HomeMy WebLinkAboutContract 41329COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
City Secretary
Contract No.
WHEREAS, the undersigned Independent School District, "Developer" desires to make
certain improvements (refer to the name of the project at the bottom of the page) an addition to the
City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule
municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter
called "City", to do certain work in connection with said improvements.
Developer:
Name: Walter Dansby
Title: CIP Deputy Superintendent
Company: Fort Worth Independent School District
Project Name: Riverside Middle School Bus Drop - Off
Project Location:
Streets: 1600 Bolton Street
•
Mapsco: 63M Council District: 4
OFFICIAL RECORD
CITY SECRETARY
FT. WORTh, TX
CFA: 2010-038
DOE: 6487 City Project No.: 01536
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of
said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in
connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section 1I, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires it to submit an Affidavit of Bills paid signed by its
contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements
contemplated by this Agreement and that said construction shall be
completed in a good and workmanlike manner and in accordance with all
City standards and the City -approved construction plans, specifications and
cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X ,
Sewer (A-1) ; Paving (B) X ; Storm Drain (B-1) ; •Street
Lights & Signs (C) .
E. The Developer shall award all contracts for the construction of community
facihties in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract
price of the infrastructure for a period of two (2) years insuring the
maintenance and repair of the constructed infrastructure during the term of
the maintenance bond. All bonds to be furnished before work is
commenced and to meet the requirements of Chapter 2253, Texas
Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, and not to install or relocate any sanitary sewer,
storm drain, or water pipe unless a responsible City inspector is present
and gives his consent to proceed, and to make such laboratory tests of
materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The
3
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water
mains constructed under this Agreement until said sewer and water mains
and service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. City is requiring the widening and/or straightening of the City road(s)
contemplated herein. City shall not be responsible for any costs that may be
incurred for the relocation of any utilities that are or may be in conflict with
any of the community facilities to be installed hereunder.
I. Developer agrees that the City shall not be responsible for any inadequacies in
the preliminary plans, specifications and cost estimates supplied by the
Developer for this Agreement and hereby releases the City from same.
J. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
K. Developer will require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any
and all claims, suits or causes of action of any nature whatsoever, whether
real or asserted, brought for or on account of any injuries or damages to
persons or property, including death, resulting from, or in any way connected
with, the construction of the infrastructure contemplated herein, whether or
not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to
indemnify, and hold harmless the City for any losses, damages, costs or
expenses suffered by the City or caused as a result of said contractor's failure
to complete the work and construct the improvements in a good and
workmanlike manner free from defects, in conformance with the Policy, and
in accordance with all plans and specifications and shall cause to be executed
4
and delivered to the City an indemnity agreement from such contractors on a
form to be promulgated by the City.
L. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
M. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated
in the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
COST SUMMARY TABLE
Items
A. Water and Sewer Construction
1. Water
2. Sewer
Water/Sewer Construction Cost Sub -Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights
4 Street Name Signs
TPW Construction Cost Sub -Total
Total Construction Cost (excluding fees):
Construction Fees:
C. Water Inspection Fee (2%)
D. Water Material Testing Fee (2%)
Sub -Total for Water/Sewer Construction Fees
E TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
Sub -Total for TPW Construction Fees
Developer's Cost
$9,695.98
$0.00
$9,695.98
$35,422.86
$0.00
$0.00
$0.00
$35,422.86
$45,118.84
$193.92
$193.92
$387.84
$1,416.91
$708.46
$2,125.37
Total Construction Fees: $2,513.21
The Checked Must be Included as Attachments to this Agreement
Included Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-I : Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in
quadruplicate, at Fort Worth, Texas this day of citr—, 2002 0 to
tte
CITY OF FORT WORTH
DEVELOPER
'Fort . Independent School istrict
OteLmA
Fernando Costa Walter Dansby 1 Deputy S p rintendent
Assistant City Manager FWISD Capital Improvement Program
Recommended by:
Transportation & Public Works Department
lest,
4amA.Vrk ,
Director
Water Department
P.E! P
Wendy Chi-B bulal, EMBA, P.E.
