HomeMy WebLinkAboutContract 41740-A1 (2)AMENDMENT No. 1 TO CITY SECRETARY CONTRACT WHEREAS, the City of b'or t Worth (CITY) and Lockwood, Andrews & Newnam, Inc., (ENGINEER) made and entered into City Secretary Contract No. 41740, (the CONTRACT) which was authorized by MC Cm24858 on the 5t' day of April, 2011 in the amount of $ 214 , 7 0 6. 0 0; and MA' aita-tilliAltf WilITIE tEAN, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation, Contract 75. WHEREM49 it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. TO%V TffllIItEFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated December 21, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $181,659.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $396,365.00. 06-06-12 P03: 33 IN OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page --1 All other provisions expressly amended herein, effect. . of the Contract, shall remain which are n o t in full force and EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager SAT)-: APPRO RECOMMENDED: / /-9/ Y C i : ( / (t) S. Frank Crumb, P.E. Director, Water Department ENGINEER LockwooAn. revs & Newnam, Inc. /T. Anthony Boyd, P.E. Senior Vice President APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ATTEST: ary J. r City Secretary r _-7/ qat gr404 ° ` ' 0 a" 0 0°qcio DATE: ijZ M&C: C=25553 Date: 4/12/2012 Page -2 OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX J Lockwood, Andrews & Newnam, Inc. A LEO A 1)lLY COMPANY December 21, 2011 Mr. David Cooper, P.E. Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, Texas 76102 RE: 2010 Sanitary Sewer Rehabilitation Contract 75, Contract Amendment No. 1 Request for Engineering Design and Surveying Project No. 1 480 Mr. Cooper, As requested and for the convenience of the city, LAN hereby submits this request for additional services. The services listed below were not part of the original contract scope and are necessary to complete the project. This request also removes segments of the design from the original scope of services and credits the city for the appropriate amounts. Included within the scope of services described below are design and surveying for new sewers lines Geotechnical services and the preparation of a second set of bid documents. The second set of bid documents, referred to as Part 2, will include designs prepared by other consultants. AMENDMENTS TO THE PROIECT SCOPE OF SERVICES 1. Design for Sanitary Sewers - LAN will provide the engineering design for the sanitary sewer lines shown in Exhibit E-IS and E-2S. 2. Design Services to Relocate Private Services, Part 2- LAN will provide the engineering design for the private sanitary sewer service relocations on Medford Rd. and Stratford Ct as shown on Exhibit E-2S. 3. Design Sanitary Sewer Rehabilitation — LAN will provide the engineering design for rehabilitation of the existing sewer lines behind Belford Ave. and Stratford Ct. shown on Exhibit E-2S by other than open cut methods. 4. Design Water Line In Cleburne Rd. — LAN will provide the engineering design for the replacement of the existing water line in Cleburne Road between Wayside Avenue and Townsend Dr. 5. Provide Additional Bid Set — A portion of the project will be separated into a second set of construction documents for bidding purpose. Additional advertisement and contractor solicitation will be required. LAN will provide bidding and construction support services for the additional work. 1320 S. University One, Suite 450 • Fort Worth, Texas 76107 • 817 820 0420 • Fax 817 8200441 • www Ian-inc com David Cooper, PE December 21, 2011 Page 2of3 6. Provide Surveying for Additonal Sewer Lines, Part 1- Additional topographic survey is required to complete the design for Part 1. The 15' sewer in Devitt Street will be extended to Sandage Street and then to north in Sandage Street crossing Berry street and reconnecting at Bowie Street. Additional surveying is also required in Cleburne Road to allow for the design of an 8" water line replacement between Townsend Street and Wayside Ave. 7. Provide Surveying for Sewers in Startford Park Area, Part 2 — Additional topographic surveying is required to complete the design of new sewers in the Stratford Park area. The survey will be conducted in Stratford Ct. and Belford Ave. Portions of these new lines will be extended in the wooded areas within the public park. Surveying is also required within the backyards of the lots along Belford Avenue and Meadowbrook Drive. These are developed lots with fences and limited access. 