HomeMy WebLinkAboutContract 41855 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. �'°I B STS-- WHEREAS, the undersigned "Developer" desires to make certain improvements (refer to the name of the project at the bottom of the page) an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule • municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. Developer Information: Developer Company Name: Race Street Lofts, Ltd. Authorized Signatory: Jesus J. Chapa Title: Assistant General Manager Project Name: Race Street Lofts Project Location: 2817 Race Street Additional Streets: N/A Plat Case No.: FS-011-014 Plat Name: L.L. Benton Subdivision Mapsco: 63Q Council District: 2 City Project No: 01706 To be completed by staff Received by: CFA: 2011-021 DOE: 6637 Date: 14° / �3 1 i OFFICIAL RECORD CITY SECRETARY NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans specifications and cost estimates provided for the Project and the exhibits attached hereto. D The following checked exhibits are made a part hereof: Paving {B) ' E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: Combined CFA final Sept 12, 2008 2 i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City- 3 issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City haiuuless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, perfoimance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees M. Developer will further require its contractors to indemnify, defend and Combined CFA final Sept 12, 2008 4 hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees Further Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of 5 the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council ii. Nothmg contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its fmancial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Combined CFA final Sept 12, 2008 6 Cost Summary Sheet Project Name• Race Street Lofts CFA No.: 2011-021 DOE No.: 6637 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1, Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain TPW Construction Cost Sub -Total Total Construction Cost (excluding the fees): $'' Developer's Cost 1s so ao $ 15,650.00 $ 15,650.00 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ D. Water/Sewer Material Testing Fee (2%) $ Sub -Total for Water Construction Fees $ E TPW Inspection Fee (4%) $ F. TPW Material Testing (2%) $ G. Street Light Inspsection Cost $ H. Street Signs Installation Cost $ Sub -Total for TPW Construction Fees Total Construction Fees: 626.00 313.00 $ 939.00 $ 939.00 Amount Choice (ck one ........_.-• .. ----r------•------- ---- Bond = 100% $ 15,650.00 V Completion Agreement = 100% / $ 15,650.00 Holds Plat Cash Escrow Water/Sanitary Sewer= 125% $ - Cash Drain r= 125% $ 19,562.50 Paving/Storm Escrow Letter of Credit = 125% w/2yr expiration period $ 19,562.50 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has frh executed this instrument in quadruplicate, at Fort Worth, Texas this 0 `- day of , 20 ` . CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi-Babulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Marcia Wise c Nio-a_ Assistant City Attorney ATTEST: 41 Marty endrix �.