Loading...
HomeMy WebLinkAboutContract 41982 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT § City Secretary Contract No. L' V'' WHEREAS, the undersigned "Developer" desires to make certain improvements (refer to the name of the project at the bottom of the page) an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. Developer Information: Developer Company Name: Barnett Gathering, L.P. Authorized Signatory: Nick J. Dungey Title: President Project Name: Night Train Compressor Station Water & Sewer Improvements Project Location: 7390 Wichita Street Additional Streets: N/A Plat Case No.: FS-008-123 Plat Name: Night Train Compressor Site Mapsco: 106 A & B Council District: 8 City Project No: 01482 To be completed by staff: Received by: ; - A CFA: 2011-005 DOE: 6453 Date: t1 OFFICIAL RECORD S�CRE'1'ARY WORTH, TX i NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement (`CFA ) as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially. accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. >>The following checked exhibits are made a part hereof. E The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Combined CFA final Sept 12, 2008 2 F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the depat tment having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the tern of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractorto allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The 3 submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City - issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Depattwent. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Combined CFA final Sept 12, 2008 4 Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. 5 iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer s share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Combined CFA final Sept 12,2008 6 Cost Summary Sheet Project Name: Night Train Compressor Station Water & Sewer Improvements CFA No.: 2011-005 DOE No.: 6453 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Sub -Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Developer's Cost 248,450.00 $ 248,450.00 $ 4,969.00 $ 4,969.00 $ 9,938.00 $ 9,938.00 Amount Choice fck one Bond = 100% $ 248,450.00 X Completion Agreement = 100% / Holds Plat $ 248,450.00 Cash Escrow Water/Sanitary Sewer— 125% $ 310,562.50 Cash Escrow Paving/Storm Drain = 125% $ - Letter of Credit = 125% w/2yr expiration period $ 310,562.50 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this of , 20 \ . CITY OF FORT WORTH o Recommended by: Water Department L. f Wendy Chi-B,abulal, EICIBA, P.E. Development Engineering Manager Approved as to Form & Legality: r 1f4/t&t W41 Marcia Wise Sr. Assistant City Attorney ATTEST: arty Hendrix City Secretary day Transportation & Public Works Department Douglas W. Wiersig, P.E. Director Approved by tl'ty Manager's Office rnando 1 `sta a.\ Asssistant City Manager 1.1 o 'T ` y o d 'a, ``t o \ Attest: TIFFANY PETERS Notary\yr�Fr, Ju ll ` WIAT TrHAs My Conn. Lxp. uwfll2013 Combined CFA final Sept 12,2008 Barnett Gathering, LP By: XTO Resources I GP, LLC Its General Partner 8 Signature Print Name: Nick J. Dungey Title: President OFFICIAL HE CIV1 Z5VaXti174 FT. dV®R1`1 PP\ Pay \ Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included • Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C. Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 9 GZ '02 CITY O\ FORT WORH JOEL EAST OAK TIMBLR OLB;I HCKOR ti VALwI E FORGE HER w�..� LINE-\CHgNCjrgGE EpERRI �-�ORSV I L -APpOMJTOX LOCATION MAP ANvIAR F APPLETRE6 D CHAT 1AM u- SWOODBRIDGE I 0 w q r-w J HA REPUBLIC - NOT TO SCALE NIGHT TRAIN COMPRESSOR SITE BLOCK 1, LOTS 1 & 2 \JOB\015428\EXHIBITS\CFA\Water_Sewer\W5_Cover.AT ER & SANITARY S EWE R IMPROVEMENTS JACOBS JACOBS ENGINEERING GROUP, INC. 777 MAIN STREET FORT WORTH, TX 76102 (817) 735-6000 • PROJECT NO. 01 5428. 01 0. 001. 0625 a 6 9' w' 5/8” oGs ° a� 00 SET EMENT AND RIGHT- OF - WA( CCF 'D20-7458309 C.R.T.C.T. / ti SEWER EASEMENT %V/ THIS PLAT 3:4" 1 RON ROD FOUND / / / • S1 Q op M QD 'I' A FINAL PLAT OF LOT 1 & 2, BLOCK 1 NIGHT TRAIN COMPRESSOR SITE SURVEY, ABSTRACT NUMBER 1375, CITY OF FORT WORTH, TARRANT COUNTY. TEXAS, AND BEING ALL OF THAT TrOF LAND DESCRIBED BY DEED TO BARNETT GATHERING, L.P. AS REQ IN COUNTY CLERK'S FILING NUMBER D207458308. COUNTY RECOR..., TARRANT COUNTY, TEXAS AND BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS/ BEGINNING AT A CONCRETE MONUMENT FOUND AT THE NORTHWEST CORNER OF SAID BARNETT GATHERING. L.P. TRACT AND BEING THE SOUTHWEST CORNER OF THAT TRACT OF LAND DESCRIBED BY DEED TO METROPOLITAN RESOURCES, INC. AS RECORDED IN VOLUME 10782, PAGE 82, SAID COUNTY RECORDS AND BEING IN THE EAST LINE OF THAT TRACT OF LAND DESCRIBED TO TXU ELECTRIC DELIVERY COMPANY AS RECORDED IN VOLUME 2574, PAGE 545, SAID COUNTY RECORDS; THENCE N 62°08'46"E, 1171.34 FEET WITH THE SOUTH LINE OF SAID METROPOLITAN RESOURCES, INC. TRACT TO A 3/4 INCH IRON ROD FOUND, THENCE S 77°33'34"E. 767.69 FEET CONTINUING WITH SAID SOUTH LINE TO A 5/8 INCH IRON ROD WITH CAP STAMPED "JACOBS" SET IN THE WEST LINE OF THAT TRACT OF LAND DESCRIBED BY DEED TO TXU ELECTRIC DELIVERY COMPANY AS RECORDED IN VOLUME 1485, PAGE 346, SAID COUNTY RECORDS, THENCE S 12°26'26"W, 463.84 FEET, DEPARTING SOUTH LINE OF SAID METROPOLITAN RESOURCES, INC. TRACT WITH THE WEST LINE OF SAID TXU ELECTRIC DELIVERY COMPANY TRACT TO A 3/4 INCH IRON ROD FOUND AT THE NORTHEAST CORNER OF THAT TRACT OF LAND DESCRIBED TO JAMES L. WEST PRESBYTERIAN SPECIAL CARE CENTER FOUNDATION AS RECORDED IN COUNTY CLERK'S FILING NUMBER 0203382981, SAID COUNTY RECORDS, THENCE S 62°07'27"W, 1456.31 FEET, DEPARTING THE WEST LINE OF SAID TXU ELECTRIC DELIVERY COMPANY TRACT WITH THE SOUTH LINE OF SAID BARNETT GATHERING, L.P. TRACT TO A 5/8 INCH IRON ROD WITH CAP STAMPED "JACOBS" SET IN THE EAST LINE OF SAID TXU ELECTRIC DELIVERY COMPANY TRACT (VOLUME 2574, PAGE 545), THENCE N 27°53'38"W, 850.82 FEET WITH SAID EAST LINE TO THE POINT OF BEGINNING AND CONTAINING 1,295,547 SQUARE FEET OR 29.742 ACRES OF LAND, MORE OR LESS. TO BE KNOWN AS' LOTS 1 AND 2, BLOCK I NIGHT TRAIN COMPRESSOR SITE AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS AND DOES HEREBY DEDICATE TO THE PUBLIC USE FOREVER THE EASEMENTS AND RIGHTS -OF -WAY AS SHOWN HEREON. EXECUTED THIS THE DAY OF ,A.D. 2011. BARNETT GATHERING, L.P. A TEXAS LIMITED PARTNERSHIP BY: NICK DUNGEY - PRESIDENT STATE OF TEXAS COUNTY OF