HomeMy WebLinkAboutContract 41607-A2 (2)�r
U.S. Department
of Transportation
Federal Aviation
Administration
September 14, 201 1
Airports Division
Southwest Region
Arkansas, Louisiana,
New Mexico, Oklahoma,
Texas
The Honorable Mike Moncrief
Mayor, City of Fort Worth
1000 Throckmorton Street
Fort Worth, Tx 76102
Dear Mayor Moncrief:
CITY SECRETARY
CONTRACT NO., IA-Il1Ol - Als-
FAA-ASW-650
2601 Meacham Blvd
Fort Worth, Texas 76137
Fort Worth Alliance Airport
AIP Grant No 3-48-0296-044-2011
DUNS No 073170458
Letter Amendment (Amendment No. )
This letter effects the amendment and commits the Federal Aviation Administration, acting
for and on behalf of the United States of America, to delete the project description, as shown
in the above referenced grant Agreement, in its entirety. Furthermore, this letter commits
the Federal Aviation Administration, acting for and on behalf of the United States of
America, to decrease the maximum obligation of the United States to $0 from $539,544 as
there is no longer a project associated with this grant. This grant is hereby withdrawn by the
Federal Aviation Administration, acting for and on behalf of the United States of America.
Sincerely,
)101 jt,%/€ altd‘e9
J. Michael Nicely
Manager, Texas Airports
Development Office
10-12-11 P03 : 35 IN
OFFICIAL 'RECORD
CITY SECRETARY
FT. WORTH, TX
I ort Worth Alliance /\ r= ort
AIP Grant No 348M296 O 4 =2O 11
DUNS No 0731 704.58
Letter Amendment (Amendment No.Z )te
Executed this the day of \CA\teM0e.1 , 20*.
ATTEST:
Marty Hendr
City Secretary
APPROVED AS
to, ON000cion. t
O FORM AND LEGALITY
Charlene Sanders
Assistant City Attorney
By:
CITY OF FORT WORTH
Fernando Costa
Assistant City Manager
APPROVAL RECOMMENDED
Kenneth L. Penney, Jr. A.A.E.
Aviation Director
OITICIAl, RECORD
CITY SECRETARY
FT. WORTH, TX
M&C Review
Page 1 of 2
CXL GENDA
COUNCIL ACTION: Approved on 3/8/2011 - Ordinance No. 19582-03-2011
DATE: 3/8/2011 REFERENCE G-17224 LOG NAME: 55AFWCARGOENTITLEMENT2011
NO.:
CODEG TYPE NON- PUBLIC NO
CONSENT HEARING:
SUBJECT: Authorize the City Manager to Apply for and Accept, if Awarded, a Grant from the Federal
Aviation Administration in the Amount Up to $1,000,000.00 to Construct Airfield
Pavement Rehabilitation on Runways Taxiways, and Aprons, Runway Guard Light
Rehabilitation and Precision Approach Path Indicator Rehabilitation at Fort Worth
Alliance and Adopt Appropriation Ordinance Airport (COUNCIL DISTRICT 2)
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the City Manager to apply for and accept, if awarded, a grant from the Federal Aviation
Administration in the amount up to $1,000,000.00 to construct airfield pavement rehabilitation on
runways, taxiways and aprons, runway guard light rehabilitation and precision approach path
indicator rehabilitation;
2. Authorize the use of land credits in the amount up to $52,631.58 for the City's in -kind local match
of five percent of the project cost; and
3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Airport Grants Fund by $1,052,631.58 subject to receipt of the grant.
DISCUSSION:
Each year Fort Worth Alliance Airport is eligible to receive Airport Cargo Entitlement and Non -Primary
Airport money from the FAA. This is based on the amount of cargo activity from the previous calendar
year and discretionary dollars available in the airport improvement program. The total amount of
entitlement and non-pnmary airport money available to Fort Worth Alliance Airport this year is an
amount up to $1,000,000.00.
