Loading...
HomeMy WebLinkAboutContract 41791COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 411 WHEREAS, the undersigned "Developer" desires to make certain improvements (refer to the name of the project at the bottom of the page) an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. Developer Information: Developer Company Name: Fountain Residential Partners, LLC Authorized Signatory: K. Brent Little Title: Manager Project Name: TCU Student Housing Project Location: 3201 S. University Drive Additional Streets: Plat Case No.: FS-008-126 Plat Name: Lot 7R, Blk 4, P.R. Weatherford Addition Mapsco: 76W Council District: 9 City Project No: 01277 To be completed by Received by: CFA: 2011-013 DOE 6163 III OFFICIAL RECORD ran SECRETARY rro iuqORTh9 TX NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X , Sewer (A-1) X , Paving (B) , Storm Drain (B-1) , Street Lights & Signs (C) _. E. The Developer shall award all contracts for the construction of communit y facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. y Combined CFA final Sept 12, 2008 2 F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The 3 submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City - issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Combined CFA final Sept 12, 2008 4 Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. 5 iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer s share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Combined CFA final Sept 12, 2008 6 Cost Summary Sheet Project Name: TCU Student Housing CFA No.: 2011-013 DOE No.: 6163 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction $ 123,962.00 5,361.00 Water and Sewer Construction Total $ 129,323.00 B. TPW Construction 1. Street 2. Storm Drain TPW Construction Cost Sub -Total Total Construction Cost (excluding the fees): $ $ IMF b 129,323.00 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 2,586.46 D. Water/Sewer Material Testing Fee (2%) $ 2,586.46 Sub -Total for Water Construction Fees $ 5,172.92 E. TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one $ $ 5,172.92 Amount Choice (ck one) Bond = 100% $ 129,323.00 Completion Agreement = 100% / Holds Plat $ 129,323.00 Cash Escrow Water/Sanitary Sewer= 125% $ 161,653.75 Cash Escrow Paving/Storm Drain r= 125% $ - / Letter of Credit = 125% w/2yr expiration period $ 161,653.75 k`'� IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this •9O4 & day of lyvi , 20 ‘‘ . CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi- abulal, EMBA, P.E. Developrnen Engineering Manager Approved as to Form & Legality: • 0111/1-eg- gal Marcia Wise Dew City Attorney Nr ATTEST: Marty Hendrix City Secretary ATTEST (Print) Name: ragoosseosiarroaseags• no mg, thialsol asesooarartairdraliall BETTY JEAN MERCHANT Notary Public Public STATE OF TEXAS Commission Expires 01 /25/13 1 Transportation & Public Works Department N/A Douglas W. Wiersig, P.E. Director Approved by City Manager's Office alesin4 Fernando Costa Assistant City Manager OR pit I'�I^►I �Q��� OOOO �uo 0 #41.00 %Qv) S0401` • 0 0% I * a° OS a 'I% *SegP tail rear Combined CFA final Sept 12, 2008 8 las Fount. in Resid Print Name: K. Title: Manager artriers S.�• ature rent Little -.-' - S'T - NO C lair RED "'T_-' - CS'r"r•-c e [OFFICIAL RECORD CITY SECRETARY FT. 0 TH9 In Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included C n n Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 9 BRI Q VIEW ATE AK HIL LY a PARKHILL ANN ARBORS 37 -70 INGSTON NCREST CLARIDGE ANNELS w 70 z 0 0 0 0 0 OOD co p PARK HILL v WEST BELLAIRE J_ U >- 0 m D 0 IFF N O 0 Oo RAIL WESTCLIFF HILLTOP BIDDISON EL TUFT RAC I i1] 0 z 0 FO WO BEI AIRF DR SHELBY z SOUTH HILLS NORFOLK AVONDALE r � w J rr McF HERSON m CC w 7 0 1- _Z J m 0 0 0 W w w 0 TH PRINCETON 0 0 m m OWDEN w �wLHAWTHCRNE RC WILSHRE GLENCC BERT *10 w (75 w_ N Mc PH ERSON CANT^Y 0 w ca 0 c c c 0 U) z DRYDE 0 F— LA co Q w 0 < 0 / O `LAM ESA PROJECT LOCATION MAPSCO PAGE 76W COUNCIL