HomeMy WebLinkAboutContract 41854-1A (2)FORT WORTHS,
Project Name
Client Project #(s)
Project Description
Contractor
City Project Mgr.
City of Fort Worth
Change Order Request
CITY SECRETARY
COWRACT NO1J
West Fork Ranch Phase 1
City Sec #
DOE No. 6624
City Proj. No. 01694
Paving Improvements
,or, A)
Conatser Construction
Raul Lopez
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Change Order #
City Inspector
A Date
9/1/2011
Emanuel Nieto
TPW -Paving
$1,788,616.00
$1,788,616.00
Water
Sewer
Totals
$1,788,616.00
Contract Time
(WD)
90
$53,955.00 $0.00
$1,842,571.00
$0.00
,788,616.00
$53,955.00
$1,842,571.00
i
$53,955.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
$0.00
$53,955.00
90
90
3.02%
$2, 235, 770.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change order required to reconcile plans released for construction with contracts. Contracts were bid and executed prior to obtaining final City
approval of the plans. While there is City particpation in the project this change order does not impact it; developer to pay 100% of the change
order. Reference CFA 2011-006.
Mary CJa Kaye'
0
0
.0 a
A
47, ilbk;10.9o0Op �)
mikcACAS ,4"
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's
Company
Name
Contractor
(Name)
__
Contract
Signature
,
Date
Conatser
Construction
L,
•
dspector/Inspectio
Superv'sof
'" j
�
Date
.
'
oject
M..
ager/Prog
am
anager
Date
(1/241"
-
/lid to10
--.7
)4,-,,,
...c----...-...,, Lida:.
Assist;
•
j
c
o
-pt)
-
Date
�
ire'.
or,
C
nt
acting
Department
(Dept)
Date
Ad0--YY
/
cJ,
!fi`
903p a-/
-
/6/
3/boii
./
.s'
...-."
% ty Atto
a
Date
Assista
1
City
Manager
Date
A t '
.1
/0 . /00 ( 1
17thrion•04
aiseaL
/0790///
Council
Action
(if
required)
M&C
Number
Npek
MC
Date
Approved
N
12 A10:29 IN
10-1
- i 1 Pu3:)> I w 10-13-11 P03: 31 IN
0RTH
Project Name
Client Project #
Project Description
Contractor
City Project Mgr.
City of Fort Worth
Change Order Additions
West Fork Ranch Phase 1
City Sec #
DOE No. 6624
City Proj. No. 01694
Paving Improvements (GONT¢ ACT A)
Conatser Construction
Raul Lopez
ADDITIONS
Change Order #
City Inspector
IA
Date
9/1/2011
Emanuel Nieto
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
Various
See attached Developer Change Order No. 1 -Paving Improvements
TPW -Paving
1.00
$53,955.00
$53,955.00
TPW -Paving
$53,955.00
Water
$0.00
Sewer
$0.00
Sub Total Additions
$53,955.00
Change Order Additions Page 1 of 1
RT
Project Name
Client Project #
Project Description
Contractor
City Project Mgr.
City of Fort Worth
Change Order Deletions
West Fork Ranch Phase 1
City Sec #
DOE No. 6624
City Proj. No. 01694
Paving Improvements (CoNTfZAGT A)
Conatser Construction
Raul Lopez
DELETIONS
Change Order #
City Inspector
IA
Date
9/1/2011
Emanuel Nieto
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
TPW -Paving
$0.00
Water
$0.00
Sewer
$0.00
Sub Total Deletions
Change Order Deletions Page 1 of 1
MINBE Sub
M/WBE Breakdown for this Change Order
Type of Service
Amount for this CO
Total
Previous
Change
Orders
•Co#
DATE
AMOUNT
Total
$0.00
CITY OF FORT WORTH — DEPARTMENT OF ENGINEERING
DEVELOPER CHANGE ORDER
DATE: May 5, 2011
PROJECT NAME:
CONTRACT:
West Fork Ranch Phase I
Paving Improvements (CnWTFe ACT A)---
CITY PROJECT #:
0I694
DOE#
WATER PROJECT #:
SEWER PROJECT #:
FILE #
6624
P265-602I50I69483
P275-702130169483
W-2166
CHANGE ORDER No. 1
INSPECTOR: Emanuel Nieto
PROJECT MANAGER: Raul Lopez, P.E.
Phone No: 817-392-8972
Phone No: 817-392-7818
WATER
SEWER
PAVING
DRAINAGE
DAYS
ORIGINAL
CONTRACT
$1,788,616.00
90
EXTRAS
TO
DATE
CREDITS
TO DATE
r
CONTRACT
TO
DATE
$1,788,616.00
90
PROP.
CHANGE
ORDER
$53,955.00
0
REVISED
CONTRACT
$1,842,571.00
90
TOTAL
(REVISED
CONTRACT)
WATER
TRANSPORTATION
AND
PUBLIC
DEPARTMENT
BY CITY
DEPARTMENT
WORKS
$1,842,571.00
TOTAL REVISED CONTRACT
$1,842,571.00
You are directed to make the following changes in the contract documents:
See attached sheets for changes to contract documents.
