Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 41854-2A (2)
FORT WORTH, Project Name Client Project #(s) City of Fort Worth Change 't rder Request West Fork Ranch Phase 1 CITV sEcRfARV � coNTRACTMO.. City Sec # 9) \I DOE 6624 City Proj No. 01694 Project DescriptionL Paving Improvements (Co T A) Contractor Conatser Construction City Project Mgr. Raul Lopez Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) TPW -Paving $1,788,616.00 $53,955.00 $1,842,571.00 $1,811,252.00 Water Change Order # City Inspector Date r 9!1/20117 Emanuel Nieto Sewer CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) Totals $1,788,616.00 $53,955.00 $1,842,571.00 -$31,319.00 $1,811,252.00 1.27% $2,235,770.00 Contract Time (WD) 90 90 90 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change order required to reconcile plans released for construction with contracts. Contracts were bid and executed prior to obtaining final City approval of the plans. While there is City particpation in the project this change order does not impact it; developer to pay 100% of the change order. Reference CFA 2011-006. Ue! by: •osvac 0A!!gSz*� ditze ap b 0 o ›sig102., kt 0 ate ecretary 0a00.0 ° )`4 L»J 7,Y) / t- a4)- Vhs It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name) Contract Signature Date Conatser Construction \--11-o-s ` 1 t L S 1 to 11 , c ) ,-- i\c C 0) (3 yr ,sv-,t cow L __, __1c- • Inspector/I s e tin Supe .vi r ) Date Pro ct Managjr/Pro m I er Date ti _`-7/ .- -� 5*&7/' i ! 1 - p, �' �J _'"' i .fir? I As ' -, • - r � - ) Date Pwi= tor, ontracti Department (Dept) Die 7 „ t7g&I`',/ --ger 0 GPI near .r.fiA.V ` ss' 4 .0 it A tb y Date " - •s §Istr i y Managor- rt0 i Date iPa / ( i zeig.i,p,„--5,_,.4$9 6e9 to/ie 111, II 4 AI ( , i D. , Council Action (if required) M&C Number M&C Date Approved A i 1 -4 ` t`! 06-28-12 A 1 0: 30 IN W Project Name Client Project # Project Description Contractor City Project Mgr. City of Fort Worth Change Order Additions West Fork Ranch Phase 1 City Sec # DOE 6624 City Proj No. 01694 Paving Improvements CCont?QAcr A) Conatser Construction Raul Lopez ADDITIONS Change Order # City Inspector 2 A Date 9/1/2011 Emanuel Nieto ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total TPW -Paving $0.00 Water $0.00 Sewer $0.00 Sub Total Additions Change Order Additions Page 1 of 1 FORT WORTH Project Name Client Project # Project Description Contractor City Project Mgr. City of Fort Worth Change Order Deletions West Fork Ranch Phase 1 City Sec # DOE 6624 City Proj No. 01694 Paving Improvements (CoNTRAGT A) Conatser Construction Raul Lopez DELETIONS Change Order # City Inspector 2A Date 9/1/2011 Emanuel Nieto ITEM DESCRIPTION anous ee attacne eveioper mange urger No. -raving improvemen DJ-5 I -Pav g Qty Unit Unit Cost Total TPW -Paving Water Sewer Sub Total Deletions $31,319.00 $0.00 $0.00 $31,319.00 Change Order Deletions Page 1 of 1 'MWBESub MIWBE Breakdown for this Change Order Type of Service Amount for this CO Total Previous Change Orders i.co).#:;:%.DATE AMOUNT Total $0.0© CITY OF FORT WORTH DEPARTMENT OF ENGINEERING DATE: July 28, 2011 DEVELOPER CHANGE ORDER PROJECT NAME: J West Fork Ranch Phase I CONTRACT: 1 Paving Improvements CITY PROJECT 01694 DOE #. 