HomeMy WebLinkAboutContract 41271-A2 (2)AMENDMENT NO. 2 TO AGREEMENT FOR ARCHITECTURAL DESIGN SERVICES EAST MULTI -PURPOSE FACILITY AT THE WILL ROGERS MEMORIAL CENTER STATE OF TEXAS CITY SECRETARY CONTRACT NO. '��-1 � — as COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Hahnfeld Hoffer Stanford, Inc. (Architect) made and entered into City Secretary Contract No. 41271 (The Contract) which was authorized by the City Council by M&C C� 24664, the 14th day of December, 2010; and WHEREAS, further amendment is necessary to reimburse the Architect as part of the design services agreement for additional design services for integration of the public art murals. NOW THEREFORE, City and Architect, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article 1.1, SECTION I m SERVICES OF THE ARCHITECT, the following paragraphs are added to read as follows: Provide additional design services for the design and detailing of handrails on the vehicular ramp. The cost of this additional service is $4,025.00 plus $0.00 in reimbursable expenses. The scope of services is described more fully in the Hahnfeld Hoffer Stanford letter dated April 28, 2011, subject. Additional Construction Administration Services which is attached hereto as Attachment "A" and made a part of this Agreement." 2. Paragraphs1 of SECTION V o COMPENSATION TO ARCHITECT, is amended as follows: "The total compensation for all of the assignments to be performed by Architect as described in CHARACTER AND EXTENT of ARCHITECT'S SERVICES hereof shall be a fixed fee of $427, 690.00 plus up to $9,000.00 in reimbursable expenses. " 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. (The remainder of this page is intentionally left blank.) FFICIAL RECORD CITY SECRET/kin WORTH, TX EXECUTED this the day of HAHNFELD HOFFE .By: Eric L. Ha President APPROVAL Douglas Transpo By: STA FOLD, INC, OM ENDED: Weirsig, Director Lion & Public Works Department 2011, in Fort Worth, Tarrant County, Texas. APPROVED AS TO FORM AND LEGALITY: By: Douglas W. Blaok-� Assistant City Attorney • By: By: APPROVED: donane4 Fernando- Costa Assistant City Manager Marty Hendrix City Secretary M&C Not Required Contract Authorization • • • 11CIAL RECORD NTY SECRETA Y ►1 N70 711'4#9 i�; • April 28, 2011 Mr. Ronald Clements Project Manager Facilities Management Group Transportation and Public Works Department City of Fort Worth 401 West 13th Street Fort Worth, Texas 76102 Re: Additional Construction Administration Services — Handrails at Vehicular Ramp Dear Ronnie: The following is a request for additional service charges for continued Construction Administration services beyond the original contract, on the part of our office and that of our consultants. O The Contract (No. 41271), dated 12-14-2010, Section IV, states that "If authorized in writing by the City, Architect shall furnish or obtain from others special services necessary to complete the Projects. These special services are not included as part of the Basic Services outlined in Section I — Services of the Architect and Attachment "A". DESCRIPTION OF CHANGES We have been asked to provide design services for the addition of pedestrian handrails on the vehicular ramp that runs in an east -west direction along the north side of the Equestrian Multi -Purpose Building, which is currently under construction. Since this ramp is not part of an accessible route, the 2003 International Building Code does not require handrails, and if handrails are provided., exempts them from the normal requirements for handrails on a pedestrian ramp. Fixed, galvanized steel pipe handrails are proposed along the south and north sides of the ramp, mounted on top of the curb that forms the sides of the ramp to prevent vehicles from straying into the side walls that enclose the -ramp. We anticipate that the fixed handrails will be continuous, with breaks designed to allow replacement of sections in the event that a vehicle ever jumps the curb and damages the rail, A.removable, galvanized steel pipe handrail is proposed down the center of the ramp, mounted in recessed galvanized steel pipe sleeves We anticipate that the removable handrail will be designed in short sections which will be spaced apart sufficiently to allow persons leading horses to turn around on the ramp and go the other direction if needed,rather than having to go all the way to the end of the ramp before turning around, SCOPE OF WORK The scope of work for the proposed changes involves 1) preparation of design sketches illustrating the proposed handrail design; 2) preparation of preliminary details, in consultation with the structural engineer, for mounting of the fixed and removable handrails; 3) discussions with the Owner regarding layout