HomeMy WebLinkAboutContract 40758CITY SECRPTIARY CITY OF FORT WORTH, TEXAS CONTPACT STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SEIlVIC.' :8 This AGREEMENT is between the City of Fort Worth, a home -rule municipal corporation situated in Tarrant, Denton, Parker and Wise Counties, Texas (the "CITY"), and Kimle-Horn and Associates, Inc. (the "ENGINEER"), for a PROJFCT generally described as: Bicycle Facility Pilot Program e American Recovery and Reinvestment Act Project. Article Scope of Services A. The Scope of Services is set forth in Attachment A. Article II Cornpensation A. The R's compensation is set forth in Attachment B. Article III Terms of Payment Payments to the ENGINEER will be made as follows: A. Invoice and Payment (1) The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMrN I , to reasonably substantiate the invoices. (2) The ENGINEER will issue monthly invoices for all work performed under this AGRf OMEN I . Invoices are due and payable within 30 days of receipt. (3) Upon completion of services enumerated in Article I, the final payment of any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The CITY will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the billing until mutually resolved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving 7 City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 1 of 15 U 9- 01- 'I o P n 4: U 0 I QEFICIALRECOR�I 1 rt SIT;' SECRETARY �"T.WORTH, TX days' written notice to CITY, suspend services under this AGREEMENT until paid in full. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. Article IV Obligations of the Engineer Amendments to Article IV, if any, are included in Attachment C. A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B Standard of Care The standard of care applicable to the ENGINEER's services will be the degree of skill and diligence normally employed in the State of Texas by professional engineers or consultants performing the same or similar services at the time such services are performed. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration and investigations have been made Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 2 of 15 Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the Contract Documents, nor shall anything in the Contract Documents or the agreement between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on -site observation(s) of a deviation from the Contract Documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 3 of 15 F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents; that the final work will be acceptable in all respects that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances or that there are not other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location type of various components or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 4 of 15 I. Minority and Woman Business Enterprise (M/WBE) Participation In accord with City of Fort Worth Ordinance No. 15530, the City has goals for the participation of minonty business enterprises and woman business enterprises in City contracts. Engineer acknowledges the M/WBE goal established for this contract and its commitment to meet that goal. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books documents, papers and records of the ENGINEER involving transactions relating to this contract ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 5 of 15 K. INSURANCE (1) ENGINEER'S INSURANCE a. Commercial General Liability — the ENGINEER shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella insurance with a limit of not less than $1,000,000.00 per each occurrence with a $2,000,000.00 aggregate. If such Commercial General Liability insurance contains a general aggregate limit, it shall apply separately to this PROJECT or location. i. The CITY shall be included as an insured under the CGL, using ISO additional insured endorsement or a substitute providing equivalent coverage, and under the commercial umbrella, if any. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the CITY. The Commercial General Liability insurance policy shall have no exclusions by endorsements that would alter or nullify: premises/operations, products/completed operations, contractual, personal injury, or advertizing injury which are normally contained within the policy, unless the CITY approves such exclusions in writing. ii ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained in accordance with this agreement. b Business Auto — the ENGINEER shall maintain business auto liability and, if necessary, commercial umbrella liability insurance with a limit of not less than $1,000,000 each accident Such insurance shall cover liability arising out of any auto', including owned, hired, and non -owned autos, when said vehicle is used in the course of the PROJECT If the engineer owns no vehicles, coverage for hired or non -owned is acceptable. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by ENGINEER pursuant to this agreement or under any applicable auto physical damage coverage. c. Workers' Compensation —ENGINEER shall maintain workers compensation and employers liability insurance and, if necessary commercial umbrella liability insurance with a limit of not less than $100,000.00 each accident for bodily injury by accident or $100 000.00 each employee for bodily injury by disease, with $500,000.00 policy limit. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 6 of 15 ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by workers compensation and employer's liability or commercial umbrella insurance obtained by ENGINEER pursuant to this agreement. d. Professional Liability — the ENGINEER shall maintain professional liability a claims -made policy, with a minimum of $1,000,000.00 per claim and aggregate The policy shall contain a retroactive date prior to the date of the contract or the first date of services to be performed, whichever is earlier. Coverage shall be maintained for a period of 5 years following the completion of the contract. An annual certificate of insurance specifically referencing this project shall be submitted to the CITY for each year following completion of the contract. (2) GENERAL INSURANCE REQUIREMENTS a. Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be delivered to the CITY prior to ENGINEER proceeding with the PROJECT. b. Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, as its interests may appear. The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. c. Certificate(s) of insurance shall document that insurance coverage specified in this agreement are provided under applicable policies documented thereon. d. Any failure on part of the CITY to request required insurance documentation shall not constitute a waiver of the insurance requirements. e. A minimum of thirty (30) days notice of cancellation or material change in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable in the event of non-payment of premium Such terms shall be endorsed onto ENGINEER's insurance policies. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 1000 Throckmorton, Fort Worth, Texas 76102. f Insurers for all policies must be authorized to do business in the State of Texas and have a minimum rating of A:V or greater, in the current A M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 7 of 15 g. Any deductible or self insured retention in excess of $25,000 00 that would change or alter the requirements herein is subject to approval by the CITY in writing, if coverage is not provided on a first -dollar basis. The CITY, at it sole discretion, may consent to alternative coverage maintained through insurance pools or risk retention groups. Dedicated financial resources or letters of credit may also be acceptable to the CITY. h. Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. i. The CITY shall be entitled, upon its request and without incurring expense, to review the ENGINEER's insurance policies including endorsements thereto and, at the CITY's discretion; the ENGINEER may be required to provide proof of insurance premium payments. is Lines of coverage, other than Professional Liability, underwntten on a claims -made basis, shall contain a retroactive date coincident with or prior to the date of the contractual agreement. The certificate of insurance shall state both the retroactive date and that the coverage is claims -made. k. Coverages whether written on an occurrence or claims -made basis, shall be maintained without interruption nor restrictive modification or changes from date of commencement of the PROJECT until final payment and termination of any coverage required to be maintained after final payments. The CITY shall not be responsible for the direct payment of any insurance premiums required by this agreement. m. Sub consultants and subcontractors to/of the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER When sub consultants/subcontractors maintain insurance coverage, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 8 of 15 any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City Amendments to Article V, if any, are included in Attachment C. A. City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 9 of 15 the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities and land, easements, rights -of -way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER bnngs such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification and Claims The CITY agrees to include in all construction contracts the provisions of Article IV E regarding the ENGINEER's Personnel at Construction Site, and provisions City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 10 of 15 providing contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER " (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this Agreement. (4) Nothing contained in this section V.H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER I. CITY's Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY will ensure that Builders Risk/Installation insurance is maintained at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) The CITY will specify that the Builders Risk/Installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 11 of 15 K. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions Amendments to Article VI, if any, are included in Attachment C. A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure The ENGINEER is not responsible for damages or delay in performance caused by acts of God, strikes lockouts, accidents, or other events beyond the control of the ENGINEER that prevent ENGINEER s performance of its obligations hereunder. D Termination (1) This AGREEMENT may be terminated only by the City for convenience on 30 days' written notice. This AGREEMENT may be terminated by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and does not commence correction of such nonperformance with in 5 days of written notice and diligently complete the correction thereafter. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 12 of 15 (3) a.) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) Out-of-pocket expenses for purchasing electronic data files and other data storage supplies or services; c.) The time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all termination expenses. The CITY'S approval will be obtained in wnting prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECTs schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification In accordance with Texas Local Government Code Section 271.904, the ENGINEER shall indemnify, hold harmless and defend the CITY against liability for any damage caused by or resulting from an act of negligence, intentional tort, intellectual property infringement, or failure to pay a subcontractor or supplier committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control. G. Assignment Neither party shall assign all or any part of this AGREEMENT without the prior written consent of the other party. H. Interpretation Limitations on liability and indemnities in this AGREEMENT are business understandings between the parties and shall apply to all the different theories of recovery, including breach of contract or warranty, tort including negligence, strict or statutory liability or any other cause of action, except for willful misconduct or gross negligence for limitations of liability and sole negligence for indemnification. Parties mean the CITY and the ENGINEER, and their officers, employees, agents, and subcontractors. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 13 of 15 I. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. J. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V F , VI B , VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. K. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment No plea of misunderstanding or ignorance thereof shall be considered ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 14 of 15 Assistant City Attorney AT EST: fl ail, 3 Coiifixact Authorizatioo \to bate City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services 6.30.09 Page 15 of 15 xecuted this the ATTEST: Article VII Attachments, Schedules, and Signatures This AGRI`.EMENT, including its attachments and schedules, constitutes the entire AGREFMrNT, supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. The following attachments and schedules are hereby made a part of this AGRrEMFNT: Attachment A e Scope of Services Attachment B m Compensation Attachment C e Amendments to Standard Agreement for Engineering Services Attachment D o Project Schedule Attachment E Location Map day of 20( b. CITY OF FORT WORTH 7 By: 4 Marty Hendrix a� a o eFernando Costa CitySecretaryao°\Zq- ;7Ytt CityMana er ., g TOOA ° ,,,Cli\-d cc"? 