6624 WATER PROJECT #: P265-602150169483 SEWER PROJECT #: P275-702130169483 FILE # W-2166 CHANGE ORDER No. 2Aq INSPECTOR. Emanuel Nieto PROJECT MANAGER: Raul Lopez, P.E. Phone No: 817-392-8972 Phone No; 817-392-7818 WATER SEWER PAVING DRA NAGE DAYS ORIGINAL CONTRACT $1,788,616.00 90 EXTRAS TO DATE I $53,955.00 CREDITS TO DATE CONTRACT TO DATE $1,842,571.00 90 PROP CHANGE ORDER -$31 319.00 0 REVISED CONTRACT $1 811,252.00 90 TOTAL (REVISED CONTRACT) WATER DEPARTMENT TRANSPORTATION AND PUBLIC BY CITY DEPARTMENT WORKS $1,811,252.00 CT $1,811, 252.00 You are directed to make the following changes In the contract documents: See attached sheets for changes to contract documents. RECOMMENDED: Peloton Land Solutions, LLP f f Gene Terrell Project Manager APPROVED: APPROVED: Pulte Homes of Texas, LP Conatser Construction TX, LP 8 Clint Vincent Div. VP Land Develop. Brock Hugg Vice President REASON(S) FOR CHANGE ORDER Change order required to reconcile approved plans with contracts. Contracts were executed prior to final city approval. PE1:0 01111gND SOLUTIONS 5751 KROGER DR, SUITE 185, KELLER, TX 76244 817-562-3350 WEST FORK RANCH PHASE 1 PAVING CONTRACT CHANGE ORDER #2 SECT ON A - 50' LOTS (LOTS EAST OF MONTBELIARD PA DESCRIPTION UNIT CHG QTY UNIT PRICE CHG IN TOTAL 1 6" Reinf Conc. Pvmt. w/7" Curb for 29' B-B Residential Street SY 0 23.00 0 00 2 6" Lime Stabilized Subgrade for 29' B-B Street SY 0 2.00 0 00 3 Hydrated Lime (30#/SY) TON 0 140.00 0.00 4 4 Wide, 4" Thick Sidewalk LF 0 9.00 0.00 5 6 Wide, 4" Thick Sidewalk Along Park & Amenity Center LF 0 12.00 0.00 6 Type H Barrier Free Ramp EA 0 800.00 0.00 _- 7 Std Street Header LF 0 10.00 0.00 8 Std Street Barricade LF 0 20.00 0.00 9 Remove Barricade & Connect to Ex St Header EA 0 200.00 0.00 10 Revision to Rebar Size EA 0 6,700.00 0.00 TOTAL PAVING - SECTION A $0.00 SECTION B - 60' LOTS (LOTS WEST OF MONTBELIARD PARKWAY DESCRIPTION UNIT QTY UNIT PRICE TOTAL 1 6' Reinf Conc. Pvmt. w/7" Curb for 29' B-B Residential Street SY 0 23.00 0.00 2 6' Lime Stabilized Subgrade for 29' B-B Street SY 0 2.00 0.00 3 Lime (30#/SY) TON 0 140.00 0.00 -Hydrated 4 4 Wide, 4' Thick Sidewalk LF 0 9.00 0.00 5 Type H Barrier Free Ramp EA 0 800.00 0.00 6 Std Street Header LF 0 10.00 0.00 7 Std Street Barricade LF 0 20.00 0.00 8 Revision to Rebar size LS 0 6,700.00 0.00 TOTAL PAVING - SECTION B $0.00 SECTION C - BASSWOOD BOULEVARD DESCRIPTION UNIT QTY UNIT PRICE TOTAL 1 9.5" Reinf. Conc. Pvmt. w/7" Curb for 28' B-B Arterial Street SY 0 29.00 0.00 2 6" Lime Stabilized Subgrade for 28' B-B Street S SY 0 2.00 0.00 3 __Hydrated Lime (30#/SY) TON 0 140.00 0.00 4 5 5' Wide, 4" Thick Sidewalk LF 0 11.00 0.00 5 Right Turn Island EA 0 1,200.00 0.00 6 Type H Barrier Free Ramp _ EA 0 800.00 0.00 7 Std Street Header LF 0 10.00 0.00 8 Std Street Barricade LF 0 20.00 0.00 9 Remove Ex Barricade & Conn to Ex Header EA 0 200.00 0.00 10 Street Markings LS 0 1,500.00 0.00 11 Traffic Signs LF 0 400.00 0.00 12 Adjust Top of BO Valve LF 1 500.00 500.00 13 Adjust Top of AR Valve EA 0 500.00 0.00 14 Revision to Rebar size LS 0 6,700.00 0.00 15 Remove & Replace Existing Conc Panels East of Project SY 93 60.00 5,500.00 TOTAL PAVING - SECTION C $6,080.00 CO2-Paving.xlsx, CO2 lof3 8/2/2011 SECTION D - MONTBELIARD PARKWAY (ADJACENT TO P D UNIT QTY UNIT PRICE TOTAL 1 7.5" Reinf. Conc. Pvmt. w/7" Curb for 43' B-B Collector Street SY 0 25.00 _ 0.00 2 6" Lime Stabilized Subgrade for 43' B-B Street SY 0 2.00 0.00 3 Hydrated Lime (30#/SY) TON 0 140.00 0.00 _ 4 5' Wide, 4" Thick Sidewalk LF 0 11.00 0.00 5 Type H Barrier Free Ramp EA 0 800.00 0.00 6 Street Markings LS _ 4,500.00 0.00 _ _ ____0_ 7 Traffic Signs EA 0 400.00 0.00 8 Revision to Rebar size LS 0 6,700.00 0.00 9 