TARRANT BEFORE ME, THE UNDERSIGNED AUTHORITY, A NOTARY PUBLIC IN AND FOR THE STATE OF TEXAS, ON THIS DAY PERSONALLY APPEARED NICK DUNGEY, PRESIDENT OF BARNETT GATHERING, L.P., KNOWN TO ME TO BE THE PERSON AND OFFICER WHOSE NAME IS SUBSCRIBED TO THE FOREGOING INSTRUMENT AND ACKNOWLEDGED TO ME THAT HE EXECUTED THE SAME FOR THE PURPOSES AND CONSIDERATION THEREIN EXPRESSED AND IN THE CAPACITY THEREIN STATED. GIVEN UNDER MY HAND AND SEAL OF OFFICE THIS THE DAY OF .201 NOTARY PUBLIC IN AND FOR THE STATE OF TEXAS CERTIFICATION I, TODD A. BRIDGES, REGISTERED PROFESSIONAL LAND SURVEYOR OF THE STATE OF TEXAS, DO HEREBY CERTIFY THAT THE MAP SHOWN HEREON ACCURATELY REPRESENTS THE DESCRIBED PROPERTY AS DETERMINED BY A SURVEY MADE ON THE GROUND UNDER MY DIRECTION AND SUPERVISION IN DECEMBER, 2010. AND THAT ALL CORNERS ARE AS SHOWN. SITUATED IN THE SHELBY COUNTY SCHOOL LAND SURVEY, ABSTRACT NUMBER 1375, CITY OF FORT WORTH, TARRANT COUNTY, TEXAS DATE OF PREPARATION: MAY 2008 / DECEMBER 2010 TODD A. BRIDGES REGISTERED PROFESSIONAL LAND SURVEYOR TEXAS REGISTRATION NO. 4940 DATED , 29.742 ACREL JACOBS JOB NUMBER 015428.010. METROPOLITAN RESOURCES INC. VOLUME 10782, PAGE 82 C. R. T. C. T. BARNETT GATHERING, L. P. CCF• D207458308 C. R. T. C. T. LEGEND PROP. WATER LINE PROP. GATE VALVE PROP. FIRE HYDRANT EXIST. WATER LINE EXIST. GATE VALVE EXIST. FIRE HYDRANT LIMITS OF PROJECT Gc\JOB\015428\EXHIBITS\CFA\Water _Sewer \Woter_CFA.sht BARNETT GATHERING, L.P. CCF' D207458308 C. R. T. C. T. JAMES L. WEST PRESBYTERIAN SPECIAL CARE CENTER FOUNDATION CCF• D203382981 C. R. T. C. T. ` N \N N. N 1 JAMES L. WEST PRESBYTERIAN SPECIAL CARE CENTER FOUNDATION CCF' D203382981 C. R. T. C. T. WATER EXHIBIT 'A' 12" WATERLINE IMPROVEMENTS FOR NIGHT TRAIN COMPRESSOR SITE 1 SCALE; 1" = 200' JACOBS JACOBS. ENGINEERING GROUP, INC. 777 MAIN STREET (817) 7 5-6000TX 76102 PROJECT NO. 015428. 010.001. 0625 PAGE 2 OF 3 UNIT I: WATER (Furnish and install, including all appurtenant work, complete in place, the following items) (D-No. refers to related items in the Part D Special Conditions) Item No. Approx. Quantity Measure Unit "D" Item Item Description reference Unit Price Amount Total met UNIT I: WATER 1. 1,687 L 12" backfill Complete Per Linear PVC and in Waterline disposal Place with of embedment, trench Dollars Cents spoils, & $ 42.00 $ 70,854.00 F Foot Forty Two No 2. 175 L backfill Per 8" Complete PVC Linear Waterline and in disposal Place with of embedment, trench Dollars Cents spoils, & $ 30.00 $ 5,250.00 F Foot Thirty No 3. 4 Ea. 12" Per Gate Valve, Hundred Complete in Dollars Cents Place & $ 1,850.00 $ 7,400.00 Each Eighteen Fifty No 4. 3 Ea. 8" Per Nine Gate Hundred Valve, Complete in Dollars Cents Place & $ 900.00 $ 2,700.00 Each No 5. 2 Cast Place Per Iron < 16", Complete Dollars Cents in & $ 3,000.00 $ 6,000.00 Ton Fittings Ton Three Thousand No B-2 GAJOB\015428\PETRO\spec book\Water SS Spec Book July 2011.doc Updated 05/16/2005 Item No. Approx. Quantity Measure Unit "D" Item Item Description reference Price Amount Total Unit ment UNIT I: WATER 6. 1 L S Remove and Replace 10" Existing Asphalt Paving with Sawcut and Thick Street Per Lump Cut Permit, Sum Complete in Place Thirty Five Hundred Dollars & No Cents $ 3,500.00 $ 3,500.00 7. 