Loading...
HomeMy WebLinkAboutContract 40959COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT City Secretary Contract No. WHEREAS. the undersigned "Developer" desires to make certain improvements (refer to the name of the project at the bottom of the page) an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth. a home -rule municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter called "City", to do certain work in connection With said improvements. Developer Information: [Developer Company Name: KB Horne Lone Star Inc. Authorized Signatory: Don Barri neau Title: President Project Naine: Emory Place II — Blocks 3, 9 & 10 Project Location: West of Waterbrook, North of John T. White Additional Streets: N/A Plat Case No.: FP- 007-052 Plat Name: Emory Place II Mapsco: 66T Council District: 4 City Project No: 01424 I [To be completed by Received by: Date: CFA: 2009-052 DOE: 6320 OFFICIAL RECORD CITY SECRETARY '7 if, WORTH, TX NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA' ) as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X , Sewer (A-1) X , Paving (B) X , Storm Drain (B-1) X , Street Lights & Signs (C) X . E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Combined CFA final Sept 12, 2008 2 F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The 3 submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City - issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. City shall not be responsible for any costs that may be incurred by Developer in the. relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleRed neRlixence of the City of Combined CFA final Sept 12, 2008 4 Fort Worth, its officers, servants, or employees. 1\4. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer ill require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. 5 iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer s share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Combined CFA final Sept 12, 2008 6 Cost Summary Sheet Project Name: Emory Place II CFA No.: 2009-052 DOE No.: 6320 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights - Installed by Developer TPW Construction Cost Sub -Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Light Materials - Poles & Arms H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Developer's Cost $ 85,171.90 99,733.00 184,904.90 $ 230.014.00 120,340.00 12,320.00 $ 362,674.00 $ 547,578.90 $ $ $ 3,698.10 3,698.10 7,396.20 14,014.16 7,007.08 729.30 5,912.62 1,225.00 28,888.16 36,284.36 (4)gq,413,c. Amount Choice (ck one) Bond = 100%0 $ —? 