Loading...
HomeMy WebLinkAboutContract 41860 (2)COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. Li I b(oc) WHEREAS, the undersigned "Developer" desires to make certain improvements (refer to the name of the project at the bottom of the page) an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. Developer Information: Developer Company Name: VWS-36AC, LLC Authorized Signatory: Randall Van Wolfswinkel Title: Manager Project Name: Villages of Woodland Springs Phase 7, Section 4 Project Location: NWC of Old Denton Rd. & Keller -Hicks Rd. Additional Streets: Plat Case No.: FP-010-030 Plat Name: The Villages of Woodland Springs West Ph. VII, Sec. IV Mapsco: 21H Council District: 2 City Project No: 01638 To be completed by staff: , Received b : CFA: 2011-002 DOE: 6571 OFFICIAL RECORD CITY SECRETLY' 1 vtwoaThsTte NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ("CFA") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub -contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. The following checked exhibits are made a part hereof: Water (A) X_ Sewer (A-1) X _, Paving (B) X Storm Drain (B-1) X , Street Lights & Signs (C) �X�,. E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. Combined CFA final Sept 12, 2008 2 F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and/or prequalified to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is connnenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre -Construction Meeting. The 3 submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City - issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such Injuries, death or damages are caused, in whole or in part, by the alleged netligence or the City of Combined CPA final Sept 12, 2008 4 Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants,_ or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workrnanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. 5 iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer s share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one } ear. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement \\fith its contractor or other related agreements. iii The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Combined CFA final Sept 12, 2008 6 Cost Summary Sheet Project Name: The Villages of Woodland Springs Ph. 7, Sec. 4 CFA No.: 2011-002 DOE No.: 6571 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain TPW Construction Cost Sub -Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees Developer's Cost $ $ 222,409.50 175.168.00 $ 397,577.50 442,159.25 161, 326.00 $ $ E. TPW Inspection Fee (4%) $ F. TPW Material Testing (2%) $ G. Street Light Inspsection Cost - Lights Installed by Tri-County $ H. Street Signs Installation Cost $ Sub -Total for TPW Construction Fees $ Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain r= 125% Letter of Credit = 125% w/2yr expiration period 603,485.25 1,001,062.75 7,951.55 7,951.55 15, 903.10 24,139.41 12,069.71 