HomeMy WebLinkAboutContract 40982-R2 (2)RENEWAL AGREEMENT FOR CITY SECRETARY CONTRACT NO. 40982 CITY SECRETARY CONTRACT NO. / CONTRACT FOR PROFESSIONAL MANAGEMENT SERVICES This Renewal Agreement ("Agreement") is made and entered into by and between the City of Fort Worth, Texas, a municipal corporation organized under the laws of the State of Texas ("City"), acting by and through Fernando Costa, its duly authorized Assistant City Manager, and the Arts Council of Fort Worth & Tarrant County ("Arts Council"), a nonprofit Texas corporation, acting by and through Jody Ulich, its duly authorized President. RECITALS The following statements are true and correct and form the basis of this Agreement: A. City and Arts Council previously entered into City Secretary Contract No. 40982 (the "Contract"), a contract for professional management services for Arts Council to manage the City's Public Art Program. The Contract commenced on October 1, 2010 and expired on September 30, 2011, subject to renewal for four one-year renewal terms. B. The Contract provides that the renewal shall occur upon the Fort Worth City Council appropriating the funds under the Contract and upon Arts Council providing City with the proof of insurance in the amounts required under the Contract. City Council has appropriated the funding, and Arts Council has provided City with the requisite proof of insurance, and the parties wish to set forth herein that the renewal has been affected for the 2012-2013 contract term. C. The Contract provides that the parties will negotiate the Contract's budget amount each year. The parties have concluded those negotiations and wish to set forth herein the amount of the budget for the 2012-2013 contract term. RENEWAL AGREEMENT FOR CSC NO. 40982 CONTRACT FOR PROFESSIONAL MANAGEMENT SERVICES Page 1 of 4 • AGREEMENT In consideration of the mutual covenants, promises, and obligations contained herein, the parties agree as follows: 1. The Contract is hereby renewed and extended for a one-year renewal term, commencing on October 1, 2012 and expiring on September 30, 2013. 2. Arts Council agrees to provide professional management services to City in the form of oversight and administrative services for City's Public Art Program, including provision of certain staff support services to the Fort Worth Art Commission These services are described in detail in Exhibit "A," the "City of Fort Worth PUBLIC ART PROGRAM FY 2013 Program Services" proposal submitted by Arts Council to City ("Program Services"). The same is attached hereafter and incorporated herein for all purposes by reference. In the event of a conflict between the terms of this Agreement, and the terms of any part of the Program Services or the Contract, this Agreement shall control Arts Council shall submit a semiannual expense and program services status reports to City in a format provided to Arts Council by City through the City's Transportation & Public Works Department 3. The amount to be paid to Arts Council for all Program Services, as hereinafter defined, shall not exceed FOUR HUNDRED THIRTY-EIGHT THOUSAND NINE HUNDRED SEVENTY-EIGHT DOLLARS AND NO CENTS ($438,978.00) for Fiscal Year 2012-2013 and shall be paid in one annual installment at the within thirty (30) days after the execution of this Agreement All other tenus and conditions of the Contract shall remain in full force and effect. RENEWAL AGREEMENT FOR CSC NO. 40982 Page 2 of 4 CONTRACT FOR PROFESSIONAL MANAGEMENT SERVICES IN WITNESS WHEREOF, the parties have executed this Agreement on this 2012. CITY OF FORT WORTH by 47-ention•••4 Cots, Fernando Costa Assistant City Manager APPROVED AS TO FORM AND LEGALITY: by: Tyler allach Assistant City Attorney ATTEST: Mary J. r City Secretary Contract Authorization M&C C-25920 Date: October 16, 2012 day of ARTS COUNCIL OF FORT WORTH AND TARRANT COUNTY, INC. 014*. op000000°Q4b ktiptigtoe OFFICIAL RECORD CITY SECRETARY EtW08TN,Fk RENEWAL AGREEMENT FOR CSC NO. 40982 CONTRACT FOR PROFESSIONAL MANAGEMENT SERVICES Page 3 of 4 EXHIBIT A City of Fort Worth Public Art Program FY 2013 Program Services On September 10, 2012, the Fort Worth Art Commission made a formal recommendation of the FY 2013 Fort Worth Public Art Annual Work Plan (attached). PROGRAM ADMINISTRATION Under the proposed Fiscal Year 2013 professional services agreement the Arts Council of Fort Worth & Tarrant County will continue to administer the Fort Worth Public Art Program, including management of up to 69 ongoing and new public art and design enhancement projects with combined budgets totaling over $8 million in