Water Development Engineering Manager
Approved as to Form & Legality:
•
.14ae-/
Amyl. Ramsey it A_
Assist= C' Atto ney
Ati g„ a
ATTEST.
\IN\
Marty Hendrix
City Secretary
o
3°°00
(cup 000
?14 °L)
z.-'.----.�_� - - ___-2.2= -- -2 _ � _
NO M&C
:r cor .;z1
o000000.
0,000so
aletex.
414
rtx 7
AFFRCIAL. RECORD
CITY SECRETARY
FT. WORTH, TX
PROP
PV
8lY
a
0
25
50
SCALE: 1 "=50'
EAGLE DRIVE
(A Of iwneMn
8"W
8'
B -.......
PROP
b A -;c,+r I -
RIVERSIDE MIDDLE SCHOOL
BUS LOOP ADDITION
Drawing No.:
R-XXXXX
Date:
05-28-10
Scale:
I"=50'
Charles Gojer
and Associates, Inc.
Consulting Engineers
11615 Forest Central Dr. Suite 303
Dallas, Texas 75243 TEXAS REG'N. # 90067
O
CQ
1
O
O
•
CD CD
fl
EAGLE DRIVE
Oman
........ -; ................. f . ........ •••
. .... ...... ... ... ......
XWAYi
0
25
50
SCALE: 1 "=50'
®
•.
•
LIMITS OF PAVING CONSTRUCTION
Exhibit B - Paving
RIVERSIDE MIDDLE SCHOOL
BUS LOOP ADDITION
Drawing No.:
Date:
10-7-10
Scale:
I"=50'
Charles Gojer
and Associates, Inc.
Consulting Engineers
11615 Forest Central Dr, Suite 303
Dallas, Texas 75243 TEXAS REG'N. # F-697
N
PART B — PROPOSAL
DEVELOPER AWARDED CONTRACTS
This proposal must not be removed from this book of Contract Documents.
TO: FORT WORTH INDEPENDENT SCHOOL DISTRICT
PROPOSAL FOR: PROJECT NAME Paving Improvements for Bus Drop-off Lane at
Riverside MS
WATER PROJECT NO. _P265-640150153683
FILE NO. K-2136
X NO. 21314
CITY PROJECT NO. 01536
Includes the furnishing of all materials, except materials specified to be furnished by the
City, equipment and labor for the installation of Bus Diop-Off Lane & for 2 file hydrants
and all necessary appurtenances and incidental work to provide a complete and
serviceable project designated as:
WATER & PAVING IMPROVEMENTS FOR BUS DROP-OFF LANE AT
RIVERSIDE MS
Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly
examined the Contract Documents, including plans, special contract documents, and the
General Contract Documents and General Specifications foi Water Department Projects,
the General Contract Documents and General specifications for Transportation and Public
works Projects, the site of the project and understanding the amount of work to be done,
and the prevailing conditions hereby proposes to do all the work, furnish all labor,
equipment and material except as specified to be furnished by the City which is
necessary to fully complete the work as provided in the Plans and Contract Documents
and subject to the inspection and approval of the Diiector of the Department of
Engineeiing of the City of Fort Worth, Texas; and binds himself upon acceptance of this
Proposal to execute a contract and furnish an approved Performance Bond, Payment
Bond, Maintenance Bond, and such other bonds if any, as may be required by the
Contract Documents for the performing and completing of the said work Contractor
proposes to do the work within the time stated and for the following sums:
B-1
Updated 05/16/2005
UNIT I: WATER
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
(Furnish and install, including all appurtenant work, complete in place, the following
items) (D-No. refers to related items in the Part D Special Conditions:)
1 2 EA 8"x6" Tapping Sleeve w/
Gate Valve
One thousand, six hundred
and sixty-eight Dollars
Zero Cents
2 30 LF 6" PVC Pipe
$1668.00 $_3336.00
Twenty Dollars
Fifty Cents $20.50 $_615.00
3 2 EA Standard Fire Hydi ant
(Complete Assembly)
One thousand, five
hundred _ Dollars $1500.0 $3000.00
Zero Cents
4 14 % SY Remove & Replace
Permanent Asphalt
Pavement per
Standard — 028 Detail 1
One hundred and ninety- $196.07_ $2744.98
six Dollars
Seven Cents
TOTAL AMOUNT BID WATER $ 9695.98
B-2
Updated 05/16/2005
UNIT II• PAVING IMPROVEMENTS
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
