HomeMy WebLinkAboutContract 41860 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. Li I b(oc)
WHEREAS, the undersigned "Developer" desires to make certain improvements (refer
to the name of the project at the bottom of the page) an addition to the City of Fort Worth,
Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule
municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter
called "City", to do certain work in connection with said improvements.
Developer Information:
Developer Company Name: VWS-36AC, LLC
Authorized Signatory: Randall Van Wolfswinkel
Title: Manager
Project Name: Villages of Woodland Springs Phase 7, Section 4
Project Location: NWC of Old Denton Rd. & Keller -Hicks Rd.
Additional Streets:
Plat Case No.: FP-010-030 Plat Name: The Villages of Woodland Springs West Ph. VII, Sec. IV
Mapsco: 21H
Council District: 2 City Project No: 01638
To be completed by staff: ,
Received b :
CFA: 2011-002 DOE: 6571
OFFICIAL RECORD
CITY SECRETLY'
1 vtwoaThsTte
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as
if copied herein verbatim. Developer agrees to comply with all provisions
of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy
in connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy and recognizes that there shall be no reduction
in the collateral until the Project has been completed and the City has
officially accepted the infrastructure. Developer further acknowledges
that said process requires the contractor to submit an Affidavit of Bills
paid signed by its contractor and Consent of Surety signed by its surety
to ensure the contractor has paid the sub -contractor and suppliers in full.
Additionally, the contractor will provide in writing that the contractor
has been paid in full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements
contemplated by this Agreement and that said construction shall be
completed in a good and workmanlike manner and in accordance with all
City standards and the City -approved construction plans, specifications and
cost estimates provided for the Project and the exhibits attached hereto.
The following checked exhibits are made a part hereof:
Water (A) X_
Sewer (A-1) X _, Paving (B) X Storm Drain (B-1) X , Street
Lights & Signs (C) �X�,.
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the Policy.
Combined CFA final Sept 12, 2008 2
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of
the department having jurisdiction over the infrastructure to be
constructed, said contractor to meet City's requirements for being
insured, licensed and bonded to do work in public streets and/or
prequalified to perform water/waste water construction as the case may
be.
ii. To require its contractor to furnish to the City a payment and
performance bond in the names of the City and the Developer for one
hundred percent (100%) of the contract price of the infrastructure, and a
maintenance bond in the name of the City for one hundred percent
(100%) of the contract price of the infrastructure for a period of two (2)
years insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is connnenced and to meet the requirements of
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required
by said documents and same will be evidenced on the ACORD
Certificate of Insurance supplied by the contractor's insurance provider
and bound in the construction contract book
iv. To require its contractor to give 48 hours notice to the City's
Construction Services Division of intent to commence construction so
that City inspection personnel will be available; and to require the
contractor to allow the construction to be subject to inspection at any
and all times by City inspection forces, and not to install or relocate any
sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such
laboratory tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The
3
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -
issued Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water
mains constructed under this Agreement until said sewer and water
mains and service lines have been completed to the satisfaction of the
Water Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities
to serve the development or to construct the improvements required herein
I. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in conflict
with any of the community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or
employees, whether or not such Injuries, death or damages are
caused, in whole or in part, by the alleged netligence or the City of
Combined CPA final Sept 12, 2008 4
Fort Worth, its officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort
Worth, its officers, servants,_ or employees. Further, Developer will require
its contractors to indemnify, and hold harmless the City for any losses,
damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the
improvements in a good and workrnanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated
by the City.
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with
its contractor along with an assignment of all warranties given by the
contractor, whether express or implied Further, Developer agrees that all
contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party
beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii Developer shall pay in cash paving and storm drain inspection fees equal
to four percent (4%) and material testing fees equal to two percent (2%)
for a total of 6% of the developer's share of the total construction cost as
stated in the construction contract.