accordance with the FY 2013 FWPA Annual Work Plan. In addition, the Arts Council will do the following: (1) Implement the program's 3rd Anti -Graffiti Mural project in collaboration with community partners in Council District 9; (2) Assess the first round of Community ID: Public Art in Neighborhoods projects and conduct public outreach sessions in preparation for the next round anticipated in Fiscal Year 2014, (3) Participate in Downtown Fort Worth Inc's Plan 2023 Urban Design, Parks and Open Space Committee to identify potential projects and opportunities for public art that connect Downtown with the Southside West 7`h Street, Near Southeast and Trinity River Vision; (4) Prepare a Fort Worth Public Art Master Plan Progress Report and review public art plans for various funding sources and recommend revisions, if necessary; (5) Host public art dedication events, artist workshops, lectures and other community outreach activities; and (6) Staff the Fort Worth Art Commission. The Administrative Budget for Fiscal Year 2012 ($438 978) includes personnel and general administrative costs, as well as funds to support artist selection processes for new projects, certain collection management operating expenses, and public education and outreach programs. The Maintenance Budget for Fiscal Year 2012 ($45,000) will be used to maintain artwork in the collection, including cleaning and routine maintenance of up to 36 artworks in the Fort Worth Public Art Collection. RENEWAL AGREEMENT FOR CSC NO. 40982 Page 4 of 4 CONTRACT FOR PROFESSIONAL MANAGEMENT SERVICES FORT WORTH PUBLIC ART FY 2013 Annual Work Plan CD PROJECT SUMMARY LOCATION ARTIST FUNDING SOURCE BUDGET STATUS PRIORITY CITYWIDE (con't) CW Fort Worth Signifier Project - A proposed public/private partnership to commission an iconic work of public art at a key location by a renowned artist. TBD TBD Public Art Fund (set aside) Private Funds TOTAL $250,000.00 TBD $250,000.00 3 CW Untitled - Purchase of limestone sculpture created during the 1999 Sculpture Symposium. Capps Park, W. Berry Street Chris Powell Public Art Fund - Acquisition cost based on appraised value TOTAL $40,000.00 $40,000.00 2 CW Pollen - Purchase of a series of limestone sculptures created during the 1999 Sculpture Symposium. Fort Worth Botanic Garden Cam Schoepp Public Art Fund - Acquisition cost based on appraised value TOTAL $65,000.00 $65,000.00 2 CD PROJECT SUMMARY COUNCIL DISTRICT 2 2, 9 Trinity River Vision Bridges Roundabout - Wind -activated cylindrical sculpture to slow traffic and enhance the pedestrian experience. LOCATION ARTIST Intersection of Henderson & White Ned Kahn Settlement FUNDING SOURCE 2004 CIP-2% (Proposition #-1) - Final Design, Structural Engineering 2004 CIP-2% (Proposition #-1) - Implementation 2008 CIP - 2% - Implementation TOTAL BUDGET STATUS $55,000.00 FINAL DESIGN contract pending Council authorization. $149,417.00 $444,000.00 $648,417.00 PRIORITY 1 2, 4 Six Points Urban Village - Integral public art Near intersection of E. Belknap and Eric McGehearty / design enhancements TBD Race Street Public Art Fund - Design Public Art Fund - Implementation TOTAL $5,000.00 PENDING commencement of associated CIP project. $45,000.00 $50,000.00 3 2 Lebow Channel Improvements - Master plan and design of public art / design enhancements on bridges Mosaics, concrete formwork, sidewalk medallions and artwork lighting Integral design enhancements TBD Dewey & Brennan Street Bridges Dewey Street Bridge Brennan Street Bridge 2004 CIP - 2% (Proposition #1) - Design 2004 CIP - 2% (Proposition #1) - Implementation 2004 CIP - 2% (Proposition #1) - Implementation TOTAL $14,250.00 FINAL DESIGN complete for Dewey; underway for Brennan. $42,875.00 FABRICATION underway. $42,875.00 PENDING bridge construction. $100,000.00 1 1 2 North Beach Street Corridor - Public art / design enhancements TBD North Beach Street Corridor (see segments listed below) North Beach at Keller Hicks Road North Beach segments: Golden Triangle - Keller Hicks; Keller Hicks - Timberland; Vista Meadows - Via Partnership (Planning 2007 CCN 2`)/0- Planning only) 2007 CCN 2% - Design and implementation 2008 CIP 2% - Implementation $20,350.00 COMMUNITY PLANNING COMPLETE $344,549.00 ARTIST SELECTION PENDING $528,379.00 $893,278.00 1 NOTE: Other projects included in the 2004 CIP, 2008 CIP and Critical Capital Needs Public Art Plans may be addressed during FY 2013. (Council adopted 10-16-12) PRIORITY CODES: 1 Active or Integral 2 Stand Alone 3 Pending FORT WORTH PUBLIC ART FY 2013 Annual Work Plan CD PROJECT SUMMARY LOCATION ARTIST FUNDING SOURCE BUDGET STATUS