41'0 FOR A CEGBAYIAPPROVAL- RECOMMENDED e4( g APPROVED AS illl qD _-_- , ,,,/ XAS --Ner Amy Ramse yt Sdsarr Alanis Director, Planning & Development KIMLEY-HORN AND ASSOCIATFS, INC. Byx• Glenn A. Gary Senior Vice President OFFICIAL RECORD CITY SECRETARY FT WORTH: TX ATTACHMENT "A" SCOPE OF SERVICES BICYCLE FACILITY PILOT PROGRAM AMERICAN RECOVERY AND REINVESTMENT ACT PROJECT FORT WORTH, TEXAS P ROJECT UNDERSTANDING The ENGINEER understands the CITY has an adopted Bike Fort Worth plan. As a first step to the implementation of the Bike Fort Worth plan, the CITY has received a grant from the Department of Energy's Energy Efficiency and Conservation Block Grant (EECBG) P rogram for the construction of bicycle pathways signs and markings and bicycle racks and shelters. The scope of services delineated in this Attachment "A" does not include any tasks that will be performed by laborers and mechanics. Accordingly, the requirements as specified in Attachment "F" when utilizing laborers and mechanics will not be applicable to the professional services delineated herein since no laborers and mechanics shall be utilized in providing the services. The ENGINEER understands the pilot project area identified is bordered by IH-30, Forest Park Boulevard and the railroad. The following sections for roadways have been identified on the Bike Fort Worth plan: • 5th Street - Forest Park Boulevard to 4th Street; • 7th Street - Forest Park Boulevard (Trinity River Bridge) to Houston Street; • 10th Street — Summit Avenue to Throckmorton Street, • 9th Street — Throckmorton Street to Jones Street (under construction); • Texas Street — Summit Avenue to Throckmorton; • Lancaster Avenue — Jennings Street to Jones Street; • 4th Street — 7th Street to Grove Street; • 3rd Street — Henderson Street (SH 199) to Railroad; • 2nd Street — Henderson Street to Burnett Street / Throckmorton Street to Grove Street; • Weatherford St. — Taylor Street to Houston Street; • Belknap Street — Burnett Street to Houston Street; • 1st Street — Grove Street to EIm Street; • Bluff Street — Grove Street to EIm Street; • Summit Avenue — IH-30 Westbound Frontage Road to 5th Street; • Henderson Street — 3rd Street to Bluff Street; • Burnett Street — 4th Street to Belknap Street; • Cherry Street — 10th Street to 7th Street; • Lamar Street — Lancaster Avenue to 10th Street; • Taylor Street — 7th Street to Belknap Street; • Jennings Street — Railroad to 10th Street; • Throckmorton Street — Belknap Street to Lancaster Avenue; • Houston Street — Belknap Street to 9th Street; • Commerce Street — Belknap Street to 4th Street / 9th Street to Lancaster Avenue; • Calhoun Street — 3`d Street to 9th Street; • Jones Street — 3`d Street to Lancaster Avenue; and • Grove Street — 1st Street to 4th Street. This ENGINEER understands this project consists of the design for signage and pavement markings depicting on -street bicycle route or lanes with supporting directional signage consistent with the bikeway recommendations of the Bike Fort Worth plan. The ENGINEER understands this project consists of decided upon location and type of bicycle parking racks and/or covered bicycle shelters locations in the City of Fort Worth right-of- way or in easements on private right-of-way, consistent with the bikeway recommendations of the Bike Fort Worth plan. The ENGINEER understands the CITY plans to compile the bidding package to include the on -street bicycle route or lane improvements and the installation of bicycle parking racks and/or covered bicycle shelters. The ENGINEER will utilize BuzzSaw for preparation and advertising of the bidding package This scope of services does not include effort for developing an environmental assessment or coordination with the Texas Department of Transportation (TxDOT). SCOPE OF SERVICES If services beyond those defined in this scope are required, the CITY and the ENGINEER shall attempt to negotiate a written amendment to this Agreement. The ENGINEER shall not proceed with work on any additional services prior to the CITY and ENGINEER executing a written amendment. The Scope of Services includes the following primary tasks. The ENGINEER is only responsible for those professional services that can be completed within the maximum contract amount specified in Attachment "B" (Compensation). If the CITY requests the ENGINEER to provide services that exceed the maximum contract amount specified in Attachment 'B' or extend beyond the schedule specified in Attachment "D' an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval Task 1 — Data Collection and Verification of Existing Plan The CITY will provide the ENGINEER with the following documents/information: • Bike Fort Worth plan; • Current Fort Worth bicycle details and specifications (if available); • Record drawings for projects identified (if available); • City Contacts — The CITY will provide contact information for the applicable CITY staff to be involved with the Bike Fort Worth plan; and • Overlay / reconstruction schedule for downtown. The CITY will provide the ENGINEER the most current ArcGIS shapefiles and layerfiles for the following datasets (NAD 83 State Plane, North Central Texas Zone coordinates): • Bike Fort Worth plan; • EECBG Project Limits; and • Most recent digital orthophotograph (DOQ) of downtown Fort Worth. Prior to our evaluation, the ENGINEER will conduct field survey measurements for each of the roadways identified in the Project Understanding. The ENGINEER will prepare for and attend a field verification meeting following Task 1.2. The meeting with consist of riding and evaluating the proposed bicycle network Task 2 — Public Involvement It is anticipated that ENGINEER will prepare for and attend up to eight (8) meetings during the public involvement process. These anticipated meetings are as follows: • Prepare for and attend three (3) meetings with the Downtown Bicycle Task Force Committee. One meeting will be focused on input for bicycle commuting pathway signs and markings. One meeting will be focused on input for bicycle commuting racks and one proposed shelter One meeting will present preliminary plans. • Prepare for and attend four (4) meetings to obtain public input. One meeting will be held during an advertised public meeting held during business hours One meeting will be an advertised public meeting held during non -business hours. One meeting will be an in -field survey at the Intermodal Transportation Center (ITC). One meeting will be with the Fort Worth Police Department Bicycle Patrol. Prepare for and attend one advertised stakeholder (1) public meeting. Task 3 — Prioritization The ENGINEER will prepare a prioritization of bicycle routes and bicycle parking location based on the input received in Task 2. This prioritization will be based on High, Medium, and Low categorization. Task 4 — Details and Specifications The ENGINEER will review available similar bicycle striping and signage and bicycle parking details from up to three (3) municipalities. The ENGINEER will prepare the technical specifications for up to two (2) recommended bicycle parking rack facilities. The ENGINEER will prepare standard detail sheets for pavement markings and parking rack facilities in accordance with the following guidelines: • Electronic drawings will be in either AutoCAD or Microstation format and conform to CITY drafting standards. • The ENGINEER anticipates that the standard details will require up to two (2) sheets for the standard pavement markings. • The ENGINEER anticipates that the standard details will require up to two (2) sheets per bicycle parking rack facility. • The ENGINEER will incorporate CITY comments that are agreed upon at the review meeting into the final standard sheets. • The standard sheets will contain construction details and design information necessary to install appropriate striping. The ENGINEER will prepare and attend up to two (2) meetings with this task. It is anticipated one of these meetings will be an educational seminar for City Staff. Task 5 — Design P reliminary (60%) Design U sing the information collected during Task 1 the ENGINEER will create electronic base files, and prepare preliminary designs for the bicycle route signing and marking plans based on schematic field survey for the project corridors identified in the Project U nderstanding The ENGINEER will create a location map for the proposed bicycle parking and bicycle shelter The bicycle route signing and pavement marking plans will generally include: • Existing marking and/or marker removal (as needed); • Proposed bike route signing* and • Proposed bike route pavement markings. For each corridor, all recommended improvements will be done on existing pavement based on field survey schematics. This project does not include any widening or curb relocations. The bicycle parking plans will generally include: • Location of proposed bicycle parking facilities and parking shelter (if applicable). The ENGINEER will utilize the following design guidelines: • City design standards; • AASHTO's Guide for the Development of Bicycle Facilities; • Texas Manual on Uniform Traffic Control Devices (TMUTCD); and • Texas Department of Transportation standards. Following completion of the preliminary design, the ENGINEER will meet with the CITY to review and discuss the preliminary design. The ENGINEER will revise the preliminary design based on CITY comments. Following this review meeting with the CITY, the ENGINEER will conduct a public meeting with the stakeholders (included in Task 2) to review and discuss the preliminary design. Draft Final (90%) Design The ENGINEER will incorporate comments received during the Task 2 public meeting and preliminary design review, and submit to the CITY draft final plans (90%) for the bicycle route improvements for the Bike Fort Worth plan (1 — PDF electronic copy; 3 —11" x 17" paper copies) The draft final plan deliverables will include: ® Title Sheet ® Estimate Summary Sheet ® Signs and Markings Layout showing removing of necessary existing signs, proposed signs, existing striping, proposed striping, pavement markings summary chart, sign summary chart, and general notes. ® Pavement Markings Standard Detail Sheets ® Bike Route Standard Details Sheets (if applicable) The ENGINEER will prepare and submit the quantity estimates and engineer s opinion of probable construction cost (OPCC) spreadsheets prepared in Microsoft Excel for the project. The ENGINEER will meet with the CITY to discuss any comments on the draft final design. Final Design The ENGINEER will incorporate comments received from the CITY's draft final plan review (1 — PDF electronic copy; 3 —11" x 17" paper copies). The final plan deliverables will include the same items from Draft Final (90%) Design. The ENGINEER will provide the CITY a CD of the electronic Microstation project files, quantity estimates, and engineer's opinion of probable construction cost for the project. Task 6 — Bidding and Construction Phase Services The ENGINEER will obtain hard copies and electronic copies of the CITY's current Transportation / Public Works (T/PW) construction Contract Documents. The ENGINEER will prepare and submit the Notice to Bidders to the CITY for advertising. The ENGINEER will respond to Contractor's questions and issue addenda as required. The ENGINEER will prepare for and conduct one Pre -Construction Conference prior to commencement of work The ENGINEER will assist the CITY in selection of the subcontractors according to the Davis Bacon act and verify the current DOL prevailing wage rate is in compliance for subcontractors who will be doing the construction. ATTACHMENT "B" COMPENSATION BICYCLE FACILITY PILOT PROGRAM AMERICAN RECOVERY AND REINVESTMENT ACT PROJECT FORT WORTH, TEXAS PROFESSIONAL ENGINEERING SERVICES For all professional engineering services included in ATTACHMENT "A' (Scope of Services, Bicycle Facility Pilot Program), the CITY agrees to pay the ENGINEER a lump sum fee of $126,975. II BASIS FOR COMPENSATION The CITY shall compensate the ENGINEER for the professional engineering services included in ATTACHMENT "A" on a lump sum fee basis. The lump sum fee includes labor costs and direct expenses identified in this contract, as well as items such as in-house duplicating, printing, facsimile, local mileage telephone, postage, and computer expenses. The ENGINEER shall be paid monthly based on statements submitted to the CITY for the work accomplished during the preceding month. Monthly statements for lump sum services will be based upon a reasonable estimation of percent complete. EXHIBIT "B-1" M/WBE SUMMARY BICYCLE FACILITY PILOT PROGRAM AMERICAN RECOVERY AND REINVESTMENT ACT PROJECT Task Description Fee M/WBE (%) Task 1 — Data Collection and Verification of Existing Plan Task 2 — Public Involvement Task 3 — Prioritization Task 4 — Details and Specifications Task 5 — Design Task 6 — Bidding and Construction Phase Services $14,000 $9,500 $3,000 $9,485 (9.3%) $10,230 (10.0%) (0.0%) $14,000 $2,860 (2.8%) $59,500 $2,400 (2.4%) $2,000 Total Project M/WBE Subconsultant $102,000 $24,975 (24.5%) Services Fee Bowman -Melton Associates, Inc. See Above Tasks $24,975 Total $24,975 This attachment is provided for informational purposes only to show the projected plan to meet the M/WBE goal of 15.0%. The actual dollars paid by the ENGINEER to M/WBE subconsultants may vary for each task as well as for each subconsultant. The subconsultants listed are those intended for use on this project but the actual subconsultants used may vary. ATTACHMENT "C" AMENDMENTS TO STANDARD AGREEMENT FOR ENGINEERING SERVICES BICYCLE FACILITY PILOT PROGRAM AMERICAN RECOVERY AND REINVESTMENT ACT PROJECT FORT WORTH, TEXAS No modifications to the Standard Agreement were necessary for this project. ATTACHMENT "D" PROJECT SCHEDULE BICYCLE FACILITY PILOT PROGRAM AMERICAN RECOVERY AND REINVESTMENT ACT PROJECT FORT WORTH, TEXAS The ENGINEER will complete the scope of services outlined in ATTACHMENT "A" according to the following schedule: Task Schedule 1 Data Collection and Verification of Existing Plan Within three weeks after NTP 2 Public Involvement Within 2 months after Task 1 3 Prioritization Within 1 month after Task 2 4 Details and Specifications Within 3 months after Task 2 5 Design Within 8 months after Task 2 6 Bidding and Construction Services After completion of Task 5 ATTACHMENT "E" LOCATION MAP BICYCLE FACILITY PILOT PROGRAM AMERICAN RECOVERY AND REINVESTMENT ACT PROJECT FORT WORTH, TEXAS PROJECT LOCATION I 111-1116711 III lialm=6IMMIMIS� AM SMIIIIIM II I NEIL= March 2010 ATTACHMENT ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT PROGRAM SPECIAL INSTRUCTIONS ADDITIONAL REQUIREMENTS ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT (EECBG) AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) PROJECT All contracts funded in whole or in part by EECBG funds shall comply with the following: 1. Ensure the safety and structural integrity of any repair, replacement, construction, and or alteration performed. 2. Comply with provisions of the City of Fort Worth EECBG Waste Stream Plan attached hereto. 3. Submit Information in Support of ARRA Reporting by the 4th day of each month, including financial, job creation/retention and performance progress reports. Submit backup documentation for expenditures of funds under ARRA including such items as timecards, invoices, and validation of purchasing American made goods 4. Submit to City on a weekly basis: (1) Payroll, (2) Statement of Compliance -for each payroll, as applicable for all laborers and mechanics, for services and activities accomplished by Contractor in performance of this Contract. Payroll and the Statement of Compliance must be signed by a duly authorized agent of the Contractor and submitted each Friday of the week following the week being reported. 5. Upon identification of possible breaches of contract, and prior to exercising its termination rights under this Contract for breach, City may elect to exercise any of the following administrative remedies: a. Issuance of warning letter indicating that further failure to comply with applicable requirements will result in serious sanction and giving Contractor a limited time to correct the deficiency; Placing conditions upon award of future grants; c. Directing Contractor to stop incurring costs until the deficiency is corrected and the correction is verified; Requiring repayment of previously reimbursed grant funds; or Reducing the amount of pending grant awards or disallowing future awards to Contractor. f. The City's election to exercise any, all, or none of the aforementioned administrative remedies does not act as a waiver of any of City's other rights or remedies under the law or this Contract for the enforcement of this Contract or the recovery of any damages relating to Contractor's actions or inactions relating to the Program, EECBG funds, and/or this Contract. RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page I of 31 March 2010 Follow mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Action (Pub. L. 94A 163, 89 Stat. 871), (53 FR 8068, 8087, Mar. 11, 1988, as amended at 60 FR 19639, 19642 Apr. 19, 1995). 7. Comply with 10 CFR 600 which outlines DOE requirements and regulations pertaining to patent rights with respect to any discovery or invention which arises or is developed in the course of or under this contract. 