HomeMy WebLinkAboutContract 41111-A2il-n (anrur wry 1/1-1"--- cl� i� drdh-
I s he wt ✓eshc.til- 4v►,a- r i s 414-eAk k)u. i h)
41u 1 CAAytiite iti"4
S � , v�� isJ�.�►-G � FIB
THE STATE OF TEXAS
ct�'�Y� I 111- �� �
KNOW ALL BY THESE PRESENTS
COUNTY OF TARRANT
,_ Geri —
AMENDMENT NO.. TO THE AG EEMENT FOR WATER SERVICE
BETWEEN THE { 1. TY OF FORT WORTH AND THE TROPHY CLUB
MUNICIPAL DIST'' ' CT NO. 1 FOR THE CONSTRUCTION OF A NORTHSIDE
I� 30—INCH WATER MAIN AND ALL 4/ CATER CAPACITY
.I. L
This Amendment No. (Amendment) is made and entered into by and between
the Trophy Club Municipal istrict No. 1, acting herein by and through its General
Manager, Jennifer McKnight, hereinafter referred to as CUSTOMER and the City of Fort
Worth, acting herein by and through its Assistant City Manager, Jesus J. Chapa,
hereinafter referred to as FORT WORTH, all of Tarrant County, State of Texas,
(collectively the "PARTIES"),
WHEREAS, FORT WORTH and CUSTOMER have entered in an Agreement for Water
Service known as Fort Worth City Secretary Contract No. 41112 ("CONTRACT"); and
WHEREAS, the PARTIES recognize that there is a need for additional water capacity in
the northeast sector of Fort Worth and in Trophy Club Municipal District No. 1 then
originally provided for in the CONTRACT; and
WHEREAS, to address this need for additional capacity, FORT WORTH is constructing
a 30-inch water main along SH 170 from N. Beach Street to 13590 Denton Hwy
(Westlake's Wholesale Metering Station), approximately 14,590 linear feet as shown in
EXHIBIT A; and
WHEREAS, CUSTOMER has requested capacity in the 30-inch water main which will
increase its total projected water demand; and
WHEREAS, Section 3.3 of the CONTRACT states that the CUSTOMER shall pay for
each new or enlarged or additional connection to the FORT WORTH system, including
the cost of the wholesale meter and the CUSTOMER's proportionate share of the
improvements required for that service; and
WHEREAS, CUSTOMER recognizes that the Town of Westlake has also requested
capacity in the Northside II 30-inch water main;
WHEREAS, the PARTIES agree that the CUSTOMER's cost and participation for the
Northside II 30-inch water main shall be as stated in this AMENDMENT.
OFFICIAL RECORD
CITY SECRETARY
Pt WORTH, TX
Pr env w-ram GIv-APIM I(i,+'t
14- s fruiAst c! re_At,e24- t-int.* rr's A-k C04j h)
LSor.kg �fi3�ti� ��rsp.►t,
S ri Ass- isS7.,0-G incevvgj
THE STATE OF TEXAS
CITY SECRETARY
CONTRACT NO. -I">»
KNOW ALL BY THESE PRESENTS
COUNTY OF TARRANT
1(4—
AMJtNTMENT NO, TO THE AGREEMENT FOR WATER SERVICE
BETWEEN THE CITY OF FORT WORTH AND THE TROPIIY CLUB
MIUNICIPAL DISTRICT NO. 1 FOR THE CONSTRUCTION OF A NORTHSIDE
II 30-INCH WATER MAIN AND ALLOCATED CAPACITY
`Zcedes.
This Amendment No. (Amendment) is made and entered into by and between
the Trophy Club Municipal'District No. 1, acting herein by and through its General
Manager, Jennifer McKnight, hereinafter referred to as CUSTOMER and the City of Fort
Worth, acting herein by and through its Assistant City Manager, Jesus J. Chapa,
hereinafter referred to as FORT WORTH, all of Tarrant County, State of Texas,
(collectively the "PARTIES").