PRIORITY COUNCIL DISTRICT 2 (con't) 2 Meacham Airport Terminal - Suspended metal "paper airplane" sculptural installation Interior lobby atrium Kipp Kobayashi Aviation Gas Well Revenue - Design Aviation Gas Well Revenue - Imiplementation TOTAL $23,000.00 FINAL DESIGN underway. $177,000.00 $23,000.00 1 2 Rosen Park (CID - FY 2011) Public art project TBD Rosen Park TBD Public Art Fund - Design Public Art Fund - Implementation TOTAL $5,000.00 ARTIST SELECTION to proceed in Fall 2 2012. $45,000.00 $50,000.00 2 Marine Creek Park Corridor - Public Art Master Plan & Parks Design Enhancements Buck Sansom Park, Marine Creek Linear Park, Lincoln Park and Rodeo Park Benito Huerta 2004 CIP - 2% (Proposition #2) - Design 2004 CIP - 2% (Proposition #2)- Implementation Public Art Fund - Implementation TOTAL $15,000.00 DESIGN COMPLETE for integral elements. $8,866.00 IMPLEMENTATION pending park construction schedule. $20,000.00 $43,866.00 3 2 Marine Park Pool - Tile mural for large New Marine Park Pool on NE 23rd TBD archway on facade of bathhouse. Street Public Art Fund - Design and Implementation TOTAL $30,000.00 - . - ARTIST SELECTION to proceed October 2012. $30,000.00 1 2 Ray White - Conceptual design of integral public art / design enhancements for future implementation. North Tarrant Parkway to Shriver TBD Road; Kroger Drive to Wall Price Road 2008 CIP - 2% (Design only) $12,000.00 $12,000.00 1 CD PROJECT SUMMARY LOCATION ARTIST FUNDING SOURCE BUDGET STATUS PRIORITY COUNCIL DISTRICT 3 3 Bomber Heights - A sculptural gateway element, benches and design of street sign toppers for Bomber Heights. Z. Boaz Park across street from Bomber Heights neighborhood Ann Ekstrom 2004 CIP - 2% (Proposition #1) - Design 2004 CIP - 2% (Proposition #1) - Implementation TOTAL $3,070.00 FINAL DESIGN substantially complete. 1 $17,630.00 FABRICATOR SELECTION pending. $20,700.00 3 Clearfork /Main Street Bridge - Integral public art to enhance the pedestrian bridge and abutment walls reflecting the history of the river and site East abutment wall West abutment wall Devan Nowlin Tommy Fitzpatrick Critical Capital Needs 2% - Design and implementation. Critical Capital Needs 2% - Design and implementation. TOTAL $84,016.50 FABRICATION underway. $84,016.50 FABRICATION underway. $168,033.00 1 1 3 Dirks Road - Public art / design enhancements TBD TBD TBD Critical Capital Needs 2% TOTAL $100,032.00 PENDING - Planning meeting to be held Fall 2012. $100,032.00 2 3 Chisholm Trail Parkway (See "Regional" above) 1 PRIORITY CODES: 1 Active or Integral 2 Stand Alone 3 Pending NOTE: Other projects included in the 2004 CIP, 2008 CIP and Critical Capital Needs Public Art Plans may be addressed during FY 2013. (Council adopted 10-16-12) FORT WORTH PUBLIC ART FY 2013 Annual Work Plan CD PROJECT SUMMARY COUNCIL DISTRICT 4 LOCATION ARTIST FUNDING SOURCE BUDGET STATUS PRIORITY 4 East First Street Bridge - Vertical sculptural Over the Trinity River elements at the entrances of the bridge. Ken Bernstein Art Studio, 2004 CIP - 2% (Proposition #1) Inc. Conceptual Design. 2004 CIP - 2% (Proposition #1) Final Design/Implementation. TOTAL $21,000.00 FINAL DESIGN COMPLETE. $189,000.00 FABRICATION PENDING award of bridge construction contract. $210,000.00 1 4, 5 Precinct Line Road / Bridge - Public art / Triangle of land with trees north of Sally Weber design enhancements TBD Fire Station #27 2004 CIP - 2% (Proposition #1) Design. 2004 CIP - 2% (Proposition #1) Implementation. TOTAL $14,300.00 CONCEPTUAL DESIGN underway. $89,700.00 $104,000.00 1 4 Riverside Drive - Integral design enhancements to bridge railing. Fossil Creek Bridge Lars Stanley (Recommended) 2008 CIP - 2% Design and Implementation. $101,194.00 $101,194.00 1 4 Randol Mill Road - Conceptual design of at Precinct Line Road integral public art / design enhancements for future implementation. TBD 2008 CIP - 2% (Design only) $30,000.00 $30,000.00 1 4 1-30 Welcome Monument - A TXDOT grant- 1-30 west of Eastchase (near funded project to indentify the eastem Pantego Bible Church sign) entrance to Fort Worth. Etty Horowitz & Kevin Sloan Public Art Fund - Design and Engineering TxDOT GCAA - Implementation TOTAL $40,000.00 DESIGN underway. $265,000.00 $305,000.00 1 4, 2 Six Points Urban Village: Integral public art / design enhancements TBD (See "CD 2" above) 3 4 Bonnie Brae Street - Public art project TBD Median TBD Critical Capital Needs 2% - Design and implementation. TOTAL $119,365.00 PENDING $119,365.00 2 4 East Regional Library (CID - FY 2010) - 6301 Bridge Street Public art project TBD TBD Public Art Fund - Design and implementation. TOTAL $50,000.00 PENDING $50,000.00 2 CD PROJECT SUMMARY COUNCIL DISTRICT 5 LOCATION ARTIST FUNDING SOURCE BUDGET STATUS PRIORITY 5, 4 Precinct Line Road / Bridge - Public art/design enhancements for bridge. See "CD 4" above. 