547,578.90 X Completion Agreement = 100% / Holds Plat $ 547,578.90 Cash Escrow Water/Sanitary Sewer= 125% $ 231,131.13 Cash Escrow Paving/Storm Drain r= 125% _ $ 453,342.50 IN TESTIMONY WHEREOF, the City of Fort -Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth,Texas this 1 �' day p of 0 20 tab . CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi- ► bulal. EMBA, P.E. Development Engineering Manger Approved as to Form & Jiegal ity: An J: nsey Assistant ity Attorney ATTEST: Marty Hendri City Secretary ATTEST Transportation & Public Works Department Director Approved by City Manager's Office Fernando Costa Assistant City Manager 0 rib. 41,9 sQe.9000000 icy ‘ti`lb earl girt; '691 , v i TO REQUIRED I KB Home Lone Star Inc. NvAti-% Prin' me: assrf rots Print Name: Don Bamneatl Title: O.inawti #f tett".4/0 4cQyj,,,Tit1e: President Combined CFA final Sept 12, 2008 8 OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included AL Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Dram Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate j (Remainder of Page Intentionally Left Blank) 9 VICINITY MAP NOT TO SCALE • • — ——...... / r_. 1 11 it 1 IF iI 19 1 18 / 17 i 16 .1I /1 / • • 1 • • • 15 ti >- 4 C 1I 1 13 12 • 21 / 10 22 F.H. r 31 32 33 ‘`"34 8 WA TER � \� I , 30 29 1 ;Ira 23\\ 24 28 8" WATER 25 KNCHT ISLAV LN.__—___ • \ tQ \ 8 11 • 12 6 13 ,. °o 5 14 4+J1 4 (S 15 3 16 2 17 \ 8" Wt • • • • • • PATE 4:• ENGINEERS7 8150 BROOKRIVER DRIVE SUITE S-700 DALLAS, TEXAS, 75247 PH. (214) 357-2981 FAX (214) 357-29B5 JOB NO. 109401302 TffR 18 — SYLVAN INEAR0W5 DR. \ 15 14 ti 13 N. 12 7. • 9 1 22 '---fir 8 1 —/1 ]' 4 t• / 49 / / I rk `^ w `1 • \ 1 I• 1— /3 T • 5 U 1 r,t _ J V / \ ' I \ 4 ,'�7 _ % �\ / ( I \ 1 / v 3 ,i' __ \ 1 / ,v 1 \\ 1 1 1 F.H. i GLADE OAKI3 DR. 8 IS so 7_ 6 1 fast . as _raimom. z rr, `�—wIrnER r— ._ -,,,--/ � r' rook TRICE _IIO1 � LVERY `. / ` ' . - 1— ----1 Ii — � � -`l n T.—KuanN^_ /Whta nLL,I. ._h ��. /.di'�I►__ SITE PNOERSO 1----�r \ �'/-I L N a ai - x 1 l�/ eErlrnodo L uoR�_, 21 -- — a lv VOL,JCL, 6.5:..-c•C, Pr -42 rrr)1 ♦I I • OHS T RD ) ifl$ FP-007-052 DOE # 6320 WATER MAP #: 2090-400W & 2084-400W SANITARY SEWER MAP #: 2090-400S & 2084-400S VICINITY MAP N .T.S. CITY OF FORT WORTH, TX WATER DEPARTMENT EMORY PLACE OVERALL WATER LAYOUT PROJECT NO. WATER: P265-604150142483 SEWER: P275-704130142483 SHEET EXHIBIT A EXHIBIT A PEI It: 109401302 CONSTRUCTION COST ESTIMATE PROJECT NAME: EmoryPlacell PHASE: FILE NAME: 109401302 DESCRIPTION ACREAGE: DATE DATE PREP: UNIT ASWATER DISTRIBUTION SYSTEM 8" P.V.C. WATERLINE LF 11.45 27-Jul-10 27-Jul-10 BY: CHECKED: REVISED: APPROXIMATE QUANTITY PRICE 2,242 $19.00 RP BD TOTAL AMOUNT $42,598.00 6" P.V.C. WATERLINE 8" GATE VALVE & BOX 8"X8" WET CONNECTION W/ SOLID SLEEVE CAST IRON FITTINGS FIRE HYDRANT ASSEMBLY LF EA EA TN 37 6 2 1 $17.00 $950.00 $2,000.00 $2,500.00 EA 2 $2,000.00 $629.00 $5,700.00 $4,000.00 $1,375.00 $4,000.00 1' WATER SRV TESTING EA LS 61 2,242 $400.00 $24,400.00 $1.00 $2 242.00 TRENCH SAFETY LS TOTAL WATER DISTRIBUTION SYSTEM 2,279 $0.10 $227.90 $85,1':71.90 MATERIAL TESTING FEES PERCENT 2.0% $85,171.90 $1,703.44 INSPECTION FEES PERCENT 2.0% $85,171.90 $1,703.44 TOTAL WATER DISTRIBUTION SYSTEM FEES PATE ENGINEERS, INC. 1 of 6 1 $3,406.88 J1 C:1Documents and Settings\RustyP.PATE01\Desktop\CFA ESTIMATES.XLS, EXHIBIT A • r °o 1D 22 23 33 KNICI-IT ISLAND us. 2 M.H 3 2 • CLAD OAK. DR. 9 S 7O 9 6 5 4 PATE u ENGINEERS —002726 8150 BROOKRIVER DRIVE SUITE S-700 DALLAS, TEXAS, 75247 PH. 214 357-2981 FAX 214 357-2955 JOB NO. 109401302 34 • 77 �f M174 14) II -7 �.