8. Comply with 10 CFR 600 which outlines DOE requirements and regulations pertaining to copyrights and rights in data. SUBRECIPIENT OR SUBCONTRACTOR FLOWDOWN REQUIREMENTS Subawardees who receive federal funds under an assistance agreement shall comply with the flow down requirements for subawardees specified in the "Special Provisions Relating to Work Funded under American Recovery and Reinvestment Act of 2009" which apply to this award. Additionally, as required by 10 CFR 600.2(b), 10 CFR 600.236 and 10 CFR 600.237 any new, continuation, or renewal award and any subsequent subaward shall comply with any applicable Federal statute Federal rule, Office of Management and Budget (OMB) Circular and Government -wide guidance in effect as of the date of such award. These requirements include, but are not limited to the following: a. DOE Assistance Regulations, 10 CFR Part 600 at http://ecfr.gpoaccess.gov. b. In addition to 10 CFR 600, Appendix A, Generally Applicable Requirements, the National Policy Assurances to Be Incorporated as Award Terms in effect on date of award at http://management.energy.gov/business doe/1374 htm apply. c. 2 CFR 215 `Uniform Administrative Requirements for Grants and Agreements with Institutions of Higher Education, Hospitals, and Other Non -Profit Organizations (OMB Circular A-1 10)." d. OMB Circular A-102, `Grants and Cooperative Agreements with State and Local Governments" Common Rules. e. OMB Circular A-21, "Cost Principles for Educational Institutions," OMB Circular A-87, 'Cost Principles for State , Local, and Indian Tribal Governments," OMB Circular A-122, ` Cost Principles for Non -Profit Organizations " or FAR at 48 CFR Part 31, "Contract Cost Principles and Procedures " for Profit Organizations, as applicable. f. OMB Circular A-133, "Audits of States, Local Governments, and Non -Profit Organizations." g. Subawardee Application/proposal as approved by DOE. RFQ 10 0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 2 of 31 March 2010 SUBGRANT FLOWDOWN PROVISIONS FOR EECBG FINANCIAL ASSISTANCE AWARDS SPECIAL TERMS AND CONDITIONS Table of Contents Number Subiect Page 1. RESOLUTION OF CONFLICTING CONDITIONS 4 2. CEILING ON ADMINISTRATIVE COSTS 4 3. LIMITATIONS ON USE OF FUNDS 4 4. REIMBURSABLE INDIRECT COSTS AND FRINGE BENEFIT COSTS 5 5. USE OF PROGRAM INCOME 5 6. STATEMENT OF FEDERAL STEWARDSHIP 5 7. SITE VISITS 5 8. REPORTING REQUIREMENTS 5 9. PUBLICATIONS 6 10. FEDERAL, STATE, AND MUNICIPAL REQUIREMENTS 6 11. LOBBYING RESTRICTIONS 6 12. NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) REQUIREMENTS 6 13. HISTORIC PRESERVATION 7 14. WASTE STREAM 7 15. DECONTAMINATION AND/OR DECOMMISSIONING (D&D) COSTS 7 16. SUBGRANTS AND LOANS 7 17. JUSTIFICATION OF BUDGET COSTS 8 18. ADVANCE UNDERSTANDING CONCERNING PUBLICLY FINANCED ENERGY IMPROVEMENT PROGRAMS 9 19. SPECIAL PROVISIONS RELATING TO WORK FUNDED UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (May 2009) 9 20. REPORTING AND REGISTRATION REQUIREMENTS UNDER SECTION 1512 OF THE RECOVERY ACT 14 21. NOTICE REGARDING THE PURCHASE OF AMERICAN-MADE EQUIPMENT AND PRODUCTS -- SENSE OF CONGRESS 14 22. REQUIRED USE OF AMERICAN IRON, STEEL, AND MANUFACTURED GOODS SECTION 1605 OF THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 14 23. REQUIRED USE OF AMERICAN IRON, STEEL, AND MANUFACTURED GOODS (COVERED UNDER INTERNATIONAL AGREEMENTS) — SECTION 1605 OF THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 17 24. WAGE RATE REQUIREMENTS UNDER SECTION 1606 OF THE RECOVERY ACT 21 25. RECOVERY ACT TRANSACTIONS LISTED IN SCHEDULE OF EXPENDITURES OF FEDERAL AWARDS AND RECIPIENT RESPONSIBILITIES FOR INFORMING SUBRECIPIENTS 21 26. DAVIS-BACON ACT AND CONTRACT WORKHOURS AND SAFETY STANDARD ACT 22 27. PROCUREMENT 22 RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 3 of 31 March 2010 1. RESOLUTION OF CONFLICTING CONDITIONS Any apparent inconsistency between Federal statutes and regulations and the terms and conditions contained in this award must be referred to the DOE Award Administrator for guidance. 2. CEILING ON ADMINISTRATIVE COSTS STATES a State Recipients may not use more than 10 percent of amounts provided under the program for administrative expenses (EISA Sec 545 (c)(4)). These costs should be captured and summarized for each activity under the Projected Costs Within Budget: Administration. b. Recipients are expected to manage their administrative costs DOE will not amend an award solely to provide additional funds for changes in administrative costs. The Recipient shall not be reimbursed on this project for any final administrative costs that are in excess of the designated 10 percent administrative cost ceiling. In addition the Recipient shall neither count costs in excess of the administrative cost ceiling as cost share, nor allocate such costs to other federally sponsored project, unless approved by the Contracting Officer. LOCAL GOVERNMENT (Cities & Counties) and INDIAN TRIBES a. Local government and Indian Tribe Recipients may not use mole than 10 percent of amounts provided under this program, or $75 000 whichever is greater (EISA Sec 545 (b)(3)(A)), for administrative expenses, excluding the costs of meeting the reporting requirements under Title V, Subtitle E of EISA. These costs should be captured and summarized for each activity under the Projected Costs Within Budget: Administration. b. Recipients are expected to manage their administrative costs. DOE will not amend an award solely to provide additional funds for changes in administrative costs. The Recipient shall not be reimbursed on this project foi any final administrative costs that are in excess of the designated 10 percent administrative cost ceiling. In addition, the Recipient shall neither count costs in excess of the administrative cost ceiling as cost share, nor allocate such costs to other federally sponsored project, unless approved by the Contracting Officer. 3. LIMITATIONS ON USE OF FUNDS a. By accepting funds under this award, you agree that none of the funds obligated on the award shall be expended, directly or indirectly, for gambling establishments, aquariums, zoos, golf courses or swimming pools. b. Local government and Indian tribe Recipients may not use more than 20 percent of the amounts provided or $250,000, whichever is greater (EISA Sec 545 (b)(3)(B)), for the establishment of revolving loan funds. Local government and Indian tribe Recipients may not use more than 20 percent of the amounts provided or $250,000, whichever is greater (EISA Sec 545 (b)(3)(C)), for subgrants to nongovernmental organizations for the purpose of assisting in the implementation of the energy efficiency and conservation strategy of the eligible unit of local government or Indian tribe. RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 4 of 31 March 2010 4. REIMBURSABLE INDIRECT COSTS AND FRINGE BENEFIT COSTS a. The Recipient is expected to manage their final negotiated project budgets, including their indirect costs and fringe benefit costs. DOE will not amend an award solely to provide additional funds for changes in the indirect and/or fringe benefit costs or for changes in rates used for calculating these costs. DOE recognizes that the inability to obtain full reimbursement for indirect or fringe benefit costs means the Recipient must absorb the under recovery. Such under recovery may be allocated as part of the Recipients cost share If actual allowable [indirect and/or fringe benefit] costs are less than those budgeted and funded under the award, the Recipient may use the difference to pay additional allowable direct costs during the project period. If at the completion of the award the Government's share of total allowable costs (i.e., direct and indirect), is less than the total costs reimbursed, the Recipient must refund the difference. 5. USE OF PROGRAM INCOME If you earn program income during the project period as a result of this award, you may add the program income to the funds committed to the award and used to further eligible project objectives. 6. STATEMENT OF FEDERAL STEWARDSHIP DOE will exercise normal Federal stewardship in overseeing the project activities performed under this award. Stewardship activities include, but are not limited to, conducting site visits; reviewing performance and financial reports; providing technical assistance and/or temporary intervention in unusual circumstances to correct deficiencies which develop during the project; assuring compliance with terms and conditions; and reviewing technical performance after project completion to ensure that the award objectives have been accomplished. 7. SITE VISITS DOE's authorized representatives have the right to make site visits at reasonable times to review project accomplishments and management control systems and to provide technical assistance, if required You must provide, and must require your subawardees to provide, reasonable access to facilities office space resources and assistance for the safety and convenience of the government representatives in the performance of their duties. All site visits and evaluations must be performed in a manner that does not unduly interfere with or delay the work. REPORTING REQUIREMENTS a. Requirements. The reporting requirements for this award arc identified on the Federal Assistance Reporting Checklist, DOE F 4600.2, attached to this award. Failure to comply with these reporting requirements is considered a material noncompliance with the terms of the award Noncompliance may result in withholding of future payments, suspension or termination of the current award, and withholding of future awards. A willful failure to perform, a history of failure to perform, or unsatisfactory performance of this and/or other financial assistance awards, may also result in a debarment action to preclude future awards by Federal agencies. RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 5 of 31 March 2010 b. Additional Recovery Act Reporting Requirements are found in the Provision below labeled: "REPORTING AND REGISTRATION REQUIREMENTS UNDER SECTION 1512 OF THE RECOVERY ACT." 9. PUBLICATIONS You are encouraged to publish or otherwise make publicly available the results of the work conducted under the award b. An acknowledgment of DOE support and a disclaimer must appear in the publication of any material, whether copyrighted or not, based on or developed under this project, as follows: Acknowledgment: "This material is based upon work supported by the Department of Energy [National Nuclear Security Administration] [add name(s) of other agencies, if applicable] under Award Number(s) [enter the award number(s)]." Disclaimer: "This report was pi epared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of autho►s expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof." 10. FEDERAL, STATE, AND MUNICIPAL REQUIREMENTS You must obtain any required permits, ensure the safety and structural integrity of any repair, replacement, construction and/or alteration, and comply with applicable federal, state, and municipal laws, codes, and regulations for work performed under this award. 11. LOBBYING RESTRICTIONS By accepting funds under this award, you agree that none of the funds obligated on the award shall be expended, directly or indirectly, to influence congressional action on any legislation or appropriation matters pending before Congress, other than to communicate to Members of Congress as described in 18 U.S.C. 1913. This restriction is in addition to those prescribed elsewhere in statute and regulation. 12. NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) REQUIREMENTS You are restricted from taking any action using Federal funds, which would have an adverse effect on the environment or limit the choice of reasonable alternatives prior to DOE providing either a NEPA clearance or a final NEPA decision regarding this project. If you move forward with activities that are not authorized for Federal funding by the DOE Contracting Officer in advance of the final NEPA decision you ale doing so at risk of not receiving Federal funding and such costs may not be recognized as allowable cost share. RFQ 10 0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 6 of 31 March 2010 If this award includes construction activities, you must submit an environmental evaluation report/evaluation notification form addressing NEPA issues prior to DOE initiating the NEPA process. 13. HISTORIC PRESERVATION Prior to the expenditure of Project funds to alter any historic structure or site the Recipient or subrecipient shall ensure that it is compliant with Section 106 of the National Historic Preservation Act (NHPA), consistent with DOE's 2009 letter of delegation of authority regarding the NHPA. Section 106 applies to historic properties that are listed in or eligible for listing in the National Register of Historic Places. If applicable, the Recipient or subrecipient must contact the State Historic Preservation Officer (SHPO), and the Tribal Historic Preservation Officer (THPO) to coordinate the Section 106 review outlined in 36 CFR Part 800. SHPO contact information is available at the following link: http://www.ncshpo org/find/index.htm. THPO contact information is available at the following link: http://www.nathpo.org/map.html . Section 1 10(k) of the NHPA applies to DOE funded activities If applicable the Recipient or subrecipient certifies that it will retain sufficient documentation, to demonstrate that the Recipient or subrecipient has received required approval(s) from the SHPO or THPO for the Project. Recipients or subsecipients shall avoid taking any action that results in an adverse effect to historic properties pending compliance with Section 106. The Recipient or subrecipient shall deem compliance with Section 106 of the NHPA complete only after it has received this documentation. The Recipient or subrecipient shall make this documentation available to DOE on DOE's request (for example, during a post -award audit). 14. WASTE STREAM The Recipient assures that it will create or obtain a waste management plan addressing waste generated by a proposed Project prior to the Project generating waste. This waste management plan will describe the Recipient's or subrectpient's plan to dispose of any sanitary or hazardous waste (e,g., construction and demolition debris, old light bulbs, lead ballasts, piping, roofing material, discarded equipment, debris and asbestos) generated as a result of the proposed Project. The Recipient shall ensure that the Project is in compliance with all Federal, state and local regulations for waste disposal. The Recipient shall make the waste management plan and related documentation available to DOE on DOE's request (for example, during a post -award audit). 15. DECONTAMINATION AND/OR DECOMMISSIONING (D&D) COSTS Notwithstanding any other provisions of this Agreement, the Government shall not be responsible for or have any obligation to the Recipient for (i) Decontamination and/or Decommissioning (D&D) of any of the Recipient s facilities, or (ii) any costs which may be incurred by the Recipient in connection with the D&D of any of its facilities due to the performance of the work under this Agreement, whether said work was performed prior to or subsequent to the effective date of the Agreement. 16. SUBGRANTS AND LOANS a. The Recipient hereby warrants that it will ensure that all activities by sub-grantee(s) and loan recipients to accomplish the approved Project Description or Statement of Project Objectives are eligible activities under 42 U.S C. 171534(1)-(13). State recipients hereby warrant that they will ensure that all activities by sub-grantee(s) and loan recipients pursuant to 42 U.S.C. RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 7 of 31 March 2010 17155(c)(1)(A) to accomplish the approved Project Description or Statement of Project objects are eligible activities under 42 U.S.C, 171534(3) (13). b. Upon the Recipient's selection of the sub-grantee(s) and loan recipients, the Recipient shall notify (i.e. approval not required) the DOE Contracting Officer with the following information for each, regardless of dollar amount - Name of Sub -Grantee • DUNS Number - Award Amount • Statement of work including applicable activities State recipients shall notify the DOE Contracting Officer with the above information within 180 days of the award date in Block 27 of the Assistance Agreement Cover Page. In addition to the information in paragraph b. above, for each sub -grant and loan that has an estimated cost greater than $2,000,000, the recipient must submit for approval by the Contracting Officer, a SF424A Budget Information — Nonconstruction Programs, and PMC 123.1 Cost Reasonableness Determination for Financial Assistance (available at http://www.eere- pmc.energy.gov/forms.aspx). 