1 Fire Station 27 - Freestanding sculpture depicting cascading water. Trinity Blvd. and Bell Hellicopter Tom Orr and Frances Road Bagley 2004 CIP - 2% (Proposition #4) Design 2004 CIP - 2% (Proposition #4) Implementation TOTAL $16,030.00 FINAL DESIGN COMPLETE. $76,170.00 FABRICATION underway. Installation anticipated Fall 2012. $92,200.00 1 5 Dallas Avenue - Public art / design enhancements near intersection. East Lancaster Avenue at Dallas TBD Avenue 2004 CIP - 2% (Proposition #1) - Design and Implementation. TOTAL $45,000.00 PENDING - Determination of specific site for public art. $45, 000.00 2 NOTE: Other projects included in the 2004 CIP, 2008 CIP and Critical Capital Needs Public Art Plans may be addressed during FY 2013. (Council adopted 10-16-12) PRIORITY CODES: 1 Active or Integral 2 Stand Alone 3 Pending FORT WORTH PUBLIC ART FY 2013 Annual Work Plan CD PROJECT SUMMARY LOCATION COUNCIL DISTRICT 5 5 Stop Six (Capers Avenue) - Public art project that commemorates Stop Six community history. (Conti) Traffic Triangle at Stalcup and Ramey near Dunbar Middle and High Schools TBD ARTIST FUNDING SOURCE Critical Capital Needs 2% - Design and Implementation. TOTAL BUDGET STATUS $97,269.00 PLANNING WORKSHOP COMPLETE. Stakeholders meeting scheduled for September 15, 2012. $97,269.00 PRIORITY 1 5 Plaza Circle (CID - FY 2010) - Public art project that commemorates community 5900 W. Rosedale TBD Public Art Fund - Design and Implementation. TOTAL $50,000.00 ARTIST SELECTION underway. $50,000.00 1 5 Lakeshore Drive - Public art / design enhancements TBD. TBD TBD 2008 CIP 2% - Design and Implementation. $100,000.00 PLANNING underway. $100,000.00 1 5 East Rosedale Street - Public art / design enhancements TBD Miller to Stalcup TBD 2004 CIP - 2% (Proposition #1) - Design of integral sidewalk enhancements TOTAL $140,719.00 PLANNING in coordination with TxDOT's project consultant to proceed Fall 2012. $140,719.00 5 Handley Urban Village - Artist designed benches and planters E. Lancaster Avenue TBD Public Art Fund (Design and Implementation j $50,000.00 $50,000.00 2 CD 6 PROJECT SUMMARY COUNCIL DISTRICT 6 Chisholm Trail Community Center - Steel sculptural elements depicting prairie grasses integrated into the main facade. LOCATION Southwest Community Park ARTIST Etty Horowitz FUNDING SOURCE 2004 CIP 2% (Proposition 2) - Design CCN 2% - Planning 2004 CIP 2% (Proposition 2) - Implementation Public Art Fund - Implementation TOTAL BUDGET STATUS $4,050.00 FINAL DESIGN COMPLETE. $2,000.00 $40,950.00 IMPLEMENTATION pending Council authorization of commission contract. $20,000.00 $67,000.00 PRIORITY 1 6 Dirks /Alta Mesa - Public art / design enhancements informed by Summer Creek Corridor Workshop. SH 121 - Summer Creek / Granbury Jill Bedgood Critical Capital Needs 2% - Design and implementation TOTAL $109,795.00 MASTER PLAN contract pending completion of time -sensitive design phase for Summer Creek Roundabout. $109,795.00 1 6 Summer Creek Drive - Public art / design enhancements informed by Summer Creek Corridor Workshop. Altamesa and Sycamore School Jill Bedgood Critical Capital Needs 2% - Design and implementation TOTAL $107,795.00 MASTER PLAN contract pending completion of time -sensitive design phase for Summer Creek Roundabout. $107,795.00 1 6 Summer Creek Drive - Sculptural components informed by the Summer Creek Corridor Workshop Summer Creek Roundabout at McPherson Jill Bedgood 2008 CIP 2% - Conceptual Design 2008 CIP 2% - Final Design and implementation 2004 CIP 2% - Implementation TOTAL $25,390.00 CONCEPTUAL DESIGN substanially complete. $127,512.00 $91,003.00 $243,905.00 1 NOTE: Other projects included in the 2004 CIP, 2008 Clip and Critical Capital Needs Public Art Plans may be addressed during FY 2013. (Council adopted 10-16-12) PRIORITY CODES: 1 Active or Integral 2 Stand Alone 3 Pending FORT WORTH PUBLIC ART FY 2013 Annual Work Plan CD PROJECT SUMMARY LOCATION ARTIST FUNDING SOURCE BUDGET STATUS PRIORITY COUNCIL DISTRICT 6 (Con't) 6 Risinger Road - Conceptual design of 135 W to Crowley Road / FM 731 TBD integral public art / design enhancements for future implementation. 