5
iii. Developer shall pay in cash the total cost of streetlights or if the city is
not installing the streetlights, inspection fees equal to four percent (4%) of
the developer s share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in
the cost of the community facilities shall terminate if the facilities are
not completed within two (2) years; provided, however, if construction
of the community facilities has started within the two year period, the
developer may request that the CFA be extended for one } ear. If the
community facilities are not completed within such extension period,
there will be no further obligation of the City to participate. City
participation in a CFA shall be subject to the availability of City funds
and approval by the Fort Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee,
its agreement \\fith its contractor or other related agreements.
iii The City may utilize the Developer's financial guarantee submitted for
this Agreement to cause the completion of the construction of the
community facilities if at the end of two (2) years from the date of this
Agreement the community facilities have not been completed and
accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause
the payment of costs for construction of same before the expiration of
two (2) years if the Developer breaches this Agreement, becomes
insolvent or fails to pay costs of construction and the financial guarantee
is not a Completion Agreement. If the financial guarantee is a
Completion Agreement and the Developer's contractors and/or suppliers
are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of
the Completion Agreement.
Combined CFA final Sept 12, 2008 6
Cost Summary Sheet
Project Name: The Villages of Woodland Springs Ph. 7, Sec. 4
CFA No.: 2011-002
DOE No.: 6571
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract
price will ultimately determine the amount of CFA fees and financial guarantee. The bid price
and any additional CFA payments will be required prior to scheduling a pre -construction
meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
TPW Construction Cost Sub -Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
Developer's Cost
$
$
222,409.50
175.168.00
$
397,577.50
442,159.25
161, 326.00
$
$
E. TPW Inspection Fee (4%) $
F. TPW Material Testing (2%) $
G. Street Light Inspsection Cost - Lights Installed by Tri-County $
H. Street Signs Installation Cost $
Sub -Total for TPW Construction Fees $
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain r= 125%
Letter of Credit = 125% w/2yr expiration period
603,485.25
1,001,062.75
7,951.55
7,951.55
15, 903.10
24,139.41
12,069.71
1,768.00
1,715.00
39,692.12
55, 595.22
Amount
$ 1,001,062.75
$ 1,001,062.75
$ 496, 971.88
$ 754,356.56
$ 1,251, 328.44
Choice
(ck one)
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested
by its City Secretary, with the corporate seal of the City affixed, and said Developer has
executed this instrument in quadruplicate, at Fort «Worth, Texas this i day
of Ur\- , 20 \ .
CITY OF FORT WORTH a Recommended by:
Water Department
Wendy Chi-
("Ik
/DAL
abulal, EMBA, P.E.
Development Engineering Manager
Approved as to F01711 & Legality:
dalit Wide
Marcia Wise
£EA! 1012 Assistant City Attorney
ATTEST:
Marty Hendri
City Secretary
ATTEST
NO M&C REQUIRED
Siiilature
(Print) Name:
/0/uy $14 cdu
Transportation & Public Works Department
Douglas W!JWiersig, P.E.
Director
Approved by City Manager's Office
5-latasa
Fernando Co4
Assi ► !�; ��, er
'4.* aQ4 ��aoP
111;071170 % Vj
0
oat° 8xrcri
0 ace
o /
Nib Pill:Sat."
,13,11:tatscs.-fcr
VWS-36AC, LLC
Si dature
Print Name: Rai all Van Wolfswinkel
Title: Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Combined CFA final Sept 12, 2008 8
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Stone Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left !flank)
9
I:\SLD\WFXJ4202\700CADD\702CIVIL\Woodland Springs 7-4\Revised Layout\CFARevised.dwg, 5/12/2011 10:48 AM, Washburn, Sam L.
ZOZb('XdM '0N L33P08d
MAIN ST.
T1VOS 01 ION
/H35w
m
c N r24
0 0�
�o
ALTA VISTA m
(FUTURI= NORTH BEACH ST) Q 0
z0I
;r-
i0000F889�
IH35
/17
SVH-213113>4
I:\SLD\WFXJ4202\7000ADD\702CNIL\Woodland Springs 7-4\Revised Layout\CFARevised.dwg, 5/2
454,
LEGEND
PROPOSED WATER LINE
PROPOSED GATE VALVE
PROPOSED FIRE HYDRANT
EXISTING WATER LINE
EXISTING GATE VALVE
EXISTING FIRE HYDRANT
LIMITS OF PROJECT
PROPOSED WATER
LINES ARE 8 UNLESS
OTHERWISE INDICATED
-34
-N
SCALE:I' = 300'
WATER
EXHIBIT 'A'
THE VILLAGE OF
WOODLAND SPRINGS WEST
PHASE VH - SECTION IV
JACOBS
JACOBS ENGINEERING GROUP INC.