17. JUSTIFICATION OF BUDGET COSTS a. In the original application, the recipient did not provide sufficient information to justify the approval or release of funds for the proposed activities. In order to receive reimbursement for the costs associated with the activities listed in the approved Statement of Project Objectives (SOPO), a justification for all proposed costs must be submitted to the DOE Contracting Officer. The Recipient must provide justification for the following costs: Personnel Costs: The Recipient must submit cost justification for the following personnel costs: for approval by the Contracting Officer Fringe Benefit Costs: The Recipient must submit a fringe benefit rate proposal/agreement for approval by the Contracting Officer. Travel Costs: The Recipient must submit cost, justification for the following travel costs: for approval by the Contracting Officer. Equipment Costs: The Recipient must submit vendor quotes for equipment with an individual item cost of $50,000 or more, for approval by the Contracting Officer. Supplies Costs: The Recipient must submit cost justification for the following supplies costs: for approval by the Contracting Officer. RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 8 of 31 March 2010 Contractual Costs: 1. The recipient shall provide the following information for each individual or company that will receive EECBG funding, regardless of dollar amount: Name DUNS Number Award Amount Statement of work including applicable activities NEPA documentation. as applicable 2. In addition to the information in paragraph 1. above, for each individual or company that has an estimated cost greater than $2,000,000, the Recipient must submit a separate SF424A Budget Information — Nonconstruction Programs, and Budget Justification. The DOE Contracting Officer may require additional information concerning these individuals or companies prior to providing written approval. Other Dhect Costs: The Recipient must submit cost Justification for the following other direct costs: for approval by the Contracting Officer. Indirect Costs: The Recipient must submit an indirect rate proposal/agreement for approval by the Contracting Officer. Upon written notification and/or approval by the Contracting Officer, the Recipient may then receive payment for the activities listed in the approved SOPO for allowable costs incurred in accordance with the payment provisions contained in the Special Terms and Conditions of this agreement. These written notifications and/or approvals will be incorporated into the award by formal modification at a future date. 18. ADVANCE UNDERSTANDING CONCERNING PUBLICLY FINANCED ENERGY IMPROVEMENT PROGRAMS The parties recognize that the Recipient may use funds under this award for Property -Assessed Clean Energy (PACE) loans, Sustainable Energy Municipal Financing, Clean Energy Assessment Districts, Energy Loan Tax Assessment Programs (ELTAPS), or any other form or derivation of Special Taxing Disti ict whereby taxing entities collect payments through increased tax assessments for energy efficiency and renewable energy building improvements made by their constituents. The Department of Energy intends to publish "Best Practices" or other guidelines pertaining to the use of funds made available to the Recipient under this award pertaining to the programs identified herein. By accepting this award, the Recipient agrees to incorporate, to the maximum extent practicable, those Best Practices and other guidelines into any such program(s) within a reasonable time attet notification by DOE that the Best Practices or guidelines have been made available. The Recipient also agrees, by its acceptance of this award, to require its sub -recipients to incorporate to the maximum extent practicable the best practices and other guideline into any such program used by the sub -recipient. 19. SPECIAL PROVISIONS RELATING TO WORK FUNDED UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (May 2009) Preamble The American Recovery and Reinvestment Act of 2009, Pub. L. 1 1 1-5, (Recovery Act) was enacted RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 9 of 31 March 2010 to preserve and create jobs and promote economic recovery, assist those most impacted by the recession, provide investments needed to increase economic efficiency by spurring technological advances in science and health, invest in transportation, environmental protection, and other infrastructure that will provide long-term economic benefits, stabilize State and local government budgets, in order to minimize and avoid reductions in essential services and counterproductive State and local tax increases. Recipients shall use grant funds in a manner that maximizes job creation and economic benefit. The Recipient shall comply with all terms and conditions in the Recovery Act relating generally to governance accountability, transparency, data collection and resources as specified in Act itself and as discussed below. Recipients should begin planning activities for their first tier subrecipients, including obtaining a DUNS number (or updating the existing DUNS record), and registering with the Central Contractor Registration (CCR). Be advised that Recovery Act funds can be used in conjunction with other funding as necessary to complete projects, but tracking and reporting must be separate to meet the reporting requirements of the Recovery Act and related guidance. For projects funded by sources other than the Recovery Act, Contractors must keep separate records for Recovery Act funds and to ensure those records comply with the requirements of the Act. The Government has not fully developed the implementing instructions of the Recovery Act, particularly concerning specific procedural requirements for the new reporting requirements. The Recipient will be provided these details as they become available. The Recipient must comply with all requirements of the Act. If the recipient believes there is any inconsistency between ARRA requirements and current award terms and conditions, the issues will be referred to the Contracting Officer for reconciliation. Definitions For purposes of this clause, Covered Funds means funds expended or obligated from appropriations under the American Recovery and Reinvestment Act of 2009, Pub. L. 111-5 Covered Funds will have special accounting codes and will be identified as Recovery Act funds in the grant, cooperative agreement or T1A and/or modification using Recovery Act funds. Covered Funds must be reimbursed by September 30, 2015. Non -Federal employer means any employer with respect to covered funds -- the contractor, subcontractor, grantee, or recipient, as the case may be, if the contractor, subcontractor, grantee, or recipient is an employer; and any professional membership organization, certification of other professional body any agent or licensee of the Federal government, or any person acting directly or indirectly in the interest of an employer receiving covered funds; or with respect to coveted funds received by a State or local government, the State or local government receiving the funds and any contractor or subcontractor receiving the funds and any contractor or subcontractor of the State or local government; and does not mean any department, agency, or other entity of the federal government. Recipient means any entity that receives Recovery Act funds directly from the Federal government (including Recovery Act funds received through grant, loan, or contract) other than an individual and includes a State that receives Recovery Act Funds. RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 10 of 31 March 2010 Special Provisions A. Flow Down Requirement Recipients rnust include these special terms and conditions in any subaward. B. Segregation of Costs Recipients must segregate the obligations and expenditures related to funding under the Recovery Act. Financial and accounting systems should be revised as necessary to segregate, track and maintain these funds apart and separate from other revenue streams. No part of the funds from the Recovery Act shall be commingled with any other funds or used for a purpose other than that of making payments for costs allowable for Recovery Act projects C. Prohibition on Use of Funds None of the funds provided under this agreement derived from the American Recovery and Reinvestment Act of 2009, Pub. L. 1 1 1-5, may be used by any State or local government, or any private entity for any casino or other gambling establishment, aquarium, zoo, golf course, or swimming pool. D. Access to Records With respect to each financial assistance agreement awarded utilizing at least some of the funds appropriated or otherwise made available by the American Recovery and Reinvestment Act of 2009, Pub. L. 111-5, any representative of an appropriate inspector general appointed under section 3 or 8G of the inspector General Act of 1988 (5 U.S.C. App.) or of the Comptroller General is authorized -- (1) to examine any records of the contractor or grantee, any of its subcontractoi s or subgrantees, or any State or local agency administering such contract that pertain to, and involve transactions that relate to, the subcontract, subcontract grant, or subgrant, and (2) to interview any officer or employee of the contractor, grantee, subgrantee, or agency regarding such transactions. E. Publication An application may contain technical data and other data, including trade secrets and/or privileged or confidential information, which the applicant does not want disclosed to the public or used by the Government for any purpose other than the application. To protect such data, the applicant should specifically identify each page including each line or paragraph thereof containing the data to be protected and mai k the cover sheet of the application with the following Notice as well as referring to the Notice on each page to which the Notice applies: Notice of Restriction on Disclosure and Use of Data The data contained in pages ---- of this application have been submitted in confidence and contain trade secrets or proprietary information, and such data shall be used or disclosed only for evaluation purposes, provided that if this applicant receives an award as a result of or in connection with the submission of this application, DOE shall have the right to use or disclose the data here to the extent provided in the award. This restriction does not limit the Governments right to use or disclose data obtained without restriction from any source, including the applicant. Information about this agreement will be published on the Internet and linked to the website RFQ 10 0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 11 of 31 March 2010 www.recovery.gov, maintained by the Accountability and Transparency Board. The Board may exclude posting contractual or other information on the website on a case -by -case basis when necessary to protect national security or to protect information that is not subject to disclosure under sections 552 and 552a of title 5, United States Code. F. Protecting State and Local Government and Contractor Whistleblowers. The requirements of Section 1553 of the Act are summarized below. They include, but are not limited to: Prohibition on Reprisals: An employee of any non -Federal employer receiving covered funds under the American Recovery and Reinvestment Act of 2009 Pub. L 1 1 1-5, may not be discharged, demoted, or otherwise discriminated against as a reprisal for disclosing, including a disclosure made in the ordinary course of an employee's duties, to the Accountability and Transparency Board, an inspector general, the Comptroller General, a member of Congress, a State or Federal regulatory or law enforcement agency, a person with supervisory authority over the employee (or other person working for the employer who has the authority to investigate, discover or terminate misconduct), a court or grant jury, the head of a Federal agency, or their representatives information that the employee believes is evidence of - gross management of an agency contract or grant relating to covered funds; - a gross waste of' covered funds; ▪ a substantial and specific danger to public health or safety related to the implementation or use of covered funds; - an abuse of authority related to the implementation or use of covered funds; or - as violation of law, rule, or regulation related to an agency contract (including the competition for or negotiation of a contract) or grant, awarded or issued relating to covered funds Agency Action: Not later than 30 days after receiving an inspector general report of an alleged reprisal, the head of the agency shall determine whether there is sufficient basis to conclude that the non -Federal employer has subjected the employee to a prohibited reprisal. The agency shall either issue an order denying relief in whole or in part or shall take one or more of the following actions: • Order the employer to take affirmative action to abate the reprisal. - Order the employer to reinstate the person to the position that the person held before the reprisal, together with compensation including back pay, compensatory damages, employment benefits, and other terms and conditions of' employment that would apply to the person in that position if the reprisal had not been taken. Order the employer to pay the employee an amount equal to the aggregate amount of all costs and expenses (including attorneys' fees and expert witnesses' fees) that were reasonably incurred by the employee for or in connection with, bringing the complaint regarding the reprisal, as determined by the head of a court of competent jurisdiction. Nonenforceability of Certain Provisions Waiving Rights and remedies or Requiring Arbitration; Except as provided in a collective bargaining agreement, the rights and remedies provided to aggrieved employees by this section may not be waived by any agreement, policy, form, or condition of employment, including any predispute arbitration agreement. No predispute arbitration agreement shall be valid or enforceable if it requires arbitration of a dispute arising out of this section. Requirement to Post Notice of Rights and Remedies Any employer receiving covered funds under the American Recovery and Reinvestment Act of 2009, Pub L . I 1 I -5, shall post notice of the rights and remedies as required therein. (Refer to section 1553 of the American Recovery and Reinvestment Act of 2009, Pub. L. 1 1 1-5, \swww.Recovery.gov, for specific requirements of this section and RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 12 of 31 March 2010 prescribed language for the notices.). G. Reserved H. False Claims Act Recipient and sub -recipients shall promptly refer to the DOE, or other appropriate Inspector General any credible evidence that a principal, employee, agent, contractor sub -grantee, subcontractor or other person has submitted a false claim under the False Claims Act or has committed a criminal or civil violation of laws pertaining to fraud, conflict of interest, bribery, gratuity or similar misconduct involving those funds. 