2008 CIP - 2% (Design only) $30,000.00 $30,000.00 1 6 Chisholm Trail Parkway (See "Regional" above) 1 CD PROJECT SUMMARY LOCATION ARTIST FUNDING SOURCE BUDGET STATUS PRIORITY COUNCIL DISTRICT 7 7 Lake Como Park Master Plan - Approaches to commemorating the history of the community and future park infrastructure development. Lake Como Park Anitra Blayton Mel Ziegler Public Art Fund - Master plan, conceptual design Public Art Fund - Master plan TOTAL $25,000.00 MASTER PLAN / CONCEPTUAL DESIGN of a garden theater substantially complete. $25,000.00 $50,000.00 1 7 Lake Como Park Project - Outdoor terraced Lake Como Park seating area. Anitra Blayton Public Art Fund - Final design and Implementation Private Funds - Implementation TOTAL $80,000.00 PENDING - Approval of conceptual design in master plan phase. TBD $80,000.00 1 7 Crestline Drive Area - Public art project TBD possibly in partnership with UNTHSC Exact location TBD TBD Critical Capital Needs 2% - Design and implementation TOTAL $155,858.00 PLANNING - Initial planning meetings with UNTHSC have been held to explore collaborative opportunities. $155,858.00 3 7 Silver Creek Road - Public art project near Brewer High School possibly involving White Settlement ISD art TBD 2008 CIP 2%- Design and implementation TOTAL $100,000.00 PENDING - Initial planning meeting with White Settlement ISD and other $100,000.00 2 7 Avondale -Haslet - Public Art / design US 287 to BNSF Railroad enhancements TBD TBD 2008 CIP 2% - Design and implementation TOTAL $200,000.00 PENDING - completion of Water Department Master Plan $200,000.00 3 7 Old Decatur Road - Public art / design enhancements TBD Bailey -Boswell to Boaz TBD 2008 CIP 2% - Design and implementation TOTAL $192,172.00 PENDING design of second phase of roadway expansion. $192,172.00 3 7 Northwest Library - Public art to complement Letters art glass windows Corner of Cromwell -Marine Creek Sandra Fiedorek and Crystal Lake Drive 2004 CIP-2% (Proposition #3) - Design & implementation $11,320.00 PLANNING - Artist is considering additional elements for the library. 2 CD PROJECT SUMMARY LOCATION ARTIST TOTAL FUNDING SOURCE $11,320.00 BUDGET STATUS PRIORITY COUNCIL DISTRICT 8 8 Police Crime Lab (FY 2009 CID) - Public art 3616 E. Lancaster Avenue / design enhancements TBD Tommy Fitzpatrick Public Art Fund - Design Public Art Fund - Implementation TOTAL $5,000.00 FABRICATION underway. $45,000.00 $50,000.00 1 NOTE: Other projects included in the 2004 C/P, 2008 C/P and Critical Capital Needs Public Art Plans may be addressed during FY 2013. (Council adopted 10-16-12) PRIORITY CODES: 1 Active or Integral 2 Stand Alone 3 Pending FORT WORTH PUBLIC ART FY 2013 Annual Work Plan CD PROJECT SUMMARY LOCATION COUNCIL DISTRICT 8 (Con't) ARTIST FUNDING SOURCE BUDGET STATUS PRIORITY 8 East Rosedale Street - Public art / design enhancements TBD (see also Guinn School Plaza). I-35W to US287 TBD 2004 CIP - 2% (Proposition #1) - Design / Implementation Critical Capital Needs 2% TOTAL $131,146.50 $40,000.00 $171,146.50 PENDING City hiring a project consultant for streetscape retrofit in Spring 2013 3 8 East Rosedale Street - Public art / design US 287 to Miller enhancements TBD Donna Dobberfuhl 2004 CIP - 2% (Proposition #1) - Design / Implementation TOTAL $181,146.50 CONCEPTUAL DESIGN $181,146.50 1 8 Sargent Street - Sculptural street clock based on the Trout Lily at East Lancaster Avenue near the Jack Mackie Ts transfer station. 2004 CIP - 2% (Proposition #1) - Design and implementation TOTAL $45,000.00 FINAL DESIGN currently underway. $45,000.00 1 8 Fire Station #5 - Tile mosaic mural depicting history of FS #5 and historic neighborhood Magnolia architecture Evans Avenue between Irma & Oscar Alvarado 1) 2007 CO Sale - 2% (Design) 2) Public Art Fund 3) 2008 CO Sale - 2% TOTAL $4,000.00 FINAL DESIGN COMPLETE $2,000.00 FABRICATION underway. $60,000.00 $66,000.00 1 8 Guinn School Plaza - Commemoration of James E. Guinn and the site of the historic school southwest comer of East Rosedale Juan & Patricia Navarrete Street & 135 W (Design Team Artists) Anita Knox, Tina McIntyre, Earline Green, Frank Frazier (benches) Raymond Wade (vertical elements) 1) 2004 CIP - 2% (Proposition 1) - Master plan and conceptual design 2) 2004 CIP - 2% (Proposition 1) Final design and implementation 3) Public Art Fund - Implementation TOTAL $10,000.00 MASTER PLAN COMPLETE $40,000.00 FINAL DESIGN underway. $50,000.00 CONCEPTUAL DESIGN in progress. $100,000.00 8 Berry/Riverside Urban Village - Sculptural elements at the intersection inspired by signage and architectural elements in the village. Berry between Sycamore Creek and Montage 48/61 (Charlotte Yuma (at Riverside) Lindsey and Larry Enge) Public Art Fund - Design Public Art Fund - Implementation TOTAL $5,000.00 FINAL DESIGN COMPLETE $45,000.00 FABRICATION PENDING City award