HomeMy WebLinkAboutContract 41326-A2 (2)AMI NMI NT NO. 2 TO AGR EMFNT
FOR ENGINI.1 RING SIRVICES TO
PARKING ACCESS AND RLVLNUE CONTROL SYSTLM
AT WILL ROGERS MI .MORIAL CIJNTER
STATE OF TEXAS §
COUNTY OF TARRAN I §
CITY SECRETARY CONTRACT NO. -fir
WHLRI AS, the City of Fort Worth (City) and Dunaway Associates, L. P., a Texas
Limited Partnership (Engineer) made and entered into City Secretary Contract No. 41326
(the Contract) on the 6th day of January, 2011; and Amendment No. 1 was
administratively executed in the amount of $5,540.00 for additional coordination meetings
and construction document modifications; and
WHEREAS, the Contract involves engineering services for the Parking Access and
Revenue Control System (PARCS) at the Will Rogers Memorial Center (WRMC); and
WHEREAS, it has become necessary to execute Amendment No. 2 to said
Contract for additional engineering services for additional coordination meetings including
the contractor selection process and development of separate construction documents for
the related projects at WRMC; and
NOW THERLFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends the
Contract:
1.
Article I, of the Agreement is amended for additional engineering services and
increased by $11,500.00 as specified in the letter from the Engineer dated July 21, 2011,
subject: Will Rogers Memorial Center Paid Parking Equipment, attached hereto as
Attachment A.
2.
Article II, of the Agreement is amended for the total Agreement price of $57,215.00
for fees.
3.
All other provisions of the Contra which are__.• expressly amended herein, shall
remain in full force and effect.
WRMC PARCS, Amendment No. 2 (July 2011)
Dunaway Associates, LP (Page 1 of 2)
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
08-02-11 P02 : 38 IN
EX I CUTthis the day of
Texas.
ATTEST:
By:
Flo
Pfleag
Vino°
0-r%
V*4- °
APPROVED AS TO FORM ANEit,LE
By:
Marty Hendrix
City Secretary
Douglas W. Black
Assistant City Attorney
M&C No.: M&C Is Not Required
M&C Date:
WRMC PARCS, Amendment No. 2 (July 2011)
Dunaway Associates, LP (Page 2 of 2)
ifir 2011, in Fort Worth, Tarrant County,
CITY OF F O R T WORTH:
stf,?? y:
Q:i Fernando Costa
C-P 0 Assistant City Manager
v �
0 *i
.. ,ter
S� /APPROVAL RECOMMENDED:
By: c\/146
' i,i ,
cice DouglO W. Wiersig, PE, S!rector
Transportation & Public Works Dept.
ENGINEER
By:
f
Brook" Baca, ' E
Assoc' te, Se for Project Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
List DUNAWAy
July 21, 2011
Mr. James D. Horner
City of Fort Worth
Public Events Department
1201 Houston St.
Fort Worth, Texas 76102
Reference: Will Rogers Memorial Center -- Paid Parking Equipment
Dear Mr. Horner:
A1rMMwr A
Dunaway Associates, LP. and the City of Fort Worth Public Events Department have a
contract in place to complete the P.A. R. C. S. projects to serve WRMC. Services were
authorized in a contract signed and dated November 19, 2010.
0
Additional coordination meetings
a Contractor selection process including multiple reference checks and best value
process
a Develop a separate set of construction drawings for the pay booth locations that are
within Gendy Street and placing them in the Gendy Street Beautification project. The
deliverables will include the constructions drawings, specifications prepared for
binding separately and an estimate of probable cost. The drawings will be signed
and sealed by a registered licensed professional engineer.
The additional effort will be a lump sum fee of $11,500. The original contract amount of
$45,715 will have a revised amount of $57,215. Please feel free to contact me should you
have any questions or comments.
Sincerely,
DUNAWAY ASSOCIATES, L,P.
a Texas limited partnership
Brooks I, Baca/P.E.
Associates, Sr. Project Manager
550 Bailey Avenue, Suitt, /100 Fort Worlh, IOxos 76107 S Tel: 81 7.335.1 121 : Fux. 81 7.335.7437 S dunnv nyossoclates.com