�-�� CitySecretary 'a,°"� gt00oo a000ip ATTEST 000000ao4 fi141 441 e X 0 Signature (Print) Name: Transportation & Public Works Department c Dough (730 tic&t, W. Wiersig, P.E. Director Approved by City Manager's Office Fernando Costa Assistant City Manager 77o tt li C� 11 • 9 ,n RE Race Street Lofts, Ltd. By its General Partner Race Street Lofts GP, LLC By its Member Fort Worth Housing Finance Corporation OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX Signature Print Name: Jesus J. Chapa Title: Assistant General Manager Combined CFA final Sept 12, 2008 8 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included /1 E • E • E Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) W Q SYLVANIA F- UJ z Ei z Q J CO RACE MCLEMORE ST ST CHANDLER ST 377 ;c SITE VICINITY MAP NTS (MAPSCO GRID 63 Q) COUNCIL DISTRICT 2 2' WOE CONOrclz RE101 TO PLANS aY WNA'MAC AS39TA= FOR =OS STREET INPIWOLONS CITY PROJECT N0. OMOt DAY Na =11 PUBLIC PMONO MID AWDOAN EASOON BAWOR • REMOVE DJSTNC CDNC CURS a OAT,a 0C*MN - CWOMUCT KW CURB A WRED • WAIR PER OTT STO. %TAOD $ 9MET O7.1 FO11RMTK WORN. PIANS M 001097' E MCLEMORE STREET WAIT PI HE PI WNTRUCT 510. MOH VOLUME 001E APPROACH PEN OTT SIC CCTM= W SIC= CEA PM 0ION0143. fl SWOT 11 MR GRACING. DOSSING ASPHALT PIT. RACE STREET CURD M (0 OTT FOR LEGEND CONSTRUCT STD SOS@PER MT AOVWIOF OOZING GS&OUT PAOTT )RAW OUIY PAWWPNT. T 1500 PS CONCRETE PWT. BF= OARS 0I0' CCLC ON C M U1C SCABWIID =CRAPE W e: COMPACTED AT 052 OF INC STANDARD PRCCtC FONTS ABBOOOE? NC=YwA( 110SD4� 2cOMM. � MOOMITTPAINMENT PSI IN POT. W/R DANS O IC O.CLW. ON B O1' IK SMDWIED 'LOOVAOE 0 B% COMPACTED AT 93t OF DC STANDARD PROCTOR OASmn D BPB DOWN DPBWIN MID 2 PERCENTAGE POOBTS OF MNWW WOSnn WNIER. RNLI DIMS P W%SMt' 4,000 PS CONCRETE PIT. WAN DMB W IDS CCLW ON C 0P ME SIABIUIID SUBOUDE O 05 COMPACTED AT ILS.E 0P DC STANDARD PROCTOR (ASHY D sac BETWEEN OPTIMUM AM 2 PORCONTMC FONTS AWOL Of OPIWM INISNRE COMM Sprig IC it PI ATONE. C REDDEN® MNOCIE 90EWMN CAM (*0U0 PSI AT 20 OATS) W/p ants • IC CCLW ON E COMPACTED SUBDOADE TO DU AT OR ABOVE MINN W M= CMITOR. (ASTM 0 00B) CUpD CUT ON CRT MOM CAUTION it 4GlOR oRuSTS0(i-m-ol O OTHER UM LOwTxO'11MCES AT LEAST a HPAii PR= 10 CONSTRUCTION AMMO=. PIRY Y PIRTMI19 G NOT teialBLC OR 10 AREA NOR N UOII� WTIC MI ODNCR= THE EXACT LO A11Mi 0P UM16 f l TIDY DRAM= MONO 0 10 20 30 40 an L ■'a. a loll f 1 bi4 Ow a aeminb I> 1CP. I.m R, no Om .an m.a kr° m. ia.... r.nn.a ff. aa. D.. wDRM ror 1RMSPOPTArpN PUWC nWO —i PIPN ••P-2 10111111111 II It ); Ill AT lw. Pw I..mmuu w ICI. 1n,Pm ..e. mot 0 in iawry wmmnan n im m.w..h,:N a........mlm. i. nannendiNotoe.. Ono. en the both. s{wms nTY G4 T0Ari WMrw 1200 IOC CLOSURC DODUR LAO PUOLC Wga19 ti PAVING PLAN cn ct 0 f CC E. I- 0 w 3 0a <0 It 06 h r- Z 2 SHEET C6.1 f920529-07\92292PYP.ON mualfe by rhom0 at Apr ]u 2011 - 10H4m 0 Bury Partners ENGINEERING SOLUTIONS Bury & Partners-DFW, Inc. 5310 Harvest Hill Road, Suite 100 Dallas, Texas 75230 Tel 972-991.0011 Fax 972-991-0278 TBPE Firm No. F-1048 ENGINEER'S PRELIMINARY OPINION OF PROBABLE CONSTRUCTION COST FOR IMPROVEMENTS in the STREET RIGHT OF WAY PROJECT: RACE STREET LOFTS LOT 2R - L.L. BENTON ADDITION PLAT FILE NO. FS-011-014 CLIENT: The NRP Group, LLC CITY PROJECT NO. 01706 DOE NO. 6637 DATE: May 31, 2011 BURY PROJECT NO: 30528-07 DESCRIPTION QUANTITY UNIT COST/UNIT TOTAL COST Along Race Street 170 SY $ 20.00 $ 3,400 Sawcut and removal of existing concrete pavement Concrete Including subgrade for drive approach and parallel pavement parking spaces (6' thick, 3,500 PSI) 140 SY $ 45.00 $ 6,300 6' Integral curb along the drive approach and pkg. spaces 150 LF $ 10.00 $ 1,500 Sidewalk (4' thick, 3,000 PSI) 830 SF $ 4.00 $ 3,320 Concrete Flume W/ metal cover 11 LF $ 30.00 $ 330 Barrier Free Ramp 1 EA $ 800.00 $ 800 Total: $ 15,650 Page 1 of 1 BUSINESS ORGANIZATIONS lNQUIRY - VIEW ENTITY :=X. S ETA Y of ST Page 1 of 1 uccI Business Organizations I Trademarks I Notary I Account I Help/Fees I Briefcase I Logout BUSINESS ORGANIZATIONS