HomeMy WebLinkAboutContract 41982 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT §
City Secretary
Contract No. L' V''
WHEREAS, the undersigned "Developer" desires to make certain improvements (refer
to the name of the project at the bottom of the page) an addition to the City of Fort Worth,
Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule
municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter
called "City", to do certain work in connection with said improvements.
Developer Information:
Developer Company Name: Barnett Gathering, L.P.
Authorized Signatory: Nick J. Dungey
Title: President
Project Name: Night Train Compressor Station Water & Sewer Improvements
Project Location: 7390 Wichita Street
Additional Streets: N/A
Plat Case No.: FS-008-123 Plat Name: Night Train Compressor Site
Mapsco: 106 A & B
Council District: 8 City Project No: 01482
To be completed by staff:
Received by: ; - A
CFA: 2011-005 DOE: 6453
Date:
t1
OFFICIAL RECORD
S�CRE'1'ARY
WORTH, TX
i
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement (`CFA ) as
if copied herein verbatim. Developer agrees to comply with all provisions
of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy
in connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy and recognizes that there shall be no reduction
in the collateral until the Project has been completed and the City has
officially. accepted the infrastructure. Developer further acknowledges
that said process requires the contractor to submit an Affidavit of Bills
paid signed by its contractor and Consent of Surety signed by its surety
to ensure the contractor has paid the sub -contractor and suppliers in full.
Additionally, the contractor will provide in writing that the contractor
has been paid in full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements
contemplated by this Agreement and that said construction shall be
completed in a good and workmanlike manner and in accordance with all
City standards and the City -approved construction plans, specifications and
cost estimates provided for the Project and the exhibits attached hereto.
>>The following checked exhibits are made a part hereof.
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
Combined CFA final Sept 12, 2008 2
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of
the depat tment having jurisdiction over the infrastructure to be
constructed, said contractor to meet City's requirements for being
insured, licensed and bonded to do work in public streets and/or
prequalified to perform water/waste water construction as the case may
be.
ii. To require its contractor to furnish to the City a payment and
performance bond in the names of the City and the Developer for one
hundred percent (100%) of the contract price of the infrastructure, and a
maintenance bond in the name of the City for one hundred percent
(100%) of the contract price of the infrastructure for a period of two (2)
years insuring the maintenance and repair of the constructed
infrastructure during the tern of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required
by said documents and same will be evidenced on the ACORD
Certificate of Insurance supplied by the contractor's insurance provider
and bound in the construction contract book.
iv. To require its contractor to give 48 hours notice to the City's
Construction Services Division of intent to commence construction so
that City inspection personnel will be available; and to require the
contractorto allow the construction to be subject to inspection at any
and all times by City inspection forces, and not to install or relocate any
sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such
laboratory tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The
3
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -
issued Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water
mains constructed under this Agreement until said sewer and water
mains and service lines have been completed to the satisfaction of the
Water Depattwent.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities
to serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in conflict
with any of the community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or
employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of
Combined CFA final Sept 12, 2008 4
Fort Worth, its officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort
Worth, its officers, servants, or employees. Further Developer will require
its contractors to indemnify, and hold harmless the City for any losses,
damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the
improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated
by the City.
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with
its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all
contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party
beneficiary of such contracts
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal
to four percent (4%) and material testing fees equal to two percent (2%)
for a total of 6% of the developer's share of the total construction cost as
stated in the construction contract.
5
iii. Developer shall pay in cash the total cost of streetlights or if the city is
not installing the streetlights, inspection fees equal to four percent (4%) of
the developer s share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in
the cost of the community facilities shall terminate if the facilities are
not completed within two (2) years; provided, however, if construction
of the community facilities has started within the two year period, the
developer may request that the CFA be extended for one year. If the
community facilities are not completed within such extension period,
there will be no further obligation of the City to participate. City
participation in a CFA shall be subject to the availability of City funds
and approval by the Fort Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee,
its agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for
this Agreement to cause the completion of the construction of the
community facilities if at the end of two (2) years from the date of this
Agreement the community facilities have not been completed and
accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause
the payment of costs for construction of same before the expiration of
two (2) years if the Developer breaches this Agreement, becomes
insolvent or fails to pay costs of construction and the financial guarantee
is not a Completion Agreement. If the financial guarantee is a
Completion Agreement and the Developer's contractors and/or suppliers
are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of
the Completion Agreement.
