HomeMy WebLinkAboutContract 41745-A2 (2)A E,ND ENT No. 2
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and Burgess and
Niple, Inc., (ENGINEER) made and entered into City secretary
Contract No. 41745, (thc CONTRACT) which was authorized by
MSC Cc=324857 on the 12th day of April, 2011 in the amount of
$130,793.00; and
";6V'it SECRE,At3V
CONTRACT WI. ��iS /77c��
WHEREAS, the CONTRACT was subsequently revised by
Amendment Number 1 in the amount of $26,907.00 which was
administratively authorized on July 20, 2012; and
WHER . , the CONTRACT involves engineering services for
the following project:
Water and sa
itary Sewer Replacement Contract 2010 STM E.
WHEREAS, it has become necessary to execute Amendment
No. 2 to the CONTRACT to include an increased scope of work
and revised fee.
NOW THEREFOT, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the
additional engineering services specified in a proposal dated
October 10, 2012, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional
design services to be performed by Engineer totals $7,750.00.
2.
Article II of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that
the total fee paid by the City for all work and services
shall be an amount of $165, 530. 00 .
12 P02 : 33 IN
Page -1
OFFICIAL RECORk
MY SECRETARY
FT. WORTH TX
O
All other provisions of the Contract, which are not
expressly amended hone i n , shall remain in full force and
effec;t .
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED:
City of Fort W rth
Fernando Costa
Assistant City Manager
DATE: l -,r f S�AZ
APPROVAL RECOMMENDED
z
(7,/
S. Frank Crumb, P .; .(
Director, Water Department
APPROVED AS TO FORM AND LEGALITY:
Douglas W. Black
Assistant City Attorney
ry J. Kayser
City Secretary
ENGINEER
Burgess & Niple, Inc.
Steven D. Sanders, P.E.
Vice President
DATE: ti &site
H&C: N/A
Date: N/A
eatitua
#4.(4.0,000F0430P3
47
0 AY
a
a ►�
oer
kki(-_,/orm
j if )E` 6ci;aP i1f`� 11
Page -2
BURGESS & NIPLE
395o Fossil Creek Blvd. I Suite 210 I Fort Worth, TX 76137 1817.306.1444
October 17, 2012
Mr. Robert Sauceda
Project Manager
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102
Re: Scope of Work Revision Reauest
WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2010, STM-E
City Project No. 01494; B&N No. PR50285
Water Project No. P253 531200 607170149431
Sewer Project No. P258 531200 707170149431
Proposed Amendment No. 2 to City Secretary Contract No. 41745
Mr. Sauceda:
This letter is our formal request for a Scope of Work Revision for engineering services.
Justification
After Preliminary Design of the two (2) sanitary sewer rehabilitation projects associated with Amendment
No. 1 we determined that a different alignment was necessary. See the attached project location map.
Changes to the project Scope of Work is as follows:
Burgess & Niple will design the reroute of M-169 from STA 13+73 at the intersection of Calmont Avenue &
Clover Lane to STA. 0+59.51. Rather than going along I-30, it will be rerouted along Clover Lane and
Birchman Avenue. This will avoid the two conflicts with the 72" arch storm drain. The main will be resized
to allow for some flow that cannot be rerouted.
This Amendment No. 2 is needed for Conceptual Design and Preliminary Design only. Effort already in
Amendment No. 1 for Final Design and Construction Administration will be utilized for this new alignment.
Based upon this scope of work, the additional design cost proposed for Amendment No. 2 is $7.750.00.
See the attached Level of Effort Spreadsheet.
CELEBRATING
I 0 0
YEARS
1912 - 2012
burgessniple.com
October 17, 2012
WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2010, STM-E
Proposed Amendment No. 2 to City Secretary Contract No. 41745
P age 2
P ROJECT FEE DETAILS
Contract Item Description
Original Contract
City Sec'y Contract # 41745
Amendment No. 1
Fee
Water and SS Repl Contract 2010, STM-E $130,793.00
Revised Scope of Work $26,987.00
P roposed Amendment No 2 Revised Scope of Work
REVISED TOTAL PROJECT FEE
$7.750.00
$165.530.00
P ROJECT TIME DETAILS
I also request that an additional 20 working days (28 calendar days) be added to the schedule for survey
and design after this amendment is approved by the City.
P lease let me know if you have any questions or need additional information concerning this request.
Respectfully submitted,
Burgess & Niple, Inc.
TBPE FIRM REGISTRATION NO. F-10834
Olga/ b• MA16441
William D. Wendland, P.E.
Associate
Director Fort Worth Municipal Projects Section
Attachments
P:IPR50285IPM1CONTRACTICOICO-21PR50285_Amendment 2_WDW_20121017.docx
burgessniple.com
•
PLOTTED. 10/17/2012 43349
c
0.
