HomeMy WebLinkAboutContract 51148-A1 CSC No.51148-A1
AMENDMENT No. 1
TO CITY SECRETARY CONTRACT No. 51148
WHEREAS, the City of Fort Worth (CITY) and Multatech Engineering,
Inc. , (ENGINEER) made and entered into City Secretary Contract No. 51148,
(the CONTRACT) which was authorized by M&C C-28764 on the 26 day of June,
2018 in the amount of $ 339,878. 00; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
MCCART AVE & ALTAMESA BLVD; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $24,864. 00. (See Attached Funding
Breakdown Sheet, Page -4-)
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $364, 742. 00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth -`—
Professional Services Agreement Amendment Template OFFICIAL RECORD
Revised:March 9, OFFICIAL 2020
Page 1 of CITY SECRETARY
FT WORTH,TX
City of Fort Worth ENGINEER
Multatech Engineering, Inc.
mw
Dana Burghdoff(J 6,202014: 1 CDT)
Dana Burghdoff, AICP Eric A. Canales, P.E.
Assistant City Manager Vice President
DATE: Jul 6, 2020 DATE: 06/26/2020
APPROVAL RECOMMENDED:
William M. Johnson
Director, Transportation & Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance
/and reporting requirements.
Derek A.White,PhD,PE(Ju16,202010:52 CDT)
Derek A. White, PhD, PE
Senior Project Manager
101 1C1�C
City of Fort Worth r F 0 9AE RF
Professional Services Agreement Amendment Template C0'PA?2-ECREI(bA R,Y
Revised: arch 9,2020
Page 2 of 4 U, WORT , �X
WORT
APPROVED AS TO FORM AND LEGALITY: M&C:
Date: Jul 6, 2020
291f/-e/.tDfD
Delack(Jul6,202014:13 CDT)
Douglas W. Black
Assistant City Attorney
ATTEST: 1 l
Mary J. Kayser
City Secretary .
OFFICIAL RECORD
City of Fort Worth
Professional Services Agreement Amendment Template CITY SECRETARY
Revised:March 9,2020
Page 3 of 4 FT.WORTH,TX
FUNDING BREAKDOWN SHEET
City Secretary No. 51148
Amendment No. 1
Department Fund-Account-Center Amount
TPW 34018-0200431-5330500-101572-003930-9999- $24, 864 . 00
18010203
Total : $24, 864 . 00
City of Fort Worth
Professional Services Agreement Amendment Template
Revised:March 9,2020
Page 4 of 4
3AE
■ M U LTAT E C H
■ ARCMITECTS@ENGIIVEERS
2821 West 7th Street.Suite 4GO. Fort Worth.Texas 75107-22191
Phone 817-877-5571•Fax:817-877-4245• www.multatech.com
April 30, 2020
Lissette Acevedo
City of Fort Worth, Transportation and Public Works
200 Texas Street
Fort Worth, Texas 76102
Re: 2018 Bond Intersection Project- MCCART AVE &ALTAMESA BLVD
Amendment#1 — Scope Modification
Services City Secretary Contract No. 51148
CPN 101572
PO FW020-0000000080
CSJ 0902-90-119
Dear Ms. Acevedo,
We appreciate the opportunity to present this Change Order for the scope modifications identified
below for the 2018 Bond Intersection Project — MCCART AVE & ALTAMESA BLVD. These
modifications were at the request of the City of Fort Worth Traffic Management.
SCOPE MODIFICATIONS
1. PLAN MODIFICATIONS
A. Revise base files to remove the bulb-outs on Altamesa Blvd. in the northwest and
northeast corners of the intersections.
B. Redesign the existing ramps in the northwest and northeast corner to make ADA
compliant
C. On northbound McCart Ave, modify existing lane widths and reduce existing
median to add a second left-turn lane. All lanes (3-through and 2-left) will be 11'
width. This modification will require adding additional sheets to the plans.
