HomeMy WebLinkAboutContract 41323COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
City Secretary
Contract No. LA \ D3
WHEREAS, the undersigned "Developer" desires to make certain improvements (refer
to the name of the project at the bottom of the page) an addition to the City of Fort Worth,
Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule
municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter
called "City", to do certain work in connection with said improvements.
Developer Information:
Developer Company Name: Hulen Mall, LLC
Authorized Signatory: Robert A. Michaels
Title: Vice Chairman
Project Name: Hulen Mall Renovations
Project Location: 4800 South Hulen Street
Additional Streets: N/A
Plat Case No.: N/A Plat Name: N/A
Mapsco: 89J
Council District: 3 City Project No: 01643
To be completed by fffir
Received byt
CFA: 2010-061 DOE: 6573
Date: � laidi I � D
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA') as
if copied herein verbatim. Developer agrees to comply with all provisions
of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy
in connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy and recognizes that there shall be no reduction
in the collateral until the Project has been completed and the City has
officially accepted the infrastructure. Developer further acknowledges
that said process requires the contractor to submit an Affidavit of Bills
paid signed by its contractor and Consent of Surety signed by its surety
to ensure the contractor has paid the sub -contractor and suppliers in full.
Additionally, the contractor will provide in writing that the contractor
has been paid in full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements
contemplated by this Agreement and that said construction shall be
completed in a good and workmanlike manner and in accordance with all
City standards and the City -approved construction plans, specifications and
cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X
Sewer (A-1) X Paving (B) Storm Drain (13-1) , Street Lights
& Signs (C) �.
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
Combined CFA final Sept 12, 2008 2
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of
the department having jurisdiction over the infrastructure to be
constructed, said contractor to meet City's requirements for being
insured, licensed and bonded to do work in public streets and/or
prequalified to perform water/waste water construction as the case may
be.
ii. To require its contractor to furnish to the City a payment and
performance bond in the names of the City and the Developer for one
hundred percent (100%) of the contract price of the infrastructure, and a
maintenance bond in the name of the City for one hundred percent
(100%) of the contract price of the infrastructure for a period of two (2)
years insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required
by said documents and same will be evidenced on the ACORD
Certificate of Insurance supplied by the contractor's insurance provider
and bound in the construction contract book.
iv. To require its contractor to give 48 hours notice to the City's
Construction Services Division of intent to commence construction so
that City inspection personnel will be available; and to require the
contractor to allow the construction to be subject to inspection at any
and all times by City inspection forces, and not to install or relocate any
sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such
laboratory tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The
3
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -
issued Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water
mains constructed under this Agreement until said sewer and water
mains and service lines have been completed to the satisfaction of the
Water Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities
to serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in conflict
with any of the community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or
employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of
Combined CFA final Sept 12, 2008 4
Fort Worth, its officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the Cite of Fort
Worth, its officers, servants, or employees. Further Developer will require
its contractors to indemnify, and hold harmless the City for any losses,
damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the
improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated
by the City.
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with
its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all
contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party
beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal
to four percent (4%) and material testing fees equal to two percent (2%)
for a total of 6% of the developer's share of the total construction cost as
stated in the construction contract.
5
iii. Developer shall pay in cash the total cost of streetlights or if the city is
not installing the streetlights, inspection fees equal to four percent (4%) of
the developer s share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in
the cost of the community facilities shall terminate if the facilities are
not completed within two (2) years; provided, however, if construction
of the community facilities has started within the two year period, the
developer may request that the CFA be extended for one year. If the
community facilities are not completed within such extension period,
there will be no further obligation of the City to participate. City
participation in a CFA shall be subject to the availability of City funds
and approval by the Fort Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee,
its agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for
this Agreement to cause the completion of the construction of the
community facilities if at the end of two (2) years from the date of this
Agreement the community facilities have not been completed and
accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause
the payment of costs for construction of same before the expiration of
two (2) years if the Developer breaches this Agreement, becomes
insolvent or fails to pay costs of construction and the financial guarantee
is not a Completion Agreement. If the financial guarantee is a
Completion Agreement and the Developer's contractors and/or suppliers
are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of
the Completion Agreement.
