Loading...
HomeMy WebLinkAboutContract 38798-A1 cy .- AMENDMENT No. 01 ciary sF.CRETARy--- -7 CONTRACT TO CITY SECRETARY CONTRACT No. 38,'198 WHEREAS, the City of Fort Worth (CITY)' and Brown & Ga-Y Engineers, Inc. , (ENGINEER) made and entered into city Secretary contract No. 38798, the CONTRACT) which was authorized on the 14 th day of August, 20112 in the amount of $ $99, 068 . 00; and WHEREAS the CONTRACT invoilves engineering services for the following project : 2008 CIS' Arterial Street Robertson Road; and WHEREAS, it has become necessary to execute Amendment No. 01 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which mends the CONTRACT: I . Article I of the CONTRACT T is amended to include the additional engineering services specified .n a proposal dated Ma 16, 2012, a copy of which is attached hereto and incorporated herein. The cost to city for the additional deign services to be, performed by Engineer totals $99, 068. 00. (See Attached Funding Breakdown Sheet, page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to! be paid to Engineer for all work and services performed under the contract as amended p so that the total fey aid by the City for all work and services shall be an amount of $483,536. 010. 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect . EXECUTED and EFFECTIVE as of the date last written by a signatory, below. Cut of Fort Worth OFFICIAL RECORD Professional Services Agreement amendment Template PMO Official Release 8/1/2012 Page e SECRETARY FIT WORT H7 T a o APPROVED:. APROVED: City of Fort Worth Brown & Gay Engineers, Inc. ell, Fernando Costa William D. D ' on PE Assistant city Manager Executive Vice President DATE: DATE- Z_ q AP VAL RECOMMENDED: Dougla S6:W. Wiersig, PE Director, Department of Transportation/ Public Works 7 APPROVED AS TO FORM AND LEGALITY: M&C: Date. D o�(4-1 a s W'. Black Assistant City Attorney ' '' AO F 0)? ATTEST: .......... OCYI 0Q ()00.4k 00 %0 0i 0wo 40 0 \ 4 \1, CIO 004 0 01 0* 0 Yl Mary Kayle 00 7 0A V0000000 j4CY City Sec ary 4Z111111 City of Fort Worth Professional Services Agreement Amendment Template OFFICIAL RECORD PMO Official Release 8/1/2012 Page 2 of 3 C'ITY SECRETARY FTo WORTH, TX . .......... FUNDING BREAKDOWN SHEET City Secretary No. Amendment No. 1 Department Fund-Account-Centex Amount Water P258 531200 VOV17 O129933 1V540 . 00 TPW C204 531200 20V230129930 81258 . 00 Total : 99f 068 . 00 ........... City of Fort Worth Professional Services c' Aty men reement Amendt Template P Official Release 8/1/2012 Page 3 of 3 BROWN & A1Y ENGINEERS, INC. May 16,2012 Mh Michael R. Weiss, PE Senior Professional Engineer City of Fort Worth 1000 Throckmorton Street Fort Worth.,TX 76102 Re: Amendment No. I —Additional Services Robertson Road (Boat Club Road- "west of Lake Country Drive) City PIroi'ec,t No. 01 299 Deal-Mr. Weiss: Brown&Gay Engineers, Inc. (BGE)has prepared the enclosed fee proposal for the following additional scope of services: • Nationwide Permit 14 • Drainage Easement Pond B Outfall • bicorporation of the New City Standard Documents and Details • Sanitary Sewer Force Main Relocation and Betterment • Sanitary Sewer Lift Station Grading • Required TXDOT Permits The Standard Agreement for Engineering Services for this project includes the scope depicted in the 60% construction documents submitted on January 13,2012. Amendment Number I includes the following additional scope items with descriptions below.- Nationwide Permit 14: Improvement for this project will require a Nationwide Permit 14(NWP 14),to environmentally clear the proposed roadway expansion and ROW acquisition. The construction of the roadway and facilities will impact existing wetlands and Waters of the US channels and waterways. A NVVT 14 is expected to document impacts and mitigation of the proposed 'improvements. Coordination with the US Army Corps of Engineers('SALE)—Fort Worth District will be required to confirm the specific permit requirements. Drainage Easement Pond B Outfall., The existing drainage channel,spillway of an adjacent pond,flows into an existing culvert under the