777 MAN STREET
FORT WORTH, TX 76102
(817) 73S6000
PROJECT NO. WFXJ4202
PAGE 2 OF 7
LEGEND
PROPOSED SANITARY SEWER
PROPOSED MANHOLE
EXISTING SANITARY SEWER
EXISTING MANHOLE
LIMITS OF PROJECT
PROPOSED SEWER LINES ARE
8 UNLESS OTHERWISE
INDICATED
SANITARY SEWER
EXHIBIT 'A-1'
THE VILLAGE OF
WOODLAND SPRINGS WEST
PHASE VII - SECTION IV
JACOBS
JACOBS ENGINEERING GROUP INC.
777 WIN STREET
FORT WORTH, TX 76102
(817) 735-6000
PROJECT NO. WFXJ9202
PAGE 3 OF 7
AM, Washburn
LEGEND
PROPOSED 29'B/B
ROADWAY/50'ROW
2li ASPHALT
OVERLAY
PROPOSED 4'SIDEWALK
(BY HOMEBUILDER)
PROPOSED 4 SIDEWALK
(BY DEVELOPER)
LIMITS OF PROJECT
STREETS
EXHIBIT 'B'
THE VILLAGE OF
WOODLAND SPRINGS WEST
PHASE VH - SECTION IV
JACOBS
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET
FORT WORTH, 1X 76102
(817) 735-6000
PROJECT NO. WFXJ4202
PAGE 4 OF 7
I0
v
v
m
N
T
J
U
N
N
N
1
N
U
C
n
N
0
0
0
OCCI
Nd-
O
n
0
0
O
0
2
0
J
(n
LEGEND
P ROPOSED STORM DRAIN LINE
P ROPOSED INLET
P ROPOSED MANHOLE
EXISTING STORM DRAIN LINE
LIMITS OF PROJECT
T
STORM DRAIN
EXHIBIT'B-1'
THE VILLAGE OF
WOODLAND SPRINGS WEST
PHASE VH - SECTION IV
JACOBS
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET
FORT WORTH, TX 76102
(817) 735-6000
PROJECT NO. WFXJ4202
PAGE 5 OF 7
I17
orn
m
N
j
W
CC
lai
T
J
N
N
N
CC
)
N
T
C
Q
N
0
0
U
N
O
0
0
N
0
2
0
J
N
LEGEND
PROPOSED SINGLE STREET LIGHT
EXISTING SINGLE STREET LIGHT
(ON STEEL POLE WITH STREET
AND STOP SIGNS ATTACHED)
EXISTING DOUBLE STREET LIGHT
LIMITS OF PROJECT
•
0
s
STREET LIGHTS
EXHIBIT'C'
THE VILLAGE OF
WOODLAND SPRINGS WEST
PHASE VII - SECTION IV
JACOBS
JACOBS ENGINEERING GROUP INC.
777 AWN STREET
FORT WORTH, TX 76102
(817) 735-6030
PROJECT NO. WFXJ4202
PAGE 6 OF 7
3
v
v
d
N
Li..