1,768.00 1,715.00 39,692.12 55, 595.22 Amount $ 1,001,062.75 $ 1,001,062.75 $ 496, 971.88 $ 754,356.56 $ 1,251, 328.44 Choice (ck one) IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort «Worth, Texas this i day of Ur\- , 20 \ . CITY OF FORT WORTH a Recommended by: Water Department Wendy Chi- ("Ik /DAL abulal, EMBA, P.E. Development Engineering Manager Approved as to F01711 & Legality: dalit Wide Marcia Wise £EA! 1012 Assistant City Attorney ATTEST: Marty Hendri City Secretary ATTEST NO M&C REQUIRED Siiilature (Print) Name: /0/uy $14 cdu Transportation & Public Works Department Douglas W!JWiersig, P.E. Director Approved by City Manager's Office 5-latasa Fernando Co4 Assi ► !�; ��, er '4.* aQ4 ��aoP 111;071170 % Vj 0 oat° 8xrcri 0 ace o / Nib Pill:Sat." ,13,11:tatscs.-fcr VWS-36AC, LLC Si dature Print Name: Rai all Van Wolfswinkel Title: Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Combined CFA final Sept 12, 2008 8 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Stone Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left !flank) 9 I:\SLD\WFXJ4202\700CADD\702CIVIL\Woodland Springs 7-4\Revised Layout\CFARevised.dwg, 5/12/2011 10:48 AM, Washburn, Sam L. ZOZb('XdM '0N L33P08d MAIN ST. T1VOS 01 ION /H35w m c N r24 0 0� �o ALTA VISTA m (FUTURI= NORTH BEACH ST) Q 0 z0I ;r- i0000F889� IH35 /17 SVH-213113>4 I:\SLD\WFXJ4202\7000ADD\702CNIL\Woodland Springs 7-4\Revised Layout\CFARevised.dwg, 5/2 454, LEGEND PROPOSED WATER LINE PROPOSED GATE VALVE PROPOSED FIRE HYDRANT EXISTING WATER LINE EXISTING GATE VALVE EXISTING FIRE HYDRANT LIMITS OF PROJECT PROPOSED WATER LINES ARE 8 UNLESS OTHERWISE INDICATED -34 -N SCALE:I' = 300' WATER EXHIBIT 'A' THE VILLAGE OF WOODLAND SPRINGS WEST PHASE VH - SECTION IV JACOBS JACOBS ENGINEERING GROUP INC. 777 MAN STREET FORT WORTH, TX 76102 (817) 73S6000 PROJECT NO. WFXJ4202 PAGE 2 OF 7 LEGEND PROPOSED SANITARY SEWER PROPOSED MANHOLE EXISTING SANITARY SEWER EXISTING MANHOLE LIMITS OF PROJECT PROPOSED SEWER LINES ARE 8 UNLESS OTHERWISE INDICATED SANITARY SEWER EXHIBIT 'A-1' THE VILLAGE OF WOODLAND SPRINGS WEST PHASE VII - SECTION IV JACOBS JACOBS ENGINEERING GROUP INC. 777 WIN STREET FORT WORTH, TX 76102 (817) 735-6000 PROJECT NO. WFXJ9202 PAGE 3 OF 7 AM, Washburn LEGEND PROPOSED 29'B/B ROADWAY/50'ROW 2li ASPHALT OVERLAY PROPOSED 4'SIDEWALK (BY HOMEBUILDER) PROPOSED 4 SIDEWALK (BY DEVELOPER) LIMITS OF PROJECT STREETS EXHIBIT 'B' THE VILLAGE OF WOODLAND SPRINGS WEST PHASE VH - SECTION IV JACOBS JACOBS ENGINEERING GROUP INC. 777 MAIN STREET FORT WORTH, 1X 76102 (817) 735-6000 PROJECT NO. WFXJ4202 PAGE 4 OF 7 I0 v v m N T J U N N N 1 N U C n N 0 0 0 OCCI Nd- O n 0 0 O 0 2 0 J (n LEGEND P ROPOSED STORM DRAIN LINE P ROPOSED INLET P ROPOSED MANHOLE EXISTING STORM DRAIN LINE LIMITS OF PROJECT T STORM DRAIN EXHIBIT'B-1' THE VILLAGE OF WOODLAND SPRINGS WEST PHASE VH - SECTION IV JACOBS JACOBS ENGINEERING GROUP INC. 777 MAIN STREET FORT WORTH, TX 76102 (817) 735-6000 PROJECT NO. WFXJ4202 PAGE 