Loading...
HomeMy WebLinkAboutContract 41956-CO1 (2)DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Timberland Blvd. & North Beach Street CHANGE ORDER No: CONTRACT: Water, Storm Drain, Pavin , & Street Lighting CFA # 2010-057 CITY PARTICIPATION: YES I 1 CITY PROJECT # 01547 DOE # 6502 WATER PROJECT # P265-602140154783 SEWER PROJECT # N/A TPW PROJECT # C204-202230169283 C205-202760154783 0206-062230154783 FILE # X-21435 W-2156 INSPECTOR: PROJECT MANAGER: Jim Bowers Debbie Willhelm Phone No: 817-994-4728 Phone No: 817-392-2481 DATE: 2/23/2012 CONTRACT UNIT CONTRACT DAYS WATER SEWER PAVING DRAINAGE STREET LIGHTS Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost ORIGINAL CONTRACT $123,915.60 $0.00 $0.00 $0.00 $438,373.77 $654,610.51 $248,500.67 $142,223.23 $13,002.15 $41,843.90 150 EXTRAS TO DATE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 CREDITS TO DATE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 CONTRACT TO DATE $123,915.60 $0.00 $0.00 $0.00 $438,373.77 $654,610.51 $248,500.67 $142,223.23 $13,002.15 $41,843.90 150 AMOUNT OF PROP. CHANGE ORDER $16,221.00 $0.00 $0.00 $0.00 $25,110.73 $0.00 ($4.312.56; $0.00 $4,510.00 $0.00 15 REVISED CONTRACT AMOUNT $140,136.60 $0.00 $0.00 $0.00 $463,484.50 $654,610.51 $244,188.11 $142,223.23 $17,512.15 $41,843.90 165 TOTAL REVISED CONTRACT AMOUNT PER UNIT $140,136.60 $0.00 $1,118,095.01 $386,411.34 $59,356.05 REVISED COST SHARE Dev. Cost: $865,321.37 City Cost: $838,677.64 TOTAL REVISED CONTRACT $1,703,999.01 CHANGE ORDER #1 IS 100% DEVELOPER FUNDED. ✓ ➢SW Revised: 10-12-2011 Page 1 You are directed to make the following changes in the contract documents: Quantities/Amounts in Red Parentheses are deletions PAY ITEM # CITY BI#D ITEM QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL Unit I - Water 3 N/A 39.00 LF Pi )e-Pressure-6 Inch PVC - Install $40.00 $1,560.00 4 N/A 3.00 EA Valve-6 Inch-gate-w/valve box - Install $703.00 $2,109.00 5 N/A 1.00 EA Valve-8 Inch-gate-w/valve box - Install $1,025.00 ($1,025.00) 6 N/A 3.00 EA Valve-12 Inch-gate-w/valve box - Install $1,863.00 ($5,589.00) $750.00 8 N/A 3.00 EA Water Valve Box - Adjust to Grade $250.00 10 N/A 3.00 EA Water Vault - Adjust Lid & GV Box to Grade $1,500.00 $4,500.00 12 N/A _ (1.00) EA Fire Hydrant - Install $2,400.00 ($2,400.00) $705.00 15 N/A 1.00 EA 1" Irrigation service with Class A meter box - Install $705.00 18 N/A 1.00 EA 2" Domestic service with Class B meter box - Install $1,507.00 $1,507.00 19 N/A 39.00 LF Trench Safety - Install $1.00 $39.00 New Item 21 N/A 334.00 SY Remove & Re.lace Concrete Pavement for Water Installation $45.00 $15,030.00 New Item 22 N/A 1.00 EA Remove & Re.Iace TY G Ram. for Water Installation $670.00 $670.00 New Item 23 N/A 7.00 EA Remove Class A Meter Box Cost from 1" Service Installation Cost $75.00 ($525.00) ($1,110.00) New Item 24 N/A (6.00) EA Remove Class B Meter Box Cost from 1.5" & 2" Service Installation Cost $185.00 Unit I - Water $16,221.00 Unit II - Storm Drain 4 N/A 8.00 LF Pi )e-36 Inch CL IV - Install $75.35 ($602.80) 7 N/A 5.45 LF Box Culvert-5 Ft X 3 Ft -- Install $158.22 ($862.30) ($2,448.30) ($59.40) ($339.76) 9 N/A 10.00 LF Box Culvert-8 Ft X 3 Ft - Install $244.83 19 N/A (0.36) CY Riprap-12 Inch Rock - Install $165.00 20 N/A (339.76) LF Trench Safety - Install $1.00 Unit II - Storm Drain ($4,312.56) Unit III - Paving 11 N/A (8.00) EA Trees -Permitted - Relocate $390.00 ($3,120.00) $733.01 13 N/A 883.15 SY Grass-Hydromulch Seeding -Medians & Parkway - Install $0.83 15 N/A 1.64 TN Subic rade-Lime for Stabilization -- Install $150.00 ($246.00) ($11,546.38) 18 N/A 334.00 SY Pavement-9.5 Inch Concrete - Install $34.57 22 N/A (779.46) SF Driveway-6 Inch - Install $8.00 ($6,235.68) $390.00 36 N/A 3 EA Pavement Marking -Turn Arrows - Install $130.00 37 NIA 3 EA Pavement Markin. -Words - Install $140.00 $420.00 39 N/A (i,192.0C LF Pavement Markin. -Bike Lane-8 Inch Dotted - Install $1.40 ($1,668.80) 43 N/A 1 EA Sign -Small- Ground Mount - Furnish and Install - Install $470.00 $470.00 45 N/A 179.00 LF Pi e-4 Inch PVC Irrigation Sleeves - Install $10.50 $1,879.50 New Item 62 N/A 6,819.18 SF Driveway-7 Inch - Install $6.00 $40,915.08 New Item 63 N/A 8 EA Remove Trees From Medians $390.00 $3,120.00 Unit III - Paving $25,110.73 Unit IV - Street Lighting New Item 11 N/A 2 EA Light Assy - D40 - Purchase from City $2,255.00 $4,510.00 Unit IV - Street Lighting $4,510.00 Total Change Order Cost - Developer $41,529.17 Revised: 10-12-2011 Page 2 REASONS FOR CHANGE ORDER By: Change Order#1 reflects changes to Developer's portion of contract. Water meter boxes removed from this contract and added to Kroger project. Pavement Repair due to water installation moved from Paving Improvements to Water Improvements. Concrete driveway thickness revised to 7" thick. Contractor required to purchase street lights from City. All other changes are reconciliation of contract amounts to match As -Built conditions. RECOMMENDED: a APPROVED: APPROVED: Wircelmann & As ciates, Inc. Name: Maria Bonilla, P.E. Title: Project Manager A-S 104 Timber) By: / 414 Name: Title: McMahon Contracting, L.P. By: tve D. A L.,; S Name: Chris Young Title: Superintendent Revised: 10-12-2011 Page 3