HomeMy WebLinkAboutContract 41225COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS §
COUNTY OF TARRANT §
City Secretary
Contract No. a:sac
WHEREAS, the undersigned Independent School District, "Developer" desires to make
certain improvements (refer to the name of the project at the bottom of the page) an addition to the
City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule
municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter
called "City", to do certain work in connection with said improvements.
Developer:
Name: Dennis McCreary
Title: Assistant Superintendent for Facilities, Planning, and Construction
Company: Northwest Independent School District
Project Name:
Northwest ISD Middle School No. 5
Project Location:
Streets: Northeast of intersection of Cowbell and Sendera Ranch
Mapsco: 5K Council District: 2
CFA:
DOE: 6579 City Project No.: 01645
OFFICIAL RECORD
CITY SECRETARY
_ WORTH, TX
1
1
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for Jhe Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of
said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in
connection with the work performed by said contractors.
B. Developer shall provide fmancial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires it to submit an Affidavit of Bills paid signed by its
contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract,
C. Developer agrees to cause the construction of the improvements
contemplated by this Agreement and that said construction shall be
completed in a good and workmanlike manner and in accordance with all
City standards and the City -approved construction plans, specifications and
cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) x
Sewer (A-1) x ; Paving.(B) x ; Storm Drain (B-1) x ; Street
Lights & Signs (C) x .
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
2
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
depaitnient having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
m the name of the City for one hundred percent (100%) of the contract
price of the infrastructure for a. period of two (2) years insuring the
maintenance and repair of the constructed infrastructure during the term of
the maintenance bond. All bonds to be furnished before work is
commenced and to meet the requirements of Chapter 2253, Texas
Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound m the
construction contract book
iv. To requireits contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, and not to install or relocate any sanitary sewer,
storm drain, or water pipe unless a responsible City inspector is present
and gives his consent to proceed, and to make such laboratory tests of
materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
3
date of the meeting. No construction will commence without a City -issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water
mains constructed under this Agreement until said sewer and water mains
and service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. City is requiring the widening and/or straightening of the City road(s)
contemplated herein. City shall not be responsible for any costs that may be
incurred for the relocation of any utilities that are or may be in conflict with
any of the community facilities to be installed hereunder.
I. Developer agrees that the City shall not be responsible for any inadequacies in
the preliminary plans, specifications and cost estimates supplied by the
Developer for this Agreement and hereby releases the City from same.
J. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
K. Developer will require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any
and all claims, suits or causes of action of any nature whatsoever, whether
real or asserted, brought for or on account of any injuries or damages to
persons or property, including death, resulting from or in any way connected
with, the construction of the infrastructure contemplated herein, whether or
not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to
indemnify, and hold harmless the City for any losses, damages, costs or
expenses suffered by the City or caused as a result of said contractor's failure
to complete the work and construct the improvements in a good and
workmanlike manner free from defects, in conformance with the Policy, and
in accordance with all plans and specifications and shall cause to be executed
and delivered to the City an indemnity agreement from such contractors on a
4
form to be promulgated by the City.
L. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
M. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated
in the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
mstalling the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
COST SUMMARY TABLE
Items
A. Water and Sewer Construction
1. Water
2. Sewer
Water/Sewer Construction Cost Sub -Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights
4. Street Name Signs
TPW Construction Cost Sub -Total
Total Construction Cost (excluding fees):
Construction Fees:
C. Water Inspection Fee (2%)
D. Water Material Testing Fee (2%)
Sub -Total for Water/Sewer Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
Sub -Total for TPW Construction Fees
Developer's Cost
$107,632.00
$7,652.00
$115,284.00
$176,952.00
$o.ao
$1,500.00
$0.00
$178,452.00
$293,736.00
$2,305.68
$2,305.68
$4,611.36
$7,138.08
$3,539.04
$10,677.12
Total Construction Fees: $15,288.48
The Checked Must be Included as Attachments to this Agreement
Included
►1
tzi
Pr
ra
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in
at Fort Worth, Texas this ViligLdayof , 2010.
quadruplicate,
CITY OF FORT WORTH
tane10004 &Ls*
Fernando Costa
Assistant City Manager
Recommended by:
Transportation & Public Works Department
William A. Verkest, P.E.