DISTRICT 9 DEVI7 o > O Z m O:ENBROOK3 1 W D_ 0 w WAGGOMAN 0 ANG M ND BUTLE DICKS R JI WAGGOMF SCALE TEAGUE NALL AND PERKINS CITY. OF FORT WORTH, TEXAS RIP ct FRP11162 NTS N/A D TE MAY 2011 78PE Registration Na F-230 1100 Macon Street Fort Worth, Texas 76102 Phons:(817)336-6773•Fax:(8171336-2813 www.tnp-onllne.00m TCU STUDENT HOUSING VICINITY MAP cn 0 rri w z A 0 -n 0 CONNECT TO EX 12' WL CONNECT TO EX 12' At CONNECT TO EX 12" WL PROPOSED 2" ASPHALT OVERLAY CONNECT TO EX. 6" W., REMOVE a 6" It TO THE SOUTH & BEGIN 12' WL cx *) -- , , PROPOSED 12. WA71:R 11411 2,1 11!i EX. 6' NE (X--/0/52) I •=0 41\ d 'I ! ,e,4 /RR. METER W/ MEM? BOX (IRR) DOM. METERS P.R. !!!!, 2-2" (D cn o 0 31VOS 01HdV240 ----------- - ----- ------- ------- TJ` LOT 7R, BLOCK 4 THERFORB'S ADDI77QN C'A A, SLIDE 12853 P.R.TC.T. a a a !c_11 PROPOSED PERMANENT ASPHALT PINT BUILDING REPAIR (TYP)1, ,-, ......!._ I. 1 , V„I.LZT 0.4 111, SOUT 'HMIVERSIITIO -CUT-IN 6' GATE VALVE PROPOSED la W1.1 SERVICE (6 EA) 1-CUT-IN 6' GATE VALW & CONNECT TO EX. 6' WL 6 It !PROPOSED 1211W,4TE:R LINE a 6' WI4X-10152) 101i -.----PROPOSED 1-=!!- ! ASPHALT OVERLAY LEGEND CONCRETE CURB/GUTTER & SIDEWALK REPAIR (T)P) 2" ASPHALT OVERLAY PROPOSED 8" SS - CONNECT TO EX. SSM PROPOSED 8" SS PROPOSED 4'SSMH i/vatTa c c 0 W Cf)Z 0 CL 0 D mm CL e VITT STREET (VARIABLE WIDTH R.O.W.) 50 GRAPHIC SCALE 0 25 50 SCALE TEAGUE NALL AND PERKINS CITY OF FORT WORTH, TEXAS 7NP PROECT FRP11162 1"=50' N�A DATE MAY 2011 /NC. TBPE Regisbit on Na P 230 1100 Macon Street Fort Worth, Texas 76102 Phone:(817)338-6773•Fax:(817)336-2813 www.tnp-onf/ne.com SEWER IMPROVEMENTS TO SERVE TCU STUDENT HOUSING EXHIBIT A-1 Civil Engineering ','', Surveying Landscape Architecture Planning OPINION OF PROBABLE CONSTRUCTION COST PROJECT: Water Itnprovernents to serve TCU Student Housing DATE: 3/30/2011 TNP JOB # FRP11162 ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL I WATER IMPROVEMENTS 12' PVC C900 DR 14 Waterline 304 LF $26.00 $7,904.00 6" PVC C900 DR 14 Waterline 38 LF $21.00 $798.00 2" Service Waterline 56 LF $25.00 $1,400.00 360 LF $18.00 $6,480.00 1" Domestic Service Waterline 1" Irrigation Service Waterline 24 LF $18.00 $432.00 12' Gate Valve with Box & Concrete Collar 2 EA $1,800.00 $3,600.00 6" Gate Valve with Box & Concrete Collar 1 EA $1,250.00 $1,250.00 6" Cut -in Gate Valve with Box & Concrete Collar 2 EA $1,250.00 $2,500.00 2" Domestic Meter with Class B Meter Box 2 EA $1,500.00 $3,000.00 3/4" Irrigation Meter with Class A Meter Box 1 EA $1,000.00 $1,000.00 12 'xl" Service Tap 7 EA $300.00 $2,100.00 12"x2" Service Tap 2 EA $1,000.00 $2,000.00 Cast Iron/Ductile Iron Fittings 1 2 TON $3,000.00 $3,600.00 Permanent Asphalt Pavement Repair 690 LF $48.00 $33,120.00 2" Asphalt Overaly w/Milled Transition 2269 SY $17.00 $38,573.00 Sawcut, Remove/Replace Concrete Curb, Gutter & Sidewalk 16 SY $375.00 $6,000.00 Abandon/Remove Ex. Water Services & Return Ex. Meter to Meter Shop 2 EA $100.00 $200.00 Remove Existing Water Main/Services 664 LF $3.50 $2,324.00 Trench Safety 781 LF $1.00 $781.00 Temporary 2" Water Main/Service Lines 1 LS $1,800.00 $1,800.00 Street Striping & Markings 1 LS $1 600.00 $1,600.00 Water Valve Adjustments 5 EA $100.00 $500.00 Traffic Control 1 LS $1 800.00 $1,800.00 Erosion Control 1 LS $1,200.00 $1,200.00 WATER IMPROVEMENTS TOTAL $123,962.00 INC Civil Engineering Surveying Landscape Architecture Planning OPINION OF PROBABLE CONSTRUCTION COST PROJECT: Sewer Improvements to serve TCU Student Housing TNP JOB # FRP11162 DATE: 3/30/2011 ITEM DESCRIPTION QTY. UNIT UNIT COST TOTAL II SEWER IMPROVEMENTS 8" Sanitary Sewer Pipe 27 LF $40.00 $1,080.00 4' Sanitary Sewer Manhole 1 LF $2,500.00 $2,500.00 Connect to Existing Manhole 1 LF $1,500.00 $1,500.00 Vaccum Testing of Manhole 1 EA $100.00 $100.00 Concrete Manhole Collar 1 EA $100.00 $100.00 Post Construction TV Inspection 27 EA $2.00 $54.00 Trench Safety 27 EA $1.00 $27.00 $5,361.00 SANITARY SEWER IMPROVEMENTS TOTAL I