-- WMER In fJdrk / ��.yrook N TRICE �f LOVIEiY f 4 l l `� <' r S' EASTFRR / KUH�� -- CB JOHN T IT -� yp.1 T R� -.\ )/ SITE - AND�R30 EL_� '_ -:' 'o — -_'7ED - LIE 0 . _ o� A1 3 _= —, Lo, ,_, nV isc. 721,C47 --L/OHNi T NHI- RB 1� FP-007-052 DOE # 6320 WATER MAP #: 2090-400W & 2084-400W SANITARY SEWER MAP #: 2090-400S & 2084-400S VICINITY MAP LEGEND • EXISTING SS PROPOSED SS EXISTING EX. M.H. PROPOSED EX. M.H, CITY OF FORT WORTH, TX WATER DEPARTMENT EMORY PLACE OVERALL SANITARY SEWER LAYOUT PROJECT NO. WATER: P265-604150142483 SEWER: P275-704130142483 SHEET EXHIBIT A-1 EXHIBIT A-1 PEI it: 109401302 CONSTRUCTION COST ESTIMATE PROJECT NAME: Emory Place II ACREAGE: 11.45 BY: P H A S E: D A T E: 27 Jul-10 CHECKED: FILE NAME: 109401302 DATE PREP: 27 Jul-10 REVISED: DESCRIPTION B.SANITARY SEWER SYSTEM 8' SDR-35 P.V.C. PIPES-8') 8SDR-35 P.V.C. PIPE (8'-10') 8' SDR-26 P.V.C. PIPE (10' 12') 8" SDR-26 P.V.C. PIPE (12' 14') APPROXIMATE UNIT UNIT QUANTITY PRICE LF LF 929 249 $20.00 $22.00 LF LF 690 70 RP BD $23.00 $24.00 TOTAL AMOUNT $18, 580.00 $5,478.00 $15,870.00 $1,680.00 8" SDR-26 P.V.C. PIPE (10' 12') W/ CONC ENCASE 4' DIAMETER MANHOLE LF EA 60 8 50.00 $2,500.00 $3,000.00 $20,000.00 4' DIAMETER DROP MANHOLE EA 1 $2,800.00 $2,800.00 EX1 RA DEPTH 4' SS MH VF 26 $130.00 $3,380.00 CLAY DAM EA 4 $50.00 CONNECT TO EXIST. S.S. LINE EA 2 $300.00 $200.00 $600.00 TRENCH SAFETY LF 1,938 $1.00 $1, 938.00 MANHOLE VACCUUM TESTING EA 9 $50.00 $450.00 SS TESTING & TV LF 1,938 $1.50 4" SDR-26 P.V.C. SERVICE EA 30 $400.00 4" SDR-35 P.V.C. SERVICE EA 31 $350.00 $2,907.00 $12,000.00 $10, 850.00 TOTAL SANITARY SEWER SYSTEM $99,733,00 MATERIAL TESTING FEES PERCENT 2.0% $99,733.00 $1,994.66 INSPECTION FEES PERCENT 2.0% $99,733.00 $1,994.66 TOTAL SANITARY SEWER SYSTEM FEES PATE ENGINEERS, INC. 2 of 6 1 $3,989.32 1 1 C:\Documents and Settings\RuslyP.PATF01\Desktop\CFA FSTIMATFS.XLS, EXHIBIT Al X a 5 L • DIJ7 an9la 2 O r 21 22 10 32 3 L__ 30 29 28 23 24 25 KNIGHT ISLAND LN. GLADE OAKS DR. 33 1 34 SYLVAN MEADOWS DR. 15 14 13 12 11 10 9 8 7 6 4 2. PATE ENGINEERS —002726 B150 BROOKRIVER DRIVE SUITE S-700 DALLAS, TEXAS, 75247 PH. (214) 357-2981 FAX (214) 357-2985 JOB NO. 109401302 Laaana- I tar, II 11 1 /1 aa-n ra au r-r IC c02 0c1 n - -, ✓ / !