Upon receipt of a grant from the FAA, Airport Cargo Entitlement and Non -Primary Airport funds will
be used for:
1. Design and construct Airfield Pavement Rehabilitation. (Runway, Taxiways, Aprons Full and
Partial Depth Repairs);
2. Complete runway guard light rehabilitation; and
3. Complete precision approach path indicator rehabilitation.
Fort Worth Alliance Airport is located in COUNCIL DISTRICT 2.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above
recommendations, receipt of the grant and adoption of the attached appropriation ordinance, funds
will be available in the current capital budget, as appropriated, of the Airport Grants Fund.
http://apps.cfwnet.org/councilpacket/mc review.asp7ID=14904&councildate=3/8/2011 10/6/2011
M&C Review Page 2 of 2
TO Fund/Account/Centers
GR14 451856 055 218 518
000
GR14 5(VARIOUS1 055 218
518 010
GR14 488189 055218518000
GR14 541110 055218518990
$1.000.000.00
$1.000,000.00
$52.631.58
$52.631.58
FROM Fund/Account/Centers
Submitted for City Manager's Office by: Fernando Costa (6122)
Originating Department Head: Kent Penney (5403)
Additional Information Contact: Ruseena Johnson (5407)
ATTACHMENTS
55AFWCARGOENTITLEMENT2011 AO.doc
http://apps.cfwnet org/council_packet/mc_review.asp7ID=14904&councildate=3/8/2011 10/6/2011
RP2 l
EASETEItT
d
OUTER WRXER SITE
4.7 NAUTCFL IDLES
FROL RtUMAY 34
THRESHOLD.
H4
A50�
LOCAL'ZER
CRITICAL A4
500'x7000'
RPj
C
IIN. SR
EASELgNT
30' TRINITY OVER
SEWER
EASEICHT
ANNUAL RATE OF CHANGE Or V
GRAPHIC SCALE
600 0 600 1200
( IN FEET )
q CARGO AFi:CIEt
OEP�Oin' UMW'P' 1
�.. p PT i .\� I - V-= PEAMETER ROAD —0" ^le
••• i.� _ 3L5.7•-a -a-ME ErARN _ RUNWAY ISi/34L B.i20' x OCT IE/ _ -- - _ _ — _ -Tbi7• CURE BEARBI4M-
*". t /'
1 N rRVR i. 11 Boo ROFA u . % E i` q�l R�r - �r OHiA �
ROE SL 1 )"'I i 1 C A iMP AEI .' 1 QC▪ E SLOPE
l�� ' S00' RSA xl ---r— RYR
T' i t I
'r U W- 'nits Y'..,t ~MY 761J3sR'M00' X 150 'IIrJ - - -
-765.7 `IT '
WPC \ to(
LAT. 32'5652.4370-
LONO. !TS6It2467•
POLE LIB
RELOCATE OYEFL EAD
UTUTY LPE
ALONG RA<RO/D
O
P ',e6O
1A0N0.397> .2 27' LOAT'0.397I1t52766- / LOONG.397'017629 6' �lOkG3 5'gb'4,106- �LOOM0T 3 97:92326S
cH'iE9hIXO
ELEV-713.6'
OMNI MEA
IC tOA C GN
JACOBS® FoitTwoRTH
777 MAIN STREET
FORT WORTH TEXAS 76102-5304
PHONE (317) 735-6000 b% ALlliarice Air Services
TELQORMY AR SHn'.T ALONENt RUNWAY
J
AYIA OR MAY
WJ
ttt
C RESTRICTION U!E IBATLI T
R!P PROJECT NLUSERREV.!
3-48-0296-41-20
JACOBS PNOJECF NUMBER: Wit:
WFXJ2000 9/8/10
Ot9GNEU: URATTN• CHtCRtrt APPROVED:
O.C.C. I R.K.C. I
IDRAWING ATN\NAVE:
H:\AWITION\ALUANCE\2010 ALP AGIS MASTER
NttENENCt URATMIG PATH \NAME'
I NO.
GLOE SLOPE
ANTENNA-7
=EU="L EIF._5S
FEDERAL EXME55 CxPARSQN
BY
5M RSA
E60 OF MY
ELEY•713.