5 OF 7 I17 orn m N j W CC lai T J N N N CC ) N T C Q N 0 0 U N O 0 0 N 0 2 0 J N LEGEND PROPOSED SINGLE STREET LIGHT EXISTING SINGLE STREET LIGHT (ON STEEL POLE WITH STREET AND STOP SIGNS ATTACHED) EXISTING DOUBLE STREET LIGHT LIMITS OF PROJECT • 0 s STREET LIGHTS EXHIBIT'C' THE VILLAGE OF WOODLAND SPRINGS WEST PHASE VII - SECTION IV JACOBS JACOBS ENGINEERING GROUP INC. 777 AWN STREET FORT WORTH, TX 76102 (817) 735-6030 PROJECT NO. WFXJ4202 PAGE 6 OF 7 3 v v d N Li.. T O J N N d t N CP C 0- 0 0 0 •04- 0 0 0 X 0 0 J LEGEND PROPOSED STREET SIGN EXISTING STREET SIGN LIMITS OF PROJECT Ak A SCALE:I" = 300' STREET SIGNS EXHIBIT'C-1' THE VILLAGE OF WOODLAND SPRINGS WEST PHASE VH - SECTION IV JACOBS JACOBS ENGINEERING GROUP INC. 777 MAIN STREET FORT WORTH, TX 76102 (B17) 735-6000 PROJECT NO. WFXJ4202 PAGE 7 OF 7 ITEM# 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 (TOTAL JACOBS ENGINEERING GROUP INC. 777 MAIN STREET, FORT WORTH, TEXAS 76102 PHONE NO (817) 735-6000 CFA ESTIMATE FOR THE VILLAGES OF WOODLAND SPRINGS WEST PHASE VII SECTION IV April 18, 2011 WATER DISTRIBUTION SYSTEM DESCRIPTION 12" Water Main 10" Water Main 8" Water Main 12" Gate Valve & Box 10" Gate Valve & Box 8" Gate Valve & Box 6" Gate Valve & Box Std. Fire Hydrant 1" Water Service & Type A Meter Box (including service taps & service lines) 1" Water Service & Type A Meter Box (Including service taps and service lines) CI Fittings Sawcut, Remove and Replace Asphalt Pvmt for service connection, Old Denton (2 locations), Bobcat Drive Remove and haul off ex 2.5" wl Connect to Ex Water System Cut and Plug existing 6" WL at Old Denton & Keller Hicks Drive Class B (2500 PSI) Concrete Class E (1500 PSI) Concrete Ballast Stone Crushed Limestone Trench Safety System Testing SWPPP Maintenance Traffic Control for Old Denton Road WATER DISTRIBUTION SYSTEM NEW QTY 98 1363 4445 2 2 11 5 5 104 UNIT L.F. L.F. L.F. EA EA EA EA EA EA 2 EA 4.5 TON 63 S.Y. 98 L.F. 5 EA 2 EA 5 C.Y. 5 C.Y. 5 C.Y. 5 C.Y. 5,906 L.F. 5,906 L.F. 1 L.S. 1 I L.S. PRICE 32.00 23.00 17.00 1,525.00 1,250.00 900.00 650.00 2,100.00 525.00 525.00 2,200.00 75.00 10.00 750.00 300.00 100.00 75.00 25.00 25.00 0.25 0.50 500.00 1,500.00 NEW AMOUNT 3 136.00 31 349.00 75 565.00 3 050.00 2 500.00 9 900.00 3 250.00 10 500.00 54,600.00 1,050.00 9,900.00 4,725.00 980.00 3,750.00 600.00 500.00 375.00 125.00 125.00 1,476.50 2,953.00 500.00 1,500.00 $222,409.50 G:\JOB\WFXJ4202\EST\CFA\Final CFA VWS 7-4 20110511 .XLSCFA prices Page 1 JACOBS ENGINEERING GROUP INC. 777 MAIN STREET FORT WORTH, TEXAS 76102 PHONE NO. (817) 735-6000 MEER CFA ESTIMATE FOR THE VILLAGES OF WOODLAND SPRINGS WEST PHASE VII SECTION IV April 18, 2011 SANITARY SEWER COLLECTION SYSTEM ITEM# DESCRIPTION 1 8" SDR 35 PVC Pipe 2 8" SDR 26 PVC Pipe 3 4' Dia Manhole (w/ Vacuum Test) 4 4' Dia Drop Manhole (w/ Vacuum Test) 5 4' Dia MH Over Ex Main w/ conc collar (w/ Vac Test) 6 Connect to Exist SS MH/SS system 4" Service SDR-35 (including service taps and 7 