(Furnish and install, including all appurtenant work, complete in place, the following
items) (D-No. refers to related items in the Part D Special Conditions:)
1 370 LF Remove Exist. Curb &
Gutter
Three Dollars $3.70 $1,369
Seventy Cents
2 370 LF Remove Exist. Sidewalk
Three Dollars $3.70
Seventy Cents
3 605 SY Proposed 7" Reinforced
Concrete Pavement
$1,369
Thirty -Three Dollars $_33.88_ $20,497.40
_Eighty -Eight Cents
4 380 LF 7" Monolithic Curb
_ Three Dollars
_Ninety -Five Cents
5 12 TON Lime Stabilized
Subgrade (35 lb./ SY)
Three hundred and
Thirty-three Dollars
_Thirty -Three Cents
6 2150 SF Proposed Sidewalk
$3.95 $ 1,501.00
$333.33 $3999.96
Two Dollars $2.77
_Seventy -Seven Cents
$5,955.50
B-3
Updated 05/16/2005
7 1 EA A.D.A. Ramp
Five Hundred Dollars $500.00 $500.00
Zero Cents
8 105 SY Topsoil & Sodding
Two Dollars $2.20
Twenty Cents
TOTAL AMOUNT BID PAVING $ 35,422.86
BID SUMMARY
TOTAL AMOUNT WATER BID $ 9695.98
TOTAL AMOUNT PAVING BID $ 35,422.86
GRAND TOTAL AMOUNT BID $_45,118.84
$231.00
B-4
Updated 05/16/2005
PART B -PROPOSAL (Cont.)
After acceptance of this Proposal, the undersigned will execute the formal contract and
will deliver an approved Surety Bond and such other bonds as required by the Contract
Documents, for the faithful performance of the Contract. The attached bid security, if
required is to become the property of the Developer.
The undersigned bidder certified that he has obtained at least one set of the General
Contract Documents and General Specifications for Water Department Projects dated
January 1, 1978, and that he has read and thoroughly understands all the requirements and
conditions of those General Documents and the specific Contract Documents and
appurtenant plans.
The successful bidder shall be required to perform the work in accord with the
following publications, both of which are incorporated herein and made a part
hereof for all purposes:
1. The General Contract Documents and General Specifications for
Water Department Projects dated January 1, 1978, which may be purchased
from the Water Department.
2. The Standard Specifications for Street and Storm Drain Construction
which may be purchased from the Department of Transportation & Public
Works.
The undersigned assures that its employees and applicants for employment and those of
any labor organization, subcontractors, or employment agency in either furnishing or
referring employee applicants to the undersigned are not discriminated against as
prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No.
7400.
The Bidder agrees to begin construction within el calendar days after issue of the work
order, and to complete the contract within36 working days after beginning construction
as set forth in the written work order to be furnished by the Owner.
(Complete A or B below, as applicable:)
B-5
Updated 05/16/2005
A. The principal place of business of our company is in the State of
Nonresident bidders in the State of , our principal
place of business, are required to be percent lower than resident bidders
by state law. A copy of the statute is attached.
Non resident bidders in the State of , our principal
place of business, are not required to underbid resident bidders.
B. The principal place of business of our company or our parent company or
majority ownei is in the State of Texas
B-6
Updated 05/16/2005
I (we) acknowledge receipt of the following addenda to the plans and specifications, all of
the provisions and requirements of which have been taken into consideration on
preparation of the foregoing bid:
Addendum No. 1 (Initials) Addendum No. 3 (Initials)
Addendum No. 2 (Initials) Addendum No. 4 (Initials)
(Seal)
Date:
Respectfully submitted,
Rea414i4,ix ca,
By
Title
arsvpi
Address
3r) 1 [-.ti c•iohm1 RP
rtier LJp,Cjai
Telephone: 12S?4fla..
B-7
Updated 05/16/2005