HomeMy WebLinkAboutContract 41054-A1 (2)AMENDMENT NO. 1
(No flliiazC Needed)
STATE OF TEXAS 6
COUNTY OF TARRANT 6
�t.:� L Y SECRETARY , \OS/a� a
aRACT Nin
WHEREAS, the Contract involves engineering services for the following project:
Old Decatur Road — Bailey -Boswell to W.J. Boaz — Construction Material Testing and
Observation, Project No. 01296
WHEREAS, it has become necessary to execute Amendment No. 1 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
Article I
Article I of the Contract is amended to include the additional engineering services
specified in a proposal letter dated December 1, 2011, a copy of which is attached hereto
and incorporated herein. The cost to City for the additional design services to be
performed by Engineer total $20,010.00.
Article II
Article II of the Contract is amended to provide for an increase in the maximum fee
to be paid to Engineer for all work and services performed under the Contract, as
amended, so that the total fee paid by the City for all work and services shall not exceed
the sum of $64,010.00.
City of Fort Worth, Texas
Amendment to Engineering Agreement
PMO Official Release Date: Pending
Page 1 of 2
1 2-1 2-1 1 Po3:57 IN
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Article III
All other provisions of the Contract which are not expressly amended herein shall remain in
full force and effect.
Executed and effective this the day of DeecJ , 2011.
M
ATTEST:VrR? � Q CITY OF FORT WORTH
11-4 2 61 1:71‘101----='
Li n ca
td g %jet) 110
0,e, os€0000000oop
0 al44.14441 ,
fil 41 0 1 0
a��
�j -yam'- dp1,7 A pc `��'� Fernando Costa
\(44 0000.00° 4.7
Acy
APPROVED AS TO FORM AND LVits APPROVAL RECOMMENDED
c
City Secretary
B
Doug as W. Black
Assistant City Attorney
NO iw &fra C ilearIERIL310
City of Fort Worth, Texas
Amendment to Engineering Agreement
PMO Official Release Date: 11/29/2011
Page 2of2
By:
Assistant City Manager
Cti
Douglas W. Wiersig, P.E. 1'
Director,
Transportation and Public Works
LANDTEC Engineers, LLC
By:
44/
T homas D. Baker, P.E. R.P.L. S
Principlal
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
LIIANDTEC
EnginEErs
Mr. Patrick Buckley, P.E.
Senior Professional Engineer
Transportation and Public Works
City of Fort Worth
1000 Throckmorton Street, 2nd floor
Fort Worth, Texas 76102
Re: Old Decatur Road Amendment
GEot€chnical & Environmental Engineering
Construction Materials Testing
Laboratory Testing
surveying
Dear Pat:
Additional money request for Old Decatur Road.
Original CMT Contract: $44,000
Additional Money Requested: $20,010
• Pavement Design Manual: $10,000
Construction Materials Testing: $10,010
o M/WBE $3,685 (Included in $10,010)
M/WBE is TSIT in Ft. Worth
Sincerely,
Julie McCormack
December 3, 2011
Project: 1565
Attachment: Spreadsheet w/cost estimate for additional CMT Service.
LANDTEC ENGINEERS 1700 Robert Road, Suite 101 Mansfield, Texas 76063 817.572.2818 Fax 817.453.9984
1565 Old Decatur Road Amendment
Construction Materials Testing Cost Estimate
Old Decatur Road, Ft. Worth, Texas
Item
Descri•tion
Unit
Estimated
Unit
Estimated
-_
---
Earthwork
/ Backfill
a
Testin
•
Engineering
Technician
hr
40
50.00
2,000.00
Transportation
ea
10
50.00
500.00
Standard
Proctor
ASTM
D
698
ea
2
130.00
260.00
Atterber•
Limit
Test
ASTM
D
4318
ea
2
50.00
100.00
Percent
Passing
#200
Sieve
-
D
1140
ea
2
35.00
70.00
Sieve
Analysis
ea
1
50.00
-
In
-Place
Densit
Test
-ASTM
D
2922
& 3017
ea
30
15.00
450.00
Report
Preparation/Clerical
hr
6
45.00
270.00
_
Geotechnical
Engineer
/
Report
Review
hr
5
130.00
650.00
Transportation
_
ea
2
_ 50.00
100.00
Subtotal
=
4,400.00
Pavement
Subgrade
a
Testing
Engineering
Technician
hr
40
50.00
2,000.00
Transportation
ea
10
50.00
500.00
Standard
Proctor
ASTM
D
698
_
ea
4
130.00
520.00
Atterberg
Limit
ea
4
50.00
200.00
Percent
Passing
#200
Sieve
ea
35.00
-
Sieve
Analysis
ea
50.00
-
Soil
/
Stabilization
/
Atterberg
Limits
Senes
ea
2
240.00
480.00
Field
Moisture/Densit
Tests
ea
40
15.00
600.00
Gradation
Tests
ea
10
20.00
_
200.00
Report
Preparation/Clerical
hr
8
45.00
_ 360.00
Geotechnical
Engineer
/
Report
Review
hr
5
130.00
650.00
Transportation
ea
2
50.00
100.00
Subtotal
= 5,610.00
Total
Estimate
= $ 10,010.00
LANDTEC ENGINEERS
3158 Old Decatur-CMT cost -Additional -August 2011.xis
A-1 12/1/2011
Professional Services Payment Request Project Manager: Patrick Buckley
Project: Old Decatur Road Construction Material Testing
City Project #: 01296
City Sec Number:
Purchase Order:
Company Name:
Consultant's PM:
Vendor Invoice #:
Payment Request #:
From Date:
To Date:
Invoice Date:
LANDTEC Engineers, LLC
Thomas D. Baker
Consultant Instructions:
Summary
Fill in green cells including Invoice Number, From and To Dates and the included worksheets.