1. Information in Support of Recovery Act Reporting Recipient may be required to submit backup documentation for expenditures of funds under the Recovery Act including such items as timecards and invoices. Recipient shall provide copies of backup documentation at the request of the Contracting Officer or designee. J. Availability of Funds Funds obligated to this award are available for reimbursement of costs until 36 months after the award date. K. Additional Funding Distribution and Assurance of Appropriate Use of Funds Certification by Governor — For funds provided to any State or agency thereof by the American Reinvestment and Recovery Act of 2009, Pub. L. 111-5, the Gover nor of the State shall certify that: 1) the state will request and use funds provided by the Act; and 2) the funds will be used to create jobs and promote economic growth. Acceptance by State Legislature --1f funds provided to any State in any division of the Act are not accepted for use by the Governor, then acceptance by the State legislature, by means of the adoption of a concurrent resolution, shall be sufficient to provide funding to such State. Distribution -- After adoption of a State legislature's concurrent resolution, funding to the State will be for distribution to local governments, councils of government, public entities, and public -private entities within the State either by formula or at the State's discretion. L. Certifications With respect to funds made available to State or local governments for infrastructure investments under the American Recovery and Reinvestment Act of 2009, Pub. L. 1 1 1-5, the Governor, mayor, or other chief executive, as appropriate, certified by acceptance of this award that the infrastructure investment has received the full review and vetting required by law and that the chief executive accepts responsibility that the infrastructure investment is an appropriate use of taxpayer dollars. Recipient shall provide an additional certification that includes a description of the investment, the estimated total cost, and the amount of covered funds to be used for posting on the Internet. A State or local agency may not receive infrastructure Investment funding from funds made available by the Act unless this certification is made and posted. RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 13 of 31 March 2010 20. REPORTING AND REGISTRATION REQUIREMENTS UNDER SECTION 1512 OF THE RECOVERY ACT (a) This award requires the recipient to complete projects or activities which are funded under the American Recovery and Reinvestment Act of 2009 (Recovery Act) and to report on use of Recovery Act funds provided through this award. Information from these reports will be made available to the public. (b) The reports are due no later than ten calendar days after each calendar quarter in which the Recipient receives the assistance award funded in whole or in part by the Recovery Act. (c) Recipients and their first -tier subrecipients must maintain current registrations in the Central Contractor Registration (http•//www.ccr.gov) at all times during which they have active federal awards funded with Recovery Act funds. A Dun and Bradstreet Data Universal Numbering System (DUNS) Number (http://www.dnb.com) is one of the requirements for registration in the Central Contractor Registration. (d) The recipient shall report the information described in section 15 12(c) of the Recovery Act using the reporting instructions and data elements that will be provided online at http://www.FederalReporting.gov and ensure that any information that is pre -filled is corrected or updated as needed. 21. NOTICE REGARDING THE PURCHASE OF AMERICAN-MADE EQUIPMENT AND PRODUCTS -- SENSE OF CONGRESS It is the sense of the Congress that, to the greatest extent practicable, all equipment and products purchased with funds made available under this award should be American -made. *Special Note: Definitization of the Provisions entitled, 'REQUIRED USE OF AMERICAN IRON, STEEL, AND MANUFACTURED GOODS — SECTION 1605 OF THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009" and `REQUIRED USE OF AMERICAN IRON STEEL, AND MANUFACTURED GOODS (COVERED UNDER INTERNATIONAL AGREEMENTS) — SECTION 1605 OF THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009will be done upon definition and review of final activities. 22. REQUIRED USE OF AMERICAN IRON, STEEL, AND MANUFACTURED GOODS SECTION 1605 OF THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 If the Recipient determines at any time that any construction, alteration, or repair activity on a public building or public works will be performed during the course of the project, the Recipient shall notify the Contracting Officer prior to commencing such work and the following provisions shall apply. (a) Definitions. As used in this award term and condition— (1) Manufactured good means a good brought to the construction site for incorporation into the building or work that has been Processed into a specific form and shape; or RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 14 of 31 March 2010 (ii) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials. (2) Public building and public work means a public building of, and a public work of, a governmental entity (the United States; the District of Columbia; commonwealths territories, and minor outlying islands of the United States; State and local governments; and multi -State, regional, or interstate entities which have governmental functions). These buildings and works may include, without limitation bridges, dams, plants, highways, parkways, streets, subways, tunnels, sewers, mains, power lines, pumping stations, heavy generators, railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys, jetties, breakwaters, levees, and canals, and the construction, alteration, maintenance, or repair of such buildings and works. (3) Steel means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements (b) Domestic preference. (1) This award term and condition implements Section 1605 of the American Recovery and Reinvestment Act of 2009 (Recovery Act) (Pub. L. 1 1 1-5), by requiring that all iron, steel, and manufactured goods used in the project are produced in the United States except as provided in paragraph (b)(3) of this section and condition. (2) This requirement does not apply to the material listed by the Federal Government as follows: To Be Determined (3) The award official may add other iron, steel, and/or manufactured goods to the list in paragraph (b)(2) of this section and condition if the Federal Government determines that— (i) The cost of the domestic iron, steel, and/or manufactured goods would be unreasonable. The cost of domestic iron, steel or manufactured goods used in the project is unreasonable when the cumulative cost of such material will increase the cost of the overall project by more than 25 percent; (ii) The iron, steel, and/or manufactured good is not produced or manufactured in the United States in sufficient and reasonably available quantities and of a satisfactory quality; or (iii) The application of the restriction of section 1605 of the Recovery Act would be inconsistent with the public interest. (c) Request for determination of inapplicability of Section 1605 of the Recovery Act . (1)(i) Any recipient request to use foreign iron, steel, and/or manufactured goods in accordance with paragraph (b)(3) of this section shall include adequate information for Federal Government evaluation of the request, including (A) A description of the foreign and domestic iron, steel, and/or manufactured goods; (B) Unit of measure; (C) Quantity; (D) Cost; RFQ 10 0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 15 of 31 March 2010 (E) Time of delivery or availability; (F) Location of the project; (G) Name and address of the proposed supplier; and (H) A detailed justification of the reason for use of foreign iron, steel, and/or manufactured goods cited in accordance with paragraph (b)(3) of this section. (ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed cost comparison table in the format in paragraph (d) of this section. (iii) The cost of iron, steel, and/or manufactured goods material shall include all delivery costs to the construction site and any applicable duty. (iv) Any recipient request for a determination submitted after Recovery Act funds have been obligated for a project for construction alteration, maintenance, or repair shall explain why the recipient could not reasonably foresee the need for such determination and could not have requested the determination before the funds were obligated. if the recipient does not submit a satisfactory explanation, the award official need not make a determination. (2) if the Federal Government determines after funds have been obligated for a project for construction, alteration, maintenance or repair that an exception to section 1605 of the Recovery Act applies, the award official will amend the award to allow use of the foreign iron, steel, and/or relevant manufactured goods When the basis for the exception is nonavailability or public interest the amended award shall reflect adjustment of the award amount, redistribution of budgeted funds, and/or other actions taken to cover costs associated with acquiring or using the foreign iron, steel, and/or relevant manufactured goods When the basis for the exception is the unreasonable cost of the domestic iron, steel, or manufactured goods, the award official shall adjust the award amount or redistribute budgeted funds by at least the differential established in 2 CFR 176.1 l0(a). (3) Unless the Federal Government determines that an exception to section 1605 of the Recoveiy Act applies, use of foreign iron, steel, and/or manufactured goods is noncompliant with section 1605 of the American Recovery and Reinvestment Act (d) Data. To permit evaluation of requests under paragraph (b) of this section based on unreasonable cost, the Recipient shall include the following information and any applicable supporting data based on the survey of suppliers: RFQ 10 0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 16 of 31 March 2010 Foreign and Domestic Items Cost Comparison Description Unit of Quantity (dollars)* Cost measure Item 1: Foreign good steel, iron, or manufactured Domestic good steel, iron, or manufactured Item 2: Foreign good steel, iron, or manufactured Domestic good steel, iron, or manufactured List name, address, telephone number, email address, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include other applicable supporting information. *Include all delivery costs to the construction site. 23. REQUIRED USE OF AMERICAN IRON, STEEL AND MANUFACTURED GOODS (COVERED UNDER INTERNATIONAL AGREEMENTS) — SECTION 1605 OF THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (a) Definitions. As used in this award term and condition — Designated country — (1) A World Trade Organization Government Procurement Agreement country (Aruba, Austria, Belgium Bulgaria, Canada, Cyprus, Czech Republic, Denmark Estonia, Finland, France, Germany Greece, Hong Kong, Hungary, Iceland Ireland Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein Lithuania, I uxembourg, Malta, Netherlands, Norway Poland, Portugal, Romania, Singapore, Slovak Republic Slovenia, Spain, Sweden, Switzerland, and United Kingdom; (2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Canada, Chile, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras Israel, Mexico, Morocco, Nicaragua, Oman, Peru, or Singapore); or (3) A United States -European Communities Exchange of Letters (May 15, 1995) country. Austria, Belgium, Bulgaria Cyprus, Czech Republic, Denmark, Estonia, Finland, France Germany, Greece, Hungary, Ireland, Italy Latvia, Lithuania, Luxembourg, Malta, Netherlands, Poland, Portugal, Romania, Slovak Republic Slovenia, Spain, Sweden, and United Kingdom. Designated country on, steel, and/or manufactured goods — (1) Is wholly the growth, product, or manufacture of a designated country; or RFQ 10 0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 17 of 31 March 2010 (2) In the case of a manufactured good that consist in whole or in part of materials from another country, has been substantially transformed in a designated country into a new and different manufactured good distinct from the materials from which it was transformed. Domestic iron, steel, and/or manufactured good — (1) Is wholly the growth, product, or manufacture of the United States; or (2) In the case of a manufactured good that consists in whole or in part of materials from another country, has been substantially transformed in the United States into a new and different manufactured good distinct from the materials from which it was transformed. There is no requirement with regard to the origin of components or subcomponents in manufactured goods or products, as long as the manufacture of the goods occurs in the United States. Foreign iron, steel, and/or manufactured good means iron, steel and/or manufactured good that is not domestic or designated country iron, steel, and/or manufactured good. Manufactured good means a good brought to the construction site for incorporation into the building or work that has been— (1) Processed into a specific form and shape; or (2) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials. Public building and public work means a public building of and a public work of, a governmental entity (the United States; the District of Columbia; commonwealths, ten itories, and minor outlying islands of the United States; State and local governments; and multi -State, regional or interstate entities which have governmental functions). These buildings and works may include, without limitation bridges, dams, plants, highways, parkways, streets, subways, tunnels, sewers, mains, power lines, pumping stations, heavy generators, railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys jetties, breakwaters, levees, and canals, and the construction, alteration, maintenance, or repair of such buildings and works. Steel means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements. (b)Iron, steel, and manufactured goods, (1) The award term and condition described in this section implements (i) Section 1605(a) of the American Recovery and Reinvestment Act of 2009 (Pub. L. 1 1 1-5) (Recovery Act), by requiring that all iron, steel, and manufactured goods used in the project are produced in the United States, and (ii) Section 1605(d), which requires application of the Buy American requirement in a manner consistent with U.S. obligations under international agreements. The restrictions of section 1605 of the Recovery Act do not apply to designated country iron, steel, and/or manufactured goods The Buy American requirement in section 1605 shall not be applied where the iron, steel or manufactured goods used in the project are from a Party to an international agreement that obligates the recipient to treat the goods and services of that Party the same as domestic goods and services. This obligation shall only apply to projects with an estimated value of $7,443,000 or more. RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 18 of 31 March 2010 (2) The recipient shall use only domestic or desioated country iron steel, and manufactured goods in performing the work funded in whole or part with this award, except as provided in paragraphs (b)(3) find (b)(4) of this section, (3) The requirement in paragraph (b)(2) of this section does not apply to the iron, steel, and manufactured goods listed by the Federal Government as follows: To Be Determined (4) The award official may add other iron, steel, and manufactured goods to the list in paragraph (b)(3) of this section if the Federal Government determines that— (i) The cost of domestic iron, steel, and/or manufactured