Combined CFA final Sept 12, 2008 6
Cost Summary Sheet
Project Name: Hulen Mall Renovations
CFA No.: 2010-061 DOE No.: 6573
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract
pace will ultimately determine the amount of CFA fees and financial guarantee. The bid price
and any additional CFA payments will be required prior to scheduling a pre -construction
meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
TPW Construction Cost Sub -Total
Total Construction Cost (excluding the fees):
$
Developer's Cost
116,150.00
87,538.75
203,688.75
$ 203,688.75
Construction Fees:
C. Water/Sewer Inspection Fee (2%) $ 4,073.78
D. Water/Sewer Material Testing Fee (2%) $ 4,073.78
Sub -Total for Water Construction Fees $ 8,147.55
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options. choose one
$ 8,147.55
Amount
Choice
jck one
Bond = 100%
$ 203,688.75
Completion
Agreement
= 100% / Holds Plat
$ 203,688.75
Cash Escrow Water/Sanitary Sewer= 125%
$
254,610.94
Cash Escrow Paving/Storm
Drain
r= 125%
$ -
Letter of Credit = 125% w/2yr expiration
period
$ 254,610.94
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested
by its City Secretary, with the corporate seal of the City affixed, and said Developer has
executed this instrument in quadruplicate, at Fort Worth, Texas this `` day
of , 20 \ .
CITY OF FORT WORTH - Recotnnmlended by:
Water Department
f
�t
Wendy Chi abulal, EMBA, P.E.
Development Engineering Manager
Approved as to Form & Legality:
Marcia E. Wise
Assistant ity Attorney
Afr
ATTEST:
Marty Hendrix
City Secretary
ATTEST
(Print) Name:
Signature
aro/ Arai/11/4as
ssisAMnest 3'ectreMj
Transportation & Public Works Department
1/2A
William A. Verkest, P.E
Director
Approved by City Manager's Office
llltib.�r C44—••
Fernando Costa
Assistant City Manager
aapeFOpt
?��o
Q0
%00
8 -4
°aX
olj
a
0
�o �°°
°000 ,cy
lb if tita S st
Hulen Mall, LLC
NO M&C REQUIRED
Signature
Print Name: Robert A. Michaels
Title: Vice Chairman
•
•
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Combined CFA final Sept 12, 2008 8
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included
AIL
S
C
n
n
n
n
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Stoini Drain Improvements
Storm Drain Estimate
1-ixhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
9
'---..111pr-
FORT
WORTH
X - 21413
WATER
PLANS
HULEN
HULEN
&
SEWER
FOR
MALL
THE
CITY
MALL
THE
ADDITION,
OF
IMPROVEMENTS
FORT
CONSTRUCTION
RENOVATIONS
WORTH,
LOT
TEXAS
12,
BLOCK
TO
1
OF
SERVE
DOE NO.6573 FI
CITY PROJECT N
irSHEET
1l
INDEX
� t
SHEET NO. DESCRIPTION
\,
FFd
yyil`1
[
O� PLAT
C,�,
C-M1 e.aER
�'
:�
4
r
1
SEWERRAN
A10 GENERAL NOTES
SITa
''
OWE mum PIM
woo¢ 1TWSWEARSPLUPID FUC3% UTIUW OEMNSN1a SIMMONS
O. P2SSBO315O154383
NO.P275-7O313O1S1383
MIKE MONCRIEF
GB, PADaW CG47B.I
MAYOR
Z$t
,cm
Ga] EROSIONDETAS.S•
wonvORO
EROSION S1DALE
""""
A. FISSELER, P.E.
`
CITY MANAGER
e
PLANS FOR THE CONSTRUCTION OF WATER PROJECT N
WATER
iOVEMENTS TO SERVE SEWER PROJECT
WILLIAM A. VERKEST, P.E.
. �
7fi
�
t
DIRECTOR, TRANSPORTATION AND
1:
'
__
��
�„ milt
��
PUBLIC WORKS DEPARTMENT
LOCATION
MAP
S. FRANK CRUMB, P.E.
N.T.S.
DIRECTOR, WATER DEPARTMENT
MAPSCO
NO.
89J
COUNCIL
DISTRICT
13
OWNED BY:
PREPARED
BY:
GENERAL GROWTH PROPERTIES
4800 S. HULEN STREET
250 HULEN MALL
FORT WORTH, TX 76132-1406
D.O.E. NO. 6573 CONTACT: KEVIN DAVIES
CIVIL CONSULTANTS
3528 VANN
BIRMINGHAM,
CONTACT
PHONE:
OF AL, INC. WILLIAM A. VERKEST, P.E. DATE:
ROAD, SUITE 105 DIRECTOR, TRANSPORTATION AND PUBLIC WORKS
AL 35235
DAVID MOON, P.E.
