HomeMy WebLinkAboutContract 41902-A1 (2)F g " �ETARY F p i VW7 Noe AMENDMENT NO.1 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Lieu tte, Inc., (ENGINEER) made and entered into City Secretary Contract No. 41902, (the CONTRACT) which was authorized by M&C C-24860 on the 12u' day of April, 2011 in the amount of $84,904.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water Improvements on Ridglea Country Club Drive; and WHEREAS, it has become No . 1 to the CONTRACT to include revised fee, necessary to execute Amendment an increased scope of work and NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 15, 2015, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $26,745.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the �J total fee paid by the City for all work and services shall be CO > an amount of $111,649.00 cM> -- 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last wr n b a CITY SECRETARY PagePicTo a11CiR'F"y TX signatory, below. APPROVED: City of Fort Worth 'Jesus J. Chapa Assistant City Manager DATE APPROVAL RECO�IENDP Andrew T. Cronberg, Assistant Director, ENGINEER DeOtte, Inc. Clayton T. a nger, Vice President ATE: P.E. Water Department APPROVED AS TO FORM AND LEGALITY Douglas W. Black Senior Assistant City Attorney ATTEST: J City Sc}dretary Date: N/A P.E. WORTH,To Page -2- KOTTE, INC. September 15, 2015 Mr John Kasavich, P E ; Project Manager City of Fort Worth, Water Department 1000 Throckmorton Fort Worth Texas 76102-6311 CWIL FNGINHERING Re: Amendment No. 1 Request — City Project No. 01690; Ridglea Country Club Drive Water Imps ovements DOI No. 2007115-00 City Project No. 01690 Dear Mr. Kasavich, This letter is in reference to a contract between DeOtte, Inc. and the City of Fort Worth (the City) dated June 22, 2011 herein referred to as the "Contract." This letter requests an amendment revising the previously approved subject project design plans and contract documents. Specifically, this amendment includes the provision of additional work associated with the following items; 1. Waterline Bridge Attachment Revision 2. Preservation of Fxisting 16" Waterline (Existing Crossing) 3. Size Reduction of Proposed Alignment to 12" Waterline and Elimination of Waterline Lowering Waterline Bridge Attachment Revision The original design proposal contemplated an alignment of a proposed 16" waterline around the Mary's Creek bridge crossing of Ridglea Country Club Drive Aftei the submittal of the so% conceptual design and before the submittal of the 60% preliminary design, at the direction of the City, a design which attached the proposed 16" waterline to an existing bridge was pursued. This revision necessitated a re -alignment of the proposed waterline, extensive research and study to determine existing bridge conditions and carrier pipe method and type, multiple meetings with the City, structural engineer pipe manufacturer and construction contractors familiar with this type of construction A structural engineering sub -consultant was hired to assist with the study and to piovide structural details. The change also required other special details for a non-standard construction resulting from the revision. 1. Structural Revision Coordination & Meetings $5,210.00 2. Structural Engineering Sub -consultant $5,000.00 3. Special Details $1,835.00 Preservation of Existing 16" Waterline (Existing Crossing) After the submission of the first submittal of the 60% preliminary design the City determined that it preferred to preserve the existing 16" waterline, which was originally scoped to be abandoned in place. The original impetus for the project was primarily to remove the existing creek crossing due to significant erosion in the area of the existing PHONE (817) 337.8899 420 JOHNSON ROAD; SUIrh 303, KFLLER, TEXAS 76248 FAX (817) 337-5133 D KOTTH'., INC. pipe, with some minor erosion control improvements to protect the existing bank. In order to preserve the existing 16" line, a waterline lowering plan was required to protect the existing line from future erosion, which was not anticipated in the proposal This also required and more detailed site assessment and research into the existing line geometry, details of connection points, construction sequencing and geometry at both the lowering area and the primary connection point. These changes were significant enough in scope to require second submittal of 60% plans for City staff review. 