of construction contract. $50,000.00 1 8 Near East Side Urban Village - Colorful permanent metal banners on light poles inspired by institutions in the village. East Lancaster between Kentucky Michael Pavlovsky and Pine Public Art Fund - Design Public Art Fund - Implementation TOTAL $5,000.00 FINAL DESIGN - Complete. $45,000.00 FABRICATION PENDING City award of construction contract. $50,000.00 3 8 South Main Urban Village - Integral public TBD art / design enhancements TBD Benito Huerta Public Art Fund - Design Public Art Fund - Implementation TOTAL $5,000.00 DESIGN PENDING City's commencement of CIP project. $45,000.00 $50.000.00 3 NOTE: Other projects included in the 2004 C/P, 2008 CIP and Critical Capital Needs Public Art Plans may be addressed during FY 2013. (Council adopted 10-16-12) PRIORITY CODES: 1 Active or Integral 2 Stand Alone 3 Pending FORT WORTH PUBLIC ART FY 2013 Annual Work Plan CD PROJECT SUMMARY LOCATION ARTIST FUNDING SOURCE BUDGET STATUS PRIORITY COUNCIL DISTRICT 8 (Con't) 8 Stone Road- A series of kinetic "airplane" Western border of Spinks Airport, Peter Richards TBD TBD FINAL DESIGN PENDING funding of 3 sculptures that identify the airport. between FM 1187 and Crowley Stone Road improvements. 8 Fire Station #42 - Public art / design on Stone Road in Sprinks Airport enhancements TBD Tierney Malone Public Art Fund TBD - Implementation $5,000.00 PRELIMINARY DESIGN on hold pending funding of fire station. TBD TOTAL $5,000.00 3 8 Hazel Harvey Peace Commemoration - Hazel Harvey Peace Center for Tina McIntire Etched glass with photo imagery and text Neighborhoods Critical Capital Needs 2% - Design $2,575.00 FINAL DESIGN underway. 1 Critical Capital Needs 2% - $16,194.00 Implementation TOTAL $18,769.00 8 Polytechnic / Weslayen Urban Village - E. Rosedale Street Donna Dobberfuhl Public Art Fund (Design and Public art integrated into streetscape (Recommended) Implementation) improvements. $50,000.00 - 1 TOTAL $50,000.00 8, 9 Hemphill -Lamar Connector - Public Art that between W. Lancaster at Lamar and Dan Corson incorporates lighting to create inviting West Vickery "gateways" from the north and south. 2004 CIP 2% - Final Design, $29,500.00 FABRICATION PENDING City award 3 engineering, prototype mockup of construction contract. 2004 CIP 2% - Implementation $203,680.00 TOTAL $233,180.00 CD PROJECT SUMMARY LOCATION ARTIST FUNDING SOURCE BUDGET STATUS PRIORITY COUNCIL DISTRICT 9 9 Ryan Place - Public art / design enhancments for central traffic circle on Elizabeth Boulevard_ near the intersection of Elizabeth Alice Bateman Boulevard 2008 CIP 2% - Design and $60,000.00 FABRICATION underway. Installation 1 implementation to be complete Fall 2012. TOTAL $60,000.00 9 West Rosedale Street - Streetscape design Forest Park to Main Street Juan & Patricia Navarrete 2004 CIP 2% (Prop #1) - 2004 CIP 2% (Prop #1) - Final Critical Capital Needs 2% - Implementation 18,000.00 CONCEPTUAL DESIGN COMPLETE. $114,297.00 FINAL DESIGN PENDING 1 $20,000.00 TOTAL $152,297.00 9 Hemphill / Berry Urban Village - Integral / Along Hemphill Street functional streetscape enhancements Leticia Huerta Public Art Fund - Design $5,000.00 FINAL DESIGN COMPLETE Public Art Fund - Implementation $45,000.00 FABRICATION PENDING 3 commencement of CIP project. TOTAL $50,000.00 9 6th Avenue - Sculptural element TBD Near the intersection of Seminary in Art Garcia 2008 CIP 2% - Design and Rosemont Park $114,972.00 CONCEPTUAL DESIGN - Contract 3 implementation pending. TOTAL $114,972.00 9, 2 Trinity River Vision Bridges Roundabout - Henderson and White Settlement Ned Kahn Wind -activated vertical sculpture to slow (CD 9), North Main (CD 2) (See "Council Distirct 2" above). 1 NOTE: Other projects included in the 2004 CIP, 2008 CIP and Critical Capital Needs Public Art Plans may be addressed during FY 2013. (Council adopted 10-16-12) PRIORITY CODES: 1 Active or Integral 2 Stand Alone 3 Pending FORT WORTH PUBLIC ART FY 2013 Annual Work Plan CD PROJECT SUMMARY LOCATION ARTIST FUNDING SOURCE BUDGET STATUS PRIORITY COUNCIL DISTRICT 9 (Con't) 9 Fairmount Park (CID - FY 2011) Public art Fairmount Park TBD Public Art Fund - Design Public Art Fund - Implementation TOTAL $5,000.00 ARTIST SELECTION underway. $45,000.00 $50,000.00 1 9 Mural Project (Year 3) - A mural project to Proposed site: W. Berry (RR Bridge TBD complement the City's efforts to curb graffiti. underpass) Public Art Fund Public Art Fund (Additional funds to address large scale site) TOTAL $30,000.00 PLANNING - Site feasibility underway. $30,000.00 $60,000.00 1 9 South Community Center - Public Art integrated into architecture. TBD TBD 2004 CIP - Proposition 2 TOTAL $46,000.00 $46,000.00 9,3 Hemphil-Lamar Connector (See CD 8 above). 