8. Provide Surveying to Relocate Private Services, Part 2. As part of the new sewer relocation in the Stratford Park area, the private services will be rerouted from the rear of the homes to the new sewers in the streets at the front of the Tots. This relocation eliminates the need for the city to maintain portions of the services from the rear of the lots to the connections to the mains in the steep park land with limited accessibility. 9. Geotechnical Engineering — A Geotechnical Report providing recommendations for the installation of two horizontal bores at the sewer crossing for the Fort Worth and Western Railroad is included in this amendment request The report and field investigation, including test bores, will cover the crossing at Devitt Street and at Benbrook Drive. 10. Credit to the City for Work in the Original Contract — Lateral 1990 and a portion Main M-76 do not require replacement. A credit for the surveying and design services for the portions of the work remaining from the original contract is included in the Level of Effort Task/Hour Breakdown COMPENSATION Based upon the work performed as described above, a lump sum fee addition of $181,659 is hereby requested. This fee allows for a $20 723 credit to the city for engineering and surveying services remaining from the original contract. This increase will adjust the total engineering fee from $214,706 to $396,365. A summary of the contract values affected by this Amendment No. 1 are provided herein. David Cooper, PE December 21, 2011 Page 3 of 3 Original Contract Amount: Amended Total Amount Contract, $214 706 Increase Amendment 1: $181,659 $396,365 As always, we look forward to continuing a mutually beneficial working relationship with the city. Please contact me should you require any -additional information. Sincerely, LOCKWOOD, ANDREWS, & NEWNAM, INC. Walter P. Norwood, P.E. Senior Project Manager W/encl. 6 6 IN 6 IN 0 nv z z 6IN W BEWICK ST 2 IN —W-6t07311 ST 0 21N IN 6 IN LEGEND co 1 IN 6 IN 4 IN W SHgW hqN I .2L,S 81DDI. ON ST t SEGMENT TO BE ADDED TO PROJECT - EXISTING WATER LINE 500 1000 SCALE: 1" = 500' CONTRACT 75 EXHIBIT E-1 W (PART 1) 1• ST 6 J 1 NO 8" WATER LIE -- AM ND 1 I 611N MON[ A ST J 4 IN IftA N NGE ST 6 IN 1. "tlV' BIDD4t7rr ST N L' 4 IN 6JN 4 IN m W BEWIfK I N • Lockwood, Andrews & Newnam, Inc. A SUBSIDIARY OF LEO A DALY 0 r U1 0 0 000! 00G 0 3NI1 2:13M3S ONLLSIX3 IN3NINOGNV9V "Wt.% Jib ORIGINAL PROJECT SEGMENTS ✓ m 0 m Z 0 C CART AVE 1226 8IN 1S VONOIN 1230 61N 1S NOSIOOI6 M NI 9 £L-IN (ON AVE L01232R' 81N EY AVE 6ZZL-1 S AVE /\ 0 z 1S NOISSIIN L-4848R' 8IN M-73R' 10 IN FOREST- PARK BLVD L-1299 8 IN WAYSIDE AVE L-1300 6IN _ L-1326 8 IN m 0 0 0 Z" FRAZIER AVE L-2421R' 8IN NI 9 Z99Z-1 0 z L-2919 a IP eF o 'QO L-2780 6 IN 2 .O,t O� <? (, FOREST PARK BLVD ��\Bp9 djCO s q '4' 6,.L-2760 6IN w << 2 �spe L-1300 8IN L-1326 6IN L-1326 8 IN TOWNSEND DR L-1324 6IN GORDON AVE L-1320 6IN LIVINGSTON AVE L-1323R' 8 IN M-76 8IN w m 0 z 1S MVHS M 1-1326R' 8 IN 8 IN L-1324 6 IN M-76 10 IN 1S 3ONV2JO 0 z L-1325 8 IN WAITS AVE L-1510R' 8 IN L-1510A 6IN L01297R' 8 IN LUBBOCK AVE M-77 6 IN ci- M-77R' a IN pr*1 ZKO) ,MERIDA AVE L-2624 6 IN CpD Z-p�I(n SANDAGE AVE "'mm0: M-73R 121N L01434R' 8IN M00077R' BIN M-73 151N CZ m z 0 0 M-73 151N2 A Tom' MC CART AVE s WAYSIDE AVE 4, z 0 L-1303 6IN Q _ FRAZIER AVE 64 V- Z mm 0 7]C L-1322 6 IN < L-1316 61N L-1315 6 IN DOo -m STANLEY AVE m Zcn 71 M-76 8IN oN L-1321 6IN L-1314 6IN L-1313R' 8IN m 0) 2 L0298R- 8IN m S-14354 11 IN 6 0 0 2 LUB° L01S85R' 81N-12634R' 8 IN r N 0) MEF- S-13870 1812 SAT Z mn!5-1386'9 8IN r >-a. L01993R' 8 IN Z( 7�" 0 L-L m "g Z 2 m m Q� 1 -l' L-1989 6IN L-1308 TOWNSEND NI-2239 6 IN L-1301 61N 6 IN 2 L-1305 AN 1 M-82 101N "Kt 2 L-1306 61N N JAMES AVE 2 GOR LIVIN LU VIEW ST. M-126 12"VC 0 ARRO{.yHEAD 6pv- tii ECCSbIERE L-1681 v L-1682 0 ce 6" ro tut O it) W w J DR. z 0 1097 L-1077 6" 6' AVE. co 1080 L-1075 6' IDGE ST. L-1074 6` NESAN SW C-1 NEW 12" /T..::.:::ff.AN