HomeMy WebLinkAboutContract 40899COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 4089C11
WHEREAS, the undersigned "Developer" desires to make certain improvements (refer
to the name of the project at the bottom of the page) an addition to the City of Fort Worth,
Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule
municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter
called "City", to do certain work in connection with said improvements.
Developer Information:
peveloper Company Name: Kimbell Art Foundation
Authorized Signatory: Brenda Cline
Title: Executive Vice -President
Project Name: Kimbell Art Museum Expansion
Project Location: 3333 Camp Bowie Boulevard
Additional Streets: N/A
Plat Case No.: FS-009-068 Plat Name: The Kimbell
Mapsco: 76A
Council District: 7 City Project No: 01496
To be completed by staff.•
Received by:
CFA: 2010-046
re
10-06-"10
DOE: 6456i
1
Date: /Z7i
� U
OFFI LAL RECORD
CITY SECRETARY
Ft WORTH/ TX
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as
if copied herein verbatim. Developer agrees to comply with all provisions
of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy
in connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy and recognizes that there shall be no reduction
in the collateral until the Project has been completed and the City has
officially accepted the infrastructure. Developer further acknowledges
that said process requires the contractor to submit an Affidavit of Bills
paid signed by its contractor and Consent of Surety signed by its surety
to ensure the contractor has paid the sub -contractor and suppliers in full.
Additionally, the contractor will provide in writing that the contractor
has been paid in full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements
contemplated by this Agreement and that said construction shall be
completed in a good and workmanlike manner and in accordance with all
City standards and the City -approved construction plans, specifications and
cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof:
Water (A)&.. ,
Sewer (A-1) X , Paving (B) _X__, Storm Drain (B-1) X , Street
Lights & Signs (C) X
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of
the department having jurisdiction over the infrastructure to be
constructed, said contractor to meet City's requirements for being
insured, licensed and bonded to do work in public streets and/or
prequalified to perform water/waste water construction as the case may
be.
ii. To require its contractor to furnish to the City a payment and
performance bond in the names of the City and the Developer for one
hundred percent (100%) of the contract price of the infrastructure, and a
maintenance bond in the name of the City for one hundred percent
(100%) of the contract price of the infrastructure for a period of two (2)
years insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required
by said documents and same will be evidenced on the ACORD
Certificate of Insurance supplied by the contractor's insurance provider
and bound in the construction contract book.
iv. To require its contractor to give 48 hours notice to the City's
Construction Services Division of intent to commence construction so
that City inspection personnel will be available; and to require the
contractor to allow the construction to be subject to inspection at any
and all times by City inspection forces, and not to install or relocate any
sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such
laboratory tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The
3
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -
issued Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water
mains constructed under this Agreement until said sewer and water
mains and service lines have been completed to the satisfaction of the
Water Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities
to serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in conflict
with any of the community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or
employees.
M. Developer will further require its contractors to indemnify, defend and
4
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such infuses, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort
Worth, its officers, servants, or employees. Further, Developer will require
its contractors to indemnify, and hold harmless the City for any losses,
damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the
improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated
by the City.
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with
its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all
contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party
beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and stoxiii drain inspection fees equal
to four percent (4%) and material testing fees equal to two percent (2%)
for a total of 6% of the developer's share of the total construction cost as
stated in the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is
not installing the streetlights, inspection fees equal to four percent (4%) of
5
the developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in
the cost of the community facilities shall terminate if the facilities are
not completed within two (2) years; provided, however, if construction
of the community facilities has started within the two year period, the
developer may request that the CFA be extended for one year. If the
community facilities are not completed within such extension period,
there will be no further obligation of the City to participate. City
participation in a CFA shall be subject to the availability of City funds
and approval by the Fort Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee,
its agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for
this Agreement to cause the completion of the construction of the
community facilities if at the end of two (2) years from the date of this
Agreement the community facilities have not been completed and
accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause
the payment of costs for construction of same before the expiration of
two (2) years if the Developer breaches this Agreement becomes
insolvent or fails to pay costs of construction and the financial guarantee
is not a Completion Agreement. If the financial guarantee is a
Completion Agreement and the Developer's contractors and/or suppliers
are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of
the Completion Agreement.
