HomeMy WebLinkAboutContract 41854-1C (2)i SORT WORTH(:; Project Name Client Project #(s) DOE 6624 City of Fort Worth Change Order Request West Fork Ranch Phase 1 CRY ECRETAr\VJ Cot dakcar a. ,±7-7 -=- City Sec # 17-1 e y City Proj No. 01694 Project Description) Street Lighting Improvements (Co sdc Contractor City Project Mgr. Conatser Construction Raul Lopez Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) TPW -Street Ligths $538,325.00 -$228,915.00 Change Order # City Inspector Water $0.00 Emanuel Nieto $0.00 CHANGE ORDERS to DA T E (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) Date I 9/1/2011 Totals $538,325.00 $538,325.00 -$228,915.00 $309,410.00 -42.52% $672,906.25 Contract Time (WD) JUSTIFICATION (REASONS) FOR CHANGE ORDER Change order required to reconcile plans released for construction with contracts. Contracts were bid and executed prior to obtaining final City approval of the plans. While there is City particpation in the project this change order does not impact it; developer to pay 100% of the change order. Reference CFA 2011-006. .z,,�. tila.,, -eve()POE FC14:411 uaa0000 b ary . Ka ecretary zi) ow c A0 i' 9 4' Yr0� Q Qoo 11/4 c+ S <091 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor (Name) Contract Signature Date Conatser Construction ` ' eiti < 1--s* i-i 1, k. C It tt s .� .t-' is Date Mana. Mana• Date inspector/Inspection ' ject er/Progra Jur rvi : o .I -ger -----:4 / f/ A WA fl SI �J//51GJ���-'�'`j✓# / lye . t i / 'i / % s' - �� - sir Ass's cirir a Date Di - or, Co trac 'ng Department (Dept) Gate 97367 i,` c', -Gm( G0l3f ®t, -- . As is1r`[„secy. Stto fney Date Assistan City Manager Date (Wit: ,•., - leen/ ?If a. AreidY Council Action (if required) M&C Number P4/A M&C Date Approved I N/A 06-28-12 A 1 0: 23 IN 10-1 -11 P03:3 IN FORT WORTH Project Name Client Project # Project Description Contractor City Project Mgr. City of Fort Worth Change Order Additions West Fork Ranch Phase 1 City Sec # DOE 6624 City Proj No. 01694 Street Lighting Improvements CCONTFZA-cT C- Conatser Construction Raul Lopez ADDITIONS Change Order # City Inspector 1c1 Date 9/1/2011 Emanuel Nieto ni nit t;os ota TPW -Street Ligths $0.00 Water $0.00 Sewer $0.00 Sub Total Additions Change Order Additions Page 1 of 1 MWBE Sub M/WBE Breakdown for this Change Order Type of Service Amount for this CO Total Previous Change Orders co # DATE AMOUNT Total $0.00 f CITY OF FORT WORTH _ DEPARTMENT OF ENGINEERING DEVELOPER CHANGE ORDER DATE: July 21, 2011 PROJECT NAME: CONTRACT: West Fork Ranch Phase 1 Street Lighting Improvements ( c) CM' PROJECT#: 01694 DOE# 6624 WATER PROJECT #: P265-602150169483 SEWER PROJECT#: P275-702130169483 FILE # W-2166 CHANGE ORDER No. lea INSPECTOR: Emanuel Nieto PROJECT MANAGER: Raul Lopez, P.E. Phone No: 817-392-8972 Phone No: 817-392-7818 STREET SEWER WATER LIGHTING DRAINAGE DAYS • ORIGINAL CONTRACT $538,325 00 90 EXTRAS TO DATE $0 CREDITS TO DATE $0 CONTRACT TO. DATE $538,325.00 90 PROP. CHANGE ORDER ($228,915.00) 0 .REVISED CONTRACT • $309,410.00 90 TRANSPORTATION AND PUBLIC TOTAL (REVISED CONTRACT) WATER DEPARTMENT WORKS BY CITY DEPARTMENT $30099,,4141 0.00 . TOTAL REVISED CONTRACT $309,410.00 You are directed to make the following changes in the contract documents: See attached sheets for changes to contract documents. RECOMMENDED: APPROVED: APPROVED: Peloton Land Solutions, LLP Gena Terrell Project Manager Pulte Homes of Texas, LP Conatser Construction TX, LP Clint Vincent Div. VP Land Develop. Vice President c:\documents and settings\egooid\local settings\temporary Internet O(es\content.outlook\6apglrlh\coi.strlightdocx CO1-Strlight-city.xlsx, CO1 PELOTONLAND SOLUTIONS 5751 KROGER DR, SUITE 185, KELLER, TX 76244 817.562.3350 - WEST FORK RANCH PHASE 1 STREET LIGHTING CONTRACT CHANGE ORDER #1 July 18, 2011 DESCRIPTION UNIT UNIT PRICE CHANGE IN TOTAL. CHG IN QTY 1 2" Sch 40 PVC LF (2,690) 5.50 (14,795 00) 2 Quad Alum 2-2-2-4 LF 0 1.60 0.00 3 #10THWN Copper LF 14,30D 1.00 14,300.00 3A #8 THWN Copper LF 1.200 1.60 1.800,00 4 Elec Service Panel EA (1) 4,501100 (4,500.00) 5 Utility Box EA (23) 350.00 (6,050.00) 6 Light Fixture- Antigua, Single EA (88) 525.00 (46,200.00) 7 L ght Fixture - Ant gue Double EA (6) 900.00 (5,400.00) 7A L ght Fixture - Cobra Head, Single 150W Metal Halide EA 64 350.00 22,400.00 8 Light Fixture - Cobra Head, Double 200W HPS EA 0 300.00 0.00 9 Ught Pole Foundation EA (35) 800.00 (28,000.00) 10 25' Pole, Antigua for Residential EA (70) 2,100.00 (147,000.00) 10A 25' Pole, Ste for Residential EA 30 1,800,00 54,000,00 11 40' Pole. Antique for Montbetiard, Single Arm FA (16) 5,165,00 (92,970.00) 11A 30' Pole, Sid for Montbeliard EA 22 2,100.0D 464200.00 12 40' Pole, Antique for Monlbetiard, Double Arm EA (6) 6.250.00 (37,500.00) 12A 40' Pole, Double Arm (Montbeliard) EA 8 2,800.00 16,800.00 13 40' Pole Single Arm (Basswood) EA 0 2,500.00 0.00 TOTAL (5228,915.00) 1 of 2 7/27/2011 REASONS) FOR CHANGE ORDER Change order required to reconcile contracts with currently approved plans. Developer changed style of lighting after city approval of plans. g:\iob\10-plt001-rancho santa fe north\coor\phase 1\bids-specs\co1-strlight.docx