2. TRAFFIC MODIFICATIONS
A. Prepare VISSIM model to accommodate wied-median offset left-turn lanes.
B. Modify ped pole locations in the northeast and northwest corners.
C. Revise westbound Altamesa Blvd. signals to accommodate three through lanes
(the previous design was for two through lanes).
D. Modify signal plans to add a second left-turn lane on northbound McCart Ave.
3. TxDOT COORDINATION
A. Prepare exhibits of scope modifications for TxDOT review and approval
B. Revise PIF, ERR and Scope documents
C. Revise Cost Estimate
D. Create secondary PIF for the addition of left-turn lane
3AE
■ M U LTAT E C H
■ ARCMITECTS@ENGIIVEERS
2821 West 7th Street.Suite 4GO. Fort Worth.Texas 75107-22191
Phone 817-877-5571•Fax:817-877-4245• www.multatech.com
4. SCHEDULE
A. TxDOT Coordination and approval — 7 days
B. Prepare Intermediate 60% Plans— 14 days
C. CFW Review— 14 days
D. TxDOT Review—28 days
COMPENSATION
The work effort outlined in Scope Modifications and the attached Level of Effort will be
accomplished an hourly, not-to-exceed fee of$24,864.00
We appreciate the opportunity to submit this proposal for Change Order#1 and look forward to
assisting you for the remainder of this project. Please call if you have any questions.
Sincerely,
J
Eric A. Canales, P.E., PMP
Vice President/ Project Manager
`a
0 0 0 0 0 0 0 0 0 0 0 0 o n o 0 o rn m o 0 0 0 0 o n m o n o n n
m Nv t� m mmmmmm N Qm V n N N N N N Nvl n"N�00 m v m m m m m m N N c! at N m m
N N N rN rN rN N N N N O
~ N N �N NmN SON mN V N IV N n
� N rN rN rN
m
Y
N
W
r
I O o 0 0 0 0 0 0 0 0 0 0 o n o 0 o m m O O O O o o n W a o W C C c
C N N NNN N NNNNNN N �N NN�� N N N N N N� E G C��`� o
E 2 J W>> W d V
p N tlJ a a� Clf
LLI
0
F
S V W~~ N a,22 mm wa
aww co
= o 0 0 0 0 0 0 0 0 o m m*mo o
O N N N N N N N N N N N m w F
cco
o
y 2
N N N N N N N N N O
d
W
C ~
W luO O n m m O O O O O ON n
0
+R C N
'p 2
m y w N N N N N N N N N O
d
E
(Q O O
O 0 000000 O 0 0000 O O O O
m Nvmmwoo N O O O
N N�
sae aW+� a mN mN mN 'N'N'N mN mN mN P N N
W V � N NN NmN N
Z f
?r a N O O O O O O O O O O O
woo
p
U r
CL z�� o E
v)a Z zw
�m d to-2
O�U) U D O= N O O O O O O O O 0 0
W D pl'p O w w
oxLU
d C N N N O V m y O O O O O O m
N O W Z N N PJ
�a
0f o v m
r o
Q� G so O O N m O O O O O O O
c a �
o w
W
N a a
N O O O O O O O O O O
W
N
O
a`o
a
r t O
m a o O a N O am
m C E-
cgC cgg W ci a
a o��2 m u"3 m c oO a' U ❑
O W N m d N N U❑ 4 a n ` d
W W a N Cl Q
dE �Y::3 0aNi >. c� m_ ,IM,Q co 2~a 1mAcWS agWCi a �oc QW a°y�l0mW 9C= Oy ya G •20
oTZ0 o WOm C {FOt a r aOm NcuiE=
a o '=
2md— 0 0 yc 2c " o v2 om N2- W Ww�
W'S g n Q M y W a ' Z
a2d (03 as >aqd c v o 0 o W
a R' F IL m U D:I lw W
N�
O
Yp N N N N N N N N N N N m 0
ci ti �'m
f O� O O t7 t7 t7 t�l t7 O O O O O O ,LO
Zl
fV P! V IH b A Qi Ol M w�
C)di a O
t W W
o��
3m�
_W
ILW O
E
O V 0
6 a