Cost Summary Sheet
Project Name: The Kimbell Art Museum Expansion
CFA No.: 2010-046 DOE No.: 6456
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract
price will ultimately determine the amount of CFA fees and financial guarantee. The bid price
and any additional CFA payments will be required prior to scheduling a pre -construction
meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
$
$
56,769.00
5,100.00
Water and Sewer Construction Total $ 61, 869.00
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights- Relocated by Developer (3)
$
$
$
115,914.00
5,300.00
10,500.00
TPW Construction Cost Sub -Total $ 131,714.00
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
hoose one
$ 193,583.00
$
$
$
$
$
$
$
1,237.38
1,237.38
2,474.76
4,848.56
2,424.28
420.00
M.
$ 7,692.84
$ 10,167.60
Amount
Choice
(ck one)
-- - 1 -
Bond
= 100%
$ 193,583.00
Completion
Agreement
= 100%
/
Holds
Plat
$ 193,583.00
Cash
Escrow
Water/Sanitary
Sewer=
125%
$
77,336.25
Cash
Escrow
Paving/Storm
Drain
r= 125%
$ 164,642.50
Letter
of
Credit
= 125%
w/2yr
expiration
period
$ 241,978.75
`‘,/
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested
by its City Secretary, with the corporate seal of the City affixed, and said Developer has
isafrk
executed this instrument in quadruplicate, at Fort Worth, Texas this
of 1?ttSa-tQM, , 20 ID .
CITY OF FORT WORTH - Recommended by:
Water Department
Wendy Chi-Babulal, EMB
Development Engineering Manager
Approved as to Form & Legality:
Assistant City Attorney
ATTEST:
Marty Hendri
City Secretary
Signature
(Print) Name:
ithocion4L
day
Transportation & Public Works Department
William A. V - rkest, P
Director
Approved by City Manager's Office
Fernando Costa
Assistant City Manager
lk
ri A#000f O oa����}�
00 f?',‘
Ovo
021;j4
y`�� othfr0000�°°oQ d(IV A .4C);-r
Kimbell A Foundation /
NO M&C REQUIRED
S ignature
(Print) Name: Brenda Cline
Title: Chief Financial Officer
OFFICIAL RECORD
CITY SECRETARY
WORTH, TX
1
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included
►1
rs
rI
Ak
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
9
NOT TO SCALE
•z
cc
m
J
0
z
LANCASTER
AVE
PROJECT LOCATION
C
VICINITY MAP
KIMBELL ART MUSEUM EXPANSION
W. 7TH
ST
HUITF2DUARS
Muitt ZaMra ha Engineering / Architecture
500 W. 7th St. Ste. 300 Fart Warth, Texas 76102
Phone 0117)428-1281 Fax Qi17) i35-/025
1: \YRUJ\VJILJLUI\11 Ur3lt,N UAU%ALAll\LI VII Il.lJr V1 I.rM a wnlnl l'IVlnlunel l Vil.
JO fv
0
„Jed
OWNER INFORMATION:
City of Fort Worth
1000 Throckmorton Street
Fort Worth, Texas 76102
Lessee:
Kimbell Art Foundation
k
GINl7 r 7y4f,
Graphic Sco%
09 O ;CP ZOO :00 he
0 AO .°
J
•
• •
P•
ao ii " '�,
��5tO` ••'
P1CiI''t'.• I
•
M• gr•
•
•
•
• :,;r
9.922 ACRES
LOT
Fo/ d of INN
Beginning
644.69'
�kv h N 89`45'24"W - 644.69' I }
—•—•—•—•—•—•—•—•-s`-•——.—.—.—.—._.—W€S�•—•—•—L>4NGArS TER—•—•—• A v€NQE.—•—•—•—•=•— — - -
•
.,n
SCALE (IN FEET)
0
100
200
400
CITY OF FORT WORTH
C
DRAFT PLAT MAP
KIMBELL ART MUSEUM EXPANSION
RECORDED: DOCUMENT NO. CCF#
HUI1T ZOLIARS
R4tt-Zol ers. Arc Engineering / Ard,if c$in
500 W. 71h St Sex 300 Forl Works, Texas 76102
Phone (517)420-1291 Fax (517)335-1025
THE CITY OF FORT WORTH, TEXAS
PLANS FOR THE •CONSTRUCTION OF'
WATER, SEWER, PAVING AND•DRAINAGE TO SERVE •
KIMBELL ART MUSEUM EXPANSION
MIKE MONCRIEF
MAYOR
DALE A. FISSELER, P.E.
