Loading...
HomeMy WebLinkAboutContract 41865-A2 (2)AMENDMENT No. 2 CITY SECRETARY CONTRACT NO r vto S- B 2- TO CITY SECRETARY CONTRACT No. 41865 WHEREAS, the City of Fort Worth (CITY) and Garver, LLC, (ENGINEER) made and entered into City Secretary Contract No. 41865, (the CONTRACT) which was authorized by M&C C-24918 on the 24th day of May, 2011 in the amount of $ 99, 500. 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $99,500.00 which was authorized by M&C # C-25634 on June 5, 2012; and WHEREAS, the CONTRACT involves engineering services for the following project: Meacham Airport Improvements; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated January 30, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $24, 900. 00. (See Attached Funding Breakdown Sheet, Page -3-) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $223, 900. 00. City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 1 of 2 OFFICIAL RECORD CITY SECRETAR\ in) oRTGllq nrc- (-{ 1-13 Vu • ,. ] )7_.,.' sJ 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE : ,2�84.5 APPROVAL RECOMMENDED: �+. Cialc(4) Bill Welstead Director, Aviation Department ENGINEER Garver, LLC Frank Mclllwain Senior Project Manager DATE: //30/5 APPROVED AS TO FORM AND LEGALITY: M&C: Date: Douglas W. Black Assistant City Attorney ATTEST: „.0.4$e*OlFril Lys% %y 0000000wr go, 4 0 Y \ / Ij AS*: 1 Pi 0 Q zt J.1 i, ... is ia 000 kri 0 ° City Secretary A 000 0411 () XL City of Fort Worth �00(moo° o Professional Services Agreement Amendment Template Nth ?EX Pktrate#°# PM0 Official Release 8/1/2012 1Q.'WQ,'O� Page 2 of 2 OFFICIAL RECORD:. CITY SECRETARY Ft WORThTJ 3010 Gaylord Parkway Suite 190 Frisco, TX 75034 TEL 972.377.7480 FAX 972.3 7 7.8380 www.GarverUSA.com January 30, 2013 Bill Welstead, A.A.E. Aviation Director City of Fort Worth Aviation 4201 Main Street Suite 200 Fort Worth, TX 76106 Re: Meacham On -Call Professional Services Proposal for Amendment No. 2 Dear Bill: With this letter, we (Garver, LLC — "Engineer") are pleased to propose our services to you (City of Fort Worth — "Owner") related to On -Call Professional Engineering Services. This letter will describe our proposed scope of services, performance schedule, and payment terms. Scope of Services We understand that you want us to provide services that may include design, bidding and construction phase services. The Engineer's scope of services will be determined on an as -needed basis and include performing professional services when requested in writing by the Owner and agreed to by the Engineer and may include, but not limited to, the tasks listed in Attachment "A" of the original agreement. Payment Terms For the work described under Scope of Services we propose the following changes to the fee amounts. P ASE On -Call Services Al El V DM_IAN 1 NO I $199,000.00 AMEN'rI MENT9 NO.2 $24,900.00 We appreciate the opportunity to provide our services to you. Sincerely, GARVER, LLC Frank Mclllwain Senior Project Manager Cc: Ruseena Johnson, EIT L:\201 1\11081210 - F-fW On-Call\Contracts\Client\Amend 2\FTW On Call Prof Svcs Agrmnt Amendmt 02 Proposal Ltr 2013-01-30.doc REVISED CONTRACT $223,900.00 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Design Services for Meacham Airport Improvements City Project No. Time and Materials with Rate Schedule Project Compensation A. The ENGINEER shall be compensated for personnel time, non -labor expenses, and subcontract expenses in performing services enumerated in Attachment A as follows: Personnel Time. Personnel time shall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Cateaory Rate for the ENGINEER's team member performing the work. Labor Cateaory Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. Labor Category Engineers E-1 E-2 E-3 E-4 E-5 E-6 Architect/Landscape Architect A-3 A-4 Planners P-1 P-2 Designers D-1 D-2 Technicians T-1 T-2 S urveyors S -1 S -2 S -3 S -4 2012 Rate ($/hour) $93.00 $105.00 $130.00 $152.00 $186.00 $234.00 $126.00 $141.00 $108.00 $130.00 $84.00 $114.00 $74.00 $99.00 $40.00 $54.00 $71.00 $102.00 2013 Rate ($/hour) Effective May, 2013 $97.00 $110.00 $136.00 $159.00 $194.00 $244.00 $132.00 $147.00 $113.00 $136.00 $88.00 $119.00 $77.00 $103.00 $42.00 $57.00 $74.00 $107.00 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Labor Category (cont.) S-5 2-Man Crew (Survey) 3-Man Crew (Survey) 2-Man Crew (GPS Survey) 3-Man Crew (GPS Survey) Construction Observation C-1 C-2 C-3 Administration X-1 X-2 X-3 I-1 Other Automation/Controls Specialist 2012 Rate ($/hour) $132.00 $167.00 $206.00 $188.00 $228.00 $81.00 $112.00 $150.00 $52.00 $70.00 $114.00 $113.00 $177.00 2013 Rate ($/hour) Effective May, 2013 $138.00 $174.00 $215.00 $196.00 $238.00 $85.00 $117.00 $156.00 $55.00 $73.00 $119.00 $118.00 $185.00 ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. Direct Expenses (non -labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work, plus applicable sales, use, value added, business transfer gross receipts, or other similar taxes. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a markup of ten percent (10%). iv. Budgets ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. If ENGINEER projects, in the course of providing the necessary services, that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER C. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1. D. Payment of invoices will be subject to certification by the City that such work has been performed. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Aviation Department monthly progress reports and schedules in the format required by the City. EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) IV. Summary of Total Project Fees Firm Prime Consultant Garver, LLC j Primary Responsibility Engineering and Design Proposed M/WBE Sub -Consultants EJES, Inc Engineering and Design Mas-Tek Site Evaluation Testing Non-M/WBE Consultants Project Number & Name Meacham Airport Improvements TOTAL Total Fee $223,900.00 Fee Amount $195,689.00 $22,731.00 $5,480.00 OA 87.4 10.2 2.4 $223,900.00 100% M/WBE Fee $28,211.00 M/WBE % 12.6% City M/WBE Goal = _% Consultant Committed Goal = % Insert required invoice format following this page, including negotiated total budget and allocations of budgets across desired work types and work phases.