Combined CFA final Sept 12,2008 6
Cost Summary Sheet
Project Name: Night Train Compressor Station Water & Sewer Improvements
CFA No.: 2011-005 DOE No.: 6453
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract
price will ultimately determine the amount of CFA fees and financial guarantee. The bid price
and any additional CFA payments will be required prior to scheduling a pre -construction
meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Sub -Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
Developer's Cost
248,450.00
$
248,450.00
$ 4,969.00
$ 4,969.00
$ 9,938.00
$ 9,938.00
Amount
Choice
fck one
Bond = 100%
$ 248,450.00
X
Completion
Agreement
= 100% / Holds Plat
$ 248,450.00
Cash Escrow Water/Sanitary Sewer— 125%
$ 310,562.50
Cash Escrow Paving/Storm
Drain = 125%
$ -
Letter of Credit = 125% w/2yr expiration
period
$ 310,562.50
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested
by its City Secretary, with the corporate seal of the City affixed, and said Developer has
executed this instrument in quadruplicate, at Fort Worth, Texas this
of
, 20 \ .
CITY OF FORT WORTH o Recommended by:
Water Department
L. f
Wendy Chi-B,abulal, EICIBA, P.E.
Development Engineering Manager
Approved as to Form & Legality:
r
1f4/t&t W41
Marcia Wise
Sr. Assistant City Attorney
ATTEST:
arty Hendrix
City Secretary
day
Transportation & Public Works Department
Douglas W. Wiersig, P.E.
Director
Approved by tl'ty Manager's Office
rnando 1 `sta
a.\ Asssistant City Manager
1.1 o 'T ` y
o d
'a, ``t
o
\
Attest:
TIFFANY PETERS
Notary\yr�Fr,
Ju ll
`
WIAT
TrHAs
My Conn. Lxp. uwfll2013
Combined CFA final Sept 12,2008
Barnett Gathering, LP
By: XTO Resources I GP, LLC
Its General Partner
8
Signature
Print Name: Nick J. Dungey
Title: President
OFFICIAL HE
CIV1 Z5VaXti174
FT. dV®R1`1
PP\
Pay \
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included
•
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C. Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
9
GZ
'02
CITY O\
FORT WORH
JOEL EAST
OAK TIMBLR
OLB;I HCKOR
ti VALwI E FORGE
HER
w�..�
LINE-\CHgNCjrgGE
EpERRI
�-�ORSV I L
-APpOMJTOX
LOCATION MAP
ANvIAR F
APPLETRE6
D CHAT 1AM u-
SWOODBRIDGE
I
0
w q r-w
J
HA
REPUBLIC -
NOT TO
SCALE
NIGHT TRAIN COMPRESSOR SITE
BLOCK 1, LOTS 1 & 2
\JOB\015428\EXHIBITS\CFA\Water_Sewer\W5_Cover.AT ER
& SANITARY S EWE R IMPROVEMENTS
JACOBS
JACOBS ENGINEERING GROUP, INC.
777 MAIN STREET
FORT WORTH, TX 76102
(817) 735-6000 •
PROJECT NO. 01 5428. 01 0. 001. 0625
a
6 9' w' 5/8”
oGs ° a� 00
SET
EMENT AND RIGHT- OF - WA(
CCF 'D20-7458309
C.R.T.C.T.
/ ti
SEWER EASEMENT %V/
THIS PLAT
3:4" 1 RON ROD
FOUND
/
/
/
•
S1
Q
op
M
QD
'I'
A FINAL PLAT OF
LOT 1 & 2, BLOCK 1
NIGHT TRAIN
COMPRESSOR SITE
SURVEY, ABSTRACT NUMBER 1375, CITY OF FORT WORTH, TARRANT COUNTY.