CITY MANAGER
WILLIAM A. VERKEST, P.E.
DIRECTOR, TRANSPORTATION AND
PUBLIC WORKS DEPARTMENT
S. FRANK CRUMB, P.E.
DIRECTOR, WATER DEPARTMENT
D.O.E. NO.
FILE NO.
6456
W-2123
WATER PROJECT NO. P265-607150149683
SEWER PROJECT NO. P275-707130149683
CITY PROJECT NO. 01496
L/
, ��,
\
\
PROJECT
�
LOCATION-N q
aNM
vk
msN
\
i
!
_
, _
J
11 .
K�
'—�s� ./
,.�
..
\,1
]P JQNN6PN-DMffi..YAN
GU6➢PNxYAY
I \\\�
',�
1/
Y
f/ /
��
vn1&.._.
DmvE „-.
/r._.
G�1,
le.
-ice
7
1
LOCATION MAP
N.TS.
MAPSCO NO. 76-A
COUNCIL DISTRICT 7
OWNED / DEVELOPED BY:
KIMBELL ART FOUNDATION
301 COMMERC.B STREET. SUITE 2900
Phone: (817) 336-6100
PREPARED BY:
nun1 LI 1
500 West 7th steel. Suite 300
FDrt Worth, Texan 76102-4728
Phone (817) 335-3000 Fax .i871335-1025
CONTACT: TOM GREEN
JUWE, 2010
FORT WORTH
SHEET INDEX
DESCRIPTION
EMT I -WATER ANDSEWER IMPROVEMENTS
01'.. COVER SHEET
02 PUT
as ObtRALL DEMCLTION PLAN
04 DIMENSION CONTROL PLAN
0S OVERALL UTILITY LAYOUT
08 WATER LINES PLANS AND PROFILES
07 WATER LINE DETAILS 1
08 WATER LINE DETAILS
O9 SANITARY SEWER DETAILS
UNIT II - DRAINAGE AND PAVING IMPROVEMENTS
10 DRAINAGE AREA MAP
11 STORM DRAIN PLAN AND PROFILE
12 GRADING PLAN
13 OVERALL PAVING PLAN
14 ENLARGED PAVING PLAN
15 CONSTRUCTION DETAILS 1
16 CONSTRUCTION DETAILS 2
17 CONSTRUCTION DETAILS 3
18 CONSTRUCTION DETAILS 4
18 '.STREET LUMINAIRE GENERA. NOTES
20 STREET LUMINAIRE POLE FOUNDATION DETAILS
21 STREET LUMINAIRE POLE DETAILS
22 STREET LUMINARE ELECTRICAL CONNECTION DETAILS
23 STREET LUMINAIRE CONDUT & GROUND BOX DETAILS
24 OVERALL -TRAFFIC CONTROL PLAN
25 TRAFFIC CONTROL AREA 1 PHASE 1
28 TRAFFIC CONTROL AREA 1 RASE 2
27 TRAFFIC CONTROL AREA2
28 TRAFFIC CONTROL AREA 3
29 TRAFFIC CONTROL AREA 4
30 TRAFFIC CONTROL ARFA $
31,.TRAFFIC CONTROL PLAN DETAILS 1 OF 2
32.. TRAFFIC CONTROL PUN. DETAILS 20F 2
33 TxDOT - PORTABLE CHANGEABLE MESSAGE SIGN STANDARDBq6>17
34 TxDOT • CHANNELIZING DEVICES STANDARD BC(10)07
35EROSION CONTROL