and. detailing of the handrails and their mounting system; 4) modifications of the architectural construction drawings illustrating the proposed changes, including a) layout of the handrails on plan sheets A.A1.1 and A.A1.3; b) indication of the fixed handrails on north exterior elevation 2, sheet A.A4.2; c) indication of the fixed handrail on wall sections 2 and 3 sheet A.A5.2; indication of the fixed handrail on wall section 2, sheet A.A5.5; d) indication of the fixed handrail on wall section 3, sheet A.A5.6; e) revision to detail 5, sheet A.A5.6; f) addition of a removable railing mounting detail; g) addition of removable railing elevations; h) indication of the fixed handrail on building section 5, sheet A.A5.8; 5) consultation, evaluation and modifications as required to thestructural construction drawings illustrating the proposed changes, including a) vehicular ramp structure for addition of sleeves for removable pipe rail sections; and b) anchorage of fixed pipe rails at the north and southsides of the vehicular ramp. 1 COMPENSATION Total compensation for professional services is a lump sum fee of $4,025 as detailed in the attached documents and consists of $2 475 for architectural services, and $1,550 for structural engineering services We do not anticipate any additional reimbursable expenses. Please contact our office if you have any questions. Sincerely, HAHNFEL©.HOFFER STANFORD architects planners interiors Gary Amyan, AIA # ieA# B Senior Project Manager Enclosures 2 Overall Fee Summary H der Id Stanford Project Manager: Gary Ryan Owner: City of Fort Worth Project Description: WRMC - Mufti -Purpose Facflitity Addition of Handrails at Vehicular Ramp Unit A Job Number: 07015-08 Discipline Management Principal in Charge Sr Project Manager. Architectural Project Architect Clerical PIC Sr PM PA' Administrative Support Construction Admin' Cler Const Admin' ' Structural - .Principal in -Charge Project Manager Sr Engineer Engineer - EIT PIC Sr Engr EIT CADD/Drafting CADD 0 4 1 7 0 8 Burdened Hourly Rate $190 $158 $115`` $82_: $130 $175' $150 25 $85 S65.63 Fee $0 $632 $0 $0 $0 $1,323 $0 $0 $0 $0 $0 $520 $0 $0 $0 $0 $150 $875 $0 $525 Date: 4/28/2011 Fee Type: Lump Sum FEE SUMMARY Architectural Fee Consultants Fee Support Services $2,475 $ 1,550 Total Fee $4,025 Reimbursables Total + Reimb $ 4,025 Total Fee Per Discipline $632 $1,323 $520 $1,550 % of Total Fee 15.70% 32.87% 12.92% 38.51% Support Services (incl. in Total Fee) Support Services (not included) $0 $o $o $o $o $0 Reimbursables 0.00% Other Other Travel/Subsistance $0 Other Other Postage/Shipping $0 Other Other Reproductions $0 Other $ Other Other $0 Other Other Other Other Markup: 0%` - - Subtotal $0 $0 Total Total $ Total $0 Page 1 of 3 Owner: Event Facilities Fort Worth, Inc. Project Description: WRMC - Multi -Purpose Facilitity Addition of Handrails at Vehicular Ramp - Unit A Job Number: 07015-08 PIC Sr PM PA Cler Const Admin Total Hrs: Date: Labor $: $ 4 Labor $: $ 12 Labor$: $ 1,323 Labor$: $ 4 Labor$: $ 520 20 Total $: $ 2,475 4/28/2011 632 Sheet No. Project Activity Comp PIC Sr PM PA Cler Const Admin Hours Cost Subtotal Total Tasks Addition ofHandraft satVehicular Ramp -- Unit A Cc rs ilt with structural sng rcer an rail mounting options' 1 4 3 $403 Prepare design s _dies illustrating proposed handrail design 0.5 • 2.5 $338 Prepare preliminary d Is for mounting handrat 1 2 4 $518 Review layout and mounting o; thOwn r 1 2 $288 Sheet A.M. 1 Add handrails and notes to plan 1 $115 A.A .3 -Add handrails and notes to plan 1 1 $115 Sheet A.A4.2-Add 'handrails to elevation SheetA.A5.2 - Add handrails to wall se 0.5 1 0.5 $115 $58 SheetA.A5.5- Add handrails to wall sections`. 0.5 $58 Sheet A.A5.6 -Add handrail to wall section and detail 1 1 $115 Prepare removable railing mounting detail 1 1 $115 Prepare reihovable railing elevations 1 $115 Sheet A.A5.s-Add handrailtobuilding section 0.5 0.5 $58 Proc ss handrail submittal '. 0.5 $65 SUBTOTAL $2,475 Page 2 of 3 Owner: Project Description: Job Number: Event Facilities Fort Worth, Inc. WRMC - Multi -Purpose Facilitity Addition of Handrails at Vehicular Ramp - Unit A 07015-08 PIC PM Sr Engr EIT CADD Total Hrs: Date: Labor $: 1 Labor $: 7 Labor $: Labor $: 8 Labor $: 16 Total $: 4/28/2011 $ 150 $ 875 $ 525 $ 1,550 Sheet No. Project Activity Comp PIC PM Sr Engr EIT CADD Hours Cost Subtotal Total Tasks Addition of Handrails at Vehicular Ramp- Unit A 'Consult With arch 1 •n^unting of bons 1 2 $275 Review structure at ramp for.handrai; inounting impacts 1 $125 Advise architea,k on handrai`•mounting details' 1 $125 Revise structural for removable.handrailsections' 2, 6 $513 Reeds structural fixed handrail sections 6 $513 SUBTOTAL $ 1,550.00 Page 3 of 3