O O O O O O O W N O a`o a r t O m a o O a N O am m C E- cgC cgg W ci a a o��2 m u"3 m c oO a' U ❑ O W N m d N N U❑ 4 a n ` d W W a N Cl Q dE �Y::3 0aNi >. c� m_ ,IM,Q co 2~a 1mAcWS agWCi a �oc QW a°y�l0mW 9C= Oy ya G •20 oTZ0 o WOm C {FOt a r aOm NcuiE= a o '= 2md— 0 0 yc 2c " o v2 om N2- W Ww� W'S g n Q M y W a ' Z a2d (03 as >aqd c v o 0 o W a R' F IL m U D:I lw W N� O Yp N N N N N N N N N N N m 0 ci ti �'m f O� O O t7 t7 t7 t�l t7 O O O O O O ,LO Zl fV P! V IH b A Qi Ol M w� C)di a O t W W o�� 3m� _W ILW O E O V 0 6 a