HomeMy WebLinkAboutContract 41753COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS §
COUNTY OF TARRANT §
City Secretary
Contract No. 41153
WHEREAS, the undersigned "Developer" desires to make certain improvements (refer
to the name of the project at the bottom of the page) an addition to the City of Fort Worth,
Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule
municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter
called "City", to do certain work in connection with said improvements.
Developer Information:
Developer Company Name: Centreport Venture, Inc.
Authorized Signatory: Daniel J Bradley
Title: President
Project Name: Centreport Phase IIA
Project Location: Southeast corner of Sovereign Road at Centreport Boulevard
Additional Streets:
Plat Case No.: FP-010-034 Plat Name: Centreport
Mansco: 56-0 Council District: 5
To be completed by staffs
Received by:
CFA: 2011-010 DOE: 6608
City Proiect No: 01679
Date:
QFFICiAL RECORD
CITY SECRETARY
Ft WORTH, TX
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated
March 2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as
if copied herein verbatim. Developer agrees to comply with all provisions
of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy
in connection with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph
6, Section II, of the Policy and recognizes that there shall be no reduction
in the collateral until the Project has been completed and the City has
officially accepted the infrastructure. Developer further acknowledges
that said process requires the contractor to submit an Affidavit of Bills
paid signed by its contractor and Consent of Surety signed by its surety
to ensure the contractor has paid the sub -contractor and suppliers in full.
Additionally, the contractor will provide in writing that the contractor
has been paid in full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements
contemplated by this Agreement and that said construction shall be
completed in a good and workmanlike manner and in accordance with all
City standards and the City -approved construction plans, specifications and
cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof:
Water (A)
Sewer (A-1) X , Paving (B) Storm Drain (B-1) X Street
Lights & Signs (C) �.
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be
administered in confonmance with paragraph 8, Section II, of the Policy.
Combined CFA final Sept 12, 2008 2
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of
the department having jurisdiction over the infrastructure to be
constructed, said contractor to meet City's requirements for being
insured, licensed and bonded to do work in public streets and/or
prequalified to perform water/waste water construction as the case may
be.
ii To require its contractor to furnish to the City a payment and
performance bond in the names of the City and the Developer for one
hundred percent (100%) of the contract price of the infrastructure, and a
maintenance bond in the name of the City for one hundred percent
(100%) of the contract price of the infrastructure for a period of two (2)
years insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required
by said documents and same will be evidenced on the ACORD
Certificate of Insurance supplied by the contractor's insurance provider
and bound in the construction contract book
iv. To require its contractor to give 48 hours notice to the City's
Construction Services Division of intent to commence construction so
that City inspection personnel will be available; and to require the
contractor to allow the construction to be subject to inspection at any
and all times by City inspection forces, and not to install or relocate any
sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such
laboratory tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The
3
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -
issued Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water
mains constructed under this Agreement until said sewer and water
mains and service lines have been completed to the satisfaction of the
Water Depai lment.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement.
H. Developer shall cause the installation or adjustment of the required utilities
to serve the development or to construct the improvements required herein
I. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in conflict
with any of the community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers,
agents and employees from all suits, actions or claims of any character,
whether real or asserted, brought for or on account of any injuries or
damages sustained by any persons (including death) or to any property,
resulting from or in connection with the construction, design, performance
or completion of any work to be performed by said Developer, his
contractors, subcontractors, officers, agents or employees, or in
consequence of any failure to properly safeguard the work, or on account
of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or
employees, whether or not such Inhales. death or damages are
caused, in whole or in vart, by the alleged negligence of the City of
Combined CFA final Sept 12, 2008 4
Fort Worth. its officers. servants. or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such iniurres, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort
Worth, its officers, servants, or employees. Further, Developer will require
its contractors to indemnify, and hold harmless the City for any losses
damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the
improvements in a good and workmanlike manner, free from defects, in
confon nance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated
by the City.
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with
its contractor along with an assignment of all warranties given by the
contractor, whether express or implied Further, Developer agrees that all
contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party
beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal
to four percent (4%) and material testing fees equal to two percent (2%)
for a total of 6% of the developer's share of the total construction cost as
stated in the construction contract.
5
iii. Developer shall pay in cash the total cost of streetlights or if the city is
not installing the streetlights, inspection fees equal to four percent (4%) of
the developer s share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in
the cost of the community facilities shall terminate if the facilities are
not completed within two (2) years; provided, however, if construction
of the community facilities has started within the two year penod, the
developer may request that the CFA be extended for one year. If the
community facilities are not completed within such extension period,
there will be no further obligation of the City to participate. City
participation in a CFA shall be subject to the availability of City funds
and approval by the Fort Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee,
its agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for
this Agreement to cause the completion of the construction of the
community facilities if at the end of two (2) years from the date of this
Agreement the community facilities have not been completed and
accepted
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause
the payment of costs for construction of same before the expiration of
two (2) years if the Developer breaches this Agreement, becomes
insolvent or fails to pay costs of construction and the fmancial guarantee
is not a Completion Agreement. If the financial guarantee is a
Completion Agreement and the Developer's contractors and/or suppliers
are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of
the Completion Agreement.