goods would be unreasonable. The cost of domestic iron, steel, and/or manufactured goods used in the project is unreasonable when the cumulative cost of such material will increase the overall cost of the project by more than 25 percent; (ii) The iron, steel, and/or manufactured good is not produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality; or (iii) The application of the restriction of section 1605 of the Recovery Act would be inconsistent with the public interest. (c) Request for determination of inapplicability of section 1605 of the Recovery Act or the Buy American Act. (1)(i) Any recipient request to use for eign iron, steel, and/or manufactured goods in accordance with paragraph (b)(4) of this section shall include adequate information for Federal Government evaluation of the request, including — (A) A description of the foreign and domestic iron, steel, and/or manufactured goods; (B) Unit of measure; (C) Quantity; (D) Cost; (E) Time of delivery or availability; (F) Location of the project; (G) Name and address of the proposed supplier; and (H) A detailed justification of the reason for use of foreign iron, steel, and/or manufactured goods cited in accordance with paragraph (b)(4) of this section (ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed cost comparison table in the format in paragraph (d) of this section. (iii) The cost of iron, steel, or manufactured goods shall include all delivery costs to the construction site and any applicable duty. RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 19 of 31 March 2010 (iv) Any recipient request for a determination submitted after Recovery Act funds have been obligated for a project foi construction, alteration, maintenance, or repair shall explain why the recipient could not reasonably foresee the need for such determination and could not have requested the determination before the funds were obligated. If the recipient does not submit a satisfactory explanation, the award official need not make a determination. (2) If the Federal Government determines after funds have been obligated for a project for construction, alteration, maintenance, or repair that an exception to section 1605 of the Recovery Act applies, the award official will amend the award to allow use of the foreign iron, steel, and/or relevant manufactured goods. When the basis for the exception is nonavailability or public interest the amended award shall reflect adjustment of the award amount, redistribution of budgeted funds, and/or other appropriate actions taken to cover costs associated with acquiring or using the foreign iron, steel, and/or relevant manufactured goods When the basis for the exception is the unreasonable cost of the domestic iron steel, or manufactured goods. the award official shall adjust the award amount or redistribute budgeted funds, as appropi iate, by at least the differential established in 2 CFR 1 76.1 10(a), (3) Unless the Federal Government determines that an exception to section 1605 of the Recoveiy Act applies, use of foreign iron, steel, and/or manufactured goods othei than designated country iron, steel, and/or manufactured goods is noncompliant with the applicable Act. (d) Data. To permit evaluation of requests under paragraph (b) of this section based on unreasonable cost, the applicant shall include the following information and any applicable supporting data based on the survey of suppliers: Foreign and Domestic Items Cost Comparison Description Unit of Quantity (dollars)* Cost measure Item 1: Foreign good steel, iron, or manufactured Domestic good steel, iron, or manufactured Item 2: Foreign steel, iron, or manufactured good Domestic good steel, iron, or manufactured List name, address, telephone number, email address, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include other applicable supporting information, *Include all delivery costs to the construction site. RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 20 of 31 March 2010 24. WAGE RATE REQUIREMENTS UNDER SECTION 1606 OF THE RECOVERY ACT (a) Section 1606 of the Recovery Act requires that all laborers and mechanics employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the Recovery Act shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40 United States Code. Pursuant to Reorganization Plan No. 14 and the Copeland Act, 40 U.S.C. 3145, the Department of Labor has issued regulations at 29 CFR parts 1, 3, and 5 to implement the Davis -Bacon and related Acts. Regulations in 29 CFR 5.5 instruct agencies concerning application of the standard Davis - Bacon contract clauses set forth in that section. Federal agencies providing grants, cooperative agreements, and loans under the Recovery Act shall ensure that the standard Davis -Bacon contract clauses found in 29 CFR 5.5(a) are incorporated in any resultant covered contracts that are in excess of $2,000 for construction, alteration or repair (including painting and decorating). (b) For additional guidance on the wage rate requirements of section 1606, contact your awarding agency. Recipients of grants cooperative agreements and loans should direct their initial inquiries concerning the application of Davis -Bacon requirements to a particular federally assisted project to the Federal agency funding the project. The Secretary of Labor retains final coverage authority under Reorganization Plan Number 14. 25. RECOVERY ACT TRANSACTIONS LISTED IN SCHEDULE OF EXPENDITURES OF FEDERAL AWARDS AND RECIPIENT RESPONSIBILITIES FOR INFORMING SUBRECIPIENTS (a) To maximize the transparency and accountability of funds authorized under the American Recovery and Reinvestment Act of 2009 (Pub. L. 1 11-5) (Recovery Act) as required by Congress and in accordance with 2 CFR 215 21 `Uniform Administrative Requirements for Grants and Agreements" and OMB Circular A-102 Common Rules provisions, recipients agree to maintain records that identify adequately the source and application of Recovery Act funds. OMB Circular A- 102 is available at http•//www whitehouse.gov/otnb/circulars/a102/a102.html. (b) For recipients covered by the Single Audit Act Amendments of 1996 and OMB Circular A-133, "Audits of States, Local Governments and Non -Profit Organizations," recipients agree to separately identify the expenditures for Federal awards under the Recovery Act on the Schedule of Expenditures of Federal Awards (SEFA) and the Data Collection Form (SF —SAC) required by OMB Circular A- 133. OMB Circular A-133 is available at http://www,whitehause.gov%omb/circulars/a133/a133.html. This shall be accomplished by identifying expenditures for Federal awards made under the Recovery Act separately on the SEFA and as separate rows under Item 9 of Part III on the SF —SAC by CFDA number, and inclusion of the prefix "ARRA-" in identifying the name of the Federal program on the SEFA and as the first characters in Item 9d of Part I11 on the SF —SAC. (c) Recipients agree to separately identify to each subrecipient, and document at the time of subaward and at the time of disbursement of funds, the Federal award number, CFDA number, and amount of Recovery Act funds. When a recipient awards Recovery Act funds for an existing program, the information furnished to subrecipients shall distinguish the subawards of incremental Recovery Act funds from regular subawards under the existing program. RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 21 of 31 March 2010 (d) Recipients agree to require their subrecipients to include on their SEFA information to specifically identify Recovery Act funding similar to the requirements for the recipient SEFA described above. This information is needed to allow the recipient to properly monitor subrecipient expenditure of ARRA funds as well as oversight by the Federal awarding agencies, Offices of Inspector General and the Government Accountability Office. 26. DAVIS-BACON ACT AND CONTRACT WORKHOURS AND SAFETY STANDARD ACT Definitions: For purposes of this provision, "Davis Bacon Act and Contract Work Hours and Safety Standards Act," the following definitions are applicable: (1) "Award" means any grant, cooperative agreement or technology investment agreement made with Recovery Act funds by the Department of Energy (DOE) to a Recipient. Such Award must require compliance with the labor standards clauses and wage rate requirements of the Davis -Bacon Act (DBA) for work performed by all laborers and mechanics employed by Recipients (other than a unit of State or local government whose own employees perform the construction) Subrecipients, Contractors, and subcontractors. (2) ` Contractor' means an entity that enters into a Contract. For purposes of these clauses, Contractor shall include (as applicable) prime contractors, Recipients, Subrecipients, and Recipients' or Subrecipients' contractors, subcontractors, and lower -tier subcontractors. `Contractor" does not mean a unit of State or local government where construction is performed by its own employees." (3) "Contract" means a contract executed by a Recipient, Subrecipient, prime contractor, or any tier subcontractor for construction, alteration, or repair. It may also mean (as applicable) (i) financial assistance instruments such as grants, cooperative agreements, technology investment agreements, and loans; and, (ii) Sub awards, contracts and subcontracts issued under financial assistance agreements. "Contract" does not mean a financial assistance instrument with a unit of State or local government where construction is performed by its own employees. (4) "Contracting Officer" means the DOE official authorized to execute an Award on behalf of DOE and who is responsible for the business management and non -program aspects of the financial assistance process. (5) "Recipient" means any entity other than an individual that receives an Award of Federal funds in the form of a grant, cooperative agreement, or technology investment agreement directly from the Federal Government and is financially accountable for the use of any DOE funds or property and is legally responsible for carrying out the terms and conditions of the program and Award. (6) "Subaward" means an award of financial assistance in the form of money, or property in lieu of money made under an award by a Recipient to an eligible Subrecipient o1 by a Subrecipient to a lower -tier subrecipient. The term includes financial assistance when provided by any legal agreement, even if the agreement is called a contract, but does not include the Recipient's procurement of goods and services to carry out the program nor does it include any form of assistance which is excluded from the definition of Award" above. RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 22 of 3 I March 2010 (7) "Subrecipient" means a non -Federal entity that expends Federal funds received from a Recipient to carry out a Federal program, but does not include an individual that is a beneficiary of such a program. (a) Davis Bacon Act (1) Minimum wages. (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and, *w ithout subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)) the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the Contractor and such laborers and mechanics. Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis -Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (a)(1)(iv) of this section; also, regular contributions made or costs incurred foi more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in § 5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein, provided that the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under paragraph (a)(t)(ii) of this section) and the Davis -Bacon poster (WH-1321) shall be posted at all times by the Contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers. (ii)(A) The Contracting Officer shall require that any class of laborers or mechanics, including helpers which is not listed in the *wage determination and which is to be employed under the Contract shall be classified in conformance with the wage determination. The Contracting Officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met. (1) The work to be performed by the classification requested is not performed by a classification in the wage determination; (2) The classification is utilized in the area by the construction industry; and (3) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination. RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 23 of 31 March 2010 (B) If the Contractor and the laborers and mechanics to be employed in the classification (if known) or their representatives, and the Contracting Officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by the Contracting Officer to the Administrator of the Wage and Hour Division, U.S. Department of Labor, Washington DC 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the Contracting Officer or will notify the Contracting Officer within the 30-day period that additional time is necessary. (C) In the event the Contractor, the laborers or mechanics to be employed in the classification or their representatives, and the Contracting Officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the Contracting Officer shall refer the questions, including the views of all interested parties and the recommendation of the Contracting Officer, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the Contracting Officer or will notify the Contracting Officer within the 30-day period that additional time is necessary (D) The wage rate (including fringe benefits where appropriate) determined pursuant to paragraphs (a)(I)(ii)(B) or (C) of this section, shall be paid to all workers performing work in the classification under this Contract from the first day on which work is performed in the classification. (iii) Whenever the minimum wage rate prescribed in the Contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the Contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof. (iv) If the Contractor does not make payments to a trustee or other third person, the Contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, provided that the Secretary of Labor has found, upon the written request of the Contractor, that the applicable standards of the Davis -Bacon Act have been met. The Secretary of Labor may require the Contractor to set aside in a separate account assets for the meeting of obligations under the plan or program. (2) Withholding. The Department of Energy or the Recipient or Subrecipient shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld from the Contractor under this Contract or any other Federal contract with the same prime contractor or any other federally -assisted contract subject to Davis - Bacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the Contractor or any subcontractor the full amount of wages required by the Contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), all or part of the wages required by the Contract the Department of Energy Recipient, or Subrecipient, may, after written notice to the Contractor, RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 24 of 31 March 2010 sponso►, applicant, or owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. (3) Payrolls and basic records. (i) Payrolls and basic records relating thereto shall be maintained by the Contractor during the cou► se of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work (or under the United States Housing Act of 1937, or under the Housing Act of 1949, in the construction or development of the project). Such tecords shall contain the name, address, and social security number of each such worker, his or her correct classification hourly iates of wages paid (including rates of contributions or costs anticipated for bona fide f►inge benefits or cash equivalents thereof of the types described in section 1(b)(2)(B) of the Davis -Bacon Act) daily and weekly numbe► of hours worked, deductions made, and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis -Bacon Act, the Contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs. (ii) (A) The Contractor shall submit weekly for each week in which any Contract work is performed a copy of all payrolls to the Department of Energy if the agency is a party to the Contract but if the agency is not such a party the Contractor will submit the payrolls to the Recipient or Subrecipient (as applicable), applicant, sponsor, or owner as the case may be, for transmission to the Department of Energy. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i), except that full social security n umbers and home addresses shall not be included on weekly transmittals. Instead, the payrolls shall only need to include an individually identifying number for each e mployee (e.g , the last four digits of the employee's social security number). The required weekly pay roll information may be submitted in any form desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Division Web site at http.//www.dol gov/esa/whd/forms/wh347►nstr.htm or its successor site. The prime Contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security n umber and current address of each covered worker and shall provide them upon request to the Department of Energy if the agency is a party to the Conti act, but if the agency is not such a part}, the Contractor will submit them to the Recipient or Subrecipient (as applicable) applicant, sponsor, or owner, as the case may be, for transmission to the Department of Energy, the Contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 25 of 31 March 2010 the sponsoring government agency (or the Recipient or Subrecipient (as applicable), applicant, sponsor, or owner). (B) Each payroll submitted shall be accompanied by a "Statement of Compliance," signed by the Contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the Contract and shall certify the following: (1) That the payroll for the payroll period contains the information required to be provided under § 5 5 (a)(3)(ii) of Regulations, 29 CFR part 5, the appropriate information is being maintained under § 5.5 (a)(3)(i) of Regulations, 29 CFR part 5, and that such information is correct and complete; (2) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the Contract during the payroll period has been paid the full weekly wages earned without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned other than permissible deductions as set forth in Regulations, 29 CFR part 3; (3) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the Contract. (C) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirement for submission of the "Statement of Compliance ' required by paragraph (a)(3)(ii)(B) of this section. (D) The falsification of any of the above certifications may subject the Contractor or subcontractor to civil or criminal prosecution under section 1001 of title 18 and section 3729 of title 31 of the United States Code. (iii) The Contractor or subcontractor shall make the records required under paragraph (a)(3)(i) of this section available for inspection, copying, or transcription by authorized representatives of the Department of Energy or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the Contractor or subcontractor fails to submit the required records or to make them available, the Federal agency may, after written notice to the Contractor sponsor, applicant, or owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12. (4) Apprentices and trainees (i) Apprentices. Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 26 of 31 March 2010 as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice. The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the Contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. in addition any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a Contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman's hourly rate) specified in the Contractor's or subcontractor's registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeymen hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office, withdraws approval of an apprenticeship program, the Contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work pet formed until an acceptable program is approved. (ii) Trainees. Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Every trainee must be paid at not less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the tiainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the p'iyroll at a trainee rate who is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed in addition any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. In the event the Employment and Training Administration withdraws approval of a training program the Contractor will no RFQ 10 0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 27 of 31 March 2010 longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved (iii) Equal employment opportunity. The utilization of apprentices, trainees, and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended and 29 CFR part 30. (5) Compliance with Copeland Act requirements. The Contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this Contract. (6) Contracts and Subcontracts. The Recipient, Subreciptent, the Recipient's, and Subrecipient's contractors and subcontractor shall insert in any Contracts the clauses contained hetein in(a)(1) through (10) and such other clauses as the Department of Energy may by appropriate instructions require, and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The Recipient shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all of the paragraphs in this clause. (7) Contract termination: debarment. A breach of the Contract clauses in 29 CFR 5.5 may be grounds for termination of the Contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12. (8) Compliance with Davis -Bacon and Related Act requirements. All rulings and interpretations of the Davis -Bacon and Related Acts contained in 29 CFR parts 1, 3 and 5 are herein incorporated by reference in this Contract. (9) Disputes concerning labor standards. Disputes arising out of the labor standards provisions of this Contract shall not be subject to the general disputes clause of this Contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the Recipient, Subrecipient, the Contractor (or any of its subcontractors), and the contracting agency, the U.S. Department of Labor, or the employees or their reptesentatives. (10) Certification of eligibility. (i) By entering into this Contract, the Contractor certifies that neither it (nor he or she) not any person or firm who has an interest in the Contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of section 3(a) of the Davis - Bacon Act or 29 CFR 5.12(a)(1). (ii) No part of this Contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of section 3(a) of the Davis -Bacon Act or 29 CFR 5.12(a)(1). (iii) The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. 1001. (b) Contract Work Hours and Safety Standards Act. As used in this paragraph, the terms laborers and mechanics include watchmen and guards. (1) Overtime requirements. No Contractor or subcontractor contracting for any part of the Contract work which may require or involve the employment of laborers or mechanics shall RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 28 of 3] March 2010 require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek. (2) Violation; liability for unpaid wages; liquidated damages. in the event of any violation of the clause set forth in paragraph (b)(1) of this section, the Contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such Contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (b)(1) of this section, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (b)(1) of this section. (3) Withholding for unpaid wages and liquidated damages. The Department of Energy or the Recipient or Subrecipient shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor or subcontractor under any such contract or any other Federal contract with the same prime Contractor or any other federally - assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such Contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in palagraph (b)(2) of this section. (4) Contracts and Subcontracts. The Recipient, Subrecipient, and Recipient's and Subrecipient's contractor or subcontractor shall insert in any Contracts, the clauses set forth in paragraph (b)(1) through (4) of this section and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts The Recipient shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (b)(1) through (4) of this section. (5) The Contractor or subcontractor shall maintain payrolls and basic payroll records during the coui se of the work and shall preserve them for a period of three years from the completion of the Contract for all laborers and mechanics, including guards and watchmen, working on the Contract. Such records shall contain the name and address of each such employee social security number correct classifications, hourly rates of wages paid, daily and weekly number of hours worked deductions made, and actual wages paid. The records to be maintained under this paragraph shall be made available by the Contractor or subcontractor for inspection, copying, or transcription by authorized representatives of the Depai intent of Energy and the Department of Labor. and the Contractor or subcontractor will permit such representatives to interview employees during working hours on the job. (c) Recipient Responsibilities for Davis Bacon Act (1) On behalf of the Department of Energy (DOE), Recipient shall perform the following functions: (i) Obtain, maintain, and monitor all Davis Bacon Act (DBA) certified payroll records submitted by the Subrecipients and Contractors at any tier under this Award; RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 29 of 3 I March 2010 (ii) Review all DBA certified payroll records for compliance with DBA requirements, including applicable DOL wage determinations; (iii) Notify DOE of any non-compliance with DBA requirements by Subrecipients or Contractors at any tier. including any non -compliances identified as the result of reviews performed pursuant to paragraph (ii) above; (iv) Address any Subrecipient and any Contractor DBA non-compliance issues; if DBA non-compliance issues cannot be resolved in a timely manner, forward complaints summary of investigations and all relevant information to DOE; (v) Provide DOE with detailed information regarding the resolution of any DBA non- compliance issues; (vi) Perform services in support of DOE investigations of complaints filed regarding noncompliance by Subrecipients and Contractors with DBA requirements; (vii) Perform audit services as necessary to ensure compliance by Subrecipients and Contractors with DBA requirements and as requested by the Contracting Officer; and (viii) Provide copies of all records upon request by DOE or DOL in a timely manner. (d) Rates of Wages The prevailing wage rates determined by the Secretary of Labor can be found at http://www.wdol.gov/. 27. PROCUREMENT (10 CFR 600.236, Section (i) "Contract Provisions," numbers 1-13) (i) Contract provisions. A grantee's and subgrantee's contracts must contain provisions in paragraph (i) of this section Federal agencies are permitted to require changes, remedies, changed conditions, access and records retention, suspension of work, and other clauses approved by the Office of Federal Procurement Policy. (i) Administrative, contractual, or legal remedies in instances where contractors violate or breach contract terms, and provide for such sanctions and penalties as may be appropriate. (Contracts more than the simplified acquisition threshold) (2) Termination for cause and for convenience by the grantee or subgrantee including the manner by which it will be effected and the basis for settlement. (All contracts in excess of $10,000) (3) Compliance with Executive Order 11246 of September 24, 1965, entitled "Equal Employment Opportunity," as amended by Executive Order 11375 of October 13, 1967, and as supplemented in Department of Labor regulations (41 CFR chapter 60). (All construction contracts awarded in excess of $10,000 by grantees and their contractors or subgrantees) (4) Compliance with the Copeland "Anti -Kickback" Act (18 U.S.0 874) as supplemented in Department of Labor regulations (29 CFR Part 3). (All contracts and subgrants for construction or repair) (5) Compliance with the Davis -Bacon Act (40 U.S.C. 276a to 276a-7) as supplemented by Department of Labor regulations (29 CFR Part 5). (Construction contracts in excess of $2000 awarded by grantees and subgrantees when required by Federal grant program legislation) RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 30 of 31 March 2010 (6) Compliance with Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-330) as supplemented by Department of Labor regulations (29 CFR Part 5). (Construction contracts awarded by grantees and subgrantees in excess of $2000, and in excess of $2500 for other contracts which involve the employment of mechanics or laborers) (7) Notice of awarding agency requirements and regulations pertaining to reporting. (8) Notice of awarding agency requirements and regulations pertaining to patent rights with respect to any discovery or invention which arises or is developed in the course of or under such contract (9) Awarding agency requirements and regulations pertaining to copyrights and rights in data. (10) Access by the grantee, the subgrantee, the Federal grantor agency, the Comptroller General of the United States, or any of their duly authorized representatives to any books, documents, papers, and records of the contractor which are directly pertinent to that specific contract for the purpose of making audit, examination, excerpts, and transcriptions. (1 I) Retention of all required records for three years after grantees or subgrantees make final payments and all other pending matters are closed. (12) Compliance with all applicable standards, orders, or requirements issued under section 306 of the Clean Air Act (42 U.S.C. 1857(h)), section 508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and Environmental Protection Agency regulations (40 CFR part 15). (Contracts, subcontracts, and subgrants of amounts in excess of $100 000). (13) Mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act (Pub. L. 94- 163, 89 Stat. 871). RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment C, Page 31 of 31 ATTACHMENT D CITY OF FORT WORTH JOINT VENTURE ELIGIBILITY FORM All questions must be answered; use "NA" if applicable. Name of City project: A joint venture form must be completed on each project RFP/Bid/Purchasing Number: 1. Joint venture information: Joint Venture Name Joint (If applicable) Venture Address Telephone: Facsimile: address: E-mail Cellular: Identify Please attach extra sheets if additional space the firms that is required comprising to provide comprise the detailed venture joint explanations venture: of work to be performed by each firm the joint DBE firm name: Non -DBE name: firm Business Address: Business Address: City, State, Zip: City, State, Zip: Telephone Facsimile E-mail Telephone Facsimile Cellular Cellular Certification Status: E-mail address Name of Certifying Agency: 2. Scope of work performed by the Joint Venture: Describe the scope of work of the DBE: Describe the scope of work of the non -DBE: RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment D, Page 1 of 10 3. What is the percentage of DBE participation on this joint venture that you wish to be counted toward meeting the project goal? 4. Attach a copy of the joint venture agreement. 