T
O
J
N
N
d
t
N
CP
C
0-
0
0
0
•04-
0
0
0
X
0
0
J
LEGEND
PROPOSED STREET SIGN
EXISTING STREET SIGN
LIMITS OF PROJECT
Ak
A
SCALE:I" = 300'
STREET SIGNS
EXHIBIT'C-1'
THE VILLAGE OF
WOODLAND SPRINGS WEST
PHASE VH - SECTION IV
JACOBS
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET
FORT WORTH, TX 76102
(B17) 735-6000
PROJECT NO. WFXJ4202
PAGE 7 OF 7
ITEM#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
(TOTAL
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET, FORT WORTH, TEXAS 76102
PHONE NO (817) 735-6000
CFA ESTIMATE FOR
THE VILLAGES OF WOODLAND SPRINGS WEST
PHASE VII SECTION IV
April 18, 2011
WATER DISTRIBUTION SYSTEM
DESCRIPTION
12" Water Main
10" Water Main
8" Water Main
12" Gate Valve & Box
10" Gate Valve & Box
8" Gate Valve & Box
6" Gate Valve & Box
Std. Fire Hydrant
1" Water Service & Type A Meter Box (including
service taps & service lines)
1" Water Service & Type A Meter Box (Including
service taps and service lines)
CI Fittings
Sawcut, Remove and Replace Asphalt Pvmt for
service connection, Old Denton (2 locations),
Bobcat Drive
Remove and haul off ex 2.5" wl
Connect to Ex Water System
Cut and Plug existing 6" WL at Old Denton & Keller
Hicks Drive
Class B (2500 PSI) Concrete
Class E (1500 PSI) Concrete
Ballast Stone
Crushed Limestone
Trench Safety
System Testing
SWPPP Maintenance
Traffic Control for Old Denton Road
WATER DISTRIBUTION SYSTEM
NEW QTY
98
1363
4445
2
2
11
5
5
104
UNIT
L.F.
L.F.
L.F.
EA
EA
EA
EA
EA
EA
2 EA
4.5 TON
63 S.Y.
98 L.F.
5 EA
2 EA
5 C.Y.
5 C.Y.
5 C.Y.
5 C.Y.
5,906 L.F.
5,906 L.F.
1 L.S.
1 I L.S.
PRICE
32.00
23.00
17.00
1,525.00
1,250.00
900.00
650.00
2,100.00
525.00
525.00
2,200.00
75.00
10.00
750.00
300.00
100.00
75.00
25.00
25.00
0.25
0.50
500.00
1,500.00
NEW AMOUNT
3 136.00
31 349.00
75 565.00
3 050.00
2 500.00
9 900.00
3 250.00
10 500.00
54,600.00
1,050.00
9,900.00
4,725.00
980.00
3,750.00
600.00
500.00
375.00
125.00
125.00
1,476.50
2,953.00
500.00
1,500.00
$222,409.50
G:\JOB\WFXJ4202\EST\CFA\Final CFA VWS 7-4 20110511 .XLSCFA prices
Page 1
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET FORT WORTH, TEXAS 76102
PHONE NO. (817) 735-6000
MEER
CFA ESTIMATE FOR
THE VILLAGES OF WOODLAND SPRINGS WEST
PHASE VII SECTION IV
April 18, 2011
SANITARY SEWER COLLECTION SYSTEM
ITEM# DESCRIPTION
1 8" SDR 35 PVC Pipe
2 8" SDR 26 PVC Pipe
3 4' Dia Manhole (w/ Vacuum Test)
4 4' Dia Drop Manhole (w/ Vacuum Test)
5 4' Dia MH Over Ex Main w/ conc collar (w/ Vac Test)
6 Connect to Exist SS MH/SS system
4" Service SDR-35 (including service taps and
7 service lines)
4" Service SDR-26 (including service taps and
8 service lines)
9 Class B (2500 PSI) Concrete
10 Class E (1500 PSI) Concrete
11 Ballast Stone
12 Crushed Limestone
13 Trench Safety
14 TV Inspection
15 Protective Coating in Manholes
NEW QTY UNIT
4,200 L.F.
300 L.F.
15 EA.
2 EA
1 EA
1 EA
50 EA
54
5
5
5
5
4500
4500
20
EA
C.Y.
C.Y.
C.Y.
C.Y.
L.F.
L.F.
V.F.