1. Waterline Lowering Plan 2. Plan revisions at primary connection point 3. Additional 60% Preliminary Design Meeting 4. Revise Specifications and Cost Estimates $2,500.00 $1,305.00 $1, 305.00 $1,040.00 CIVIL ENGINEERING Size Reduction of Proposed Alignment to 12" Waterline and Elimination of Waterline Lowering After the second submittal of the 60% design plans, the City expressed a desire to reduce the size of the proposal waterline alignment from 16" to 12' . This required new water system modeling determine system capacity a revision to all plan and profile sheets of the existing plans, a revision to the structural plans and special details previously mentioned Additionally, the elimination the waterline lowering plan requires a this d concept of the design to protect the existing 16" waterline in place at the existing ci eek crossing. 1. Additional Water Modeling 2. Plan & Profile Plan Revisions 3. Structural Plan Revisions 4. Special Detail Revisions 5. Protect Existing Waterline in -place Plans Revision 6. Revise Specifications and Cost Estimates $910.00 $3,060.00 $800.00 $660.00 $2,080.00 $1,040.00 Total: $26,745.00 We recommend the City increase the budget by $26,752 for these additional services. The following tables summarize the recommended budget revisions Water Sewer Total Original Contract $ 84,904 $ - $ 84,904 Amendment No. 1 $ 26,745 $ - $ 26,745 Total $ 111,649 $ - $ 111,649 PHONE (817) 337.8899 420 JOHNSON ROAD; SUJr b 303, KFLLER, TExAs 76248 FAX (817) 337-5133 D VOTTH, I\C CIVIL NNGINEI-RING Description Original Fee No Contract Revised Amendment 1 31-Conceptual Design $ 20,905 $ 8,023 $ 28,928 32-Preliminary Design $ 41,810 $ 16,047 $ 57,857 33-Final Design $ 6,968 $ 2,675 $ 9,643 51-Preliminary Survey $ 15,221 $ - $ 15,221 Total Project $ 84,904 $ 26,752 $ 111,649 Description Original Revised Contract $ 84,904 $ 111,649 Amount Total Contract M/WBE $ 21,066 $ 21,066 Total Contract M/WBE (%) 25% 19% City's M/WBE Goal (%) 15% 15% I sincerely appreciate your consideration of this request. Please call or email me if you have any questions or would like to discuss the details included in this letter. Respectfully, DeOtte, Inc. a/7 Clayton T. Redinger Vice President PHONE (817) 337.8899 420 JOHNSON ROAD; SUITE 303, KFLLER, TENS 76248 FAX (817) 337-5133 Level of Effort Spreadsheet TASKIHOUR BREAKDOWN Design Services for Water and Sanitary Sewer Replacement Contract - Amendment 1 City Project No. 01690 Task No. Labor hours) Expense Total Expense Cost Task Sub Total Task Description Project Director Project Manager project Engineer EIT CADD Administrative Total Labor Cost Subconsultant Travel Reproduction Rate $160 $130 :;.. $0 $0 $100 550 MWBE Non-MWBE 1.0 Project Management 4.5 4.5 _ -; 0 _. 0 0 0 $1,305 $D $0 $0 $0 $0 $1,305 1,1 Design Submittal Review Meetings 4,5 4,5 $1,305 $0 2.0 Conceptual Design (30-Percent) 22 20 - ....i 0 -: 0 0 0 $6,120 $0 $0 $0 $0 $0 $6,120 2.1 Structural Design Coord & Meetings 22 13 .... . _ $5,210 $0 $5,210 2.2 Additional Water Modeling 7 -'. r: , - $910 $0 $910 3,0 Preliminary Design (6D Percent) >:: 3 -.--30 - r0 ;, 0 23 0 $6,680 $0 $4,545 $0 $0 $4,545 $11,225 3.1 Structural Engineering $D $4,545 $4,545 $4,545 3.2 Special Details for Bridge Crossing 2 5.5 8 $1,835 $0 $1.835 3.3 Waterline Lowering Plan 1 B _.. - 13 $2,500 $0 $2,500 3.4 Plan Revisions @ Primary Connection 8.5 - 2 $1,305 $0 $1,305 3.5 Specifications 4 ., _.. $520 $0 $520 3.6 Construction Estimate 4 l(._.... $520 $0 $520 4.0 Final Design 0 38 .' -0 "O 19 0 $6,840 $0 $728 $0 $D $728 $7,568 4.1 Reduce Line from 16" Line to 12" Line �';,: -.. $0 $D $0 4.1.1 Plan & Profile Plan Revisions 12 - 15 $3,060 SD $3,060 4.12 Structural Plan Revisions ,......'r: $0 $728 $728 $728 4.1.3 Special Detail Revisions 2 , _ 4 $660 $D $660 42 Protect Ex. Water In -place Plan Revision 16 �.. -. - .._._.. $2,080 $0 $2,080 4.3 Spedfication 4 .. _ $520 $0 $520 4.4 Construction Estimate 4 .._ . _ -- __ - $520 $o a520 5.0 Bid Phase 0 0 '.0 t0 0 0 $0 $0 $0 SD $D $0 50 6.0 Construction Phase Services D D D . 0 D 0 $0 $0 $0 $D 5D SD 50 7.0 ROW/Easement Services 0 0 ..0 '. , '.0 0 0 $0 $0 $0 $D $0 $0 $0 8.0 Survey 0 0 r.0 'D 0 0 50 $D $0 SD $0 $0 $0 9.0 Permitting 0 D _0 _ t0 0 0 SD $0 $0 $0 $0 $D $0 10.0 Geotechnical ,�. . 5D $D SO .... $0 Totals 29.5 92.5 :;0 . ,:0 42 0 $20,945 $O $5,273 $0 $0 $26,218.00 $5,273 Water Line Footage 2,200 Sewer Line Footage (A Total Fee (B Survey Fee D 2200 $26,745 $0 $26,745 100% 0% 100% Water Fee (100% of C) Sewer Fee (0% of C) $26,745.00 $0.00 Description WP Water Sewer Conceptual Design (30%) 31 $8,024.00 $0.00 Preliminary Design (60%) 32 $15,047.00 $0.00 Final Design (10%) 33 $2,675.00 $0.00 Survey 51 $0.00 $0.00 Subtotal $26,746.00 $0.00 Total $26,746.00 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 5.19.2010 Project Summary Total Hours 164 Total Labor $20,945 Total Expense $5,273 MWBE Subconsultant $0 Non-MWBE Subconsultant $5,273 10% Sub Markup $527 MWBE Participation 0.0% Total Project Cost $26,745.110 1 of 1