SWR 6 MEADOWBROOk o C-/679 6* C` o LAt0 1...i t. IT Q _1N JD J 0) LANCASTER M-61 6'Conc. 0 AVE, o 0 L-1O74 D L-1075 0 6' -1672 i 0 J D MT.VERNOII AVE. L-1085'A' MOUNTAIN VIEW N D CO J lQ L-2882 u 0 0 0 r,•n,ir u4. O LEGEND - - - EXISTING SEWER TO BE REHABILITATED NEW 8' SANITARY SEWER ABANDONMENT EXISTING SEWER LINE CONNECT PRIVATE SERVICE 0 500 1000 SCALE: 1" = 500' 1-4 0 L-1093 6' z 0 tit 0 rt U00 0 J CONTRACT 75 EXHIBIT E-2S (PART 2) NEW 8" SAN SWR is O J 0 1' 726 f 0 J 09% ti; <D 0 1- J J cc J L-1674 DR GgESi1EW 6' J D 6' L-1667 \ W a ui J 0 Q J L-1659 SEWER TO BE REHABILITATED to ,. o, L-1622. O Q0 iD N J L-1660 0 0 S L-1093 i L-1094 O, Q a O Q = W O 2 L-1365 L-1659 i0 L-3436 0 ? I L-4572 5 O co up to 0 OD O to') ry O J 2.1 J co O J D N J inn 15" MEADC KENWOOD L-9075. 6`VC IANCAS VIRGINIA AT Lockwood, Andrews & Newnam, Inc. A SUBSIDIARY OF LEO A DALY City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 4/10/2012 DATE• Tuesday, April 10, 2012 LOG NAME: 60SS75A1-LAN S UBJECT: Authorize Execution of Amendment No. 1 to City Secretary Contract No. 41740 with Lockwood, Andrews & N ewnam, Inc., in the Amount of $181 659.00 for a Total Contract Amount of $396,365.00 for Sanitary Sewer Rehabilitation Contract 75 on Cleburne Road, Sandage Avenue, Devitt Street, Orange Street, Medford Court and Stratford Court (COUNCIL DISTRICTS 8 and 9) REFERENCE NO.: **C-25553 RECOMMENDATION. It is recommended that the City Council authorize execution of Amendment No 1 to City Secretary Contract No. 41740 with Lockwood, Andrews & Newnam, Inc. in the amount of $181,659.00 for Sanitary Sewer Rehabilitation Contract 75, thereby increasing the contract amount to $396 365.00. DISCUSSION: On April 12, 2011, (M&C C-24858) the City Council authorized an Engineering Agreement with Lockwood, Andrews & Newnam, Inc. in the amount of $214,706.00 to prepare plans and specifications for Sanitary Sewer Rehabilitation Contract 75. Amendment No. 1 will provide compensation for the additional services on the project required for: • Geotechnical services for soil borings at proposed railroad crossings (2); • Additional sewer design within scope of original contract required to eliminate an existing conflict with a 72 inch storm drain; • Additional sewer design for severely deteriorated lines in the Stratford Park area as requested by Field Operations; • Design for replacement of existing eight inch water line in Cleburne Road due to break history and proximity to sewer main to be replaced; • Additional survey services for water and sewer lines added to original project scope; and • Additional bidding and construction phase services required to accommodate additional design. Lockwood, Andrews & Newnam, Inc., proposes to provide the additional requested services for a lump sum fee in the amount of $181,659.00 Staff considers this fee to be fair and reasonable for the scope of services provided. Lockwood, Andrews & Newnam, Inc , is in compliance with the City s M/WBE Ordinance by committing to an additional 42 percent M/WBE participation on this Amendment No. 1. The City's goal on this amendment is 42 percent. The project is located in COUNCIL DISTRICTS 8 and 9. FISCAL INFORMATION / CERTIFICATION: Logname: 60SS75A1-LAN Page 1 of 2 budget, as appropriated, of the Water Capital Projects Fund and the Sewer Capital Projects Fund. FUND CENTERS: TO Fund/Account/Centers CERTIFICATIONS: Submitted for City Manager's Office bv: Originating Department Head: Additional Information Contact: FROM Fund/Account/Centers P253 P253 P 253 P253 P258 P258 P 258 P258 531200 609170148031 531200 609170148032 531200 609170148033 531200 609170148051 531200 709170148031 531200 709170148032 531200 709170148033 531200 709170148051 Fernando Costa (6122) S . Frank Crumb (8207) David L. Cooper (8252) ATTACHMENTS 1. 60SS75A1-LAN Map 1.pdf (Public) 2. 60SS75A1-LAN Mao 2.0df (Public) 3. 60SS75A1-LAN MWBE Comoliance.pdf (CFW Internal) 4. 60SS75A1-LAN Sewer FAR.pdf (CFW Internal) 5. 60SS75A1-LAN Water FAR.odf (CFW Internal) 6. P253-472045-601159990100.doc (CFW Internal) 7. P258-476045-701139990100.doc (CFW Internal) $1,463.50 $6, 521.00 $3,931.00 $2.000.00 $13,174.50 $581692.00 $35,376.00 $601501.00 Logname: 60SS75A 1-LAN Page 2 of 2