REVISIONS
DATE DESCRIPTION
CKD
OE SLOPE
OVICAL AREA
550'41100'
FLU-2t Sl5STMEN—
FP -7 b.50
R0:
-lea iZER WORM
OCN.UER
CRITCAL AREA
400:2000'
Fel
FAA APPROVAL
SUBJECT TO Lti I LR GATED'
FEDERAL AVIATION ADM 'NISTRATION
DATF^'
CASE NO
CSO
RR?.
A
v
ti
670
GENERAL NOTES
1
1
1
1. SEE SHEET 6 FOR MASTER AIRPORT BUILDING TABLE.
2. SEE SHEET 6 FOR MASTER AIRPORT LEGEND
3. SEE SHEET 6 FOR AIRPORT FACILITY LIST.
4. SEE SHEET 6 FOR POLE IDENTIFICATION CHART.
5. SEE SHEET 5 FOR DECLARED DISTANCE LENGTHS.
6. THROUGH THE FENCE ACCESS POINT (TTF)
AIRPORT LAYOUT PLAN
(EXISTING CONDITIONS)
SHEET 2 OF 17
.\\
(�01Cn)C
Y l
D 3;
Di
RD/IV/A) 16Li 34R
RAXIWA
o) (
PHASE A
RUNWAY 34L-16L AIRFIELD PAVEMENT REPAIRS
PEE
SCILE I = 40'
NOTES. LEGEND
REFER TO SHEET G-102 FOR LOCATION OF PAVEMENT REPAIR
2 REFER TO SHEET C-110 THFU C-112 FOR ErISTINF PAVEMENT
CROSS-SECTION & JOINT DETAILS
3 CONTRACTOR TO 4EP.IF1 LOCATION AND NUMBER OF PANELS TO BE
FELIOVED PRIOR TO DE:INIIItIG 601 STRIe=T10;
4 (OUTRAC TOR TO RE-ESTABLISH 60AELED JNiITS PRIOR TO INSTALLATION
OF REINFORCING STEEL
AFTER REPLACING CONCRETE PANELS, AND CONCRETE HAI UIPED,
ERDITFACTOF TO SAV-OTT CRONES AND REPLACE PIJIIYAI DARLINGS
5 ,TAIIPACTOR TO MATCH EdSTING F'AVEMEIII ELEVATIONS
CONTRACTOR TO RE} E lIJRINA COMPO0II[1 PRIOR TO FAIIITIN(
MAFI IIU,
D)
E+SNt1G
( F.) DOVSELED CONTRALTION JOINT. TIRE 'F
-PROPOSED
VOYIELED LOPIC4TDDINAL/TRANSVERSE T'ONSTRUrTION JOINT, TIPE TOT
RtJW IOL)34F AIRFIELD PAVEMENT 1i RE REMfVED AND REPLACED
\\✓Nf/1..
EXISTING
LIGHT CAN
4i/0 _00 0
400
E00
SCALE III FEET
ISSUE DESCRIPOON
C t
111 a)
's s
r r
to el
CD O
riRI 46
0 0
F
Z
W
I
W Z
< 0
1 y_
la
Z-J
ra'
Za
W
2W
a
Q Q
a. I
CL w
a. a
2
a_Q Z
F Q
J
cc cc
7
W o
N
Q
a
PAVEMENT REPAIRS
s'Al ?II CD
0
0 Lai z
oa w 6 TT wk' a
w i d
n 00•_ t-D eg n
SAW -CUT. REMUME & --
REPLACE CONCRETE
PAVEMENT AND LURE
E T PAT ('SIGH IUUIT
FLIGHT LINE ROAD
MATCH EXISTING
PAVEMENT
ELEVATION REF 3/C- 112 FOR
CURB DETAILS
EYPANSION jfpljT
PRLYI
20.-0
34'-3'
FLIGHT LIME ROAD
-EXISTING MANHOLE
PPOt!