TOTAL SANITARY SEWER COLLECTION SYSTEM
PRICE
17 00
20 50
2,145 00
3,304.00
2,480.00
1,200 00
360.00
445.00
100.00
75.00
25.00
25.00
1.00
1.00
150.00
NEW AMOUNT
71 400.00
6 150.00
32 175.00
6 608.00
2 480.00
1 200.00
18,000.00
24, 030.00
500.00
375.00
125 00
125.00
4,500.00
4,500.00
3,000.00
$175,168.00
G:\JOB\WFXJ4202\EST\CFA\Final CFA VWS 7-4 20110511 .XLSCFA prices
Page 2
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET FORT WORTH, TEXAS 76102
PHONE NO (817) 735-6000
CFA ESTIMATE FOR
THE VILLAGES OF WOODLAND SPRINGS WEST
PHASE VII SECTION IV
STREET IMPROVEMENTS
ITEM# DESCRIPTION
1 6' Lime Subgrade
2 Hydrated Lime (28#/SY)
3 6', 3000 psi R.C. Street Pvmt w/7" Curb
4 2' Asphalt Overlay
5 Barrier Free Ramps
6 Sawcut/Remv Ex Sidewalk
7 Sawcut/Remv /Ex C&G
8 Sidewalk Adj to Open Space
9 Concrete Street Header
10 End of Street Barricades
11 Adjust Sanitary Sewer Manhole Rim
12 SWPPP (Maint.)
13 Traffic Control
TOTAL PAVING
April 18, 2011
PAVING
NEW QTY
15,475
217
14,454
708
12
88
155
140
66
0
18
1
1
UNIT I
S .Y
TON
S .Y.
S .Y.
EA
L.F.
L.F.
S .F.
L.F.
L.F.
EA
L.S.
L.S.
PRICE
2 25
145 00
23 50
12 00
1,100 00
18 00
25 50
3.50
24.00
35.00
75.00
3,850.00
1,700.00
NEW AMOUNT
34 818.75
31 465.00
339 669.00
8 496.00
13 200.00
1 584.00
3 952 50
490.00
1,584.00
0.00
1,350.00
3,850.00
1,700.00
$442,159.25
G:\JOB\WFXJ4202\EST\CFA\Final CFA VWS 7-4 20110511 .XLSCFA prices
Page 3
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET, FORT. WORTH, TEXAS 76102
PHONE NO. (817) 735-6000
CFA ESTIMATE FOR
THE VILLAGES OF WOODLAND SPRINGS WEST
PHASE VII SECTION IV
ITEM# DESCRIPTION
1 48" RCP Storm Pipe
2 42" RCP Storm Pipe
3 39" RCP Storm Pipe
4 33" RCP Storm Pipe
5 30" RCP Storm Pipe
6 27" RCP Storm Pipe
7 24" RCP Storm Pipe
8 21" RCP Storm Pipe
9 Trench Safety
10 STD 15' Curb Inlet
11 STD 10' Curb Inlet
12 5' Std. Storm Manhole
13 Adjust Storm Drain Manhole Rim
14 48' Sloping Headwall
15 42' Sloping Headwall
16 27' Sloping Headwall
17 12' Bottom Channel
18 Rock Rip Rap
19 Traffic Control
(TOTAL STORM DRAIN SYSTEM
April 18, 2011
STORM DRAIN SYSTEM
NEW QTY UNIT
197 L.F.
360 L.F.
0 L.F.
268 L.F.
92 L.F.
169 L.F.
41 L.F.
74 L.F.
1,201.00 L.F.
4 EA.
6 EA
3 EA.
3 EA.
1 EA.
1 EA.
2 EA.
1,307 L.F.
380 SY.
1 LS
PRICE
111 00
93 00
91 00
66 00
61.00
56.00
51.00
48.00
1.00
2,800.00
2,300.00
2,850.00
3,500.00
1,950.00
1,550.00
1,000.00
3.00
30.00
1,500.00
NEW AMOUNT
21,867.00
33,480.00
0.00
17, 688.00
5,612 00
9,464.00
2,091.00
3,552.00
1,201.00
11,200.00
13,800.00
8,550.00
10,500.00
1,950.00
1,550.00
2,000.00
3,921.00
11,400.00
1,500.00
$ 161,326.00
G:\JOB\WFXJ4202\EST\CFA\Final CFA VWS 7-4 20110511 .XLSCFA prices
Page 4
JACOBS ENGINEERING GROUP INC.