3 Standard Fire Hydrant with Lead and Ea. 6 ' Valve, Complete in Place Per Each Dollars & Three Thousand No Cents $ 3,000.00 $ 9,000.00 8. 1 L S Connect to Waterline , Existing Complete in Place Per Lump Sum Sixty Hundred Dollars & Five No Cents $ 6,500.00 $ 6,500.00 9. 1 L S Detour Installation, Traffic Maintenance & Removal in the Wichita/Alta Mesa Intersection, Complete in Place Per Lump Sum Thousand Dollars & Two No Cents $ 2,000.00 $ 2,000.00 10. 1,862 L Trench Safety, Complete in Place F Per Linear Foot None Dollars & Cents $ .50 $ 931.00 Fifty 11. 1 L S Control Per Sheets 11 & 12, Erosion Complete in Place Per Lump Sum Dollars & Two Thousand No Cents $ 2,000.00 $ 2,000.00 B-3 G:\JOB\0154281PETROIspec book\Water SS Spec Book July 2011.doc Updated 05/16/2005 Item Approx. Unit Item Description Unit Total No. Quantity Measure "D" Item reference Price Amount ment UNIT I: WATER Remove Ex Fence, Complete in Place 12. 100 L F Per Linear Foot Three Dollars & No Cents $ 3.00 $ 300.00 13. Replace Fence 8' High in Kind, 50 L F Field Complete in Place Per Linear Foot Eighteen Dollars & No Cents $ 18.00 $ 900.00 14. 50 L F 5-Strand Barbed Wire Fence Complete in Place Per Linear Foot Eight Dollars & No Cents $ 8.00 $ 400.00 TOTAL AMOUNT BID WATER $ 117,735.00 B-4 Updated 05/16/2005 G:UOB10154281PETRO\spec book\Water SS Spec Book July 2011.doc LEGEND PROP. SANITARY SEWER PROP. MANHOLE EXIST. SANITARY SEWER EXIST. MANHOLE LIMITS OF PROJECT BARNETT GATHERING, L.P. CCFP D207458308 C. R. T. C. T. 0 G,\JOB\015428\EXHIBITS\CFA\Water _Sewer \ Sewer _CFA.sht FX ! (9f 1 GARRETT FAMILY PARTNERSHIP LTD`` VOLUME 012505, PAGE 0253 )�' C. R. T. C. T. /I METROPOLITAN RESOURCES INC. VOLUME 10782, PAGE 82 C. R. T. C. T. S L. WEST PRESBYTERIAN CIAL CARE CENTER FOUNDATION CCF• D203382981 C. R. T. C. T. SCALE:1" = 300' SANITARY SEWER IMPROVEMENT EXHIBIT 'A-1' NIGHT TRAIN COMPRESSOR SITE JACOBS„ JACOBS ENGINEERING GROUP, INC. 777 MAIN STREET FORT WORTH, TX 76102 (817) 735-6000 PROJECT NO. 015428. 01 0. 001. 0625 PAGE 3 OF 3 Item No. Approx. Quantity Measure Unit "D" Item Item Description reference Unit Price Amount Total ment UNIT IP SEWER 1. 1,616 L.F. 10" backfill Per Complete Linear SDR-35 and in PVC disposal Place with of embedment, trench Dollars Cents spoils, & $ 35.00 $ 56,560.00 Foot Thirty Five No 2. 950 L 8" backfill Complete Per SDR-35 Linear and in PVC disposal Place with embedment, of trench Cents Dollars spoils, & $ 32.00 $ 30,400.00 F Foot Two Thirty No 3. 1 4' water sanitary Per Thirty diameter sewer, pressure standard Hundred Complete tight manhole cover in Dollars Cents Place with over ex. & $ 3,800.00 $ 3,800.00 Ea. and Each Eight No 4. 3 4' Per water Complete diameter and in pressure standard Place Hundred tight cover, Dollars Cents with & $ 2,800.00 $ 8,400.00 Ea. manhole Each Twenty Eight No 5. 5 4' Complete Per diameter Five standard in Place Hundred Dollars Cents & $ 2,500.00 $ 12,500.00 Ea. manhole, Each Twenty No 6. 280 L Remove barbed Per Linear and replace fence, ex. 5-strand in Dollars Cents Place $ 8.00 $ 2,240.00 F wire Complete & Foot Eight No B-5 G:WOB10154281PETROIspec book\Water SS Spec Book July 2011.doc Updated 05/16/2005 Item No. Approx. Quantity Measure Unit Item Item Description reference Unit Price Amount - Total D ment UNIT 11 SEWER 7. 