SAW -CUT. REUOVT &
REPLACE (ONCRE E
PAVEMENT .AIID C IRE
EKPAti3101 JOINT —
EXISTING MANHOLE-'
A.
MATCH EXISTING
SIDEWALK ELEVATION
MTH CURB
F T GRASS
1 F
EXPANSION J0IIITJ
ARFF STATION ARFF STATION
PHASE B
ARFF STATION STAGING APRON PAVEMENT REPAIRS PHASE I
FET SCAE 1 = 30
2
PHASE B
ARFF STATION STAGING APRON PAVEMENT REPAIRS PHASE II
REF ScaLE i = 30'
NOTES. LEGEND
1 REFER TU SHEET G-102 FOR LOCATION OF PAVEMENT REPAIR
2 REFER TO SHEET C-110 THFU i-112 FOR PAVEMENT
CROSS -:.EC TIOU & JOINT DETAILS
CONTRACTOR TO 11011Ff ARFF COMMANDER AND AIRPORT OPERATION'S
72 HOURS PRIOR TO BEGINNING CONSTRCU11011 PHASE 1 AND PHASE
CAII HOT BE CONSTRUCTED SI!AJLTANECINSL!
S(TiITRAL TOR f( MATCH ETI_TINT: PAVEMENT Ts CUF'B ELEVATUMI,
CONTRACTOR RILL t1O1 BE ALLURED TO BLOo IHE ADJACENT "PEN
TRUE. BAT V1TH PERSONNEL TJP CONSTRN1 TINT: VEHICLE-
CONTRACTOR'S SUPERINTENDENT TO BE 011 SITE AT ALL TIMES
DIIRIN0 CON;TRUCTIOI! OF AREF �PRCnG
6 CON MAC TuR TO 1.LORUII IA IL EMER6EI4CT =LAFU SUUI IDl tITH ARFF
STATION COMMANDER AND PREPARE APPROPRATE Al_ POtl PLAIT TO
BE INITIATED BT COH IR AC TOP DURING EMERGENT TES
EXSTING-T- F T
G
- • PR0F!O ED
EXISTING, ELECTRICAL LINE
E LISTING SAKI TART SERER
EXISTING TELEPHCKIE LINE
DOPTELED LONGITUDINAL/TRANSVERSE CriIISTRUCTON
,MINT TIPE D" IREFEP To SHEET C-1111
DOWELED CONTRA( TIN TONT, TT PE 'F- (REFER TO SHEET (-11 T
HINGED CTolITPAC TION JuII IT, TIRE G (REFER 10 SHEET 1 -1111
NEW 8" AFFF STATION APRON (ON(RETE PAVEMENT REFER TO SHEET F-1121
- REF 2 & 3/L-112
FOR CURB DETAILS
15 0
30
SCALE 111 FEET
ISSUE DESCRIPTION
kEn
s E
ir
TB
FORT WORTH ALLIANCE AIRPORT
0
✓
z
w
<> Z
0
a�
z.szt�
a
w= za
W C� W
Q Cc
-
Q • 't m N 1-
a A z w
• Q v O
3aa�
%(z a VI a
• 2
1' Q U_
s-
r CC o
aw a a
3� a
ce re
ce C
n
�
0Li
Q
tn
a.
u
01
a
• oaz
a V ta Q a Li - it-ti"
n o o n v
2 ,J EXISTING DAMAGED TRENCH DRAIN
REF I/C-104
SCALE N I S
EXISTING DAMAGED JOINT LINE
I PEI 1/C-104
SCALE if T <.
