Loading...
HomeMy WebLinkAboutContract 41696-A2 (2)AMENDMENT No. 2 TO CITY SECRETARY CONTRACT CLTY SECRTAt cTRA©LuJ,xq wulaulam9the City of Fort Worth (CITY) and Stream Water Group, Inc., (ENGINEER) made and entered into City Secretary Contract No. 41696, (the CONTRACT) which was authorized by Ct24795 on the 22nd day ©f March, 2011 in the amount of $213,202.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $8,666.00 which was administratively authorized on June 19, 2 013 ; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation, Contract 76. WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fe e. . NOWTHEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, entex' into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to inalude the additional engineering services specified in a proposal dateld March 14, 2012, a copy of which .�i, s attachcd hereto a n d incorporated herein. The cost to City for the additional design y =-1 r vj ens to be performed by Engineer totals $9 , 2 45 , 00 . 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for al:l 0 shall be an amount of $ 2 31,119. 0 0 . { CITY SECRETARY FtWORTI'hTY tChVEr3 JUL i 0 2Efl3 page c-,, d All other provisions expressly amended herein, effect. 3. of the Contract, which are not shall remain in full force and EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: Wila aPP7xEcorMErmED/ 4,5:" S. Frank Crumb, P.E. Director, Water Department APPRO D AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ATT Mary J °`, yser City Secretary i Eu�s�Legs , ENGINEER Stream Water Group, Inc. Shamsul Arefin , President DATE: M&C: N/A Date: N/A 00 Oatioippr o�i o 0 A 0 8i60 1\ 43 0 itcy tricTit&<11 ±:1 i�- , c a — 2 June 13, 2013 Roberto C. Sauceda, P.E. Project Manager Water Department, City of Fort Worth 1000 Throckmorton St, Fort Worth, TX 76102 Phone: (682) 432 5478 RE: Contract Amendment No. 2 Engineering Design Services: Sanitary Sewer Rehabilitation Contract LXXVI (76) City Project No. 01488 Dear Mr. Sauceda: The following is a summary of additional work requested for Amendment No. 2 to the above referenced project, per recent design meetings with City of Fort Worth officials. Amendment No. 2: • Additional 673 linear feet of sanitary sewer replacement design along Zwolle Street (from Jasper Street to Terminal Road) (2 Sheets,) and prepare guaranty takeoff cost estimate Amendment No. 2 Amount (see Exhibit B-3B): Sewer Improvements (Water Department): Total Amendment No.2 $9.245.00 $9,245.00 The current status of the contract between Stream Water Group, Inc and City of Fort Worth for the above referenced project is as follows: Original Contract Amount = Amendment No. 1 Amount = Amendment No. 2 Amount = Total Contract Amount including Amendment No. 1= $ 213,202.00 $ 8,666.00 $ 9,245.00 $ 231,113.00 Please process Amendment No. 2, to the Engineering Design Services: Sanitary Sewer Rehabilitation Contract LXXVI (76), City Project No. 01488 in the amount of $9,245.00. If you require any additional information or have any questions regarding this matter, please give me a call at (817) 446-4171 ext 106. We appreciate the opportunity to provide engineering design services for the City of Fort Worth. Sincerely, Stream Water Group, Inc. Shamsul Arefin, P.E. President Copy: File ! Irt n I' I 11. I Ill c EXHIBIT B-3B (SUPPLEMENT TO ATTACHMENT B) Contract Amendment No. 2 Engineering Design Services: Sanitary Sewer Rehabilitation Contract LXXVI (76) City Project No. 01488 Hourly Rate $150 $135 $135 $105 $90 $45 Task Description 1 Design Sheets Update i Zwolle ST Sanitary Sewer Design Sheets (2) ii Quantity and Cost Estimate iii Conduct Site Visit iv Total SS Design (Zwolle Street) 1 1 Pricipal Project Staff QA/QC Manager Proj Eng Engineer CAD Clerical 1 I 1 1 1 1 4 1 33 1 1 1 2 1 Direct Cost Total Fee 1 I 1 I 36 I I $ 50 I $ 8,435 I 2 I $ 465 Is 75I$ 345 1 $ 9,245 Argiffirp