Director
Water Department
/.1
Wendy Chi-l3 ulal, EMBA, P.E.
Water Devel �ment Engineering Manager
Approved as to Form & Legality:
A 'ettfr9eY—MAReiA E
1 J Ekf1411 Assistant *ten* City Attorney
ATTEST:
a.
Marty Hendrix
City Secretary
a .a
DEVELOPER
Dennis McCreary
Assistant Superintendent
for Facilities, Planning, & Construction
NO IVi&C "NAKED
RiiD
%t0DOGt Qpo4 {P
.*
0.30
3
o,s
o a 0
a
o
?io
V , 00o 440
d0000c(Ittif eXAM
OFFICIAL RECORD
CITY SECRETARYFt�WORTH, TX
DATE:
MJT PROJECT NO.
WATER, PAVING, DRAINAGE and SANITARY SEWER IMPROVEMENTS
TO SERVE
NORTHWEST ISD MIDDLE NO. 5
Water Construction Cost
12/1/2010
549-001
ITEM NO.
ITEM DESCRIPTION
UNITS ,
QTY.
UNIT PRICE
AMOUNT
1
2" Service
Line - Install (Type
R Copper)
LF
31
$33.00
$1,023.00
2
4" Service
Line
'
Install
LF
25
$25.00
$625.00
3
Pipe-Pressure-10
Inch PVC -
Install
LF
40
$30.00
$1,200.00
4
Tapping
Sleeve & 10 Inch G.V -12 Inch X 10 Inch - Install
EA
2
$6,500.00
$13,000.00
5
Water Service-2 Inch -Tap
to Main - Install
EA
4
$866.00
$3,464.00
6
Water Service-4 Inch -Tap
to Main - Install
EA
1
$4,500.00
$4,500.00
7
Pipe
Fitting
-
Install
Ton
0.5
$3,600.00
$1,800.00
8
Pipe-Pressure-20
Inch PVC.C905 - Install
LF
654
$65.00
$42,510.00
9
Valve-Pressure-20 Inch-Gate-wNalve Box - Install
EA
1
$11,000.00
$11,000.00
10
Valve-1 Inch-Air&Vacuum Release - Install
EA
1
$3,200.00
$3,200.00
11
Valve Box -Adjustment
-Services
EA
1
$250.00
$250.00
12
Traffic Control for Utilities - Install
LF
654
$15.00
$9,810.00
13
4" Domestic Meter and Vault - Install
EA
1
$10,000.00
$10,000.00
14
2" Irrigation
Meter Box - Install
EA
4
$250.00
$1,000.00
15
Manhole-1 Inch-Air&Vacuum Release - Install
EA
1
$3,500.00
$3,500.00
16
Trench Safety
LF
750
$1.00
$750.00
WATER
UNIT
TOTAL
= $107.632.00
Sewer Construction Cost
17
Pipe-Sewer-8
Inch-SDR26
(All Depths)
- Install
LF
7
$45.00
$315.00
18
EA
1
$5,012.00
$5,012.00
Manhole-Std
4
Ft
D
am -(to
6 Ft
Depth)
-
Install
19
Manhole-Std
4
Ft
Diam-Added
Depth
(over 6 Ft depth)
- Install
VF
4
$300.00
$1,200.00
20
Sewer Service-8
Inch-2
Way Clean Out -
Install
EA
1
$1,000.00
$1,000.00
21
Inspection
-Post Construction Cleaning & TV - Study
LF
7
$2.00
$14.00
22
EA
1
$104.00
$104.00
Manhole -Vacuum Test - Services
23
Trench Safety
LF
7