SAW -CUT. CLEAN UP DAMAGED PCC IN
SOUTHWEST CORNER OF EXISTING
TRENCH DRAIN & REPAIR WITH POLYMER
,PATCHING MATERIAL SILSPEC FLEXPATCH
SAW -CUT, REMOVE AND
REPLACE 18. PCC FIRE STOP
•
4
s
6
C-I12
nr
TAZIWA f A'
r.a
20'
SAW -CUT, REMOVE AtID
REPLACE CONCRETE PANELS
TFRMIIIAL APRON
PHASE E
`i APRON PAVEMENT REPAIRS
REF
NOTES:
I REFER TO SHEET G-120 FOR LOCATION OF PAVEMEtT REPAIR
2 REFER TO SHEET C-110 & C-1I1 FOR EXISTING PAVEMENT
CROSS-SECTION & JOINT DETAILS
3
4
5
CONTRACTOR TO VERIFY LOCATION AND NUMBER OF PANELS
REMOVED PRIOR TO BEGINNING CONSTRUCTION
CONTRACTOR TO RE-ESTABLISH DOWELED JOINTS PRIOR TO
INSTALLATION OF REINFORCING STEEL
LEGEND
�B1
SCALE I = 30'
EXPANSION JOINT, T rPE
(REFER TO SHEET C-111)
Y
THICKENED EDGE PANEL
(REFER TO SHEET C-11I,
DETAIL I4)
DOWELED LONGITUDINAL/TRANSVERSE CONSTRUCTIONTO BE ( )
FOR PAVEMENT REPAIR USING POLIMER PATCHING MATERIAL SILSPEC
FLEXPATCH, CONTRACTOR SHALL FOLLOW THE CONSTRUCTION METHOD
c MATERIAL PROVIDED BY THE MANUFACTURER.
6 CONCRETE PAVEMENT REPAIR WORK; USING SILSPEC FLEXPATCH
PATCHING MATERIAL WILL BE PAID FOR AT CONTRACT LUMP SUM
PRICE BID THE PRICE SHALL BE FULL COMPENSATION FOR
SAW -CUTTING, REMOVAL OF CONCRETE, ALL LABOR, EOUIPMEHT. ALL
MATERIALS ACID INCIDENTALS TO COMPLETE THE ITEM
7 CONTRACTOR TO RE-ESTABLISH DOWELS. INSTALL REINFORCING STEEL
PRIOR TO PLACING PCC AIRFIELD PAVEMENT
EXISTING —
(REFER TO SHEET C-1I1)
DOWELED CONTRACTION JOINT, TAPE
(REFER TO SHEET C-11I)
PROPOSED
JOINT. TYPE 'Df
15'
30
SCALE 111 FEET
-I V
J J
J J
ISSUE DESCRIPTION
2 cr —
FORT WORTH ALLIANCE
H
z
W
2
L z
Q O
0.
Q
z iz
-
z Q
W 2
W
ce
EL
a
Q EL
Q • z
� a
r
ac
z
ce
i\
w0
to
S
a
T
0
O
MS UJJ Y C1 '^
:Li Jga CO
r r
m W K
aCALrafIWa w
iltcl
CC ¢ W S J¢ 0 S
Q 0 Si 0 LL 0 V+ N
w
w
01
d
0
0a
PAVEMENT REPAIRS
z
0
ce
0
BELL
HELICOPTER
SAW -CUT, REMOVE .,
REPLACE CONCRETE
PAVEMENT AHD CURB
3
LAI
TEPOIIIAL APRON
L -C--
TERMINAL ACCE 3 GATE-
1
THICKENED EDGE
' EXPANSIOII JOIIIT
—_� a,
-REF 2 & 3/C-II3
FOR CURB DETAILS
(TIP )
— — -------------CONTRACTOR i0 FIELD VERIFI
AND MATCH EXISTING LOCATION
D OF REFLECTORIZED PAVEMENT
IJAREERS (TIPE II -A -A) AHD
TRAFFIC BUTTONS (TIPE r) REF
5 & 6 /C-113
PHASE C
AOA ENTRANCE GATE PAVEMENT REPAIRS
FEF
SCREE I' = l0
- oECUPITI FENCE —
NOTES
I REFER TO SHEET 3-102 FOR LOCATION OF PAVEMENT REPAIR
REFEP TO SHEET C-Iln C-I1' FOP PAVEMENT CRIBS -LET ➢011 &
JOINT DETAILS
(1lLI HITE GATE ENTRANCE i AN BE I LD_ED FriF JI-IRUCTiGH AT A
TIME
J oITRAC TiIR To MATCH E51)TING PAVEMENT i riIEB ELEVATIGNS
Cn ITRAI A:F' TV VEPIFI PAVEMEUT THILI11E3'. FS JFD DRA'AJ6:S,
REFLECT A 6 REIHFL'RCED CuUCRE TE PAVEMENT
SAY( -CUT, REMOVE &
REPLACE CONCRETE
PAVEMENT AND CURB
x /v
TERMINAL ACCESS GATE--
2
LEGEND
TERMINAL APRON
C-112
9'
w
AA
- THICKENED EDGE
ExPATISION JOIN
B)
-REF 2 & 3/C-114
FOR CURB DETAILS
TlP
/ l
DJ
CONTRACTOR TO RI_D YERIFI
AND MATCH EXISTING LOCATION(
OF REFLECTORIZEO PAVEMENT
MARKERS (TYPE II -A -A), AIID
TRAFFIC BUTTONS TrPE 1) REF
5 , 6/C-113
PHASE D
AOA ENTRANCE GATE PAVEMENT REPAIRS
REF
SCALE r = 10'
DOYIELED LUIIIGIAJDIIIAL/TRANSVERSE COUSIRUCTION JOINT TIPE -D.
