Loading...
HomeMy WebLinkAboutContract 29110-A5CO1 DIS TROUTION: WHITC--FILE CITY OF FORT WORTH �~ CANARY-CONSTRUCTION FILE Cff Y StuETARY PINK-PROJECT MANAGER CHANGE ORDER REQUEST - J GOLDENROD-CONTRACTOR CWRACT HO 1 CHANGE ORDER NO. DATE D.Q.E.NO. PROJECT NO. City Project No.01407 August 10,2012 N/A PE45 -0705002 PROJECT DESCREPTION: Energy Savings Performance Contract Phase V,section 2 at Village Creek WRF CITY SECRETARY CONTRACT NQ. 29110-A5 ORIGINAL CONTRACT AMOUNT........................_..............$ _ 17.889,397.00 EXTRAS TO DATE............................................$ 0.00 CREDITS TO DATE...........................................$ 0.00 CONTRACTCOST TO DATE.......................................................................................................................................................$ 17 889,397.00 AMOUNT OF PROPOSED CHANGE O RDER..............................................................................................................................$ 0.00 REVISEDCONTRACT AMOUNT................................................................................................................................................$ 17 889 397.00 ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS.........................................................................................................$ 0.00 ADDITIONAL FUNDING(IF NECESSARY)...................................................................................................................4............$ 0.00 REMAINING FUNDS AVAILABLE FOR CHANGE ORDER........................................................................................................$ 0.00 IN ACCORDANCE WITH THIS CHANGE ORDER,THE CONTRACTOR SHALL: modify/change the contract as shown below to provide a complete, functional,and operational plant. These changes are as listed below. Further descriptions and Cost Breakdowns are attached. ContractTime Extension --------------------_-_-.._____________________-_______-____-___-_-_-_-_-_-___-_-_-___-_-_______-__-___--------_-_-___-__-_-$NOCOST The Contractor has requested a 151 calendar day time extension. This contract, ESPC Phase V, Section 2 contained overlapping work areas in the Aeration Basins with ESPC Phase V, Section 1. The time required for coordination of shutdowns necessary for the work in the overlapping work areas and for required coordination with plant operations to maintain treatment was longer than estimated in the preliminary schedule (approximately double). In addition, some equipment related to the steam system was delayed in delivery and additional effort is required for integration of the upgraded aeration blowers into the new SCADA project (Section 1). The contract guaranteed savings were also tied to these functioning systems. This Change Order 1 defines the final completion date of this contract to September 28, 2012. The Contractor requested no modification to the contracted guaranteed savings and requested ensation to extend the completion date. 4 X 00 TOTAL COST FOR CHANGE ORDER NO. 1 ____________________________________________ ___ _____-#A�°_---_-__ ST a v The Completion date for th contract is revise o tuber 28, 2012. a AMeW _ 0 OFFICIAL RECORD o � q CITY SECRETARY FT. WORTH TX J,SIFF-Pfe v .�. It is understood and agreed that the acc tance of this Change order by the c ntractor constitutes an accord and sates ction ee a n costs arising out of,or incidental to,the Change orden ��' �' ORIGINAL CONTRACT TIME ADDITIONAL APPROVED TIME TO DATE APPROVED CONTRACT TIME TO DATE ADDITIONAL TIME FOR THIS CHANGE ORDER 549 Calendar Days None 549 Calendar Days 151 Days CONTRACTOR DATE FIELD EN DATE 1 v 1., Johnson Controls,Inc. Te Gay, PE, reese&Nichols, Inc, �MANAGERIC NST.SER, DATE DIRE CTOPUMANAGING DEPT. DATE e 1k ,PEi CA/I7 DIRECTORIC TAT T. DATE C ATTO I'` DATE rew T.Cronbe ,PE, Assistant Director %zf CITY MANAGER DATE COUNCIL ACTION(IF REQUIRED): DATE r ❑ APPROVED ❑ DISAPPROVED OTHER r a Assistant it Fe nano ost , City Manager a a er 00--21 —ti ? P05 : __'54 IN Johnson Controls,Inc. 7461 Aiipoi#Freeway Richland Hills,Texas 76118 hnson Tel.:(817)548-22aa(Office) Controls (817)548-2201(Fax) June 0, 2012 Madelene Rafalko, P.E. Fort (North Water Department 1 000 Throckmorton Fort Worth, Tx 70102 Ref: JCI ESPC Phase V-2 Project Village Creek Water Reclamation Facility City Secretary Contract #2911 0-A5 Subject: Change Request #1 (#2911 0-A5) Dear Madelene, JCI is requesting a no-cost time extension to the Phase V-2 construction contract. The following is a summary of scope of work modifications which has resulted in the requirement for additional time for the completion of the project: FIM# Phase Scope of work Modifications 2 V-2 Delivery delay of two (2)steam driven blowers 2 V-2 Delivery delay of two (2)surface condenser packages 2 V-2 Add backpressure steam relief valve 2 V-2 Add steam vent silencer 2 V-2 Upsize water treatment equipment 3A V-2 Electrical changes on 100% construction plans S V-2 City requested that JCI add 10 days to the construction schedule for each of the aeration basins #1-6 While these scope modifications will be very beneficial to the plant staff, it has reSLIlted in the requirement for additional time to complete portions of this project. JCl has agreed to incorporate these changes and construction extensions at no additional cost to the City. Due to -these scope modifications, JCI is requesting a time extension for the Phase V-2 contract to September 28; 2012. If you have any questions, please give me a call at 817-480-6953. Regards, t Harry Romine, P.E. Account Manager Johnson Controls, Inc. Page 2