$1.00
$7.00
SEWER
UNIT
TOTAL
=
$7,652.00
Paving
Construction
Cost
24
Pavement -Unclassified Street Excavation - Remove
CY
2,000
$5.00
$10,000.00
25
Curb-6
Inch - Install
LF
1,059
$2.00
$2,118.00
26
Curb-7
Inch - Install
LF
490
$2.00
$980.00
27
Pavement -Concrete s- Install
SY
1,731
$60.00
$103,860.00
28
SY
1849
$6.00
$11,094.00
Subgrade-6
Inch -Lime Stabilized-28 Ibs/sy - Install
29
Grass-Hydromulch
Seeding
- Install
LS
1
$5,000.00
$5,000.00
30
Pavement Marking-Str
ping
- Install
LF
400
$1.50
$600.00
31
EA
2
$300.00
$600.00
Pavement Marking
-Turn Arrows Install
32
Sidewalks
- 5" Thick - Install
SY
1120
$35.00
$39,200.00
33
Sediment Control and
SWPPP
EA
1
$3,500.00
$3,500.00
PAVING
UNIT
TOTAL
= $176.952.00
34 IStreet Light - Install
Street Light Construction Cost
I EA I 1
$1,500.001 $1,500.00
STREET LIGHT UNIT TOTAL = $1,500.00
CONSTRUCTION COST TOTAL = $293,736.00
NEW MIDDLE SCHOOL SITE
PROPOSED 10'x15'
WATER EASEMENT
PROPOSED 10"
FIRE WATER LINE m
r
PROPOSED 2-2" IRRIGATION
WATER METERS
EXISTING 12"
WATER LINE
D.O.E. NO. 4387
ATBT PAST & FIHFIAG
PROPOSED 20'x15'
WATER EASEMENT
BY PLAT
PROPOSED 2-2"
IRRIGATION WATER METERS
PROPOSED 10"
FIRE WATER LINE
' N
EXISTING 12"
WATER LINE
D.O.E. NO. 4387
PLUG EXISTING 8"
TAP - D.O.E. NO.
4989
PROPOSED 15'x15'
SEWER EASEMENT
BY PLAT
CITY OF FT. WORTH
PERMANENT SEWER LINE
EASEMENT, D206301846,
D.R.T.C.T. TO BE
ABANDONED
PROPOSED 4" DOMESTIC
WATER METER
EXISTING 1 T
WATER LINE
D.O.E. NO. 4387
PROPOSED 4"
DOMESTIC WATER
LINE
L_
\%
\\ x
\
\�2°c
EXISTING 8"
WATER LINE N"�
D.O.E. NO. 4989 s
SCALE 1" - 100'
50
FEET
ioo
THOMAS
ENGINEERING, LLC *
3400 HULEN STREET, SUITE 100
FORT WORTH, TX 76107
REGISTRATION N0. F-9435
PHONE - (817) 732-9839
FAX- 817)732-9841
MJT NO. - 549-001
EXHIBIT A
WATER IMPROVEMENTS
to serve
NORTHWEST ISD MIDDLE NO. 5
NOVEMBER 2010
PROPOSED 20"
PUBLIC WATER
LINE
THOMAS
* ENGINEERING, LLC *
3400 HULEN STREET, SUITE 100
FORT WORTH, TX 76107
REGISTRATION NO. F-9435
PHONE - (817)732-9839
FAX - (817) 732-9841
MJT NO. - 549-001
SCALE 1" - 100'
NEW MIDDLE SCHOOL SITE
PROPOSED 20"
PUBLIC WATER
LINE
SENORA-RANCkL
PHASE I, SECTION 3A'---
CAB. A,SIO. 11050
EXHIBIT A
EXISTING 20"
PUBLIC WATER
LINE D.O.E. NO.
5014
ClaCR
ABLE 447RKER J v
CABLE MARKER J .
