Loading...
HomeMy WebLinkAboutContract 41696-A1 (2)AMENDMENT No. 1 car SECRETARY CONTRACT NO. TO CITY SECRETARY CONTRACT WtIERJfAAi 9 the City of Fort Worth (CITY) and Stream Water Group, (ENGINE} R) made and entered into City Secretary Contract No. 41696, (the CONTRACT) which was authorized by ITC Cc24795 on the 22nd day of March, 2011 in the amount of $214,706.00; and WIBIEREAO, the CONTRACT involves engineering services for the following project,: Sanitary Sewer Rehabilitation, Contract 76. WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOVITIBIEREFOREI, CITY and » NGINEXR , acting herein by and through their duly authorized representatives, enter into the following agreement, which ch amends the CONTRACT: : 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated March 14, 2012, a copy of which is attached hereto and incorporated herein. The cost t© City for the additional design services to be performed by Engineer totals $8,666.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $221, 868 . 00 . OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX 06 19-1 2 Al 1 : 04 Page -1 All other provisions expressly amended herein, effect. 3. of the Contract, which are not shall remain in full force and EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth 43/4:764-4•41woLW4 Fernando Costa Assistant City Manager DAT� ; : 4*/dIde APPR VAL RECOMMENDED: ,5t a Nmilei S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ALI ary J. Kayser Lp I (G City Secretary ENGINEER Stream Water Group Shamsul Arefin, P.E. President DAT a; 0 ‘1 M&C: N/A Date: N/A mepnmax att. FOliz. 4ziN #'000 0 ¢ r� Os'ri O111 i d " o o°-(a p 44 ..pOUOgv e k OFFICIAL RECOVM ©IITV SECRETARY t WO II9 TN Page -2 March 14, 2012 Mr. David Cooper, P.E. Project Manager Water Department, City of Fort Worth 1000 Throckmorton St, Fort Worth, TX 76102 Phone: (817) 392-8252 RE: Contract Amendment No. 1 Engineering Design Services: Sanitary Sewer Rehabilitation Contract LXXVI (76) City Project No. 01488 Dear Mr. Cooper: The following is a summary of additional work requested for Amendment No. 1 to the above referenced project, per recent design meetings with City of Fort Worth officials. Amendment No. 1: • Additional topographic survey (approximately 800 I, update sewer relocation design sheets (2 Sheets,) and prepare existing sewer abandonment sheet (1 sheet) 1. Design New Sewer Line (approximately 800 LF of Sewer) and Relocation of sewer services (8 locations) 2. Preparation of eight (8) rights of entry documents and mailed to home owner 3. Additional 800 If of survey along proposed sewer alignment) Amendment No. 1 Amount (see Exhibit B-3B): Sewer Improvements (Water Department): Total Amendment No.1 $8,666.00 $8,666.00 The current status of the contract between Stream Water Group, Inc and City of Fort Worth for the above referenced project is as follows: Original Contract Amount = Amendment No. 1 Amount = Total Contract Amount including Amendment No. 1= $ 213,202.00 8,666.00 $ 221,868.00 Please process Amendment No. 1, to the Engineering Design Services: Sanitary Sewer Rehabilitation Contract LXXVI (76), City Project No. 01488 in the amount of $8,666.00. If you require any additional information or have any questions regarding this matter, please give me a call at 800-446- 8076 ext 106. We appreciate the opportunity to provide engineering design services for the City of Fort Worth. Sincerely, Stream Water Group, Inc. Shamsul Arefin, P.E. President Copy: File 6737 Brentwood Stair Rd a Suite 230 © Fort Worth, TX 76112 o Phone: 817.446.4171 ® Fax: 817.446.4335 www. streamwatergroup.com EXHIBIT Ba3R (SUPPLEMENT TO ATTACHMENT B) Contract Amendment No. 1 Engineering Design Services: Sanitary Sewer Rehabilitation Contract LXXVI (76) City Project No. 01488 Hourly Rate Task Description 1 Design Sheets Update i (Sanitary Sewer Design Sheets (2) Update ii IROE Documents Preparation and Mail (8) iii (Conduct Site Visit and Additional Survey (approx 800 If) iv (Additional Sheet (1), SS Abandonment Total SS Design Update $150 $135 Pricipal Project QA/QC Manager 1 3 1 2 2 $135 $105 $90 $45 Staff Proj Eng Engineer CAD Clerical 3 2 1 Direct Cost 16 $ 8 2 $ $ 12 $ 100 100 3,026 100 Total Fee $ 2,500 $ 1,150 $ 3,566 $ 1,450 $ 8,666