WHEREAS, the City of Fort Worth (City) and Kellogg Brown &
Root Services, Inc., (Engineer) made and entered into City
Secretary Contract No. 41962, (the Contract) which was authorized
by the City Council by M&C C-24959 on the 14th day of June, 2011 ro
and
WHEREAS, the Contract involves engineering services for the
following project.
Engineering Services Related to the Bridge Maintenance Program
WHEREAS, it has become necessary to execute Amendment No. 1
to said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and
through their duly authorized representatives, enter into the
following agreement which amends the Contract:
1.
Article I of the Contract is amended to include the
additional engineering services specified in a proposal letter
dated August 29, 2011, copies of which are attached hereto and
I
ncorporated herein. The cost to City for the additional design
services to be performed by Engineer total $6,500.25.
2.
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work
and services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $56,500.25.
City of Fort Worth, Texas
Amendment to Engineering Agreement
PMO Official Release Date: 6.18.2010
Page 1 of 2
0£i : 1 19009-9
3.
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on this the oZ J`�
Worth, Tarrant County, Texas.
day of SCay 2011, in Fort
ATTEST:
Marty Hend ' x 4�� %X411
City Secretary 0�000000eoap�,
ri o
d,.0 o s�
Dougl(a�s W. Wiersig,
Director, Transportation and
Public Works
Kellogg Brown
By:
ontract Authorization
APPROVED:
Fernando Costa
Assistant City Manager
& Root Services, Inc.
Name: Leisa Nelson
Vice President
100 E. 15" St., Ste. 345
Fort Worth, Texas 76102
AS TO FORM AND LEGALITY:
Assi�ant City Attorney
City of Fort Worth,
Amendment to Engineering Agreement
PMO Official Release Date: 6.18.2010
Page 2 of 2
�Tv F k M � ��P TX
Infrastructure & Minerals - Americas
100 E. 15th Street, Suite 345, Fort Worth, Texas 76102
August 29, 2011
Mr. George Behmanesh, P.E.
TPW, City of Fort Worth
5001 James Avenue, Suite 201
Fort Worth, TX 76115
Re: Engineering Services Related to Texas Department of Transportation Bridge
Inspections
Dear Mr. Behmanesh:
Please find attached our proposed budget to provide construction phase engineering
support. The budget estimate is based on the following'
The first package is 7 projects bundled for 120 calendar days.
The second package is Eastchase Parkway Bank Stabilization with 230 calendar days.
KBR SCOPE:
1 Attend pre bid meeting Allow 2 hours each for PM and Engineer for each package
2 Address issues - allow 4 hours each for PM and Engineer
3 Shop Drawing review. Allow 1 hour for PM 8 hours for Engineer and 4 hours for
admin
4. G&A to review shop drawings for soil nails. This does not include G&A field
verification for geotechnical which would add another 16 loaded hours or so.
There will be no site visits and no design/cadd work budgeted
Reimbursable non -labor will include transportation costs for meeting attendance and
mailing shop drawings.
If you have any questions, please do not hesitate to call.
Very truly yours,
R, INC.
Ralph A. Browne, P.E.
Enc.
City of Fort Worth
Annual Bridge Inspection Program
Work Authorization 1 Construction Phase Services
Classification
Rate
Est
Hours
Billing
Project
Manager
$233.41
9
$2,100.69
$220.01
16
$3,520
16
Structures
Engineer
$104.58
0
$0.00
Junior
Structures
Engineer
$159.25
0
$0.00
Roadway
Engineer
$95.25
0
$0.00
Junior
Roadway
Engineer
Structural
Inspector
$87.13
0
$0.00
Building
Inspector
$74.13
0
$0.00
Civil
Inspector
$68.93
0
$0.00
$57.35
4
$229.40
Admin/Record
Keeper
$156
74
0
$0.00
Field
Environmental
Specialist
$63.05
0
$0.00
CADD
Operator
$95.02
0
$0.00
Sr.
CADD
Operator
29
$5,850.25
Gorrondona Geotech Support
Soil nail shop drawing review
$500.00
non
-labor
$150.00
Reimbursible
$6,500 25
City of Fort Worth
Annual Bridge Inspection Program
Work Authorization 1 Construction Phase Services
Scope Task
PM
Structures
Engineer
Jr Structures
Engineer
Roadway
Engineer
Jr Roadway
Engineer
Structural
Inspector
Building
Inspector
Civil
Inspector
Admin/Record
Keeper
Field
Environmental
Specialist
CADD
Operator
Sr. CADD
Operator
1. inspection of 7 bridges in package 1
2. Inspection of East Chase Parkway Bank Stabilization
3. Construction phase Engineering support Package 1
5
12
3
3. Construction phase Engineering support Package 2
4
4
1
Totals 9
29
The first package is 7 projects bundled for 120 calendar days.
The second package is Eastchase Parkway Bank Stabilization with 230 calendar days.
SCOPE:
1. Attend pre bid meeting Allow 2 hours each for PM and Engineer for each package
2. Address issues - allow 4 hours each for PM and Engineer
3. Shop Drawing review. Allow 1 hour for PM 8 hours for Engineer and 4 hours for admin
4. G&A to review shop drawings for soil nails. This does not include G&A field
verification for geotechnical which would add another 16 loaded hours or so.
16
There will be no site visits and no design/cadd work budgeted
Reimbursible non -labor will include transportation costs for meeting attendance and mailing shop drawings.
0
0
0
0
4
0 0 0