36 EROSION CONTROL DETMLS
UNIT III- RETAINING WALL IMPROVEMENTS
37 TEMPORARY RETENTION SYSTEM PLAN AND PROFILE - FOR REFERENCE ONLY
WILLI.AM A VE 8T, P.E. DATE:
DIRECTOR, TRANSPORTATION AND PUBLIC WORKS
RECOMGIEP4DED BY DATE:
7/ 4- M-10
REVIEWED: DATE:
X-21228
X-21228
X-21228 W-2
RY SEWER, PAVING AND DRAINAGE IMPROVEMENTS TO SERVE
DESIGN OF TEMPORARY RETENTION
SYSTEM WILL BE SUBMITTED TO CITY OF
FORT WORTH INFRASTRUCTURE PLAN
REVIEW FOR REVIEW AND APPROVAL
PRIOR TO ANY CONSTRUCTION PER IPRC
6/16/10
J
134
x
w
0
-56
LEGEND
IRRIGATION WATER PQINT OF CONNECTION
INSTALL (1) 12' x 4' TEE
DOMESTIC WATER POINT OF CONNECTION
INSTALL (1) 12" x 4" TEE
INSTALL (I) 3" IRRIGATION WATER METER
PER DETAIL WTR-024 CITY OF FORT WORTH 02/09
INSTALL (1) 3' DOMESTIC WATER METER
PER DETAIL WTR-024 CITY OF FORT WORTH 02/09
INSTALL (1) 12" x 6" TEE FOR FIREWATER
3/4" SAMPLING WATER LINE PER DETAIL WTR-024
CITY OF FORT WORTH 02/09
INSTALL WATER SAMPLING STATION PER IPRC 6/16/10
REDUCED PRESSURE BACKFLOW PREVENTION DEVICE
VAULT PER IPRC 6/16/10
78.73 LF OF 6" FIREWATER TO REDUCED PRESSURE
BACKFLOW PREVENTION DEVICE
( EXHIBIT "A" -WATER DISTRIBUTION
0
= 20'
HUI1TBARS
KIMBELL ART MUSEUM EXPANSION
Milt-ZcMn Inc. Engineering / ArchltSCSMe
500 W. 7th 81 Sts. 300 Fat Worth, Texas 78102
Phone (817)429-1201 Fax (817)335-1025
CURB INLET
I
POINT OF CONNECTION
EXISTING SSMH L-1985A
PRIVATE SS LINE
CURB INLET
( EXHIBIT "A-1 "-SANITARY SEWER
KIMBELL ART MUSEUM EXPANSION
STORM SEWER
BRICK PAVERS
((
PROPOSED PAVING
LEGEND
eel
•eeteerne eetef'S%eilve�,
1' =100'
8" CONCRETE
P AVEMENT
6" CONCRETE
P AVEMENT
P ROPOSED
P IDEWALK
HMAC
P AVEMENT
BRICK
P AVERS
Qe�` PROPOSED PAVING
'PROPOSED SIDEWALK
\A
PROPOSED SIDEWALK
it
PROPOSED PAVING
c
EXHIBIT NB" -PAVING
KIMBELL ART MUSEUM EXPANSION
c
0
d
HUITr.r. ARS
HuNi-Zckn, he
Engineering / Architecture
500 W. 71h 8k Ste. 300 Fort Worth, Texas 76102
Phone (617)429-1291 Fax (017)3351026
n
IB'
t
a
fL
•
, <!