TEXAS, AND BEING ALL OF THAT TrOF LAND DESCRIBED BY DEED TO
BARNETT GATHERING, L.P. AS REQ IN COUNTY CLERK'S FILING
NUMBER D207458308. COUNTY RECOR..., TARRANT COUNTY, TEXAS AND
BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS/
BEGINNING AT A CONCRETE MONUMENT FOUND AT THE NORTHWEST CORNER
OF SAID BARNETT GATHERING. L.P. TRACT AND BEING THE SOUTHWEST
CORNER OF THAT TRACT OF LAND DESCRIBED BY DEED TO METROPOLITAN
RESOURCES, INC. AS RECORDED IN VOLUME 10782, PAGE 82, SAID COUNTY
RECORDS AND BEING IN THE EAST LINE OF THAT TRACT OF LAND DESCRIBED
TO TXU ELECTRIC DELIVERY COMPANY AS RECORDED IN VOLUME 2574,
PAGE 545, SAID COUNTY RECORDS;
THENCE N 62°08'46"E, 1171.34 FEET WITH THE SOUTH LINE OF SAID
METROPOLITAN RESOURCES, INC. TRACT TO A 3/4 INCH IRON ROD FOUND,
THENCE S 77°33'34"E. 767.69 FEET CONTINUING WITH SAID SOUTH LINE TO A
5/8 INCH IRON ROD WITH CAP STAMPED "JACOBS" SET IN THE WEST LINE OF
THAT TRACT OF LAND DESCRIBED BY DEED TO TXU ELECTRIC DELIVERY
COMPANY AS RECORDED IN VOLUME 1485, PAGE 346, SAID COUNTY RECORDS,
THENCE S 12°26'26"W, 463.84 FEET, DEPARTING SOUTH LINE OF SAID
METROPOLITAN RESOURCES, INC. TRACT WITH THE WEST LINE OF SAID TXU
ELECTRIC DELIVERY COMPANY TRACT TO A 3/4 INCH IRON ROD FOUND AT
THE NORTHEAST CORNER OF THAT TRACT OF LAND DESCRIBED TO JAMES L.
WEST PRESBYTERIAN SPECIAL CARE CENTER FOUNDATION AS RECORDED
IN COUNTY CLERK'S FILING NUMBER 0203382981, SAID COUNTY RECORDS,
THENCE S 62°07'27"W, 1456.31 FEET, DEPARTING THE WEST LINE OF SAID
TXU ELECTRIC DELIVERY COMPANY TRACT WITH THE SOUTH LINE OF SAID
BARNETT GATHERING, L.P. TRACT TO A 5/8 INCH IRON ROD WITH CAP
STAMPED "JACOBS" SET IN THE EAST LINE OF SAID TXU ELECTRIC
DELIVERY COMPANY TRACT (VOLUME 2574, PAGE 545),
THENCE N 27°53'38"W, 850.82 FEET WITH SAID EAST LINE TO THE POINT OF
BEGINNING AND CONTAINING 1,295,547 SQUARE FEET OR 29.742 ACRES OF
LAND, MORE OR LESS.
TO BE KNOWN AS'
LOTS 1 AND 2, BLOCK I
NIGHT TRAIN COMPRESSOR SITE
AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS AND
DOES HEREBY DEDICATE TO THE PUBLIC USE FOREVER THE EASEMENTS
AND RIGHTS -OF -WAY AS SHOWN HEREON.
EXECUTED THIS THE DAY OF ,A.D. 2011.
BARNETT GATHERING, L.P.
A TEXAS LIMITED PARTNERSHIP
BY:
NICK DUNGEY - PRESIDENT
STATE OF TEXAS
COUNTY OF TARRANT
BEFORE ME, THE UNDERSIGNED AUTHORITY, A NOTARY PUBLIC IN AND FOR
THE STATE OF TEXAS, ON THIS DAY PERSONALLY APPEARED NICK DUNGEY,
PRESIDENT OF BARNETT GATHERING, L.P., KNOWN TO ME TO BE THE PERSON
AND OFFICER WHOSE NAME IS SUBSCRIBED TO THE FOREGOING INSTRUMENT
AND ACKNOWLEDGED TO ME THAT HE EXECUTED THE SAME FOR THE PURPOSES
AND CONSIDERATION THEREIN EXPRESSED AND IN THE CAPACITY THEREIN
STATED.
GIVEN UNDER MY HAND AND SEAL OF OFFICE THIS THE DAY
OF .201
NOTARY PUBLIC IN AND FOR THE STATE OF TEXAS
CERTIFICATION
I, TODD A. BRIDGES, REGISTERED PROFESSIONAL LAND SURVEYOR
OF THE STATE OF TEXAS, DO HEREBY CERTIFY THAT THE MAP
SHOWN HEREON ACCURATELY REPRESENTS THE DESCRIBED
PROPERTY AS DETERMINED BY A SURVEY MADE ON THE GROUND
UNDER MY DIRECTION AND SUPERVISION IN DECEMBER, 2010. AND
THAT ALL CORNERS ARE AS SHOWN.
