Loading...
HomeMy WebLinkAboutContract 40954-A1 (2)AMENDM NT NUMBI R 1 STATL OF TEXAS 6 CITY SECRETARY CONTRACT NO MVFLS4SP M COUNTY OF TARRANT 6 WHEREAS, the City of Fort Worth (City) and URS Corporation, Inc. (Engineer) made and entered into City Secretary Contract No. 40954, (the Contract) which was authorized by the City Council by M&C C- 24222 on the 14th day of September 2010; and WHEREAS, the Contract involves engineering services for the following project: Temporary Downtown Heliport, Project Non 1576 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee for additional project management, survey and layout; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in the proposal letter dated March 24, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by ENGINEER total $10,000.00. 2. Article II of the Contract is amended to provide for an increase in the fee to be paid to ENGINEER for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $165,500.00. Page -1 • • • tro otrt CITY ; ! r4I FY WORMU a.NN�H .k ,X All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. SA% I-XECUTED on this the day o APPROVAL RECOMMENDED: Kenneth L. Penney, Jr., A.A.E. Aviation Director URS Corporation Engineer By. Aowv 43_4Name: �dc,✓c �h, l<4 .s � 1� Title: :tic_ Ps/CS f'al t,l, l_ APPROVED AS TO FORM AND LEGALITY: Doug Black Assistant City Attorney Attested t • Marty ity Secretwry NO ':FC REQUIRED 2010 in Fort Worth, Tarrant County, Texas. APPROVED: Fernando Costa Assistant City Manager ATT0. 692S-4x, Authorization: Date: fill fir• 4% 01%°" "D etfrx?? ig 0 '0 00,00 } 0000 '1/4.41.1g# Page -2 March 24, 2011 Mr. Kent Penney, AAE Airport Systems Director City of Fort Worth Aviation Department 4201 North Main Street, Suite 200 Fort Worth, Texas 76106 RE: Request for Amendment to Project Budget for Design and Construction Management for a Temporary Heliport near the Intersection of 1-30 and Montgomery Street (City Project 01575) Dear Mr. Penney: This letter is to request an amendment to the budget for the above -referenced project in the amount of ten -thousand dollars ($10,000.00). The requested amendment is based on additional services provided by URS at the request of the Aviation Department and is related to new task assignments, revised roles and responsibilities and facilities planning on this project. This additional work was requested by the City due in part, to staff time restrictions, desired HFBO facility improvements, and difficulties in securing FAA heliport site approval because of approach protection issues. Following is a brief explanation of the additional work carried out by URS to provide these services to the City on its accelerated schedule: Personnel Management oversight was increased due to such issues as schedule coordination and meetings related to permits, inspection, and interdepartmental issues. URS also assisted with preparation of change orders for subconsultants. Extra designer and CAD time was required to prepare additional drawings for heliport siting; HFBO screening, lighting and electrical, and Fixtures, Furniture and Equipment (FF&E); and replacement parking lot layouts, preparation, and traffic flow. Projects Following are some of the new scope items carried out by URS at City's request: • Design of exterior enclosure for HFBO facility; • Investigation of route markings lighting, building access, etc; • Preparation of drawings to locate fencing, additional lighting, and signage; • Coordination of permits, approvals and inspections (other than heliport); • Determine additional parking locations and preparation of replacement parking layouts; URS Corporation 1300 Summit Avenue, Suite 600 Fort Worth, TX 76102 Tel: 817.390.1000 Fax: 817.882.9462 www.urscorp.com 0 Multiple detailed surveys and calculations of tree top elevations for approach path alternatives• and Multiple changes to heliport site positioning in order to meet FAA obstruction clearance requirements. These additional services for roles and responsibilities that were originally to be performed by City Staff, and added facility scope items, were not included in the Contract Scope of Services. As was discussed in December, URS believed that there were probably sufficient funds left in the project budget for us to stop work on the interim heliport and shift the remaining funds to the completion of the permanent heliport plan. In retrospect this was an inaccurate assumption, hence the additional fees are requested Please contact me or Lisa Pyles if you have any questions or require any additional information. Thank you for your consideration. Sincerely, URS Corporation Michael R. McClintock, AICP Project Manager Cc: Lisa Pyles ATTACHMENT "B" Rev 4-6-10 COMPENSATION Planning Services for Heliport City Project No. 1575 Compensation A. The ENGINEER shall be compensated a total lump sum fee of $10,000 as summarized in Task List and Summary of Fees. Payment of the total lump sum fee shall be considered full compensation for the services described in Attachment A, for all labor materials, supplies, and equipment necessary to complete the project. B. The ENGINEER shall be paid monthly payments as described in Exhibit "B-1" Section 1 - Method of Payment. Each invoice is to be verified as to its accuracy and compliance with the terms of this contract by an officer of the ENGINEER B-1 EXHIBIT "B-1" METHOD OF PAYMENT (Supplement to Attachment B) Planning Services for Heliport City Project No. 1575 Method of Payment Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice from the ENGINEER outlining the estimated current percent complete of the total project. The aggregate of such monthly partial fee payments shall not exceed the following: 1. Task 1 $ 2. Task 2 Subtasks $ Subtasks $ Totals $ The balance of the earnings (less previous payments, surveying and bidding/construction phase services) shall be payable when the project is advertised Surveying and Bidding/Construction services shall be paid after services are rendered. II. Progress Reports A. The ENGINEER shall submit to the designated representative of the Director of the Department of Aviation monthly progress reports covering all phases of planning in the format required by the City. Rev 4-6-10 B-2 EXHIBIT "B-3" (Supplement to Attachment B) Design Services for Heliport Design City Project No. 01575 SUMMARY OF TOTAL PROJECT FEES Consulting Firm Prime Responsibility Amount P rime Consultant: URS Corporation P roposed M/WBE S ub -Consultants Design Services $6,878 68% Amount Gorrondona Associates Topo Survey $3,122 31 N on-M/WBE Consultants: MWBE Fee M/WBE % Total Fee Project Number and Name 01575 $10,000 $3,122 31 City M/WBE Goal = _% Consultant Committed Goal = %