roadway. During construction,this culvert will be removed and precast box culverts will be 2595, Dallas, Parkway,9 Suite 204 & Frisco, Texas 75034 *TEL: 972-464-48001 o FAX: 97'2-464-4899 o www.browngay.com Mr. Michael R. Weiss,PE May 16,2012 Page 2 installed under the road to convey the flow. This new outfall location requires grading to realign the channel with the new outfall location, The proposed grading will take place across the ONCOR Right-of-Way and adjacent easement. Detailed design of the realignment and grading will require additional survey beyond the Robertson Road Right-of-Way and production of two additional,easement documents. The easement documents are for two separate property owners. The first property being Oncor and the second property owner is a private landowner. Additional Survey, ROW and Easement Documents The design of Robertson Road will include embankment slopes to reduce the required 'length of retaining walls. The toe of the slope will meet the existing ground outside of the proposed ROW., Sl�ope easements,will be acquired to accommodate these slopes. Additional topographic survey at Pond D is required to complete the design of the pond outfall. Incorporation of the New City Standard Documents and Details, The City of Fort worth has unveiled the new standard construction documents and details. These . I changes will be incorporated into the final submittal. The bid items, specifications, and standard details will be revised in the existing contract documents. Sanitary Sewer Force Main Relocation and Betterment The proposed profile of Robertson Road follows the design criteria to the meet the required design speed. Cut and Fill was utilized to accommodate the required design speed,and ultimately the capacity of the road. This practice conflicted with an existing sanitary sewer force main located north of the existing pavement. The 770 linear feet of sanitary sewer force main requires relocation. This design effort will be compensated by the Transportation and Public Works Department. The remainder of the sanitary sewer force main and eventually gravity main has been described in the attached as the betterment,portion. The engineering services required for the betterment of 1160 linear feet of force and gravity main is requested from the Water Department. • Sanitary Sewer Lift Station Grading The aforementioned sanitary sewer force main originates at a lift station north of Robertson Road. The lift station site will require additional grading for the driveway access and drainage concerns. 0 TXDOT Required Permits The Department of Transportation requires three permits for the Robertson Road improvements within the TxDIOT ROW at Boat Club Road. 1.) An access permit is required to expand the existing intersection of Robertson Road and Boat Club Road (FM 1220). - h in ,2.) A utility crosising permit is required to foi•the sanitary sewer gravity i�-nain consti-Liction wi t the Boat Club Road Right-of-Way at the tie in point. Mr.Michael R. Weiss, PE May 16,2012 Page 3 3.) A traffic signal permit is requh•ed for the work associated with traffic signal at the intersection of Robertson Road and Boat Club Road. The proposed man hour breakdown for the additional services is attached. The proposed$99,068 for these services was determined based on the time estimated to complete at the hourly rates outlined in the STANDARD AGREEMENT FOR ENGINEERING SERVICE,S,., This i*ncludes$9,700 for NY"E sub consultants resulting in approximately 9.8%M1 participation for this amendment. The breakdown of the proposed fee for additional services is attached for your review. This proposed amendment increases the total contract amount summarized below., Original contract amount $384,398.00 Amendment No. I $ 992068.00 Revised Conti-act Amount $483,466.00 Please let me know if you have any questions or comments. Sincerely, Chris Kuykendall,PE Project Manager Enclosures May 16,201:l2 City of Fort Worth BROWN Robertson Road (Boat Club Road -West of Lake Country Drive) City Project No.01219!91 MM & uAY Amendment No. I -Summary ENGI�'EE