9 Manhole Place Per vacuum test, Complete Dollars Cents in & $ 50.00 $ 450.00 Ea. Each Fifty No 8. 2,566 L F. Trench Per Linear safety, Complete in Place & $ 1.00 $ 2,566.00 One Foot Dollars Cents No 9. 1 L S Lump Control in Sum Place per sheets 11 Dollars Cents & 12, & $ 4,000.00 $ 4,000.00 Erosion Complete Per Four Thousand No 10. 2,566 L Post Complete Per One Linear construction in Place TV inspection, Dollars Cents & $ 1.50 $ 3,849.00 F Foot Fifty 11. 1 L S Mobilization, Per One Lump Sum Complete in Place Dollars Cents & $ 1,000.00 $ 1,000.00 Thousand No 12. 66 C.Y. Rock Per Seventy Cubic Rip Rap, Yards Complete in Place Dollars Cents & $ 75.00 $ 4,950.00 Five No AMOUNT BID SEWER $ 130,715 TOTAL B-6 G:UOB\015428\PETRO\spec booklWater SS Spec Book July 2011.doc Updated 05/16/2005 Page 1 of 2 Chakrathouk, Manivanh From: Knight, Jana Sent: Friday, July 08, 2011 2:24 PM To: Chakrathouk, Manivanh Subject: RE: Contracts Night Train Compressor Station Water & Sewer An M&C is only required if the City is participating in the cost of the project. This project does not have any City participation funds included and does not require an M&C regardless of the amount. The developer is fully funding the project with no funding from the City. Jana Knight City of Fort Worth I Community Facilities Administration 1000 Throckmorton Street I Fort Worth, TX 76102 Phone (817)392-2025 I E-mail: jana.knight c7,fortworthgov.org From: Chakrathouk Manivanh Sent: Friday, July 08, 2011 2 16 PM To: Knight, Jana Subject RE: Contracts: Night Train Compressor Station Water & Sewer Even when the project cost is $248,450.00 in which exceed the limit of $50,000.00? Please advised? Thank you, ela that% Administrative Technician City Secretary Office 11000 Throckmorton St. I Ft Worth, TX. 76102 0: 817-392-6090 I ;: V1an.ivanh..Chakrathouk(d;tortworthgov.org From: Knight, Jana Sent: Friday July 08, 2011 2:12 PM To: Chakrathouk, Manivanh Subject: RE: Contracts: Night Train Compressor Station Water & Sewer Hi Monni, No, this contract does not include City Participation and therefore does not require an M&C. Thank you, Jana Knig}it City of Fort Worth ( Community Facilities Administration 1000 Throckmorton Street ( Fort Worth, TX 76102 Phone (817)392-2025 ( E-mail: jana.knight cr,fortworthgov.org From: Chakrathouk, Manivanh Sent: Friday, July 08 2011 2 10 PM 7/8/2011 Page 2 of 2 To: Knight, Jana Subject Contracts: Night Train Compressor Station Water & Sewer Hi Jana, Please advised if this contract requires an M&C? If so, please provide a hard copy of one for processing. Thank you, et i eea6rat dale Administrative 'Technician City Seci.etary Office 11000 rarockmorton St. I Ft Worth, TX. 76102 0: 817-392-6090 I E• Manivanh.Chakrathouk@tortworthgov.org 7/8/2011 BUSINESS ORGANIZATIONS IN AS SI-:=C " - VIEW ENTITY Page 1 of l UCC I Business Organizations I Trademarks I Notary Account Help/Fees I Briefcase I Logout BUSINESS ORGANIZATIONS INQUIRY -VIEW ENTITY Filing Number: 800224222 Entity Type: Domestic Limited Partnership (LP) Original Date of Filing: July 11, 2003 Entity Status: