Loading...
HomeMy WebLinkAboutContract 41756-A2 (2)AMENDMENT No. 2 CITY SECRETARY��'✓�Z CONTRACT MOD TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and ARS Vingineers , Inc., (ENGINEER) made and entered into City Secretary Contract No. 41756, (the CONTRACT) which was authorized by MAC Cc=24832 on the 5u' day of April, 2011 in the amount of $175, 387.00; and WIRER, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $9,682.00 which was administratively authorized on April 5, 2012; and WHEREAS,the CONTRACT involves engineering services for the following project: Sanitax y Sewer Rehabilitation Contract LXXXV (85). WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated October 31, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $1,700.O0. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be -an amount of $186,769.0O. OFFICIAL RECORD CITY SECRETARY 1 i -19- 7 2 A IN FT, WORTH, TIC Page -10 -- 3. All other provisions of the Contract, which are not expressly amended herein, shall r it-ain in full force and effect EXECUTED and EVFECTIVE as of the date last written by a s ignatoKy , below. AP PROVED : City of Fort Worth Fernando Costa Assistant City Manager DATE: APPROVAL RECOMMENDED: �.S. Frank Crumb, P . E.2) Director, Water Department APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ATT Nary J City Sec etary y°'AF_ F�44i' 00000 f#A $ Page =2 ENGINEER ARS Engineers, Inc. Ay{ub Re S andhu , P.E. President DATE: M&C: N/A Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX October 31, 2012 Civil Engineering • Planning • Surveying Mr. Rakesh Chaubey, P E. Project Manager City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Re: Amendment No 2 Sanitary Sewer Rehabilitation Contract 85-CPN 01504 Easement Document Preparation — DOE 6613 Parcel 1-Lots 14 & 19 Dear Mr. Chaubey: Based on our recent discussions, ARS will collect data, and conduct additional survey to revise easement documents for lots 14 & 19. The following are the additional scope items broken down by tasks: Survey Tasks 1. Research appraisal district, plats, utilities, etc., 2. Perform boundary survey to recover and set monurnentation. 3. Revise Easement created for lots 14 & 19 into two separate easement documents. In accordance with our contract, Article V, Section K of the STANDARD AGREEMENT FOR ENGINEERING SERVICES, ARS Engineers, Inc. requests an equitable adjustment to our contract to account for the additional cost incurred to perform these services for the City. Proposed Fee Original Contract Amount : $175, 387.00 Fee for additional services, amendment no. 1: $9,682.00 Proposed fee for additional services, amendment no. 2: $1,700.00 Total Contract Amount (after amendment no.2): $186,769.00 After reviewing this submittal, please do not hesitate to contact me at 214-739-3152 to further discuss this matter. Sincerely, Ram C Gopal, P.E., CFM Senior Project Manager Attachment: Fee Proposal Spread Sheet Consulting Engineers 12801 N. Central Expressway • Suite 1250 • Dallas. Texas 75243 • Phone (214) 739-3152 • Fax (214) 739-3169 website: www.arsengincers.com TASK A.R.S. ENGINEERS SUPPLEMENTAL SURVEY FEE PROPOSAL DOE 6613 PARCEL. 1 City of Fort Worth Sanitary Sewer Rehabilitation Contract 65 ARS Proles* No. 30110010 RPLS SR SVY SVY 2 MAN 2 MAN 3 MAN FIELD TECH PROJ. MGR. TECH TECH CREW CREW w/GPS CREW GPSIROBOT ADMIN ABSTRACTOR A RESEARCH 1 Research appraisal districtt plats, utilies, etc. 2 B CONTROL DATUM 1 Locate, verify and transfer horizontal and vertical control to site C BOUNDARY SURVEY 1 Recover and Set monumental on for easements D TOPOGRAPHIC SURVEY 1 Perform topographic survey 1 4 E UTIUTY SURVEY 1 Coordinate wi0t DIGTESS 2 Tie DIGTESS markings and other visible utilities 3 Mears flowlines on au wastewater and storm sower manholes. inlets, top ofwater valves, etc. E EASEMENT DOCUMENT PREPARATIONS 1 Prepare saver separate easement documents for 7 properties (Annie/Lincoln Alley) 2 Revise Easement created for Lots 14 t:19 into two seParata 1 6 easement documents. Page 1 TOTALS 2 .8 0 0 4 0 0 0 0 10/31/12 TOTAL MANHOURS FROM PAGE 1 Hourly Service Rates AILS. ENGINEERS SUPPLEMENTAL SURVEY FEE PR POS4i DOE 6613 PARCEL 1 City of Fort Wald Sanitary Sewer Rehabilitation Contract 85 ARS Project No. 30110910 MANHOUR ESTIMATE SUMMARY SR SW RPLS TECH 2 8 $95.00 Subtotal $240.00 $760.00 5120.00 Subtotal Labor Cost $1,660.00 Map/Deed Copies Mileage: 80 miles Ai $0.50 each Reprographics (Xerox Copies & Plots) DellvenjlCourier Service: Misc. Field Expenses (Equipment Rental, Supplies, eta) Note: This proposal does not include a right-of-way survey This proposal does not include a tree survey Page 2 $40.00 Subtotal 540.00 TOTAL CONTRACT COST $1,700.00 Abstractor 0 $55.00 SW 2 MAN 2 MAN 3 MAN FIELD TECH TECH CREW CREW w/GPS CREW GPSIROBOT ADMIN 0 0 4 0 0 0 $79.00 $152.00 $165.00 $189.72 $122.56 544.81 50.00 $660,00 50.00 $0.00 50.00 $0.00 10/31/12