WHEREAS, FORT WORTH and CUSTOMER have entered in an Agreement for Water
Service known as Fort Worth City Secretary Contract No. 41112 ("CONTRACT"); and
WHEREAS, the PARTIES recognize that there is a need for additional water capacity in
the northeast sector of Fort Worth and in Trophy Club Municipal District No. 1 then
originally provided for in the CONTRACT; and
WHEREAS, to address this need for additional capacity, FORT WORTH is constructing
a 30-inch water main along SH 170 from N. Beach Street to 13590 Denton Hwy
(Westlake's Wholesale Metering Station), approximately 14,590 linear feet as shown in
EXHIBIT A; and
WHEREAS, CUSTOMER has requested capacity in the 30-inch water main which will
increase its total projected water demand; and
WHEREAS, Section 3.3 of the CONTRACT states that the CUSTOMER shall pay for
each new or enlarged or additional connection to the FORT WORTH system, including
the cost of the wholesale meter and the CUSTOMER's proportionate share of the
improvements required for that service; and
WHEREAS, CUSTOMER recognizes that the Town of Westlake has also requested
capacity in the Northside I130-inch water main;
WHEREAS, the PARTIES agree that the CUSTOMER's cost and participation for the
Northside II 30-inch water main shall be as stated in this AMENDMENT.
OFFICIAL RECOh
CITY SECRFTAWI
Pt WORTH,
NOW THEREFORE, the PARTIES agree to amend the CONTRACT as follows:
1.) FORT WORTH shall be responsible for the preparation of plans and
specifications together with any modifications required during
construction, and contract documents for the construction of the Northside
II 30-inch water main, shown on Exhibit A.
2.) The future demand for the CUSTOMER is estimated to be 10.3 MGD.
CUSTOMER currently has 3.7 MGD capacity from the existing 21-inch
water main. CUSTOMER requests an additional 6 6 MGD at this time.
The additional 6.6 MGD equals to 42.72 percent of the total 15.45 MGD
capacity of the Northside II 30-inch water main. Town of Westlake is cost
participating 5.8 MGD capacity and FORT WORTH is cost participating
3.05 MGD capacity of this Northside II 30-inch water main.
3.) The estimated total engineering, survey and appraisal cost of the Northside
II 30-inch water main is estimated to be $954,200. CUSTOMER agrees
that its proportionate share of this cost is 42.72 percent, estimated to be
$407,635.
4.) The Actual Project costs shall include the costs for engineering, project
management easements and right-of-way acquisition and appraisal fees
necessary for the Northside II 30-inch water main.
5.) CUSTOMER agrees that the Actual Project costs shall be shared by
CUSTOMER, Town of Westlake and FORT WORTH proportionately.
CUSTOMER agrees that the Actual Project cost may differ from the
projection stated in subsection 3 and CUSTOMER shall pay FORT
WORTH its proportionate share of 42 72 percent of the Actual Project
cost.
6.) Payments for CUSTOMER's share of the Actual Project Costs shall be
due prior to the award of the Northside II 30-inch water main design
contract. A payment is late if not paid within 30 days after the full
execution of this agreement Late payments shall accrue interest at the rate
of one and one-half percent (1-1/2%) per month until paid.
Amendment:F.2 Northside II 48-inch Water main
Ita
This AMENDMENT shall become effective upon full and complete execution:
EXECUTED this) day of
CITY OF FORT WORTH
JESUS J. CHAPA
ASSISTANT CITY MANAGER
DATE:
APPROVED AS TO FORM AND
LEGALITY
IAAS4K7_,X)W- dr--
CHRI A LOPEZ-REYN LDS
SR. ASSISTANT CITY ATTORNEY
ATTEST
tt. VP"stv
MARY 4 r 00
ti P.
r .
CITY SEC TAR ,
IN I ilk
dea rict Authorization
0
Date
10 1 l
®
, 2016.
TROPHY CLUB MUNICIPAL
DISTRICT NO. 1
ER MCKICTIGHT
L MANAGER
DATE: Ole
APPROVED AS ji) FORM AND
LEGALITY
ATTEST
A
DISTRICT SECRETARY
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Amendment:F.2 Northside II 48-inch Water main
t
• 1 . . ..iI •• •ti 'I•'1
♦.fr 04:4 f.. �..-•.-•1r1 • AP ,ll% 1
7
'.I It
CITY OF FORT WORTH
1:r ti/1:d..7 Fr LL►l: F,C.TC S; 6:0r
FIGURE 2-ROUTE E
1.FSr"1.:if
FORT WORTH,
City of
Keller
--• :AA 9rcerL+,e
¢A_tres
).;AO es3TSTc %LL• _ ::Cy. Tr
Cc•0"11:. IC list Fr':.....