S1, INC. Amendment No. 1 -Transportation and Public Wolrks, Nation Wide Permit Attainment $ 251438 Drainage Easement Outfall Pond B Survey of the drainage easement area (North and South of roadway) $ 2ti0o Grading layout sheet $ 6,240 Drainage Easement Documents(2 property owners) $ 11800 Additional Survey, ROW and Easement Documents Slope Easement Documents 4170101 Additional Survey of Pond D $ MOO Incorporation of the New Standard Specifications $ 4;880 Relocation of Sanitary Sewer Force,Main Design and Plan production for 770 LF of Force and Gravity main $ 101380 Sanitary Sewer Lift Station Site Layout $ 311800 TxDOT Permits-Roadway, Traffic and Utilities $ 201120 Administrative (10%) Fee on M/WBE Firms $ 970 Transportation and Public Works Department Subtotal $ 81)628 Amendment No. 1 -Water Department Betterment of Sanitary Sewer Force Main $ 151040 Sanitary Sewer Layout,Sleet $ 2)500 Administrative (10%) Fee on M/WBE Firms $ - v ater Department,S,uib;t,otal, $ 173540 Amendment No. 1 Total $ 99,068 B Summary CD N 2! C. C) 4-0 1011�0 00 CD C) 0) C6 CLI co 0 00 co 0 (D (0 C) 0 cr) LL (1) 0 0 00 Ml 0 < L tr.� ta m E 0 a) 0 (D C/) E (1): El r Z 0 *NJ LL " z 0 0 4- 0 4-1 M a. E 0- cn c I CL m 0 0 a 06 w co 0 0) 06 C- 0 E CD c C: 0i ui 0 VT a) E w 0 1 C: 0 (n CD En w c 0 c va od, 4-j (n 0 U)i 06 0 0 "0 L- c () c a_ 0 c 0 U) wl Lf U) C) L- 0 a) 0 (9 -E 4- E 4-j ol IN mmil. co C> C) 0 0 0 C) C> 0 C> 0 Co m C) 4q 0 C> 0 Co ico 0 N t- IC4 Co "I T-1 041 CO t%. ool ce) CID T— m T- M co (0 01) 61% 69 w (AM 69 64 64), 69 Lh (A co C) Y. C) Q to w co, ull Oo IM. W CL 64H 6F), 0 C> 0— Lh - co W, C) o w c3 m m C: > L) too (0 c c C c a) 0 0 1 0 0 lit (1)J 4- C> 0 > o a 0 to T- O)l tn 70 ri 0) 'co ui a > z 4e 4-J CL 0 Aw; 0 0 S 0 0 #~ tmi 1 "l CO MID ANN" c *4 @ v- J3 uj U) U) 9 t: 0) jM.- 0 co 0. Will 4- 0) 0 cn 0 0 36- m, 46 00 CID 100 mi 4-4 z 0) 0 0 ol U. ol CL w CL 4- vu I- 0 0 LA co Low c MCZ 0,, 0. CL low w�ft LJ co z >1 0 E _0 co 2 Wl 0 Z3 01 70 0) c 0 E a . I cul M i8L 0 0 0 .3 c U. MOOM-11 CL C CL m 2 E U.1 .MlMMMMO i(D 0 CD m 2 C) >t 7C) M Ol 0 t— (ol 0 C uj c m '0� LL -j (D 4-0 E c 00 0 E Cw o M C: c m E 0 C: C-- 0 C) LL 0 0 E 0 0 701 4-0 ol a 2 C:)� c: 0 E > r 6M Z (1) CL -ol i-> c 4- 0 :3 0 0 Ml tZ 70 4- m o c Wl �p tAl ol C) C: L� c: o E 0 m m 0 0 AS a 0 CIL w c z *01 b � m U) 0 C) c 10 W F- AP 0% . ....... saw=" 7� o ........--- V" C) CD 0 0 LO et Q C) 12 Co DL 09- .r LA 4) 60 0 Z > C 4i Cll w to E 0)1 Ol 0 0 CN > CO w M W i LA CY) r: w CL 0 cn m LA CD CL o L� :F 0 z 4-J U- 0 CL IL 15 2 li u 0 LL U- CL 0) -J w p— (.) 0 Lo (D Q L-0 LL 40- 0 Co V- (D > 0 EL d cn (D (n Ca 0) ra Zz CL c) (j) cc 'Now BROWN GAY ENGINEERS, INC. May 16,2012 Mr. W.Truett Wilson,RPLS Gorrondona and Associates,Inc. 6707 Brentwood Stair Road, Suite 50 Fort worth,TX 76112 Re: Letter of Intent-2008 Capital Improvement Program(Arterial Streets) Robertson Road(Project No. 01299)—From W. of Lake Country Dr to Boat Club Rd. BGE Project No.COF 10 Dear Mr. Wilson: It is our intention to execute an agreement with Gorrondona and Associates,Inc.,pending execution of the contract with the City of Fort worth for the above mentioned project. The agreed upon terms of the agreement are as follows: i Total scope of surveying will include topographic surveying for drainage improvements,ROW surveying and temporary and permanent slop easement document preparation. SCOPE/COMPENSATION.- Topographic Surveying for Drainage Improvements: 2 Areas @ Pond B=$22100 1 Area @a.Pond D=$1,100 _$3,200 Preparation of ROW and Easement Documents: 6 ROW Documents @ $12750=$102500 3 Permanent Drainage Easements @a $900=$22700 10 Permanent Slope Easements @ $900=$92000 3 Ternporgy Construction Easements 600=$1%800 4 _$242000.00 1 Original Contract Amount: = 17 500.00 ($173500.00) TOTAL FOR SURVEYING SERVICES: $9,700.00 2595 Dallas Parkway • Suite 204 • Frisco, Texas 75034 •TEL: 972-464-4800 • FAX: 972-464-4899 • www.browngay.com Page 2 M-. W.Truett Wilson May 16, 2012 We look forward to working with you. Please confirm you concur with the terms above. Sincerely, Accepted for Gorrondona and A ociates,Inc. Cluis