(REFEP TO SHEEET T'-!III
DOWELED CONTRACTION JOINT, TYPE 'F (REFER TO SHEET C-1111
(p THI6 EKED EDGE E'PAHSIVN ion T, TIRE 'B (REFER ➢o SHEET C-III )
-PROP HIE,
NEW CONCRETE ENTRANCE POAD PAVEMENT (REFEP TO SHEET C-1111
10 5
0
TERMINAL
BLDG
10
2n
SCALE III FEET
ci
z
0
SSUE DESCRIPTION
FORT WORTH ALLIANCE AIRPORT
a
a
CC
1-
z
w
w
0 0
a
a
®I
T
3
0
o
n o ov; 5..
PHASE J
1 I TAXIWAY 'A' AIRFIELD PAVEMENT REPAIRS
NOTES.
REF
I REFER 10 SHEET G-IU_ FOR LOCATION OF PAVEMENT REPAIR
REFER TO 'SHEET C-Ilu THRU C-112 FOR EXISTING PAVEMENT
CROSS -SEC TI011 & JOINT DETAILS
3 CONTRACTOR TO VERIFI LOCATION AND IIUMBER OF PANEL; TO BE
REMOVED PRIOR TO BEGINNING CONSTRUCTION
4 CONTRACTOR TO RE-ESTABLISH DOWELED JOINTS PRIOR TO INSTALLATION
OF REINFORCING STEEL
5 AFTER REPLACIIIF, WtJLRETE PANELS. AND CONCRETE HAS CURED,
CONTRACTOR TO SAW -CUT GRUUVES AND REPLACE RUUWAi MARI,IHGS
0H TRAC TOR TO MATCH E<ISTING PAVEMEII I ELEVATIONS
T ONTRAC TOR T!I FEMObE CURING COMPOUND PRIOR TO PAINTING
ldLRFINGS
.3 PEF SHEET C-100 FOP PHASING PLAN Oil TA 'WAS A & TAYIYIAi E
VLC 1 = N1
LEGEND
EiIST1NG ( T
F)
--PRTIPC SED
DOWELED LONGITUDINAL/TRANSVERSE CONSTRUCTION JOIIIT, TYPE 'D"
DOWELED CONTRACTION JOINT TIRE 'F-
TAxIWAl 'A' AIRFIELD PAVEMENT TO BE REMOVED AND REPLACED
T.i F1WA r *AT -
SAW -CUT, REMOVE AIID
REPLACE CONCRETE PANEL'S
PHASE F
TAXIWAY 'A' AIRFIELD PAVEMENT REPAIRS
REF
40 20 0
40
SCALE IN FEET
ISSUE DESCRIPTION
r
itrt
-
0
FORT WORTH ALLIANCE AIRPORT
w
N
2
a
0
s
Y
0
w sx-
a00JC.
0aQ