Loading...
HomeMy WebLinkAboutContract 40923-A1 (2)C1WSECREiAR'( CONTRACT NO. I Z j J� L� AMEWOMINT No P11ND CITY SECRETARY CONTRACT WHIERREM39 the City off: Vor t Worth (CITY) and Dunaway associates, L.P., WNGIN R) made and enter into City ocretary Contract No. 40923, (CONTRACT) which was authorized by MC C - 2 4 4 91 on the 2 8th day of Septethber, 2010 in the amount of $263,800.00. WHIERIEAS, the CONTRACT involves engineering services for the following project: Water Main Relocation Along State Highway 114 at F.M. 156; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINExR, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the, CONTRACT is amended to include the additional engineering seKvi --.es specified in a proposal dated August 14, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to he performed by Engineer totals $10,000.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $273 , 800.00 Page OFFICIAL RECORD CITY SECRETARY r ',PATH, iX ECEIVED SEP 09 ioi3 All other provisions expressly amended herein, effect. of the Contract, which ane not shall n Rain in Evilforce and EXECUTED anal EPFEC FIVE signatory, below. PROVED : City of Fort Worth Fernando Costa Assistant City Manager DATE APPROVAL RECOMMENDED: f ; flyer in/ vtLivviezAvi S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: h of the date last written by a ENGINEER Dunaway Associates, L.P. .40? Brian :3:Darby, P.E. Associate DATE: e/io1 M&C: N/A 3 Date: N/A D nrYl chew, Yn rc- im&Assistant City Attorney ATTE Marie J. t".a = e'r City Secretary Page 3. • OFFICIAL RECORD CITY SECRETARY MflRT#, TX DA No. B000155.001 August 14, 2013 Mr. Robert Sauceda, P.E. Project Manager City of Fort Worth Water Department Fort Worth, Texas 76102 Reference: Amendment No 1 State Highway 114 Water Line Relocation Part 1 City Project No 01515 D.O.E. Project No 6485 Dear Mr. Sauceda: Dunaway Associates, L.P. is pleased to present this Amendment No. 1 for the following additional services that are beyond our original scope of services. Dunaway Associates, L.P. (Dunaway) is pleased to submit for your consideration this proposal for professional land surveying services on the above -referenced project. Based on our e-mail correspondence over the last month, we believe the following scope of services will meet your needs for this project. SCOPE OF WORK 1. Preparation of Sinned/Sealed Metes and Bounds Descriptions and Exhibits for Two (2) Water Easements and two (2) Temporary Construction Easements — Dunaway will provide signed/sealed parcel plats and legal descriptions for areas (see attached Exhibit A) to be acquired for water easement purposes. The parent tracts of land in which these proposed easements will be located is across a tract of land described to Beechwood Portfolio Investments, LLC, in Document Number 2010-72091 and across a tract of land described to Oak Creek Trails Partners, L P. in Document Number 2005-25409 .These exhibits and descriptions will substantially conform to the current Texas Board of Professional Land Surveying. No buildings, improvements, or other surface features will be shown on the face of the exhibits. Dunaway will provide any title research and abstracting necessary to complete this task. 2. Preparation of Signed/Sealed Metes and Bounds Description and Exhibit for One (1) Permanent Sanitary Sewer Easement , Dunaway will provide a signed/sealed parcel plat and legal description for one area (see attached Exhibit 8) to be acquired for utility easement purposes. The parent tract of 550 Batley Avenue, Suite 400 4 Fort Worth, Texas 76107 0 Tel: 817.335.1121 0 fax; 817.335.7437 S dunawoyassociotetcom • Amendment No. 1 State Highway 114 Water Line Relocation Part 1 August 14, 2013 Page 2 FEE land in which this proposed easement will be located is Lot 2, Block 17, Westover Hills, Volume 388-32, Page 82. This tract of land is located at 6207 Westover Drive, respectively. This exhibit and description will substantially conform to the current Texas Board of Professional Land Surveying. No buildings, improvements, or other surface features will be shown on the face of the exhibit. Dunaway will provide any title research and abstracting necessary to complete this task. The horizontal datum for the survey on which these exhibits and metes and bounds descriptions will be based is NAD83, Texas North Central Zone, 4202 (State Plane Coordinates). As owner of the property, Client hereby authorizes Surveyor to enter upon the property for the purposes of conducting Surveyors work thereon If Client is not the owner of the property, Client is to obtain such authorization from owner and provide same in writing to Surveyor at the same instance that Surveyor receives the written notice to proceed. Preparation of One (1) Burlington Northern Santa Fe Railroad Permit — Dunaway will prepare appropriate permit forms and associated exhibits for submittal by the City for the railroad crossing located north of SH 114 and just south of Petty Place adjacent to the east side of FM 156. All railroad fees would be paid for directly by the City. Dunaway proposes to provide the above described scope of work for a LUMP SUM fee of $10,000. The following is a partial list of services that are not anticipated to be required for your project and are not proposed to be provided by Dunaway. Some of these services can be provided if they are requested or if it is later determined that they are necessary. In general, additional services will be authorized either by a contract amendment or a separate proposal 1. Construction Staking 2. Topographic Surveying 3. Platting Services Only those services specifically mentioned in the Scope of Work section are offered as a part of this proposal. Amendment No. 1 State Highway 114 Water Line Relocation Part 1 August 14, 2013 Page 3 A summary of the total project is as follows: Original Contract $263,800 Amendment #1 $ 10,000 Total Project $273,800 Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Sincerely, DUNAWAY ASSOCIATES, L.P. Brian Darby, P. r Associate B155-1 Amendment #1 Ltr - bsd 13-0814.docx