In existence Formation Date: N/A Tax ID: 11136967715 FFIN: Duration: Perpetual Name: Address: Barnett Gathering, LP 810 Houston Street Fort Worth, TX 76102 USA REGISTERED AGENT FILING HISTORY NAMES MANAGEMENT ASSUMED NAMES ASSOCIATED ENTITIES Last Update November 10, 2008 Name XTO Resources I GP, LLC Title General Partner Address 810 Houston Street Fort Worth, TX 76102 USA Order I Return to Search Instructions: To place an order for additional information about a filing press the 'Order' button. https://direct.sos.state.tx.us/corp_inquiry/corp_inquiry-entity.asp?spage=mgmt&:Spagefrom=&:Sfiling_nu... 06/27/2011 BUSINESS ORGANIZATIONS Y - VIEW ENTITY :ffiCAS S :=:C, FRY oil STAT In Page 1 of 1 UCC I Business Organizations J Trademarks I Notary J Account J Help/Fees J Briefcase BUSINESS ORGANIZATIONS INQUIRY o VIEW ENTITY Filing Number: 800175709 Entity Type: Foreign Limited Liability Company (LLC) Original Date of Filing: February 19, 2003 Entity Status: In existence Formation Date: N/A Tax ID: 32010845330 FEIN: Name: Address: XTO Resources I GP, LLC 810 HOUSTON STREET Fort Worth, TX 76102 USA Fictitious Name: N/A Jurisdiction: DE, USA Foreign Formation Date: January 29, 2003 1 Logout REGISTERED AGENT FILING HISTORY NAMES MANAGEMENT ASSUMED NAMES ASSOCIATED ENTITIES Last Update March 14, 2008 Name MARK A STEVENS Title SENIOR VP March 14, 2008 VAUGHN 0 VENNERBERG II PRESIDENT Address 810 HOUSTON STREET FORT WORTH, TX 76102 USA 810 HOUSTON STREET FORT WORTH, TX 76102 USA March 14, 2008 VIRGINIA N ANDERSON SECRETARY 810 HOUSTON STREET FORT WORTH, TX 76102 USA December 31, 2010 VAUGHN 0 VENNERBERG II Director 810 Houston Street Fort Worth, TX 76102 USA December 31, 2010 BRENT CLUM Treasurer 810 Houston Street Fort Worth, TX 76102 USA Order Return to Search Instructions: J To place an order for additional information about a filing press the 'Order' button. - https://direct.sos.state.tx.us/corp_inquiry/core_inquiry-entity.asp?spage=mgmt&: Spagefrom=&: Sfiling_nu... 06/27/2011 Certificate of Incumbency Of Barnett Gathering, LP The undersigned, being the duly authorized Assistant Secretary of Barnett Gathering, LP (the "Partnership") hereby certifies: 1. That the undersigned is duly elected, qualified and acting incumbent of the office of Assistant Secretary; 2. That the undersigned is qualified to make this certification and is authorized to give this certificate; 3. That each of the person(s) named below (each an "Officer"), whose respective office appears opposite such Officer s name and whose respective true, and correct, specimen signature appears opposite such Officer's name, is duly elected, qualified and acting incumbent of such Officer's office; and, Name Office Shv Ar 4. That each Officer, by virtue of the authority delegated to such Officer by the Ails - general partner of the partnership, is authorized on behalf of Partnership to sign documents and is authorized to make representations, give notices, execute transactions, and give instructions on behalf of the Partnership. Nick J Dungey President SIGNED this 9th day of March, 2011. Barnett Gathering, LP By: Frank G. McDonald Assistant Secretary Sworn and subscribed before me on this 9th day of March, 2011