SITUATED IN THE SHELBY COUNTY SCHOOL LAND SURVEY,
ABSTRACT NUMBER 1375, CITY OF FORT WORTH,
TARRANT COUNTY, TEXAS
DATE OF PREPARATION: MAY 2008 / DECEMBER 2010
TODD A. BRIDGES
REGISTERED PROFESSIONAL LAND SURVEYOR
TEXAS REGISTRATION NO. 4940
DATED ,
29.742 ACREL
JACOBS JOB NUMBER 015428.010.
METROPOLITAN RESOURCES INC.
VOLUME 10782, PAGE 82
C. R. T. C. T.
BARNETT GATHERING, L. P.
CCF• D207458308
C. R. T. C. T.
LEGEND
PROP. WATER LINE
PROP. GATE VALVE
PROP. FIRE HYDRANT
EXIST. WATER LINE
EXIST. GATE VALVE
EXIST. FIRE HYDRANT
LIMITS OF PROJECT
Gc\JOB\015428\EXHIBITS\CFA\Water _Sewer \Woter_CFA.sht
BARNETT GATHERING, L.P.
CCF' D207458308
C. R. T. C. T.
JAMES L. WEST PRESBYTERIAN
SPECIAL CARE CENTER FOUNDATION
CCF• D203382981
C. R. T. C. T.
` N
\N N.
N
1
JAMES L. WEST PRESBYTERIAN
SPECIAL CARE CENTER FOUNDATION
CCF' D203382981
C. R. T. C. T.
WATER
EXHIBIT 'A'
12" WATERLINE IMPROVEMENTS FOR
NIGHT TRAIN COMPRESSOR SITE
1
SCALE; 1" = 200'
JACOBS
JACOBS. ENGINEERING GROUP, INC.
777 MAIN STREET
(817) 7 5-6000TX 76102
PROJECT NO. 015428. 010.001. 0625
PAGE 2 OF 3
UNIT I: WATER
(Furnish and install, including all appurtenant work, complete in place, the following items)
(D-No. refers to related items in the Part D Special Conditions)
Item
No.
Approx.
Quantity
Measure
Unit
"D"
Item
Item
Description
reference
Unit
Price
Amount
Total
met
UNIT
I: WATER
1.
1,687
L
12"
backfill
Complete
Per
Linear
PVC
and
in
Waterline
disposal
Place
with
of
embedment,
trench
Dollars
Cents
spoils,
&
$
42.00
$ 70,854.00
F
Foot
Forty
Two
No
2.
175
L
backfill
Per
8"
Complete
PVC
Linear
Waterline
and
in
disposal
Place
with
of
embedment,
trench
Dollars
Cents
spoils,
&
$ 30.00
$ 5,250.00
F
Foot
Thirty
No
3.
4
Ea.
12"
Per
Gate
Valve,
Hundred
Complete
in
Dollars
Cents
Place
&
$
1,850.00
$ 7,400.00
Each
Eighteen
Fifty
No
4.
3
Ea.
8"
Per
Nine
Gate
Hundred
Valve,
Complete
in
Dollars
Cents
Place
&
$ 900.00
$ 2,700.00
Each
No
5.
2
Cast
Place
Per
Iron
< 16",
Complete
Dollars
Cents
in
&
$ 3,000.00
$ 6,000.00
Ton
Fittings
Ton
Three
Thousand
No
B-2
GAJOB\015428\PETRO\spec book\Water SS Spec Book July 2011.doc
Updated 05/16/2005
Item
No.
Approx.
Quantity
Measure
Unit
"D"
Item
Item
Description
reference
Price
Amount
Total
Unit
ment
UNIT
I: WATER
6.
1
L
S
Remove and
Replace
10"
Existing
Asphalt
Paving with
Sawcut
and
Thick
Street
Per
Lump
Cut
Permit,
Sum
Complete
in
Place
Thirty
Five
Hundred
Dollars
&
No
Cents
$ 3,500.00
$ 3,500.00
7.
3
Standard
Fire
Hydrant
with
Lead
and
Ea.
6 ' Valve,
Complete
in
Place
Per
Each
Dollars
&
Three
Thousand
No
Cents
$ 3,000.00
$ 9,000.00
8.