Combined CFA final Sept 12, 2008 6
Project Name: Centreport Phase IIA
CFA No.: 2011-010
Cost Summary Sheet
DOE No.:6608
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract
price will ultimately determine the amount of CFA fees and financial guarantee. The bid price
and any additional CFA payments will be required prior to scheduling a pre -construction
meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total $ 165,069.00
8
165, 069.00
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Sub -Total $ 60,303.00
$ 60.303.00
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
$ 225,372.00
$
$
3,301.38
3,301.38
6,602.76
E. TPW Inspection Fee (4%) $ 2,412.12
F. TPW Material Testing (2%) $ 1,206.06
G. Street Light Inspsection Cost $
H. Street Signs Installation Cost $
Sub -Total for TPW Construction Fees $ 3,618.18
Total Construction Fees:
$ 10,220.94
Choice
Financial Guarantee Options, choose one Amount (ck one)
'Bond = 100% 1 $ 225,372.00
'Completion Agreement = 100% / Holds Plat I $ 225,372.00
Cash Escrow Water/Sanitary Sewer= 125% I $ 206,336.25
Cash Escrow Paving/Storm Drain r= 125% I $ 75,378.75
Letter of Credit = 125% w/2yr expiration period I $ 281,715.00
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested
by its City Secretary, with the corporate seal of the City affixed, and said Developer has
at Fort Worth, Texas this 14` day
this instrument in quadruplicate,y
of _ , 20 1‘. .
CITY OF FORT WORTH - Recommended by:
Water Department
Wendy Chi-{Babulal, EMBA, P.E.
Development Engineering Manager
Approved as to Form & Legality:
1,_ga VII
Marcia Wise
Assistant City Attorney
ATTEST:
fak fl.
Marty Hendrix
City Secretary
ATTEST
5
Transportation & Public Works Department
Douglas W. Wiersig, P.E.
Director
Approved by City Manager's Office
��l�'aAloriraaoret
Fernando Costa
Assistant City Manager
0
a‘4>
z4 aFo� oaar4
0*
. ries G 000 0 00
of 0 04 04
0 ou o 0 0 x _aka
0 lid ii
OA
�0D n0 's�cyd .I
14, )0i0 0 a„rz ir . 1
4 4 4 t 3 4 iiict eel -1 SI°
Centreport Venture, Inc.
Ma RECILMICE
Signature Signature
(Print) Name: 0,N N L km0 Print Name: Daniel J. Brad iey
Title: Authorized Signatory
•
Combined CFA final Sept 12, 2008 8
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
X Location Map
(l Exhibit A: Water Improvements
n Water Estimate
X Exhibit A-1: Sewer Improvements
X Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
X Exhibit B-1: Storm Drain Improvements
X Stoini Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
9
FORT WORTH CITY
FULLER - WISER
LIMIT
FERR'L
POST OAK
J
tL
Ra.
5l
VICINITY MAP
N.T S.
FORT WORTH MAPSCO 56Q
COUNCIL DISTRICT #5
f
SOVEFEIGN
BUCKINGHAM
A
LJ . 0
a, 0
a! 1-
W W
LJ
RAILTRAN
CITY OF FORT WORTH, TX
WATER DEPARTMENT
CENTREPORT
LOT 1, BLOCK 104, PHASE IIA
VICINITY MAP
DOE: 6608
WATER: N/A
SEWER: P275-705130167983
SHEET
CENTREPORT
I N DRIVE
-_. Q..N,10_W.4-
N W
W U
MH
4 `' 1,--12" SS (BY BORE)
)
- �.s.WIi
MORE Zr NNER
IK/T N Ti45 NNIRAGT
PATE ENGINEERS
2540 KING ARTHUR BLVD
SUITE 209G
LEWISVILLE. TEXAS, 75056
PH. (214) 357-2981
FAX (214) 357-2985
JOB NO. 093900600 DATED: 03/01/2011
12
NTS
MH
72
SS
MH
4,7
1
1
72 �� Po
•
BTp.
WATER MAP #: N/A
SANITARY SEWER MAP #: 2132-4205
EX M
EX 10" SS
DOE #5692
SEWER PROJECT
NO. P-274-70513007
CITY OF FORT WORTH, TX
WATER DEPARTMENT
SANITARY SEWER
TO SERVE
CENTREPORT
LOT 1, BLOCK 104, PHASE IIA
OVERALL SANITARY SEWER LAYOUT
DOE: 6608 SHEET
WATER: N/A Al
SEWER: P275-705130167983 EXHIeff
Al: SANITARY SEWER IMPROVEMENTS —PRELIMINARY COST ESTIMATE
CPMS APPROX. UNIT TOTAL
RECORD QUANTITY/ CPMS NAME/ PRICE AMOUNT
NUMBER/ UNIT DESCRIPTION OF ITEMS
BID ITEM MEASUREMENT
(Furnish and install, including all appurtenant work, complete in place, the following items)
1. Inspection -Post
Construction Cleaning &
TV /, Study
BID-00201 1,049 L F $ 1.00 $1,049.00
2. Manhole-Std 4 Ft Diam-(to
6 Ft Depth),--, Install
BID-00213 5 EA $3,500.00 $17,500.00
3.