Kuykenda PE Project Manager By W.Truett Wil,sion Title: Survey Manager Date: 7 cc: Mr.Mike Weiss,,RE,Cl*ty of Fort Worth City o,,,f Fort o�,. I, Texas e% al N1 Mayor and Council %,.0ommunication VPW1­1'1011) ))�Or (P�,Jl/ 1K "A", 0 ff"W"If,�1, 'w"',vw*........... J W, COUNCIL ACTION: Approved on 8/14/2012 ,�fyj"l""""),Wfll�W,4))�,)��l,�,rfe,,,,,I,jyjl�I/flwf F 41"11-110 "7"Iff"', W, 4, 114 A le" DATE: Tuesday, August 14, 2012 REFERENCE, NO.: **C-, 5783 LOG NAME:, 20R,OBERTSON—AMEND 1 SUBJECT: Authorize Execution of Amendment No. 1 to City Secretary Contract No. 38798 an Engineering Services Agire,lemen:t with Bro,wn, and Gay Engineers, Inc., in the,Amount of$99,068.00 for the Design of Robertson Road from Boat Club Road to West of Lake Country Drive, Thereby Increasing the Total Contract Amount from $384,468.00 to $483,536.00 (COUNCIL DISTRICT 7) RECOMMENDATION: It is recommended that the City council authorize, the execution, of Amendment No,. 1 to City Secreta,ry Contract No. 38798 and Engineering Servies, Agreement with Brown and Gay Engineers, Inc., in the amount of $99,068.00 for the design of Robertson Road from Boat Club Road' to West of Lake Country Drive, thereby increasing the, total contract cost in the amount of $483,536.,00. DISCUSSION: The 2008 Capital Improvement Program ('CIP) provided funding for the design and construction of'this project. The need for this contract amendment is primarily a result of necessary improvements to the easternmost box culvert. As the project design progressed, it became apparent that additional work outside the limits of the existing right-of-way would be needed and that the preparatilion of a Nationwide, Permit for the United States Army Corps of Engineers, field surveys, additional right-of-way and. easements were necessary. These design changes would also provide sufficient detail for a permit from the Texas Department of Transportation (TxDOT)1 for work within, the Boat Club, Road (FIVI. 1220) intersection, The sewer Capital Projects fund will be paying for a portion of this amendment, this sewer design will be paid by the transfer of $17,540.00 from the Water and Sewer Operating Fund to the Sewer Cap,itall Projects Fund, aind adopting the attached appropriation ordinance On June 16, 2009, (M&C C-23600) the City Council, authorized an Engineering Services Contract 387'918 with Birolwn and Gay Engineers, Inc,,: in the amount of$384,,468.00 for the design of Robertson Road from Boat Club Road to West of Lake Country Drive as a four-lane undivided roadway. Brown, and Gay Engineers, Inc., proposes to complete Amendment No, 1 for a lump sum fee of $99,068.00. Staff considers this fee to be fair and reasonable for the scope of services to be performed. Brown and Gay Engineers, Inc., is, in compliance with the City's IVIA/VBE Ordinance by committing to an additional 10 percent M/WBE participation on Amendment No. 1 The City's goal on this amendment is 9 percent, This project is located in COUNCIL DISTRICT 7, Mapsco 32W and 32X FISCAL INFORMATION / CERTIF]GATION: Thie Finianciial Management Services Director certifies that funds, are available in the current capital Logname: 20ROBERTSON--AMEND I Page 1, of 2 budgets, as appropriated, of the Sewer Ca�pi tall Projects Fund and Street Improvements 2008 Fund. FUND CENTERS: TO Fund/Account/Centers, FROM Fund/Account/Centers, P258 531200 707170129933 $ 0.00 0204 531200 207230129930 $81 8.00 CERTIFICATIONS: Submitted for Ci!y,Manager's Office Fernando Costa (6122) Originating Department Head: Douglas W. Wiersig (7801) Additional Information Contacto.. Mike Weiss (8485) ATTACHMENTS 11, 01'299 - Robertson F'AR,8.pdf (CFW Internal) 2. 20 ROBERTSON AMEND 1 STREET FAR df CFW Internal) 3. 20 ROBERTSON EN'D1 MAP d Public) 4. 20ROBERTSON AMEND 1 Corrected Sewer FAR.pdf (CFW Internal) 5. 20ROBERTSON AMEND 1 MW`BE df (CFW Internal) 6. 24. 20Robertson Amend 1 (7.-30-2012).PDF (CFW Internal) 7. C204-485208-2012399901 OO.doc (CFW Internal) 8. 8258 91919!011 alval*ilalb:le, .fllllu�nids,.dolcx (CFW Internal) Logname- 20R OBE RI"'SON--AMEND I Page 2 oft