service lines) 4" Service SDR-26 (including service taps and 8 service lines) 9 Class B (2500 PSI) Concrete 10 Class E (1500 PSI) Concrete 11 Ballast Stone 12 Crushed Limestone 13 Trench Safety 14 TV Inspection 15 Protective Coating in Manholes NEW QTY UNIT 4,200 L.F. 300 L.F. 15 EA. 2 EA 1 EA 1 EA 50 EA 54 5 5 5 5 4500 4500 20 EA C.Y. C.Y. C.Y. C.Y. L.F. L.F. V.F. TOTAL SANITARY SEWER COLLECTION SYSTEM PRICE 17 00 20 50 2,145 00 3,304.00 2,480.00 1,200 00 360.00 445.00 100.00 75.00 25.00 25.00 1.00 1.00 150.00 NEW AMOUNT 71 400.00 6 150.00 32 175.00 6 608.00 2 480.00 1 200.00 18,000.00 24, 030.00 500.00 375.00 125 00 125.00 4,500.00 4,500.00 3,000.00 $175,168.00 G:\JOB\WFXJ4202\EST\CFA\Final CFA VWS 7-4 20110511 .XLSCFA prices Page 2 JACOBS ENGINEERING GROUP INC. 777 MAIN STREET FORT WORTH, TEXAS 76102 PHONE NO (817) 735-6000 CFA ESTIMATE FOR THE VILLAGES OF WOODLAND SPRINGS WEST PHASE VII SECTION IV STREET IMPROVEMENTS ITEM# DESCRIPTION 1 6' Lime Subgrade 2 Hydrated Lime (28#/SY) 3 6', 3000 psi R.C. Street Pvmt w/7" Curb 4 2' Asphalt Overlay 5 Barrier Free Ramps 6 Sawcut/Remv Ex Sidewalk 7 Sawcut/Remv /Ex C&G 8 Sidewalk Adj to Open Space 9 Concrete Street Header 10 End of Street Barricades 11 Adjust Sanitary Sewer Manhole Rim 12 SWPPP (Maint.) 13 Traffic Control TOTAL PAVING April 18, 2011 PAVING NEW QTY 15,475 217 14,454 708 12 88 155 140 66 0 18 1 1 UNIT I S .Y TON S .Y. S .Y. EA L.F. L.F. S .F. L.F. L.F. EA L.S. L.S. PRICE 2 25 145 00 23 50 12 00 1,100 00 18 00 25 50 3.50 24.00 35.00 75.00 3,850.00 1,700.00 NEW AMOUNT 34 818.75 31 465.00 339 669.00 8 496.00 13 200.00 1 584.00 3 952 50 490.00 1,584.00 0.00 1,350.00 3,850.00 1,700.00 $442,159.25 G:\JOB\WFXJ4202\EST\CFA\Final CFA VWS 7-4 20110511 .XLSCFA prices Page 3 JACOBS ENGINEERING GROUP INC. 777 MAIN STREET, FORT. WORTH, TEXAS 76102 PHONE NO. (817) 735-6000 CFA ESTIMATE FOR THE VILLAGES OF WOODLAND SPRINGS WEST PHASE VII SECTION IV ITEM# DESCRIPTION 1 48" RCP Storm Pipe 2 42" RCP Storm Pipe 3 39" RCP Storm Pipe 4 33" RCP Storm Pipe 5 30" RCP Storm Pipe 6 27" RCP Storm Pipe 7 24" RCP Storm Pipe 8 21" RCP Storm Pipe 9 Trench Safety 10 STD 15' Curb Inlet 11 STD 10' Curb Inlet 12 5' Std. Storm Manhole 13 Adjust Storm Drain Manhole Rim 14 48' Sloping Headwall 15 42' Sloping Headwall 16 27' Sloping Headwall 17 12' Bottom Channel 18 Rock Rip Rap 19 Traffic Control (TOTAL STORM DRAIN SYSTEM April 18, 2011 STORM DRAIN SYSTEM NEW QTY UNIT 197 L.F. 360 L.F. 0 L.F. 268 L.F. 92 L.F. 169 L.F. 41 L.F. 74 L.F. 1,201.00 L.F. 4 EA. 6 EA 3 EA. 3 EA. 1 EA. 1 EA. 2 EA. 1,307 L.F. 380 SY. 1 LS PRICE 111 00 93 00 91 00 66 00 61.00 56.00 51.00 48.00 1.00 2,800.00 2,300.00 2,850.00 3,500.00 1,950.00 1,550.00 1,000.00 3.00 30.00 1,500.00 NEW AMOUNT 21,867.00 33,480.00 0.00 17, 688.00 5,612 00 9,464.00 2,091.00 3,552.00 1,201.00 11,200.00 13,800.00 8,550.00 10,500.00 1,950.00 1,550.00 2,000.00 3,921.00 11,400.00 1,500.00 $ 161,326.00 G:\JOB\WFXJ4202\EST\CFA\Final CFA VWS 7-4 20110511 .XLSCFA prices Page 4 JACOBS ENGINEERING GROUP INC. 777 MAIN STREET FORT WORTH, TEXAS 76102 PHONE NO..