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Projects folder.
email: tbaker@landteceng.com
Office Address: 1700 Robert Road, S 101
Telephone: 817-572-2618
Fax: 817-453-9984
Mansfield, TX 76063
Agreement Amendment
Sheet FAC and Work Type Description Amount Amount
Agreement
Amount to
Date
Amount
Spent
Percent
Spent
($) Invoiced
Previously
Current
Invoice
Remaining
Balance
Work Type 1
Task 1, 2 & 4 C204-531200-207230129680
$24,000.00
$24,000.00
$24,000.00
Work Type 2
Task 3 - Testing C204-531200-207230129684
$20,000.00
$20,000.00
$20 000 00
Work Type 3
Work Type 4
Work Type 5
Work Type 6
Totals This Payment Request
$44.000.00
$44,000.00
Overall Percentage Spent:
$44,000.00
PMP Revision Requests Page 1 of 2
a General
PMP Revision Requests
PMP Revision Request Information
= Required Field IF Part of Project
Project Number: 01296 Creator: Pat Buckley
Project Name. Old Decatur Road -Bailey- Status: Pending
Bosewell to Boaz
PMP Request Reference: PMP-00001 Creation Date: 2010-10-26 11:42:54.0
Record Number: PMPR-00005 *Federally Funded: No
Title: PMPR-5 - Engineering List Impacted Amendment
Agreement and Change Order Numbers:
Budget Revision Amount 0.00
Description.
Justification: An Engineering Agreement with LANDTEC for Construction Material Testing
and Observation is required.
Long Description: This project is about to go to construction. City wants to use the new Pavement
Design Manual and provide testing of the materials using new guidelines.
LANDTEC will provide this testing and the final draft of the Pavement Manual.
PMP Revision Request_ Checklist
Revised Scope, Schedule &
Cost Defined?
Revised Funding Identified &
Adequate?
M&C Approval Required?
N/A
Task Details
From.
To:
Cc:
Sent For:
Malena Doty; Michael Hasler
2 Review and Recommend
Workflow Progress
Task Due Date: Not Applicable
Task Status: View Only
Task Notes (0)
Step Name
1 Creation
2 Review and
Recommend
2 Review and
Recommend
3 Revision
4 Funding
Confirmation
5 Approval
End
Assignee
Pat Buckley
Michael Hasler
Malena Doty
Company
CFW
CFW
CFW
Status
Action , Completion Date
Completed Send 10/26/2010 01:42 PM
Not Started
Not Started
Local (GMT-6)
f= Line Item
3 Item(s)
https://u3 0. skire.com/bp/studio/print/open?id=19614&model=uprr&process_id=868784&... 10/26/2010
PMP Revision Requests Page 2 of 2
No.
WBS
Code
WBS FAC
Original FAC
FBS Code
Funding FAC
Amount
003
002
001
STREET-
STREET- C204-541200-
23-83-20- 207230129683
541200-
C204
STREET-
STREET- C204-531200-
23-84-20- 207230129684
531200-
C204
A-,
STREET-
STREET- C204-531200-
23-80-20- 207230129680
531200-
C204
BONDS-
2008CIP-
STREET- C204-485208-
STREET-C204- 201239990100
23-20-485208-
201239990100
BONDS-
2008C I P-
STREET- C204-485208-
STREET-C204- 201239990100
23-20-485208-
201239990100
BONDS-
2008CIP-
STREET- C204-485208-
STREET-C204- 201239990100
23-20-485208-
201239990100
-441000.00
20,000.00
24,000.00
Total Amount: $ 0.00