INQUIRY -VIEW ENTITY Filing Number: Original Date of Filing: Formation Date: Tax ID: Duration: Name: Address: 801307195 August 17, 2010 N/A 32042446529 FEIN: Perpetual Race Street Lofts, Ltd. 1000 Throckmorton Fort Worth, TX 76102 USA Entity Type: Domestic Limited Partnership (LP) Entity Status: In existence REGISTERED AGENT FILING HISTORY NAMES MANAGEMENT ASSUMED NAMES ASSOCIATED ENTITIES Last Update August 17, 2010 Name Race Street Lofts GP, LLC Title General Partner Address 1000 Throckmorton Fort Worth, TX 76102 USA Order j I Return to Search Instructions: To place an order for additional information about a filing press the 'Order' button. https://direct.sos.state.tx.us/core_inquiry/corp_inquiry-entity.asp?spage=mgmt&: Spagefrom=&: Sfiling_nu... 06/03/2011 BUSINESS ORGANIZATIONS lNQUIRY - VIEW ENTITY TEXAS SEA L`VJAM/ of ST L Page 1 of 1 UCC Business Organizations I Trademarks Notary I Account I Help/Fees I briefcase I Logout BUSINESS ORGANIZATIONS INQUIRY -VIEW ENTITY Filing Number Original Date of Filing: Formation Date: Tax ID: Duration: Name: Address: 801307191 August 17, 2010 N/A 32042446560 Perpetual Entity Type: Entity Status: FEIN: Race Street Lofts GP, LLC 350 N SAINT PAUL ST STE 2900 DALLAS, TX 752014234 USA Domestic Limited Liability Company (LLC) In existence REGISTERED AGENT FILING HISTORY NAMES MANAGEMENT ASSUMED NAMES ASSOCIATED ENTITIES Last Update August 17, 2010 Name Fort Worth Housing Finance Corporation re Title Member Address 1000 Throckmorton Fort Worth, TX 76102 USA Order I I Return to Search Instructions: To place an order for additional information about a filing press the 'Order' button. • https://direct.sos.state.tx.us/corp_inquiry/corp_inqui y-entity.asp?spage=mgmt&:Spagefrom=&:Sf ling_nu... 06/03/2011 BUSINESS ORGANIZATIONS 1NQUIRY - VIEW ENTITY Page 1 of 1 L 1 3 ¥XAS SECRETA f STAT UGC I Business Organizations I Trademarks I Notary I Account Help/Fees I Briefcase I Logout BUSINESS ORGANIZATIONS INQUIRY VIEW ENTITY Filing Number: Original Date of Filing: Formation Date: Tax ID: Duration: Name: Address: 50162801 December 27, 1979 N/A 17518898535 Perpetual Entity Type: Entity Status: Non=Profit Type: FEIN: Domestic Nonprofit Corporation In existence Housing Finance Corporation FORT WORTH HOUSING FINANCE CORPORATION 1000 THROCKMORTON CHARLES BOSWELL FORT WORTH, TX 761020000 USA REGISTERED AGENT FILING HISTORY NAMES MANAGEMENT ASSUMED NAMES ASSOCIATED ENTITIES Last Update March 9, 2007 March 9, 2007 March 9, 2007 March 9, 2007 March 9, 2007 March 9, 2007 March 9, 2007 March 9, 2007 March 9, 2007 March 9, 2007 March 9, 2007 Name Carter Burdette Wendy Davis Salvador Espino Kathleen Hicks Jungus Jordan Mike Moncrief Danny Scarth Chuck Silcox Donavan Wheatfall Kathleen Hicks Donavan Wheatfall Title Director Director Director Director Director Director Director Director Director President Secretary Address 4717 Lafayette Ave Fort Worth, TX 76107 USA 2737 Calder Fort Worth, TX 76107 USA 4920 Robinson Fort Worth, TX 76114 USA 817 W. Tucker Apt #201 Fort Worth, TX 76104 USA 5316 Starry Court Fort Worth, TX 76123 USA 5000 Bryce Ave Fort Worth, TX 76107 USA 505 High Woods Fort Worth, TX 76112 USA 4221 Selkirk Fort Worth, TX 76109 USA 3855 Colton Court #227 Fort Worth, TX 76040 USA 817 Tucker #201 Fort Worth, TX 76104 USA 3855 Colton Court #227 Fort Worth, TX 76040 USA Order IReturn to Search Instructions: 4 To place an order for additional information about a filing press the 'Order' button. • https://direct.sos.state.tx.us/corp inquiry/corp inquiy-entity. asp?spage=mgmt&: Spagefrom=& : S filing_nu... 06/03/2011