9 Chisholm Trail Parkway (SH 1217) (See "REGIONAL" above) 1 CD PROJECT SUMMARY LOCATION CONSULTANTS FUNDING SOURCE BUDGET STATUS CONSERVATION PROJECTS CW Annual Conservation Maintenance & Collection Management - various pieces in the collection (Al Hayne, Avenue of Light, Birds and Flora of Texas, Birth of Love, Charles Tandy, Chroma Refraction, Duty, Early Texas, Earth Fountain, Fishing Rock,For Better Life, Water Fountain, Freedom Train, Friends for Life, Frog, Intimate Apparel, Midnight, Molly, Naiads, Natures Essence, Nature's Finials, Night Song, Our Heroes, Parking in Color, Prairie Wind, Quanah Parker, Riding into the Sunset, Rodeo Plaza, Save the Future, Solar Disc, Bulldogger, United We Stand, Northside Library, Vision of the Third Fve1. Various Various Conservation Fund - Maintenance (Transferred to General Fund and included in the Arts Council Professional Services Agreement) $45,000.00 1 CW WRMC Exhibition Barn Murals - Planning Will Rogers Memorial Complex TBD and Treatment Conservation Fund - Capitol TBD IN PROGRESS - FWPA and City staff 1 to develop a plan of action based on McKay Lodge recommendations for approval. CW Panther Fountain - Weir repairs to prevent damage to the fountain, relocation of mechanical equipment and utilities to city - owned property. Hyde Park TBD Conservation Fund - Capitol Private Funds (Committed) Estimated Total $30,000.00 $4,000.00 $34,000.00 PENDING - City's agreement with donor and FWAC action to formally accession the work into the FWPA Collection. 3 CW Along the River - Reinstallation of granite Heritage Park (Future Park Road) TBD elements. Conservation Fund - Capital Estimated Total $13,000.00 $13,000.00 2 NOTE: Other projects included in the 2004 CIP, 2008 CIP and Critical Capital Needs Public Art Plans may be addressed during FY 2013, (Council adopted 10-16-12) PRIORITY CODES: 1 Active or Integral 2 Stand Alone 3 Pending FORT WORTH PUBLIC ART FY 2013 Annual Work Plan CD PROJECT SUMMARY LOCATION CONSERVATION PROJECTS (Con't) CW Runnels - Replacement of damaged ceramic Garden Center Entrance, Fort Worth TBD tiles and fountain work. Botanic Garden CONSULTANTS FUNDING SOURCE Conservation Fund - Capital BUDGET $25,000.00 STATUS JC PROGRAM ADMINISTRATION STATUS CW FWPA Master Plan Progress Report - Publication reviewing accomplishments of FWPA's first 10 years (FY 2002 - FY 2012) IN PROGRESS - Most project page layouts complete; Additional content being written. Funding for publication being sought. 1 CW REVIEW OF PUBLIC ART PLANS - Evaluate the implementation status of all funding plans, including 2004 CIP, CCN, 2008 CIP, Water Fund to determine if revisions are necessary. 1 CW DOWNTOWN FORT WORTH PLAN 2023 - Participate in process with a focus on for future public art partnership opportunities. 1 CW Community ID: Public Art in Neighborhoods - Evaluation of initiatiave and planning for relaunch in FY 2014 IN PROGRESS 1 CW Anti -Graffiti Mural Program - Assessment of initiative and planning for relaunch in FY 2014. NOTE: Other projects included in the 2004 C1P, 2008 CIP and Critical Capital Needs Public Art Plans may be addressed dunng FY 2013. (Council adopted 10-16-12) IN PROGRESS 1 PRIORITY CODES: 1 Active or Integral 2 Stand Alone 3 Pending lvi&C Review Page 1 of 2 CITY COUNCIL AGENDA Official site of the City of Fort Worth, Texas Fowi WoRTII COUNCIL ACTION: Approved on 10/16/2012 ® Ordinance No. 20458-10=2012 REFERENCE 2OMANAGEMENT OF THE DATE: 10/16/2012 **C-25920 LOG NAME: 2013 PUBLIC ART NO.: PROGRAM CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Transfer from the Specially Funded Capital Projects Fund to the General Fund in the Amount of $483,978.00 for Management of the Fort Worth Public Art Program and Maintenance of the Public Art Collection and Authorize Execution of a Professional Management Services Agreement with the Arts Council of Fort Worth and Tarrant County, Inc., in the Amount of $438,978.00 for Fiscal Year 2013 Management of the Public Art Program and Adopt Appropriation Ordinance (ALL COUNCIL DISTRICTS) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer in the amount of $483,978.00 from the Specially Funded Capital Projects Fund to the General Fund for management of the Fort Worth Public Art Program and maintenance of the public art collection; 2. Adopt the attached supplemental appropriation ordinance increasing the estimated receipts and appropriations in the General Fund in the amount of $483,978.00; and 3. Authorize a