1
L
S
Connect
to
Waterline
,
Existing
Complete
in
Place
Per
Lump
Sum
Sixty
Hundred
Dollars
&
Five
No
Cents
$ 6,500.00
$ 6,500.00
9.
1
L
S
Detour
Installation,
Traffic
Maintenance
&
Removal
in
the
Wichita/Alta
Mesa
Intersection,
Complete
in
Place
Per
Lump
Sum
Thousand
Dollars
&
Two
No
Cents
$ 2,000.00
$ 2,000.00
10.
1,862
L
Trench
Safety,
Complete
in
Place
F
Per
Linear
Foot
None
Dollars
&
Cents
$ .50
$ 931.00
Fifty
11.
1
L
S
Control
Per Sheets
11
&
12,
Erosion
Complete
in
Place
Per
Lump
Sum
Dollars
&
Two
Thousand
No
Cents
$ 2,000.00
$ 2,000.00
B-3
G:\JOB\0154281PETROIspec book\Water SS Spec Book July 2011.doc
Updated 05/16/2005
Item
Approx.
Unit
Item
Description
Unit
Total
No.
Quantity
Measure
"D"
Item
reference
Price
Amount
ment
UNIT
I: WATER
Remove
Ex
Fence, Complete
in
Place
12.
100
L
F
Per
Linear
Foot
Three
Dollars
&
No
Cents
$ 3.00
$ 300.00
13.
Replace
Fence 8'
High
in
Kind,
50
L
F
Field
Complete
in
Place
Per
Linear
Foot
Eighteen
Dollars
&
No
Cents
$
18.00
$ 900.00
14.
50
L
F
5-Strand
Barbed
Wire
Fence Complete
in
Place
Per
Linear
Foot
Eight
Dollars
&
No
Cents
$ 8.00
$ 400.00
TOTAL
AMOUNT
BID
WATER
$
117,735.00
B-4 Updated 05/16/2005
G:UOB10154281PETRO\spec book\Water SS Spec Book July 2011.doc
LEGEND
PROP. SANITARY SEWER
PROP. MANHOLE
EXIST. SANITARY SEWER
EXIST. MANHOLE
LIMITS OF PROJECT
BARNETT GATHERING, L.P.
CCFP D207458308
C. R. T. C. T.
0
G,\JOB\015428\EXHIBITS\CFA\Water _Sewer \ Sewer _CFA.sht
FX ! (9f 1
GARRETT FAMILY PARTNERSHIP LTD``
VOLUME 012505, PAGE 0253 )�'
C. R. T. C. T.
/I
METROPOLITAN RESOURCES INC.
VOLUME 10782, PAGE 82
C. R. T. C. T.
S L. WEST PRESBYTERIAN
CIAL CARE CENTER FOUNDATION
CCF• D203382981
C. R. T. C. T.
SCALE:1" = 300'
SANITARY SEWER
IMPROVEMENT
EXHIBIT 'A-1'
NIGHT TRAIN
COMPRESSOR SITE
JACOBS„
JACOBS ENGINEERING GROUP, INC.
777 MAIN STREET
FORT WORTH, TX 76102
(817) 735-6000
PROJECT NO. 015428. 01 0. 001. 0625
PAGE 3 OF 3
Item
No.
Approx.
Quantity
Measure
Unit
"D"
Item
Item
Description
reference
Unit
Price
Amount
Total
ment
UNIT
IP
SEWER
1.
1,616
L.F.
10"
backfill
Per
Complete
Linear
SDR-35
and
in
PVC
disposal
Place
with
of
embedment,
trench
Dollars
Cents
spoils,
&
$ 35.00
$ 56,560.00
Foot
Thirty
Five
No
2.
950
L
8"
backfill
Complete
Per
SDR-35
Linear
and
in
PVC
disposal
Place
with
embedment,
of
trench
Cents
Dollars
spoils,
&
$ 32.00
$ 30,400.00
F
Foot
Two
Thirty
No
3.
1
4'
water
sanitary
Per
Thirty
diameter
sewer,
pressure
standard
Hundred
Complete
tight
manhole
cover
in
Dollars
Cents
Place
with
over
ex.
&
$ 3,800.00
$ 3,800.00
Ea.
and
Each
Eight
No
4.
3
4'
Per
water
Complete
diameter
and
in
pressure
standard
Place
Hundred
tight
cover,
Dollars
Cents
with
&
$ 2,800.00
$
8,400.00
Ea.
manhole
Each
Twenty
Eight
No
5.