WATER IMPROVEMENTS
to serve
NORTHWEST ISD MIDDLE NO. 5
NOVEMBER 2010
NEW MIDDLE SCHOOL SITE
PROPOSED MANHOLE
CONNECTION OF 8" SANITARY
SEWER LINE TO EXISTING
SANITARY SEWER STUBOUT
s,4
Fly
END OF 8" SANITARY
SEWER LINE WITH
2-WAY CLEANOUT
CITY OF FT. WORTH PERMANENT
SEWER LINE EASEMENT,
D206301846, D.R.T.C.T. TO BE
ABANDONED BY PLAT
PROPOSED 15'x15'
SEWER LINE
EASEMENT BY PLAT
pat
THOMAS
* ENG/NEER/NG, LLG *
3400 HULEN STREET, SUITE 100
FORT WORTH, TX 76107
REGISTRATION NO. F-9435
PHONE - (817) 732-9839
FAX- 817)732.9841
MJT NO. - 549-001
T AIN
F7_ f ='r'&;P
;;:
q�l l T gt P
I
T11
EXISTING 8" SANITARY
SEWER LINE
D.O.E. NO. 4989
-- 8"W
C '�SF��F
qg ////PqR
N
SF q
T >/04/9
62j ,
KACHINA LANE
CgsF/4F
.0. 7/6>1C
EXHIBIT A-1
SANITARY SEWER IMPROVEMENTS
to serve
NORTHWEST ISD MIDDLE NO. 5
SCALE 1" - 50'
25
FEET
50
NOVEMBER 2010
PROPOSED
LEFT —TURN LANE
AND MEDIAN
OPENING
e
\ \•
APPROX. 698 L.F. OF 5'
WIDE CONCRETE SIDEWALK
•
•
ION/N0,
4•�S
\
3
PROPOSED DRIVE
APPROACH
/r
„so
NEW MIDDLE SCHOOL SITE
THOMAS
* nvossVEER/NG, LLC *
3400 NULEN STREET, SUITE 100
FORT WORTH, TX 76107
REGISTRATION NO. F-9435
PHONE - (817)732-9839
FAX- (817)732.9841
MJT NO. - 549-001
lec W ri / / e�
e,% ��
i �' q a;
PROPOSED DRIVE
APPROACH
PROPOSED
DECELERATION LANE
A,"
/
a\�
APPROX. 968 L.F. OF 5'
\
WIDE CONCRETE SIDEWALK
EXHIBIT B
� _\
SCALE 1" - 200'
0
SIDEWALK & ROAD IMPROVEMENTS
to serve
NORTHWEST ISD MIDDLE NO. 5
100
FEET
200
NOVEMBER 2010
I_ -
ores
—in cp2d
C>
0
O
Im
0
I0
N z
co m
,I.
LIGHT POLE
TO REMAIN
NEW MIDDLE SCHOOL SITE
LIGHT POLE
TO REMAIN
PROPOSED CONDUIT
REPLACEMENT
NDERATRANCH BLIP 42
PROPOSED CONDUIT RELOCATED
REPLACEMENT LIGHT POLE
13'11'00"
1265.00
732.63^"
SENDERA NCH BOULEVARD
CAB. SLO. 3414
PHASE I, SECTION 3A
CAB. A, 5L0. 11050
P.R.T.C.T.
f`Je r'bb AiR „moms
tv
„
1 ZANrAPY 1 i 40 42
nW
SEW 39 i 43
«R10' PV.26' MNHOLE 36 1 1 i
11 fL IO�TVC OtlT�W�7s»a;
I 1
1
1
it I
DUN HORSE DR
THOMAS
* ENC//VEER//VG, LLC *
3400 HULEN STREET, SUITE 100
FORT WORTH, TX 76107
REGISTRATION NO. F-9435
PHONE - (817) 732-9839
FAX- (817) 732-9841
MJT NO. - 549-001
SCALE 1" - 100'
0
FEET
50 100
PROPOSED CONDUIT
REPLACEMENT
'H BOULEVARD
---.�_� CONTROL VALV,
. „,4;
/
/
/
x Q/ m
tr. ..
VCR rcH
sox 'w //
E En
sou
v
4 of / w v
/_*j o//
\y,�L. (E �'" SANITARY
T/RIM_7
�. FL 8- 83.85
I
ATV PAINT k Pit
VC HOLE
"L PVC lH jµ -433,75'
10^ „LOOT E :783.721
is/*' *y.
i4" t *Wass - —r- - WATT W. i 83.58
SEND I 45 CABLE FIRER gg ' r ' / ' `� \
® I KER /,
AB q�sta Ci/ON 3q / C46R MARKER-' ' �%/
r�T
' P.R.LC.T,11050 , / / 19.4µ� R i rti Q
44
r < S
I / o/
I ' aQ/
1 / 1' /
EXHIBIT C
STREET LIGHT IMPROVEMENTS
to serve
NORTHWEST ISD MIDDLE NO. 5
CqI$ASLc
t 1SASEPN.O,R,E.RT.q.T.050
NOVEMBER 2010