5 SDMH
POINT OF CONNECTION
cD
( EXHIBIT "B1 "-STORM DRAIN
KIMBELL ART MUSEUM EXPANSION
HUITEADUARS
Mitt-ZcIen, Inc. Fnginewirg / Architecture
500 W. 71h et. 84. 300 Fat Worth, Texas 76102
Phone (017)429-1201 Fax (817)335-1025
=100'
PROPOSED STREET LUMINAIRE
RELOCATION
9.923 RES
lbi
\\Nts•fl
( EXHIBIT "Cm —STREET UGHTS
KIMBELL ART MUSEUM EXPANSION
HUITMDLIARS
EUU-Zct.... Inc. Enp(rsrkig / Architecture
500 W. 7th St. 81e. 300 Fort Wort+, Texas 76102
Phone (817)429-1291 Fax (817)335-1025
BID SUMMARY
KIMBELL ART MUSEUM
U NIT I - TOTAL AMOUNT BID WATER
$ 56,769
U NIT II - TOTAL AMOUNT BID SEWER
$ 5,100
U NIT III - TOTAL AMOUNT BID STORM DRAIN
$ 5,300
U NIT IV - TOTAL AMOUNT BID PAVING
$ 115,914
U NIT V - TOTAL AMOUNT STREET LIGHTS
$ 10,500
GRAND TOTAL AMOUNT BID
$ 193,583
i
Kimbell Art Museum Expansion - City of Fort Worth
Community Facilities Agreement
Estimate of Probable Cost Page 1 of 2
Section A - Water Line
Quantity
Unit
Unit
Price
Total
Amount
Item
Description
Item
No
1
1
EA
12"X6"
Tapping
Sleeve
w/ 6" Gate
Valve
$ 3,700
$ 3,700
2
2
EA
12"X4"
Tapping
Sleeve
w/ 4"
Gate
Valve
$ 3,450
$ 6,900
3
2
EA
12"
Gate
Valve
w/ Valve
Box
$ 2,300
$ 4,600
4
2
EA
$ 12,200
$ 24,400
3" Water
Combo
Turbine
Meter
Vault
w/ 2"
Bypass
5
12
LF
$ 182
$ 2,184
4"
Water
Line
-
PVC
6
15
LF
6" Water
Line
-
PVC
$ 130
$ 1,950
7
45
LF
$ 207
$ 9,315
12"
Water
Line
-
PVC
8
0.04
Ton
$ 93,000
$ 3,720
Pipe
Fittings
< 16"
Pipe
Section Al - Sanitary Sewer Line
Quantity
Unit
Item
Description
Unit
Price
Total
Amount
Item
No
1
1
EA
6" Sanitary Sewer Service
Tap
$
5,100
$ 5,100
Kimbell Art Museum Expansion - City of Fort Worth
Community Facilities Agreement
Estimate of Probable Cost Page 2 of 2
Section B - Pavin
Quantity
Unit
Unit
Price
Total
Amount
Item
No
Item
Description
1
320
SF
Pavement
HMAC
Repair
$ 31.00
$ 9,920
$
2,968
2
53
SY
$ 56.00
Pavement
- 6 inch
Concrete
3
312
SY
Pavement
- 8
inch
Concrete
$ 56.00
$ 17,472
4
364
SY
$ 59.00
$ 21,476
Subgrade-
8
inch
Lime
Stabilized
5
190
LF
$ 33.00
$ 6,270
7" Curb
&
18"
Gutter
—Install
6
330
LF
$ 3.00
$ 990
Curb
& Gutter
—Remove
7
5548
SF
Sidewalk
Install
$ 3.50
$ 19,418
8
2395
SF
$ 1.00
2,395
Sidewalk
Remove
$
$ 3,200
$ 12,800
9
4
EA
ADA
Wheelchair
Ramp
10
210
LF
Transverse Construction
Butt
Joint
$ 11.00
$ 2,310
11
100
LF
$ 15.00
$ 1,500
Pavement
Marking
- 4
inch
Line - White
12
0.30
Ton
6"
HMAC
Transition
$ 1,150
$ 345
13
420
SY
Install
Grass Sod
$ 3.00
$ 1,260
14
730
SF
$ 23.00
$ 16,790
Remove, Salvage
&
Repair
Brick
Street
Pavers
Section B1 Storm Drain
Quantity
Unit
Item
Description
Unit
Price
Total
Amount
Item
No
1
1
EA
Install
Storm
Drain
Manhole
Greater
than
4'
$ 5,300
$ 5,300
Section C - Street Lights
Quantity
Unit
Unit
Price
Item
Description
Total
Amount
Item
No
1
3
EA
$ 3,500
$ 10,500
Remove, Store
and
Relocate
City
Luminaire