5
4'
Complete
Per
diameter
Five
standard
in
Place
Hundred
Dollars
Cents
&
$ 2,500.00
$
12,500.00
Ea.
manhole,
Each
Twenty
No
6.
280
L
Remove
barbed
Per
Linear
and
replace
fence,
ex.
5-strand
in
Dollars
Cents
Place
$ 8.00
$ 2,240.00
F
wire
Complete
&
Foot
Eight
No
B-5
G:WOB10154281PETROIspec book\Water SS Spec Book July 2011.doc
Updated 05/16/2005
Item
No.
Approx.
Quantity
Measure
Unit
Item
Item
Description
reference
Unit
Price
Amount
-
Total
D
ment
UNIT
11
SEWER
7.
9
Manhole
Place
Per
vacuum
test,
Complete
Dollars
Cents
in
&
$ 50.00
$ 450.00
Ea.
Each
Fifty
No
8.
2,566
L
F.
Trench
Per
Linear
safety,
Complete
in
Place
&
$ 1.00
$ 2,566.00
One
Foot
Dollars
Cents
No
9.
1
L
S
Lump
Control
in
Sum
Place
per sheets
11
Dollars
Cents
&
12,
&
$ 4,000.00
$
4,000.00
Erosion
Complete
Per
Four
Thousand
No
10.
2,566
L
Post
Complete
Per
One
Linear
construction
in
Place
TV
inspection,
Dollars
Cents
&
$
1.50
$ 3,849.00
F
Foot
Fifty
11.
1
L
S
Mobilization,
Per
One
Lump
Sum
Complete
in
Place
Dollars
Cents
&
$ 1,000.00
$ 1,000.00
Thousand
No
12.
66
C.Y.
Rock
Per
Seventy
Cubic
Rip
Rap,
Yards
Complete
in
Place
Dollars
Cents
&
$ 75.00
$ 4,950.00
Five
No
AMOUNT
BID
SEWER
$ 130,715
TOTAL
B-6
G:UOB\015428\PETRO\spec booklWater SS Spec Book July 2011.doc
Updated 05/16/2005
Page 1 of 2
Chakrathouk, Manivanh
From: Knight, Jana
Sent: Friday, July 08, 2011 2:24 PM
To: Chakrathouk, Manivanh
Subject: RE: Contracts Night Train Compressor Station Water & Sewer
An M&C is only required if the City is participating in the cost of the project. This project does not have any City
participation funds included and does not require an M&C regardless of the amount. The developer is fully
funding the project with no funding from the City.
Jana Knight
City of Fort Worth I Community Facilities Administration
1000 Throckmorton Street I Fort Worth, TX 76102
Phone (817)392-2025 I E-mail: jana.knight c7,fortworthgov.org
From: Chakrathouk Manivanh
Sent: Friday, July 08, 2011 2 16 PM
To: Knight, Jana
Subject RE: Contracts: Night Train Compressor Station Water & Sewer
Even when the project cost is $248,450.00 in which exceed the limit of $50,000.00? Please advised?
Thank you,
ela that%
Administrative Technician
City Secretary Office 11000 Throckmorton St. I Ft Worth, TX. 76102
0: 817-392-6090 I ;: V1an.ivanh..Chakrathouk(d;tortworthgov.org
From: Knight, Jana
Sent: Friday July 08, 2011 2:12 PM
To: Chakrathouk, Manivanh
Subject: RE: Contracts: Night Train Compressor Station Water & Sewer
Hi Monni,
No, this contract does not include City Participation and therefore does not require an M&C.
Thank you,
Jana Knig}it
City of Fort Worth ( Community Facilities Administration
1000 Throckmorton Street ( Fort Worth, TX 76102
Phone (817)392-2025 ( E-mail: jana.knight cr,fortworthgov.org
From: Chakrathouk, Manivanh
Sent: Friday, July 08 2011 2 10 PM
7/8/2011
Page 2 of 2
To: Knight, Jana
Subject Contracts: Night Train Compressor Station Water & Sewer
Hi Jana,
Please advised if this contract requires an M&C? If so, please provide a hard copy of one for processing.