(205) 655-1991
PHONE: (817)294-1200
FAX: (205)
655-8366
FILE NO. X - 21413
RECOMMENDED BY: DATE:
WATER PROJECT NO. P265 - 603150164383
BOARD
SECRETARY
OF ENGINEERS: F-6612
OF STATE: FILE 800204288
SEWER PROJECT NO. P275 - 703130164383
CITY PROJECT NO. 01643
NOVEMBER
2010
REVIEWED: DATE:
PROJECT MANAGER
...\CFA Exhibit\Title Sheet.dgn 12/17/2010 1:57:58 PM
HULEN MALL RENOVATIONS
Fort Worth, Texas
Public Utility Cost Estimate 12/17/10
Item #
Approx.Q
uantity
Unit
Mearurement
Description
of
Items
with Bid
Prices
in Written Words
Unit Price
Total Amount
Water Distribution
1
662
LF
12"
PVC
Water
Line
per
Linear
Foot,
Dollars & Cents
$ 67.50
$ 44,685.00
2
100
LF
10"
PVC
Water
Line
per
Linear
Foot,
Dollars & Cents
$ 65.00
$ 6,500.00
3
55
LF
8"
PVC
Water
Line
per
Linear
Foot,
Dollars & Cents
$ 60.00
$ 3,300.00
4
140
LF
6"
PVC
Water
Line
per
Linear
Foot,
Dollars & Cents
$ 52.50
$ 7,350.00
5
957
LF
Trench
Safety
per
Linear
Foot
Dollars & Cents
$ 7.50
$ 7,177.50
6
8
EA
12"
Gate
Valve
with
Box per
Each,
Dollars & Cents
$ 1,100.00
$ 8,800.00
7
1
EA
10"
Gate
Valve
with
Box per
Each,
Dollars & Cents
$ 1,100.00
$
1,100.00
8
2
EA
8"
Gate
Valve
with
Box
per
Each,
Dollars & Cents
$ 950.00
$ 1,900.00
9
5
EA
6"
Gate
Valve
with
Box
per
Each,
Dollars & Cents
$ 950.00
$ 4,750.00
10
1.2
Ton
Ductile
Iron
Fittings
per
Ton,
Dollars & Cents
$ 9,500.00
$ 11,400.00
11
3.5
CY
Blocks
per
Cubic
Yard,
Dollars & Cents
$ 250.00
$ 875.00
Thrust
12
2
EA
2 1/2"
Tap
to
Water
Main (Domestic)
per Each,
Dollars & Cents
$ 500.00
$ 1,000.00
13
4
EA
2"
Tap
to
Water
Main
(Domestic)
per
Each,
Dollars
& Cents
$ 500.00
$ 2,000.00
14
3
EA
1
1/2"
Tap
to
Water
Main
(Irrigation)
per
Dollars
Each,
& Cents
$ 500.00
$ 1,500.00
15
20
LF
2
1/2"
Water
Service
per
Linear
Foot,
Dollars & Cents
$ 60.00
$ 1,200.00
16
55
LF
2'
Water
Service
per
Linear
Foot,
Dollars & Cents
$ 50.00
$ 2,750.00
17
3
EA
Each,
Meter
Box
-
Class
B
with
Angle
Valve
(Domestic
Dollars
&
Service)
Cents
per
$ 750.00
$ 2,250.00
18
3
EA
Meter
Each,
Box
-
Class
A
with
Angle
Valve
(Irrigation
Dollars
&
Service)
per
Cents
$
650.00
$ 1,950.00
19
2
EA
Relocate
Existing
2"
Water
Meter
Assembly
Dollars
per
&
Each,
Cents
$
500.00
$ 1,000.00
20
2
EA
Relocate
Existing
Fire
Hydrant
per
Each,
Dollars
& Cents
$
500.00
$ 1,000.00
21
73
LF
Concrete
Encasement
per
Linear
Foot
Dollars & Cents
$ 50.00
$ 3,650.00
Water
Subtotal
$ 116,137.50
Sanitary
Sewer
1
616
LF
8"
Ductile
Iron
Sanitary
Sewer
Line
per
Dollars
Linear
&
Foot,
Cents
$ 75.00
$ 46,200.00
2
5
EA
Std
4'
Dia.