— *INTER / a �� /Swdybrook Park TRICE o Kill i � / / L /1R I �, �s1�RN � � o �µ'hit6� /i\v" /�l" 4\ SITS �Rso a: �� / Hs �� -JOHN T WHI RD 1211,1101 VICINITY MAP N_T.S_ FP-007-052 EMORY PLACE OVERALL STREET LAYOUT PROJECT NO_ D.O.E. # 6320 STREET & STORM DRAIN PLAN FILE NO. W-1581 SHEET EXHIBIT B EXHIBIT B PEI it: 109401302 CONSTRUCTION COST ESTIMATE PROJECT NAME: EmoryPlacell ACREAGE: PHASE: DATE: FILE NAME: 109401302 DATE PREP: DESCRIPTION D.STREET PAVING 6' LIME STAB SUBGRADE 7' REINFORCED CONCRETE PAVEMENT 11.45 27-Jul-10 27-Jul-10 BY: RP CHECKED: BD REVISED: APPROXIMATE UNIT UNIT QUANTITY PRICE TOTAL AMOUNT SY 7,480 $2.50 $18,700.00 SY 7,030 25.80 $181,374.00 HYDRATED LIME (30#) 3000 PSI SIDEWALK REMOVE EX DRIVE TN 112 $150.00 $16,800 00 SF 1700 $3.00 $5,100.00 SY 35 $20.00 $700.00 7" CURB LF 47 $20.00 940.00 BARRIER FREE RAMPS EA 4 $1,000.00 $4,000.00 REMOVE BARRICADE EA 2 $200.00 $400.00 TRAFFIC CONTROL LS 1 $2,000.00 $2,000.00 TOTAL STREET PAVING 230,014,00 MATERIAL TESTING FEES INSPECTION FEES PERCENT 2.0% $230,014.00 $4,600.28 PERCENT 4.0% $230,014.00 $9,200.56 TOTAL STREET PAVING FEES PATE ENGINEERS, INC. 3 of 6 1 $13,800.84 1 1 C:IDocuments and Setangs\RustyP.PATF011Desktop\CFA FSTIMATES.XI. S, EXI!I13II B 9 A F 3 2 x2" D.I. 2'x2' D.I. 2'x2' D.I. 2'x2' D. 2.x2' D,l, 2'x2' D.I, 15 14 13 12 TIT Q 2'x2' al. 2'x2' D.I. 2'x2' al. 2'x2' D,l,+ '+ 1 , Z31 L I+Co 30 1 101 0. 29 21x2' D.l,�l Li iI 28 1 23 24 SD-,49 25 rely 9 15' C.I. 10 8 11 7 12 6 13 5 14 4 15 3 16 2 17 18 sac PATE •u ENGINEERS 8150 BROOKRIVER DRIVE SUITE S-700 DALLAS, TEXAS, 75247 PH. (214) 357-2981 FAX (214) 357-2985 JOB NO. 109401302 GLADE OAKS DR. J 32 33 re 1 Yi 34 I SA5I. 55 .33 VAN'MEADOWS DR. 14 13 12 I 11 10 9 8 7 6 r 1 26 55' RQ -- 1 1 12 1/111117 I rS OIEG '1/0' 50655. ; 4 1R1 ijyC-----�.J�.,RAy�O� AA7Z__ ';/- ,T.WIN7ER N }III/ v/ lY ---- tic --1/2,Ab,00k TRICE o « 01 d m KCome, JOHN T, R G — �` \�'� /\�� -- /. SITE '! ANDERSOrr•j.. — �_— i..., w es. ; , �wr i� a I \. 'r/c, s I 0-o---' , 34 ✓'--1 `a-. i/CURIE_I /JBRENIIVDLIQ C._..Y- __ � t_ n .4.,_....,----- � �'V4pN6Ri"'- JOdN T NH RD 12Rao VICINITY MAP FP-007-052 EMORY PLACE OVERALL STORM SEWER LAYOUT PROJECT NO, D.O.E. # 6320 STREET & STORM DRAIN PLAN FILE NO. W-1581 SHEET EXHIBIT 9-1 EXHIBIT B-1 PEI #: 109401302 CONSTRUCTION COST ESTIMATE PROJECT NAME EmoryPlacell ACREAGE PHASE: DATE: FILE NAME: 109401302 DATE PREP: DESCRIPTION C.STORM SEWER SYSTEM 21" RCP 24" RCP 30" RCP 36" RCP 11.45 27 Jul-10 27-Jul-10 APPROXIMATE UNIT QUANTITY BY: RP CHECKED: BD REVISED: UNIT PRICE TOTAL AMOUNT LF 55 $42.00 $2,310.00 LF 290 $45.00 $13,050.00 LF 384 $52.00 LF 92 $65.00 24" HDPE 2'x2 DROP INLET LF EA $19,968.00 $5,980.00 977 $42.00 $41,034.00 11 $1, 500.00 10' STD CURB INLET EA 2 $2,000.00 $16,500.00 $4,000.00 15' STD CURB INLET 4' SQ MANHOLE EA 2 $3,000.00 $6,000.00 EA 1 $2,500.00 2,500.00 5' SQ MANHOLE EA 2 $3,200.00 $6,400.00 TRENCH SAFETY LF 1,798 $1.00 $1,798.00 REMOVE EX DROP INLET & CONNECT EA 1 $800.00 $800.00 TOTAL STORM SEWER SYSTEM 20,340,00 MATERIAL TESTING FEES PERCENT 2.0% $120,340.00 $2,406.80 INSPECTION FEES PERCENT 4.0% $120,340.00 $4,813.60 TOTAL STORM SEWER SYSTEM FEES PATE ENGINEERS, INC. 4 of 6 I $7,220.40 C:1Documenis and Settings\RustyP.PATF011Desktop\CFA