HomeMy WebLinkAboutContract 41328-A1 (2)STATE OF TEXAS
COUNTY OF TARRANT
AMENDMENT NO. I TO
COMMUNITY 1�'-} ACILITIES AGREEMENT
CITY SECRETARY CONTRACT NO. `-1 I 3 2_% \
WHEREAS, the City of Fort Worth (City) and D.R. Horton - Texas, Ltd. (Developer) entered into
Community Facility Agreement, City Secretary Contract No. 41328 wherein Developer is to make certain
improvements to Beechwood Creek Phase 3A, 3B an addition within the City; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the CFA to reflect additional storm
drain improvements at an estimated construction cost of $19,512.50 and as more fully described on Attachment No. 1.
NOW THEREFORE, City and Developer, acting herein by and through their duly authorized representatives,
enter into the following agreement, which amends the CFA:
A) 1. Summary of Cost Section is amended to be and read:
A. Water and Sewer Construction
1. Water
2 Sewer
Water Construction Cost Sub -Total
B TPW Construction
1. Paving
2 Storm Drain
3. Street Lights - Installed by Developer
TPW Construction Cost Sub- Total
Total Construction Cost
Construction Fees:
C. Water/Sewer Inspection Fee
D. Water/Sewer Material Testing Fee
Total Water/Sewer Construction Fees
E. TPW Inspection (4%)
F. TPW Material Testing Fee (2%)
G. Street Light Inspection Fee (4%)
H Street Name Signs
Total TPW Construction Fees
Total Construction Fees
$
Developer's Cost
227,709.00
208,649.00
$
436, 358.00
547,221.00
264,015.50
64, 040.00
875.276.50
$ 1,311,634.50
8,727.16
8,727.16
17,454.32
32,449.46
16,224.73
2,561.60
980.00
52,215.79
$ 69,670.11
2. All other provisions of the CFA, which are not expressly amended herein, shall remain in full force and effect.
Page 1 of 2
12-10-12
P03 :4 22
OFFICIAL RECORD
VITY SECRETARY
EXECUTED on this the / (/ #"-- day of ayal71/
County, Texas.
City %/Laiy
4061e*ORT4
Ira
Aill? %
090
Oto,:%
ti
1.*000.
n�wnp�°i'�.
APPROVED AS TO FORM
ALIT
Douglas W. Black
Assistant City Attorney
M&C No.: /()----
Date:
tkia.111fr�r
Page 2 of 2
, 2012, in Fort Worth, Tarrant
CITY OF FORT WORTH:
-1447:14.040 6004a.
Fernando Costa
Assistant City Manager
Recommended by:
Douglas (W. Wiersig, P.E
Director
Transportation and Public Works Department
DEVELOPER
D.R. Horton — Texas, Ltd.
A Texas Limited Partnership
By its authorized agent
D.R. Horton, Inc.,
A Delaware Corporation
Developer Name: Don Allen
Developer Title: Assistant Secretary
OFFICIAL RECORD
CITY SECRETARY
Fru NORTH, TX
flBJ TC i W%OODD CIREEKS
PHASE 3A(/3 3
STORM DRAIN-
EXI E "B "
LEGEND
PROPOSED STORM DRAIN LINE
EXISTING STORM DRAIN LINE
PROPOSED STORM DRAIN INLET
DI3VBL OIail3/OWN13R:
D • R HORTON
6751 North Freeway
Fort Worth, Texas 76131
Phone: (817)230-0800
Fax: (817)230-0896
9y-
-p-0 4'x4'DROP INLET
s
SCALE: I" 300'
PREPAR13I) BY:
GOOD\\ I\ 2
AJRSHA1ILIL
CIVIL ENGINEERS — PLANNERS — SURVEYORS
2405 Mustang Drive, Grapevine, Texas 76051
Metro (317) 329-4373
E:\I0409\pions \Beechwood Creeks._Ph3__CFA.pro 29 Nov 2012
Date: 11 / 12/ 10
Job No: 10409
ENGINEER'S OPINION OF PROBABLE COST
Project: Beechwood Creeks - Phase 3A/3B (CFA)
Location: Fort Worth, Texas
Client: D.R. Horton
Page: 2 of 3
ITEM
No. DESCRIPTION
UNIT
UNIT QUANTITY PRICE
TOTAL
COST
1. 10' Curb Inlet
2. 15' Curb Inlet
3. Std 4' x 4' Storm Drain Manhole
4. Std 5' x 5' Storm Drain Manhole
5. 4'x4 Drop Inlet
6. 42" R.C.P.
7. 39" R.C.P.
8. 36" R.C.P.
9. 30" R.C.P.
10. 27" R.C.P.
11. 24" R.C.P.
12. 21" R.C.P.
13. Gabion Mattress
14. Trench Safety
Storm Drain Subtotal
Storm Drain Facilities
Ea.
Ea
Ea.
Ea.
Ea.
L.F.
L .F.
L .F.
L .F.
L .F.
L .F.
L.F.
S.Y.
L .F.
10
2
2
6
1
608
368
250
66
266
964
156
66
2,678
$2,500.00
$3,250.00
$3,800.00
$4,500.00
$3,500.00
$100.00
$85.00
$78.00
$62.00
$53.00
$50.00
$48.00
$85.00
$1.25
$25,000.00
$6,500.00
$7,600.00
$27,000.00
$3,500.00
$60,800.00
$31,280.00
$19,500.00
$4,092.00
$14,098.00
$48,200.00
$7,488.00
$5,610.00
$3,347.50
$264,015.50
This Engineer's opinion of probable construction cost is made on the basis of the Engineer's experience
and best judgement as a design professional. It must be recognized that any evaluation of work to be
performed to construct this project must by necessity be speculative in nature until completion of its actual
detailed design. In addition the engineer has no control over the cost of labor material or services to be
furnished by others or over market conditions. Accordingly Goodwin & Marshall, Inc. can not guarantee
that actual costs will not vary from the opinions expressed herein.