(817) 735-6000 CFA ESTIMATE FOR THE VILLAGES OF WOODLAND SPRINGS WEST PHASE VII SECTION IV (ITEM# DESCRIPTION 1 Street Lights 2 Street Sign Fee TOTAL STREET LIGHTS & SIGNS April 18, 2011 STREET LIGHTS & SIGNS NEW QTY UNIT 17 EA. 7 EA *Contruction service, and maintenance provided by Tn-County **City is still requiring Inspection of the street lights. 4% UNIT PRICE $2,600.00 245.00 NEW AMOUNT` 0.001 1 715.00 $11715.011 G:\JOB\WFXJ4202\EST\CFA\Final CFA VWS 7-4 20110511 .XLSCFA prices Page 5 ITEM# 1 2 3 4 5 6 7 8 9 10 11 CB AOcBS °ENGINEERING- GROUPS:I NCB 777: MAIN STREET,• FORT. -WORTH, TEXAS • 76102 • PHONE NO. (8.17):735-6000 VILM_AG WOODLAND SPRINGS WFSL- CFA ESTIMATE FOR EP]-flASiV011 Sir7C1-1ll N IIV April 18, 2011 CITY PARTICIPATION o WATER LINE CONSTRUCTION DESCRIPTION 12" Water Main 10" Water Main 8" Water Main Diff. Between 10" Water Main & 8" Water Main Connect to Ex Water System 12" Valve 10" Valve Diff. Between 10" Valve & 8" Valve CI Fittings Diff. Between 10" CI Fittings and 8" CI Fittings Sawcut, Remove and Replace Asphalt Pvmt for service connection, Old Denton (2 locations), Bobcat Drive 12 2" Asphalt Overlay 13 Remove and haul off ex 2.5" wl Cut and Plug existing 6" WL at Old Denton & Keller 14 Hicks Drive 15 Trench Safety 16 System Testing 17 Traffic Control 18 Inspection Fees 19 Material Testing Fees TOTAL CITY PARTICIPATION - WATER LINE QTY UNIT PRICE 98 L.F. 32.00 432 L.F. 23.00 55 L.F. 17.00 862 L.F. 6.00 2 EA. 750.00 2 EA. 1,525.00 1 EA. 1,250.00 2 EA. 350.00 1.2 TONS 2,200.00 0.6 TONS 440.00 63 S.Y. 708 S.Y. 98 L.F. 2 585 585 1 2% 2% EA. L.F. L.F. L.S. L.S. L.S. 75.00 12.00 10.00 300.00 0.25 0.50 1,500.00 45,327.15 45,327.15 NEW AMOUNT 3,136.00 9,936.00 935.00 5,172.00 1,500.00 3,050.00 1,250.00 700.00 2,640.00 268.40 4,725.00 8,496.00 980.00 600.00 146.25 292.50 1,500.00 906.54 906.54 47,140.24 I G:\JOB\WFXJ4202\EST\CFA\Final CFA VWS 7-4 20110511 .XLSCFA prices Page 6 BUSINESS ORGANIZATIONS INQT "'ZY - VIEW ENTITY Page 1 of 1 UCC I Business Organizations I Trademarks I Notary I Account I Help/Fees I Briefcase Logout BUSINESS ORGANIZATIONS INQUIRY -VIEW ENTITY Filing Number: 801336999 Entity Type: Domestic Limited Liability Company (LLC) Original Date of Filing: October 28, 2010 Entity Status: In existence Formation Date: N/A Tax ID: 32042928344 FEIN: Duration: Perpetual Name: Address: REGISTERED AGENT Last Update October 28, 2010 VWS-36AC, LLC 4161 MCKINNEY AVE FL 4 DALLAS, TX 752048213 USA FILING HISTORY ASSUMED NAMES MANAGEMENT NAMES Name Title Randall Van Wolfwinkel Manager Order 1 I Return to Search ASSOCIATED ENTITIES Address 500 Crescent Court, Ste. 350 Dallas, TX 75201 USA Instructions: To place an order for additional information about a filing press the 'Order' button. i https://direct. sos.state.tx.us/corp inquiry/corp inquiry-entity.asp?spage=mgmt&: Spagefrom=&: Sfiling_nu... 01/06/2011