Manhole
(to
6 ft depth)
per
Each
Dollars
& Cents
$ 2,500.00
$ 12,500.00
3
19.5
VF
Additional
Depth
Manhole
(over
6')
per
Vertical
Dollars
&
Foot
Cents
$ 125.00
$ 2,438.75
4
5
EA
Concrete
Collar
per
Each
Dollars & Cents
$ 500.00
$ 2,500.00
5
550
LF
Pre
TV
Inspection
of
SS
Lines
Dollars
per
&
Linear
Foot
Cents
$ 4.44
$ 2,439.86
-Construction
6
616
LF
Post
-Construction
TV
Inspection
of
Dollars
SS
&
Lines
per
Cents
Linear
Foot
$ 4.44
$ 2,732.64
7
616
LF
Trench
Safety
per
Linear
Foot
Dollars & Cents
$
15.00
$ 9,240.00
8
1
EA
Connect
to
Existing
Manhole
per
Each
Dollars & Cents
$ 1,000.00
$ 1,000.00
9
2
EA
Re
Existing
8"
Service
to
New
Dollars
Manhole
per Each
& Cents
$ 500.00
$ 1,000.00
-connect
10
5
EA
Vaccuum
Test
per
Each
Dollars & Cents
$ 1,000.00
$ 5,000.00
11
50
LF
Concrete
Encasement
per Linear
Foot
Dollars & Cents
$ 50.00
$ 2,500.00
Sewer
Subtotal
$
87,551.25
Project
Total
$ 203,688.75
•. •
8- WATER UNE1
•
•
4.
UTILITY LEGEND
— B SS — PROPOSED SANITARY UNE
PROPOSED GREASE WASTE UNE
STOFt• UNE
WATER UNE
to FIRE DEPARTMENT CONNECTION
• FIRE HYDRANT
GE— UNDERGROUND POWER
-UGT - UNDERGROUND PHONE
NATURAL GAS UNE
i
I.! .0........
40°" 44,
..... - ........ I
.........--..-..---..---..--_—.-.—.,-.._------...-.......---..-.1_---
...J ,.... 1 ........"........... ... .......,....,....... ....0-"
00.
... .••.
‘. :i :• .
• . I j - •
..i..i
2 I
i .-jI-•..i
• -
ir j i '
LOT 17, BLOCK 1, HULEN MALL ADDITION
4000 S HULEN STREET
FORT WORTH, TEXAS
CITY MAP: 2030-384 8 2030-38B
MAPSCO PAGE Bal
0 IS 3o 60 90
SCALE IN FEET
1" 30'
PROPOSED SANITARY
• MANHOLE
O PROPOSED CLEANOUT
LC)rry CO.4mFT1mAI 1
ErVISE9,-M,1114
erkeal
EXISTING
SANITARY UNE
EXISTING WATER UNE
EXISTING GAS UNE
mg 1- IRRIGATION WATER
MEI ut
0 1 lir DomEsmc WATER
METER
Boalweerl
HULEN MALL RENOVATIONS
FT. WORTH, TEXAS
WATER EXHIBIT
WI*
cm mon iltupono
001INT Litet4010
OA MINT 12/11/2010
HULEN MALL RENOVATIONS
R. WORTH MAL
RCM Pt IWO/67040100a \174.1
10.1•••••
dal/ S•
lia.Et I M.!
WATER EXHIBIT
C-302-RO
..\ CFA Exhibit\Water Exhibit.dgn 12/20/2010 11:38:19 AM
\
O
—8 SS-
-12' W—
GE
—UGT
"fib:_:, ..
iA:✓
!
UTILITY LEGEND
PROPOSED SANITARY UNE
PROPOSED GREASE WASTE UNE
STORM UNE
WATER UNE
FIRE DEPARTMENT CONNECTION
FIRE HYDRANT
UNDERGROUND POWER
UNDERGROUND PHONE
NATURAL GAS UNE
LOT 12, BLOCK 1, HULEN MALLADONION
4800 S HULEN STREET
FORT NORTH. TEXAS
CITY MAP: 2030384 62030388
MAPSCO PAGE 80J
0 15 30 60 90
SCALE IN FEET
- 30'
s
e
PROPOSED SANITARY
MANHOLE
e PROPOSED CLEANOUT
OP9PFI9yG ++y,mr�wleA. Iw
.utlmuuf...' wie
ExISTNG
SANITARY UNE
EXISTING WATER UNE
EXISTING GAS UNE
• M IRRIGATION WATER
D 1t7 DOMESTIC WATER
METER
mammon ay
FT. WORTH, TEXAS
2
SEWER EXHIBIT
laumai
71. OWN
.1 COMM
HULEN MALL RENOVATIONS
n.'MIRM MAC
N:vruc+sna.00uPM
WWI
Gahm
SEWER EHIBIT
C-302-RO
...\CFA Exhibit\Sewer Exhibit.dgn 12/20/2010 11:54:19 AM