Traffic Signs - two placards EA 5 500.00 2,500.00 10 Shared Lane Markings EA 16 500.00 8,000.00 TOTAL PAVING - SECTION D $10,500.00 SECTION E - MONTBELIARD PARKWAY (PHASE DESCRIPTION UNIT QTY UNIT PRICE TOTAL 1 7.5" Reinf. (transitions Conc. Pvmt. w/7" Curb to 24.5' width) for 43' B-B Collector Street SY 0 25.00 0.00 2 6" Lime Stabilized Subgrade for 43' B-6 Street SY 0 2.00 0.00 3 Hydrated Lime (30#/SY) TON 0 140.00 0 - 4 Street Markings LS 0 500.00 0.00 5 Traffic Signs EA 2 400.00 800,00 6 Revision to Rebar size LS 0 6,700.00 0.00 7 Traffic Signs - two placards EA 3 500.00 1,500.00 TOTAL PAVING - SECTION E $2,300.00 SECTION F - FUTURE 50' LOTS (LOTS NORTH OF FUTURE BAILE DESCRIPTION UNIT CHG QTY UNIT PRICE CHG IN TOTAL 1 6" Reinf. Conc. Pvmt. w/7' Curb for 37' B-B Residential Street SY (765) 23.00 (17,595.00) - 2 6" Lime Stabilized Subgrade for 37' B-B Street SY (810) 2.00 (1,620.00) 3 6" Reinf. Conc. Pvmt. w/7" Curb for 29' B-B Residential Street SY (3,990) 23 00 (91,770.00) 4 6" Lime Stabilized Subgrade for 29' B-B Street SY (4,265) 2.00 (8,530.00) 5 Hydrated Lime (30#/SY) - TON (29) 14.0.00 (4,060.00) _ 6 4' Wide, 4" Thick Sidewalk LF (76) 9.00 (684.00) 7 Type H Barrier Free Ramp E EA (4) 800.00 (3,200.00) 8 Std Street Header LF (56) 10.00 (560.00) 9 Std Street Barricade LF (56) 20.00 (1,120.00) 10 Street Markings LS 0 _ 500.00 0.00 11 Traffic Signs (with one Placard) E EA 3 400.00 1,200.00 12 Traffic Signs (with two Placard) -_ - EA 1 500.00 500.00 13 7-1/2" Reinf Conc Pvmt w/ 7' Curb for 20.5' width section SY 2 840 25.00 71,000,00 14 6" Lime Stabilized Subgrade for 20.5' Section SY 3,120 2,00 6,240.00 TOTAL PAVING - SECTION F ($50,199.00) CO2-Paving.xlsx, CO2 2 of 3 8/2/2011 S ECT ON G - OFFSITE IMPROVEMENTS FOR HORSEMAN ROAD AND WHITE FEATHER N ORTH OF PULTE HOMES PROPERTY LINE DESCRIPTION UNIT CHG QTY UNIT PRICE CHG IN TOTAL 1 7-1/2" Reinf. Conc. Pvmt. w/7" Curb for 37' B-B Street S SY 0 23.00 0 00 2 6" Lime Stabilized Subgrade for 37' B-B Street SY 0 2.00 0 00 3 6" Reinf. Conc. Pvmt. w/7' Curb for 29' B-B Residential Street SY 0 23.00 0 00 4 6" Lime Stabilized Subgrade for 29' B-B Street SY 0 2.00 0.00 5 Hydrated Lime (30#/SY) TON 0 140.00 0.00 6 4 Wide, 4" Thick Sidewalk LF 0 9.00 0.00 7 Type H Barrier Free Ramp EA 0 800.00 0.00 8 Std Street Header LF 0 10.00 0.00 9 Std Street Barricade LF 0 20.00 0.00 10 Street Markings LS 0 500.00 0.00 11 Traffic Signs EA 0 400.00 0.00 12 Remove Barricade & Connect to Ex Street Header EA 0 200.00 0.00 13 Unclassified Excavation for Horseman Road CY 0 4.00 0.00 14 Sawcut & Remove Ex Pvmt (White Feather) SY 0 10.00 0.00 15 Sawcut & Remove Ex Sidewalk LF 0 6.00 0.00 16 Remove & Replace Ex Street Light EA 0 500.00 0.00 17 Seeding of Disturbed Area SY 0 0.50 0.00 18 Type III Temporary Barricades LF 0 20.00 0.00 19 8" SS (SDR 35) LF 0 20.00 0.00 20 Adjustment of 48" Water Vault EA 0 750.00 0.00 TOTAL PAVING - SECTION G $0.Q0 PAVING CHANGE ORDER SUMMARY S ECTION A - 50' LOTS (LOTS EAST OF MONTBELIARD PARKWAY) S ECTION B - 60' LOTS (LOTS WEST OF MONTBELIARD PARKWAY) S ECTION C - BASSWOOD BOULEVARD S ECTION D - MONTBELIARD PARKWAY (ADJACENT TO PHASE 1) S ECTION E - MONTBELIARD PARKWAY (PHASE 1 TO FUTURE BAILEY BOSWELL) S ECTION G - HORSEMAN ROAD (FROM NORTH PL TO WHITE FEATHER) S ECTION E - MONTBELIARD PARKWAY (PHASE 1 TO FUTURE BAILEY BOSWELL) TOTAL PAVING CHANGE $0.00 $0.00 $6,080.00 $10,500.00 $2,300.00 ($50,199 00) $0 00 ($31,319.00) CO2-Paving.xlsx, CO2 3 of 3 8/2/2011