FSTIMATFS.XI S, EXI lIBIT 131 V_ 21 22 23 t 32 1 33 31 L__ 30 e1 29 24 25 19 18 17 16 15 14 1 13 12 11 U 10 KNIGHT ISLAND La 9 10 6 11 12 6 13 N 4 1 1 SYLVAN MEADOWS DR. 15 14 13 12 11 10 9 27 8 27, 7 6 5 14 4 15 3 16 2 17 18 O 0 GLADE OAKS DR. T 4 10 /..Et CAv. IS IS OM MD S 1 Y � PATE •) ENGINEERS TBPE F-002726 8150 BROOKRIVER DRIVE SUITE S-700 DALLAS, TEXAS, 75247 PH. (214) 357-2981 FAX (214) 357-2985 JOB NO, 109401302 G C>r fir a1E/ 1ri r a4MD YekTER 0 r . L �� ' _, a r tJ F T( KU& j J 1C "1-;.--- o e"�IIT. ff 7 ,\ SITE ANDpaSOM11 E. LIE o G Q ..� I�C 1$ ,-__.4 � . a Uvbddgl�--�oKr�7 l L�I n L�` -I r41I�NdA1!- ' 1QHb T fiHITE RD '7-* 120,rr WALT ,_ 5656, Pa_ 4 T .. .. VICINITY MAP LEGEND EXISTING STREET LIGHT PROPOSED STREET LIGHT N.T.S. FP-007-052 EMORY PLACE STREET LIGHTS LAYOUT PROJECT NO. D.O.E. # STREET & STORM DRAIN PLAN FILE NO. W-1581 SHEET EXHIBIT C PROJECT NAME: PHASE: FILE NAME: DESCRIPTION E,STREET LIGHTS POLE & ARMS INSTALLATION EXHIBIT C PEI #: 109401302 CONSTRUCTION COST ESTIMATE Emory Place II ACREAGE DATE: 109401302 DATE PREP: UNIT EA 11.45 27 Jul-10 27 Jul-10 APPROXIMATE QUANTITY 7 BY: CHECKED: REVISED: UNIT PRICE $1,500.00 RP BD TOTAL AMOUNT $10,500.00 2" PVC SCH 40 CONDUIT LF 140 $8.00 $1,120.00 118 CONDUCTOR 4 WIRES LF 140 $5.00 $700.00 TOTAL STREET LIGHTS TOTAL STREET LIGHTS FEES STREET LIGHTS PURCHASE FROM THE CITY POLE & ARMS MATERIALS FA 7 STREET LIGHTS PURCHASE FROM THE CITY PATE ENGINEERS, INC. 5 of 6 $844.66 $12,320.00 1 $492.80 $5,912.62 I $5,912.62 C:IDocuments and Settings\RustyP,PATF011Desktop\CFA FSTIMATFS.XI S, EXI IIBIT C 'ADO/T(tt1 19 18 1 17 1 16 15 14 13 21 fY 5- 22 23 31 L 32 \ 33 30 29 24 28 25 KNIGHT ISLAND LN, 9 10 8 11 7 12 6 13 O 5 14 4 15 3 16 2 17 18 GLADE OAKS DR. 3 1 4 Y SYLVAN (MEADOWS DR. 15 14 13 12 11 25 10 9 8 7 6 4 7 3 2 OL A1t OAKS 9 8 7O 6 5 4 PATE 4;• ENGINEERS -002726 8150 BROOKRIVER DRIVE SUITE S-700 DALLAS, TEXAS, 75247 PH. 214 357-2981 FAX 214 357-2985 JOB N0. 109401302 3I2 77, � , � a ?Mo< tl_ / RELar4E+M /��1ram' !`�!1I!lRiii A..) ---, ,I — r teaWiT7EC r KU6W7 _L. -1/0 �7 111 itG h-� Co'mMry cill dOhR{IT. R �7 if 1 SITE�4 _ ADaR300,1 ctL. /� SO t//// 1 -c 31 8 r—Ay :_ I �i iJ_r'-- '� ,. �BReit) "' UuntLa 1 . , , l � ` . ' youimOzr -5'O `r;rc n;c rij 50 n Ass- T WHE RD >Igo VICINITY MAP LEGEND PROPOSED STREET SIGN N.T.S. FP-007-052 EMORY PLACE SIGNS LAYOUT PROJECT NO. D.O.E. # 6320 STREET & STORM DRAIN PLAN FILE NO. W-1581 SHEET EXHIBIT C- I EXHIBIT C-1 PEI tt: 109401302 CONSTRUCTION COST ESTIMATE PROJECT NAME Emory Place ll ACREAGE 11.45 BY: RP PHASE: D A T E: 27 Jul-10 CHECKED BD E I L E NAME: 109401302 DATE PREP: 27 Jul-10 REVISED: DESCRIPTION F STREET SIGNS STREET SIGN APPROXIMATE UNIT UNIT QUANTITY PRICE EA TOTAL AMOUNT $245.00 $1,225.00 TOTAL STREET SIGNS PATE ENGINEERS, INC. 6 of 6 1225.00 I' C:1Documents and Settings \RustyP.PATF011Desktop\CFA FSTIMATFS.XLS, EXHIBIT Cl