renewal of a Professional Management Services Agreement with the Arts Council of Fort Worth and Tarrant County, Inc., in the amount of $438,978.00 for management of the Fiscal Year 2013 Fort Worth Public Art Program for a period of one-year. DISCUSSION: Under the proposed Fiscal Year 2013 Professional Services Agreement, the Arts Council of Fort Worth and Tarrant County, Inc. will continue to administer the Fort Worth Public Art Program (FWPA), including management of up to 69 ongoing and new public art and design enhancement projects, with combined budgets totaling over $8 million in accordance with the Fiscal Year 2013 Fort Worth Public Art Annual Work Plan. The Administrative Budget for Fiscal Year 2013 ($438,978.00) includes personnel and general administrative costs, as well as funds to support artist selection processes for new projects, certain collection management operating expenses and public education and outreach programs. The Maintenance Budget for Fiscal Year 2013 ($45,000.00) will be used to maintain artwork in the collection, including cleaning and routine maintenance of up to 36 artworks in the Fort Worth Public Art Collection. This Maintenance Budget is held by the City of Fort Worth and accessed via contracts with conservators and other professionals, as needed. In addition to management of new public art projects and maintenance and conservation of the FWPA Collection, the Arts Council will do the following: (1) Implement the program's third Anti -Graffiti Mural project in collaboration with community partners in Council District 9, (2) Assess the first round of Community ID: Public Art in Neighborhoods projects and conduct public outreach sessions in preparation for the next round anticipated in Fiscal Year 2014, (3) Participate in Downtown Fort Worth Inc's Plan 2023 Urban Design, Parks and Open Space Committee to identify potential projects and opportunities for public art that connect Downtown with the Southside, West 7th Street, Near http://www.fortworthgov.org/council packet/mc_review.asp?ID=17506&councildate=10... 10/23/2012 ivi&C Review Page 2 of 2 S outheast and Trinity River Vision; (4) Prepare a FWPA Master Plan Progress Report and review public art plans for various funding sources and recommend revisions, if necessary; (5) Host public art dedication events, artist workshops, lectures and other community outreach activities; and, (6) Staff the Fort Worth Art Commission. On June 11, 2012, the Fort Worth Art Commission set public hearings on the draft Fiscal Year 2013 Annual Work Plan for purposes of public comment, which was widely publicized through various print and electronic media, including the City of Fort Worth and Fort Worth Public Art web sites, as well as the Fort Worth Public Art Enews The Fort Worth Art Commission held public hearings on July 9, 2012 and August 6 2012 The Fiscal Year 2013 Annual Work Plan was formally recommended on S eptember 10, 2012. On September 18, 2012, (M&C G-17672) the City Council authorized the transfer of $973,483.58 from the Fiscal Year 2011-2012 Water and Sewer Cash -Funded Capital Projects Fund to the S pecially Funded Capital Projects Fund for the Fort Worth Public Art Program in accordance with City Council policy established in Chapter 2 Article III, Division 2 of the City Code. As set forth in the Long Range Public Art Plan for the Water Fund (approved by City Council on May 9, 2006, by M&C G- 15185), these funds are used for the administration of the public art program ($438,978.00), annual maintenance of the public art collection ($45,000.00), specific public art projects and initiatives outlined in the Fort Worth Public Art Fiscal Year 2013 Annual Work Plan, including two new Urban Villageprojects funds for an Anti -Graffiti Mural Project, acquisition of existing works ($389,505.58) and set aside for the Public Art Conservation Fund ($100,000.00). FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations and adoption of the attached supplemental appropriation ordinance, funds will be available in the current operating budget as appropriated of the General Fund. TO Fund/Account/Centers 1 & 2) GG01 472291 0901600 $483,978.00 2) GG01 539120 0901600 $483,978.00 FROM Fund/Account/Centers 1) C291 538070 201989990500 $483,978.00 3) GG01 539120 0901600 $438,978.00 Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: Douglas W. Wiersig (7801) Additional Information Contact: Martha Peters (298-3025) ATTACHMENTS 20MANAGEMENT OF THE 2013 PUBLIC ART PROGRAM SAO13.doc http://www. fortworthgov.org/council_packet/mc_review. asp9ID=17506&councildate=10... 10/23/2012