777 MAIN STREET FORT WORTH, TEXAS 76102
PHONE NO..(817) 735-6000
CFA ESTIMATE FOR
THE VILLAGES OF WOODLAND SPRINGS WEST
PHASE VII SECTION IV
(ITEM# DESCRIPTION
1 Street Lights
2 Street Sign Fee
TOTAL STREET LIGHTS & SIGNS
April 18, 2011
STREET LIGHTS & SIGNS
NEW QTY UNIT
17 EA.
7 EA
*Contruction service, and maintenance provided by Tn-County
**City is still requiring Inspection of the street lights. 4%
UNIT PRICE
$2,600.00
245.00
NEW AMOUNT`
0.001
1 715.00
$11715.011
G:\JOB\WFXJ4202\EST\CFA\Final CFA VWS 7-4 20110511 .XLSCFA prices
Page 5
ITEM#
1
2
3
4
5
6
7
8
9
10
11
CB
AOcBS °ENGINEERING- GROUPS:I NCB
777: MAIN STREET,• FORT. -WORTH, TEXAS • 76102 •
PHONE NO. (8.17):735-6000
VILM_AG
WOODLAND SPRINGS WFSL-
CFA ESTIMATE FOR
EP]-flASiV011 Sir7C1-1ll N IIV
April 18, 2011
CITY PARTICIPATION o WATER LINE CONSTRUCTION
DESCRIPTION
12" Water Main
10" Water Main
8" Water Main
Diff. Between 10" Water Main & 8" Water Main
Connect to Ex Water System
12" Valve
10" Valve
Diff. Between 10" Valve & 8" Valve
CI Fittings
Diff. Between 10" CI Fittings and 8" CI Fittings
Sawcut, Remove and Replace Asphalt Pvmt for
service connection, Old Denton (2 locations),
Bobcat Drive
12 2" Asphalt Overlay
13 Remove and haul off ex 2.5" wl
Cut and Plug existing 6" WL at Old Denton & Keller
14 Hicks Drive
15 Trench Safety
16 System Testing
17 Traffic Control
18 Inspection Fees
19 Material Testing Fees
TOTAL CITY PARTICIPATION - WATER LINE
QTY UNIT PRICE
98 L.F. 32.00
432 L.F. 23.00
55 L.F. 17.00
862 L.F. 6.00
2 EA. 750.00
2 EA. 1,525.00
1 EA. 1,250.00
2 EA. 350.00
1.2 TONS 2,200.00
0.6 TONS 440.00
63 S.Y.
708 S.Y.
98 L.F.
2
585
585
1
2%
2%
EA.
L.F.
L.F.
L.S.
L.S.
L.S.
75.00
12.00
10.00
300.00
0.25
0.50
1,500.00
45,327.15
45,327.15
NEW AMOUNT
3,136.00
9,936.00
935.00
5,172.00
1,500.00
3,050.00
1,250.00
700.00
2,640.00
268.40
4,725.00
8,496.00
980.00
600.00
146.25
292.50
1,500.00
906.54
906.54
47,140.24 I
G:\JOB\WFXJ4202\EST\CFA\Final CFA VWS 7-4 20110511 .XLSCFA prices
Page 6
BUSINESS ORGANIZATIONS INQT "'ZY - VIEW ENTITY Page 1 of 1
UCC I Business Organizations I Trademarks I Notary I Account I Help/Fees I Briefcase Logout
BUSINESS ORGANIZATIONS INQUIRY -VIEW ENTITY
Filing Number: 801336999 Entity Type: Domestic Limited Liability
Company (LLC)
Original Date of Filing: October 28, 2010 Entity Status: In existence
Formation Date: N/A
Tax ID: 32042928344 FEIN:
Duration: Perpetual
Name:
Address:
REGISTERED
AGENT
Last Update
October 28, 2010
VWS-36AC, LLC
4161 MCKINNEY AVE FL 4
DALLAS, TX 752048213 USA
FILING
HISTORY
ASSUMED
NAMES MANAGEMENT NAMES
Name Title
Randall Van Wolfwinkel Manager
Order 1 I Return to Search
ASSOCIATED
ENTITIES
Address
500 Crescent Court, Ste. 350
Dallas, TX 75201 USA
Instructions:
To place an order for additional information about a filing press the 'Order' button.
i
https://direct. sos.state.tx.us/corp inquiry/corp inquiry-entity.asp?spage=mgmt&: Spagefrom=&: Sfiling_nu... 01/06/2011