RECOMMENDED:
Peloton Land Solutions, LLP
Y
Gene Terrell
Project Manager
APPROVED:
APPROVED:
Pulte Homes of Texas, LP Conatser Construction TX, LP
Clint Vincent
Div. VP Land Develop,
By: 4
Brock Hug His
Vice President
PELOTON LAND SOLUTIONS
5751 KROGER DR SUITE 185, KELLER, TX 76244
817-562-3350
WEST FORK RANCH PHASE 1
PAVING CONTRACT CHANGE ORDER #1
50' LOTS (LOTS EAST OF MONTBELIARD PARKWAY
v�r
DESCRIPTION
UNIT
QTY
UNIT
PRICE
TOTAL
1
6'
Reinf
Conc.
Pvmt. w/7" Curb
for 29' B-B
Residential
Street
SY
217
23.00
4,991.00
2
6
Lime Stabilized
Subgrade
for 29' B-B
Street
SY
232
2.00
464.00
3
Hydrated
Lime
(30#/SY)
TON
3
140.00
420.00
4
4
Wide,
4'
Thick
Sidewalk
LF
(68)
9.00
(612.00)
5
6' Wide,
4"
Thick
Sidewalk
Along
Park
& Amenity
Center
LF
(68)
12
00
(816.00)
6
Type
H
Barrier
Free
Ramp
EA
3
800.00
2 400.00
10
Revision
to
Rebar
size
LS
1
6,700.00
6,700.00
TOTAL
PAVING
- SECTION
A
$13,547.00
- 60' LOTS (LOTS WEST OF MONTBELIARD PARKWAY
DESCRIPTION
UNIT
QTY
UNIT
PRICE
TOTAL.
1
6' Reinf
Conc. Pvmt. w/7" Curb
for 29'
B-B
Residential
Street
SY
(72)
23.00
(1,656
00)
2
6" Lime
Stabilized
Subgrade
for 29'
B-B Street
SY
(77)
2.00
(154.00)
TON
140.00
(140.00)
3
Hydrated
Lime
(30#/SY)
(1)
(90.00)
4
4
Wide, 4"
Thick
Sidewalk
LF
(10)
9.00
5
Type
H
Barrier
Free
Ramp
EA
1
800.00
800.00
8
Revision
to
Rebar size
LS
1
6,700.00
6,700.00
TOTAL
PAVING-
SECTION
8 $5,460.00
SECTION C - BASSWOOD BOULEVARD
DESCRIPTION
UNIT
QTY
UNIT
PRICE
TOTAL
1
9.5"
Reinf.
Conc.
Pvmt. w/7" Curb
for
28'
B-B
Arterial
Street
SY
429
29.00
12,441.00.
2
6"
Lime Stabilized
Subgrade
for 28
B-B
Street
SY
444
2.00
888.00
3
Hydrated
Lime
(30#/SY)
TON
6
140.00
840.00
4
5 Wide,
4"
Thick
Sidewalk
LF
(27)
11.00
(297.00)
11
Traffic
Signs
EA
1
400.00
400.00
14
Revision
to
Rebar
size
LS
1
6,700.00
6,700.00
TOTAL
PAVING
- SECTION
C $20,972.00
C01-Paving, CO1
1of2
5/9/2011
REASONS) FOR CHANGE ORDER
Change order required to reconcile approved plans with contracts. Contracts were
executed prior to final city approval.
PHASE 1
D
DESCRIPTION
UNIT
QTY
UNIT
PRICE
TOTAL
1
7.5"
Reinf.
Conc.
Pvmt. w/7" Curb
for 43'
B-B
Collector Street
SY
(783)
25.00
(19,575.00)
2
6'
Lime
Stabilized
Subgrade
for 43
B-B
Street
SY
(835)
2.00
(1,670.00)
3
Hydrated
Lime
(30#/SY)
TON
(13)
140.00
(1,820.00)
4
5 Wide,
4"
Thick
Sidewalk
LF
(159)
11,00
(1,749.00)
7
Traffic
Signs
EA
(3)
400.00
(1,200.00)
8
Revision
to
Rebar
size
LS
1
6,700.00
6,700,00
TOTAL
PAVING
- SECTION
D
($19,314.00)
- MONTBELIARD PARKWAY {PHASE 1 TO FUTURE BAILEY BOSWELL
vDESCRIPTION
UNIT
. QTY
UNIT
PRICE
TOTAL
1
7.5"
(transitions
Reinf.
Conc.
to 24.5'
Pvmt.
Curb
for
43'
B-B
Collector
Street
SY
892
25.00
22,300.00
w/7"
width)
2
6'
Lime Stabilized
Subgrade
for
43'
B-B Street
SY
965
2.00
1,930.00
3
Hydrated
Lime
(30#/SY)
TON
14
140.00
1,960.00
7
Traffic
Signs
EA
1
400.00
400.00
8
Revision to
Rebar
size
LS
1
6,700.00
6,700.00
TOTAL
PAVING
- SECTION
E $33,290.00
PAVING CHANGE ORDER SUMMARY
S ECTION A - 50 LOTS (LOTS EAST OF MONTBELIARD PARKWAY)
S ECTION B - 60 LOTS (LOTS WEST OF MONTBELIARD PARKWAY)
S ECTION C - BASSWOOD BOULEVARD
S ECTION D - MONTBELIARD PARKWAY (ADJACENT TO PHASE 1)
S ECTION E - MONTBELIARD PARKWAY (PHASE 1 TO FUTURE BAILEY BOSWELL)
TOTAL PAVING CHANGE
CHANGE TO CONTRACT SUMMARY
TOTAL PAVING CONTRACT CHANGE
•
$13,547.00
$5,460.00
$20,972 00
($19,314.00)
$33,290 00
$53,955.00
$53,955.00
•
CO1-Paving, CO1
2 of 2 5/9/2011