Manhole-Std 4 Ft Diam-
Added Depth (over 6 Ft
Depth) —' Install
BID-00214 52 V.F.
4. Collar Manhole - 32 Inch -
Frame & Cover ,., Install
BID-00198 5 EA
5. Pipe-Sewer-12 Inch-SDR26
(All Depths) ,., Install
BID-00258 1,049 L F
6. Manhole Vacuum Test
Services
BID-00217 5 EA
$ 200.00 $10,400.00
$ 500.00 $2,500.00
$ 51.25 $53,761.00
$ 300.00 $1,500.00
7. Pipe-Casing-20 Inch -Casing
with Flowable Fill -Other
Than Open Cut Install
BID-00578 170 L F $ 420.00 $71,400.00
8. Tiench Safety System
5 Foot Depth Install
BID-00372 879 L F $ 1.00 $ 879.00
Page 1 of 2
9. Fill Material -Cement
Stabilized Backfill Install
BID-01174 36 L F $ 30.00 $1,080.00
10. Routing Install
BID-00501 1 L S. $5,000.00 $ 5,000.00
Sign -Barricades & Traffic
Al - SANITARY SEWER LINE
PRELIMINARY COST ESTIMATE TOTAL AMOUNT: $165,069.00
Page 2 of 2
F� x
�CA N-)7,-u 1.3
CENTREPORT DRIVE
v
�wm
"P
>0X
0,0x'A'0
0 X
O W
RCP
dJ�££ X3
PATE ENGINEERS
2540 KING ARTHUR BLVD
SUITE 209G
LEWISVILLE, TEXAS. 75056
PH. (214) 357-2981
FAX (214) 357-2985
JOB NO. 093900600 DATED: 03/01/2011
NTS
EX
24" RCP
4tc*/
CITY OF FORT WORTH. TX
T/PW DEPARTMENT
CENTREPORT
LOT 1, BLOCK 104, PHASE IIA
OVERALL STORM DRAIN LAYOUT
SHEET
D.O.E. NO : 6608 EXIT Ql0
STREET & STORM DRAIN PLAN FILE NO.: W-2163
PATE * ENGINEERS
2540 KING ARTHUR BLVD
SUITE 209G
LEWISVILLE, TEXAS, 75056
PH. (211 357-2981
FAX (214 357-2985
JOB NO. 093900600 DATED: 03/01/2011
NTS
14 L.F. 27" RCP
AND HEADWALL
CONC. HEADWALL
EAXND27H"EARDCWPALL AND APRON
• —.-.
—
CENTREPORT DRIVE
r--.
EX 36" RCP
r••••••••• S.-- .4-- ••••-•1
— • — MR- .•••te
5 14
! EX 60"X45"
RCP BOX c4,
1:4
— —111sstr—
• )
CITY OF FORT WORTH, 7X
T/PW DEPARTMENT
CENTREPORT
LOT 1, BLOCK 104, PHASE IIA
OVERALL STORM DRAW LAYOUT
D.O.E. NO : 6608 I SHEET
EXHIBff Bib
Jimtt & STORM DRAIN PLAN FILE NO.: W-2163
B1: STORM DRAIN IMPROVEMENTS — PRELIMINARY COST ESTIMATE
CPMS APPROX.
RECORD
NUMB ER/
BID ITEM
(Furnish and
1.
BID-00072
2.
BID-00075
3.
BID-00082
4.
BID-00085
5.
BID-00094
6.
BID-01097
7.
BID-00372
8.
BID-00062
9.
BID-00065
QUANTITY/
UNIT
MEASUREMENT
install, including all
1 EA
1 EA
25 L F
40 L F
380 S.Y.
40 L F
1 LS
1,000 C.Y.
1,800 C.Y.
CPMS NAME/
DESCRIPTION OF ITEMS
appurtenant work, complete in
Type B Headwall - 27 Inch
Pipe --# Install
Type B Headwall - 36 Inch
Pipe Install
Pipe - 27 Inch - CL III
Remove and Install
Pipe - 36 Inch - CL III
Remove and Install
RipRap- < Than 18 Inch
Rock — Install
Pipe-33 Inch -Class IV
Remove and Install
Trench Safety System
5 Foot Depth Install
Channel -Earthen Install
Channel -Unclassified
Excavation — Remove
UNIT TOTAL
PRICE AMOUNT
place, the following items)
$3,250.00 $3,250.00
$4,500.00 $4,500.00
$ 95.00 $ 2,375.00
$ 125.00 $ 5,000.00
$ 54.60 $20,748.00
$ 70.00 $ 2,800.00
$ 150.00 $ 150.00
$ 3.75 $ 3,750.00
$ 9.85 $ 17,730.00
B1: STORM DRAIN IMPROVEMENTS —
PRELIMINARY COST ESTIMATE TOTAL AMOUNT: $ 60,303.00