5. List components of ownership of joint venture: (Do not complete if this information is described in joint venture agrees rent) Profit and loss sharing: Capital equipment: contributions, including Other applicable ownership interests: 6. Identify by name, race, sex and firm those individuals (with titles) who are responsible for the day- to-day management and decision making of the joint venture: Financial (to include decisions Account Payable and Receivable): Management a. b. c. d. Estimating Hiring personnel Purchasing and/or Marketing decisions: and supplies and Firing of Sales of management equipment major Supervision of field operations The City's Disadvantage Business Enterpnse Office will review your joint venture submission and will have final approval of the DBE percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amounts/percentages change from the originally approved information, then the participants must inform the City's DBE Office immediately for approval. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's DBE Program RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment D, Page 2 of 10 AFFIDAVIT The undersigned affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture Furthermore, the undersigned shall agree to provide to the joint venture the stated scope of work decision -making responsibilities and payments herein. The City also resetves the right to request any additional information deemed necessary to determine if the Joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits, interviews with owners and examination of the books, records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract which may be awarded under the provisions of this joint venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false statements or willful mistepresentation of facts. Name of DBE firm Name of non -DBE firm Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Printed Name of Owner Printed Natne of Owner Signature of Owner Signature of Owner Title Title Date Date Notarization State of County of On this day of , 20 , before me appeared and to me personally known and who, being duly sworn, did execute the foregoing affidavit and did state that they were properly authorized to execute this affidavit and did so as their free act and deed. Notary Public Print Name Notary Public Signature Commission Expires RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment 0, Page 3 of 10 City of Fort Worth Disadvantage Business Enterprise GOOD FAITH EFFORT Prime Company Name Project Name Bid Date Project Number If you have failed to secure DBE participation and you have subcontracting and/or supplier opportunities or if your DBE participation is less than the City's project goal, you must complete this form. If the bidder's method of compliance with the DBE goal is based upon demonstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation the facts or intentional discrimination by the bidder. Failure to complete this form in its entirety with supporting documentation and teceived by the Managing Department on or before 5 00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being consideted non -responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunity (DO NOT LIST NAMES OF FIRMS) which will be used in the completion of this project, regardless of whether it is to be provided by a DBE or non -DBE. On Combined Projects, list each subcontracting and or supplier opportunity through the 2nd tier. (Use additional sheets, if necessary) List of: Subcontracting Opportunities List of: Supplier Opportunities RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment D, Page 4 of 10 2.) Obtain a current (not more than three (3) months old from the bid open date) list of DBE subcontractors and/or suppliers from the City's M/WBE Office. Yes Date of Listing No 3.) Did you solicit bids from DBE firms, K Rhin the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? Yes If yes, attach DBE mail listing to include name of firm and address and a dated No copy of letter mailed. 4.) Did you solicit bids from DBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? Yes No If yes, attach list to include name of DBE firm, person contacted, phone number and date and time of contact. NOTE: A facsimile may be used to comply with either 3 or 4 but may not be used for both. If a facsimile is used, attach the fax confirmation which is to provide DBE name, date, time, fax number and documentation faxed. NOTE: If the list of DBEs for a particular subcontracting/supplier opportunity is ten or less, the bidder must contact the entire list to be in compliance with questions 3 and 4 If the list of DBEs fot a particular subcontracting/supplier opportunity is ten of mole, the bidder must contact at least two-thirds of the list within such area of opportunity, but not less than ten to be in compliance with questions 3 and 4. 5.) Did you provide plans and specifications to potential DBEs or information regarding the location of plans and specifications in order to assist the DBEs? Yes No 6.) Submit documentation if DBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the DBE was rejected and any supporting documentation the bidder wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the bidder will provide for confidential in -camera access to a inspection of any relevant documentation by City personnel. (Please use additional sheets, necessar), and attach. Name Contact Person Scope of Work Reason Rejection for Telephone Company RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment D, Page 5 of 10 ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain DBE participation on this project. The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. The undersigned certifies that the information provided and the DBE(s) listed was/were contacted in good faith. It is understood that any DBE(s) listed in Attachment 1C will be contacted and the reasons for not using them will be verified by the City's M/WBE Office. Authorized Signature Printed Signature Title Contact Name and Title (if different) Company Name Number Phone Number Fax Address Email Address City/State/Zip Date RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment D, Page 6 of 10 City of Fort Worth Disadvantage Business Enterprise Specifications Prime Contractor Waiver Prime Company Name Project Name Bid Opening Date Project Number If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form). All questions on this form must he completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1C. This foi m is only applicable if both answers are yes. Failure to complete this form in its entirety and be received by the Managine Department on or before 5.00 p.m., five (5) City business days after bid opening, exclusive of the bid opening date, will result in the bid being considered non -responsive to bid specifications. Will you perform this entire contract without subcontractors? Yes No If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? Yes No If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including DBE(s) on this contract, the payment therefore and any proposed changes to the original DBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the DBE(s) on this contract by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. Authorized Signature Printed Signature Title Contact Name (if different) Company Name Phone Number Fax Number Address Email Address City/State/Zip Date RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment D, Page 7 of 10 CITY OF FORT WORTH PRIME COMPANY NAME: PROJECT NAME: Disadvantaged Business Enterprise Office Schedule of Subconsultants/Suppliers 0 MWBE 0 NON-M/W/DBE PROJECT NUMBER: BID DATE: CITY'S DBE PROJECT GOAL: ❑ DBE Prime's DBE GOAL COMMITMENT: Please read the following statements prior to executing this form. Bidders/Offerors must provide information on all prospective subconsultants who submit bids/quotations in support of this solicitation. Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bit opening, exclusive of bid opening date, will result in the bid being considered non -responsive to the bid specifications. The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including DBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. Prime contractors must identify by tier level of all sub -consultants. Tier: means the level of subcontracting below the prime contractor/consultant i.e. a direct payment from the prime contractor to a sub -consultant is considered lst tier, a payment by a sub -consultant to its supplier is considered 2"'.tier. The prime contractor is responsible to provide proof of payment of all tiered subcontractors identified as a DBE and counting those dollars towards meeting the contract committed goal. Prime contractors must also provide the previous years annual gross receipts of all sub -consultants listed on the utilization form. This information may be expressed in the dollar ranges provided that column. RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment D, Page 8 of 10 FORT WORTH CITY OF FORT WORTH SCHEDULE OF SUBCONSULTANTS/SUPPLIERS Check this box 0 if any subcontractor/supplier is a Sole Source and identify by writing sole source by the subcontractor/supplier name. NAMES AND ADDRESSES OE SUBCONSULTA NT/SUPPLIERS TYPE OF WORK TO BE PERFORMED Specify Tier CERTIFIED DBE FIRM PREVIOUS YEAR'S ANNUAI. GROSS RECEIPTS ( check one) Name: Address: Phone: Fax: Email: Contact Person: Type of Work: $ AMOUNT: Yes No less than S500K ! $500K to S2M _ $2M to S5M __ more than $5M Certified By: NCTRCA TXDOT _ Other_ please attach DBE certification Name: Address: Phone: Fax: Email: Contact Person: Type of Work: $ AMOUNT: Yes No less than S500K _ $500K to $2M _ $2M to $5M _ more than S5M Certified By: NCTRCA TXDOT Other please attach DBE certification Name: Address: Phone: Fax: Email: Contact Person: Type of Work: $ AMOUNT: Yes No less than $500K _ S500K to $2M _ $2M to 55N1 _ more than $5M Certified By: NCTRCA TXDOT Other please attach DBE certification Name: Address: Phone: Fax: Email: Contact Person: Type of Work: $ AMOUNT: Yes No less than $500K _ $500K to S2M _ $2M to $5M _ more than $51S1 Certified By: NCTRCA TXDOT Other please attach DBE certification RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment D, Page 9 of 10 F ORT WORTH CITY OF FORT WORTH SCHEDULE OF SUBCONSULTANTS/SUPPLIERS NAMES AND ADDRESSES OE SUBCONSULTANTS!SUPPLIERS TYPE OF WORK TO BE PERFORMED Specify Tier CERTIFIED DBE FIRM PREVIOUS YEAR'S ANNUAL GROSS RECEIPTS ( check one) Name: Type of Work: Address: Yes No less than $500K Phone: Certified By: _ $500K to $2M Fax: NCTRCA Email: $ AMOUNT: TXDOT $2M to $5M Contact Person: Other please _ _ more than $5111 attach DBE certification ;Name: Type of Work: Address: Yes No less than 5500K Phone: Certified By: _ $500K to $2M Fax: NCTRCA Email: $ AMOUNT: _ TXDOT $2M to $5M Contact Person: _ Other please _ _ more than $5M attach DBE certification The undersigned bidder agrees to enter into a formal agreement with the DBE firms for work listed in this schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the ;proposal being considered non -responsive to the solicitation. ALL DBES MUST BE CERTIFIED BY THE CITY OF FORT WORTH PRIOR TO A RECOMMENDATION FOR AWARD TO THE CITY COUNCIL. Authorized Signature Printed Signature Title Contact Name and Title (if different) Company Name Address City/State/Zip Code Phone Number Fax Number Email Address Date RFQ 10-0416, Bicycle Facilities Pilot Program, Grant Program, Attachment D, Page 10 of 10 'f&C Review http://apps.cfwnet.org/council packet/mc_review.asp?ID=13 804&council ... Official site of the City of Fort Worth, Texas FORT WoRTn t DATE: CODE: SUBJECT: COUNCIL ACTION: Approved on 8/17/2010 8/17/2010 REFERENCE NO.: C TYPE: **C-24391 LOG NAME: 06DOWNTOWN B I KE P I LOT CONSENT PUBLIC NO HEARING: Authorize an Engineering Services Agreement with Kimley-Horn and Associates, Inc., Using Grant Funds in the Amount of $126,975.00 from the U. S. Department of Energy - Energy Efficiency and Conservation Block Grant to Conduct a Downtown Bicycle Facilities Pilot Program Under the City's Energy Efficiency and Conservation Block Grant COUNCIL DISTRICTS 2 and 9) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute an engineering services agreement with Kimley-Horn and Associates, Inc., using grant funds in the amount of $126,975.00 to conduct a Downtown Bicycle Facilities Pilot Program of approved activities under the City' s Energy Efficiency and Conservation Block Grant awarded by the United States Government' s Department of Energy. DISCUSSION: On May 26, 2009, (M&C C-23554) the City Council authorized application for and acceptance of a $6,738,300.00 grant from the U S Department of Energy (DOE) through the Energy Efficiency and Conservation flock Grant Formula Program (EECBG) The grant agreement authorizes implementation of specific activities in accordance with the City's Energy Efficiency and Conservation Strategy (EE&CS), which was submitted with the EECBG application. A portion of the grant ($381,232.00) is allocated to conduct a Downtown Bicycle Facilities Pilot Program. On February 9, 2010, (Res. No. 3856-02-2010) City Council adopted a resolution to accept and implement the Bike Fort Worth plan and adopt it by reference into the Comprehensive Plan. The EECBG grant will help to implement the Bike Fort Worth Plan by encouraging commuters to use a bicycle for transportation to and from downtown Fort Worth, helping to decrease single -occupant vehicle travel and alleviate traffic congestion and parking demand. This project includes the following approved activities: Bicycle Commuting Pilot Pathway Signs and Markings: This project consists of the installation of signage and pavement markings and/or striping depicting on -street bicycle routes and lanes with supporting directional signage, consistent with the bikeway recommendations of the Bike Fort Worth plan, Americans with Disabilities Act Accessibility Guidelines, and the AASHTO Guide for the Development of Bicycle Facilities. Bicycle Commuting Pilot Racks and Shelters: This project consists of the purchase and installation of bicycle parking racks and covered bicycle shelters in the City of Fort Worth right-of-way or in easements on private right -of way, consistent with the bikeway recommendations of the Bike Fort Worth plan, Americans with Disabilities Act Accessibility Guidelines, and the AASHTO Guide for the Development of Bicycle Facilities. 1 of 2 0 8/ 18/2010 10 : 03 AM 1'4SC Review http://apps.cfwnet.org/council packet/mc_review.asp?ID=13804&council... The Kimley-Horn and Associates, Inc., contract amount for the Downtown Bicycle Facilities Pilot Project is $126,975.00 and consists of the design for signage and pavement markings depicting on -street bicycle routes and lanes with supporting directional signage consistent with the recommendations of the Bike Fort Worth plan necessary for the approved EECBG activities. This grant -funded project requires no matching funds or cost sharing. Kimley-Horn and Associates, Inc., is in compliance with the City's DBE Program by committing to 20 percent DBE participation on this project. The City's DBE goal on this project is 15 percent. The project is located in COUNCIL DISTRICTS 2 and 9. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current operating budget, as appropriated, of the Grants Fund. TO Fund/Account/Centers FROM Fund/Account/Centers GR76 531200 006484371870 $126, 975.00 Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: Fernando Costa (6122) Susan Alanis (8180) Katherine Beck (7918) Julia McCleeary (2593) ATTACHMENTS M C Map.pdf signed resolution.pdf 2 of 2 0 8/ 18/2010 10 : 03 AM