1rp_trr..p
•.,I. s _,
3
H
r. rs.
r , r. Tl. �.
•
•
• v•
..J•
C:IIr
• .0111.
ye.
IP
•
EXHIBIT "A"-
30-inch water main along SH 170 from N. Beach Street to 13590 Denton Hwy (Westlake's Wholesale Metering Station)
M&C Review
Page 1 of 2
ITY COUNCIL AGENDA
Official site of the City of Fort Worth, Texas
FORT %ORTII
COUNCIL ACTION: Approved on 6/21/2016
DATE:
CODE:
SUBJECT:
6/21/2016 REFERENCE **C 27783 LOG
NO.: NAME:
C TYPE: CONSENT PUBLIC NO
HEARING:
60TROPHYCLUBWLAKE3OINCHCOSTPARTICIPATION
Authorize Execution of Amendment No. 1 to the Wholesale Water Contracts with the Trophy Club
Municipal District No. 1 and the Town of Westlake for the Engineering Cost Participation Toward the
Capacity Needed from the Northside II 30-Inch Water Main from Beach and SH-170 to SH-377 and
Liberty Way (COUNCIL DISTRICT 7)
RECOMMENDATION:
It is recommended that the City Council authorize execution of an amendment to the Wholesale
Water Contracts with Trophy Club Municipal District No. 1 and Town of Westlake for the Engineering
Cost Participation toward the Northside II 30-inch Water Main from Beach Street and SH-170 to SH-
377 and Liberty Way.
DISCUSSION:
The existing wholesale water contracts with Trophy Club Municipal District No. 1 (City Secretary
Contract No. 41111) and the Town of Westlake (City Secretary Contract No. 41112) requires the
wholesale customer to cost participate toward the additional capacity needed from proposed Fort
Worth's water transmission mains These wholesale customers have requested capacity from the
Northside II 30-inch water main from Beach and SH-170 to SH-377 and Liberty Way.
Fort Worth will be designing a Northside II 30-inch water main of approximately 14,590 linear
feet. The 30-inch water main has a proposed 15 45 million gallon per day (MGD) capacity and the
estimated engineering, survey and appraisal cost is $954,200.00.
Below is the requested capacity from each wholesale water customer and the associated
engineering, survey and appraisal cost participation.
Wholesale
Customer Cities
Requested
Capacity
Engineering
Cost
(%)
Estimated
Participation
Engineering
for the
Water Main
NSII
Cost
30-inch
(MGD)
Participation
Fort Worth
3.05
19.74%
$188,358.00
Trophy
Club MUD #1
6.6
42.72%
$407,635.00
Westlake
5.8
37.54%
$358,207.00
Under the terms of the existing wholesale contract, the entities will pay toward the engineering,
survey and appraisal service cost of the proposed Northside 11 30-inch water main. The above is only
a cost estimate.
Each wholesale water customer will provide the engineering cost participation to the City of Fort
Worth prior to the award of the engineering contract. The final cost participation amount from each
wholesale water customer will be based on the final engineering, survey and appraisal service
cost City staff has reviewed the requested capacity and has no objection to approval of these
requests.
The construction and right-of-way acquisition cost participation terms will be negotiated and brought
forth for Council approval later this summer.
The project is located in COUNCIL DISTRICT 7.
This contract will be with a governmental entity, state agency or public institution of higher education:
the Trophy Club Municipal District No. 1 and the Town of Westlake
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that the Water Department is responsible for the collection and
http://apps.cfwnet org/council_packet/mc_review.asp?ID=22388&councildate=6/21/2016 06/28/2016
M&C Review
Page 2 of 2
deposit of funds due to the City.
TO
Fund
Department
Account
Project
Program
Activity
Budget
Reference
#
Amount
ID
ID
Year
(Chartfield
2)
FROM
Fund
Department
ID
Account
Project
ID
Activity
Budget
Year
Reference
(Chartfield
#
2)
Amount
Program
Submitted for City Manager's Office by:
Originating Department Head:
Additional Information Contact:
Jay Chapa (5804)
John Carman (8246)
Wendy Chi-Babulal (8242)
ATTACHMENTS
Proposed 30-inch Water Main.pdf
http://apps.cfwnet org/cmincil_packet/mc_review.asp?ID=22388&councildate=6/21/2016 06/28/2016