Thank you,
et i eea6rat dale
Administrative 'Technician
City Seci.etary Office 11000 rarockmorton St. I Ft Worth, TX. 76102
0: 817-392-6090 I E• Manivanh.Chakrathouk@tortworthgov.org
7/8/2011
BUSINESS ORGANIZATIONS IN
AS SI-:=C "
- VIEW ENTITY
Page 1 of l
UCC I Business Organizations I Trademarks I Notary Account Help/Fees I Briefcase I Logout
BUSINESS ORGANIZATIONS INQUIRY -VIEW ENTITY
Filing Number: 800224222 Entity Type: Domestic Limited Partnership
(LP)
Original Date of Filing: July 11, 2003 Entity Status: In existence
Formation Date: N/A
Tax ID: 11136967715 FFIN:
Duration: Perpetual
Name:
Address:
Barnett Gathering, LP
810 Houston Street
Fort Worth, TX 76102 USA
REGISTERED AGENT
FILING HISTORY
NAMES
MANAGEMENT
ASSUMED NAMES
ASSOCIATED
ENTITIES
Last Update
November 10, 2008
Name
XTO Resources I GP, LLC
Title
General Partner
Address
810 Houston Street
Fort Worth, TX 76102 USA
Order I Return to Search
Instructions:
To place an order for additional information about a filing press the 'Order' button.
https://direct.sos.state.tx.us/corp_inquiry/corp_inquiry-entity.asp?spage=mgmt&:Spagefrom=&:Sfiling_nu... 06/27/2011
BUSINESS ORGANIZATIONS Y - VIEW ENTITY
:ffiCAS S
:=:C,
FRY oil STAT
In
Page 1 of 1
UCC I Business Organizations J Trademarks I Notary J Account J Help/Fees J Briefcase
BUSINESS ORGANIZATIONS INQUIRY o VIEW ENTITY
Filing Number: 800175709 Entity Type: Foreign Limited Liability
Company (LLC)
Original Date of Filing: February 19, 2003 Entity Status: In existence
Formation Date: N/A
Tax ID: 32010845330 FEIN:
Name:
Address:
XTO Resources I GP, LLC
810 HOUSTON STREET
Fort Worth, TX 76102 USA
Fictitious Name: N/A
Jurisdiction: DE, USA
Foreign Formation Date: January 29, 2003
1
Logout
REGISTERED AGENT
FILING HISTORY
NAMES
MANAGEMENT
ASSUMED NAMES
ASSOCIATED
ENTITIES
Last Update
March 14, 2008
Name
MARK A STEVENS
Title
SENIOR VP
March 14, 2008 VAUGHN 0 VENNERBERG II PRESIDENT
Address
810 HOUSTON STREET
FORT WORTH, TX 76102 USA
810 HOUSTON STREET
FORT WORTH, TX 76102 USA
March 14, 2008 VIRGINIA N ANDERSON SECRETARY 810 HOUSTON STREET
FORT WORTH, TX 76102 USA
December 31, 2010 VAUGHN 0 VENNERBERG II Director 810 Houston Street
Fort Worth, TX 76102 USA
December 31, 2010 BRENT CLUM Treasurer 810 Houston Street
Fort Worth, TX 76102 USA
Order
Return to Search
Instructions:
J To place an order for additional information about a filing press the 'Order' button.
-
https://direct.sos.state.tx.us/corp_inquiry/core_inquiry-entity.asp?spage=mgmt&: Spagefrom=&: Sfiling_nu... 06/27/2011
Certificate of Incumbency
Of
Barnett Gathering, LP
The undersigned, being the duly authorized Assistant Secretary of Barnett Gathering, LP
(the "Partnership") hereby certifies:
1. That the undersigned is duly elected, qualified and acting incumbent of the office
of Assistant Secretary;
2. That the undersigned is qualified to make this certification and is authorized to
give this certificate;
3. That each of the person(s) named below (each an "Officer"), whose respective
office appears opposite such Officer s name and whose respective true, and
correct, specimen signature appears opposite such Officer's name, is duly elected,
qualified and acting incumbent of such Officer's office; and,
Name Office Shv
Ar
4. That each Officer, by virtue of the authority delegated to such Officer by the Ails -
general
partner of the partnership, is authorized on behalf of Partnership to sign
documents and is authorized to make representations, give notices, execute
transactions, and give instructions on behalf of the Partnership.
Nick J Dungey President
SIGNED this 9th day of March, 2011.
Barnett Gathering, LP
By:
Frank G. McDonald
Assistant Secretary
Sworn and subscribed before me on this 9th day of March, 2011