E
i
ID
c
lI II
0- . , c
W
(hrr.'
It R `1 1 J
II
t
Holt otor or.n Sunni/
A ]'I4
Twin: VOL - V
NVaN60uWat pouatj
BIRCHMAN AVE.
CALMONT AVE.
f
—.n
Jr
4-
1
Borr « He .1N S. rye:.- 74u
r
I j � nl r1I I
PROP SS. I INF
Parrett HOII,n24..ORn Survey
A - 796
ALIGNMENT
BE REROUTED
0
PROP SS. LINE r
WEST FREEWAY FRONTAGE
P
K 69477429661
E: 2306020.7014
LEY. 072411
1
2 A
3 A
REVISIONS
OCOCRPTew
PREtMit ARY - FOR RE✓IEN ONLY
These dacvnents ore for Desgn Revels
and not intended for Construction. Bddely,
or Parrott Wrpo:c$ thcy rcre Pfrpo'rd
by, or order the supervision of:
*thorn D. Wmdbnd
P.E / 67958 Dole. 49-TO- I?
04TE
CONSTRUCTION NOTES
NOTE. CONTRACTO'. SHALL PROTECT ALL COSTING TREES. FENCES_
RETMNWC WALLS M4J STRUCTURES' UNLES OIMER CC NOTED
NOTE. ALL u1RCCT RAD. SMALL BE IO' AND ALL DRIVEWAY RAW 'JHA.1 BC
S. UNLESS OTKRCSE NOTED.
NOTE, CONTRACTOR SMALL RELOCATE 00'11NL RNCc^ AS NOTED TO ONE Fill
W PROPOSED it CRT W WAY,
THE CONTRACTOR -nML CONTACT ME FOLOW %C AT LEAST 46 Mac Nng1 TO
EXCAVATING AT [ACM LOCATION.
At&T 1-800-078-8711
FORT WORTH NAT& &CPT -FELD (YCKAOON.S (817) 611-8296
FLAT WORN T&PV (017) 671-6100
ATUOS ENERGY (ei>) 215-4346
ONCCR GAS Al RECTOC (617) 215-62I4
TXu ENERGY I-100-233-2111
S8C TELEPHONE om 336-6419
CHMTER Cato (et) SW-6172 cAr 3M3
All OTINH FAOUTIE5 1-600-oIG-TC
8
E-
rn
0
0
HORIZONTAL g VERTICAL CONTROL U
CONTROL POINT j12 CONTROL POINT j23 CONTROL POINT j26 cd
cS
z
Q
U
L:l
U
a'N
F
z
N. 6952921.0292
C 23131:043s24
Etzv 430613
DOE / 656r
GlY PROJECT /D04
WATER PROJECT / P251-5J1200-6077707494J1
SEWER PRQIECf / P258-53I200->07170fa94Jl
X- 21.386
C.WPED IN$
N. GS544131524
C 231193b2100
ncv rn >24
CITY OF FORT WORTII, TEXAS
WATER DEPARTMENT
WATER AND SAN. SEWER REPLACEMENT
CONTRACT 2010, STM-E
OVERVIEW
SEWER LINES D; E; AND r
CONCEPTUAL SEWER PLAN
CALMONT AVENUE
BURGESS & NIPLE
MOO FOUL CRUD( !Yt.SIAMM 210
PIOC IBM ao 4444
TIM MIA PFLOf ONTO/ N0. F50 W
OEJGNED: AMA SCALE. OATS.
DRAWN- Jute I-ROO' 10/02/12
SHEET
1 of 7
a
FORT WoK-i'H
Task No.
Task Description
31 Conceptual Design (30%)
32 Preliminary Design (60%)
33 Final Design (90%and 100%1
51 Preliminary Survey
80 Construction
Totals
Basis for
Hour
Estimate
Unit
Attachment B - Level of Effort Supplement
TASK/HOUR BREAKDOWN
Design Services for
Sanitary Sewer Rehabilitation Contract # 2010 STM-E, Amendment #2
City Project No. 01494
Project
Director
$220
0
0
0
0
0
0
Project
Manager
$201
2
Labor (hours)
Senior Project CADD
Designer_ Enaineer
$143 $112 $88
0 8 0
8 0 28 0
0 0 0 0
o 6 0 6
o o 0 6
10 0 36 0
0.00% 100.00%
Water Sewer Total
Engineering $ - $ 6,250.00 $ 6.250.00
Surveying $ - $ 1.500.00 $ 1,500.00
Total $ - $ 7,750.00 $ 7.750.00
BREAKDOWN OF WATER AND SEWER FEES (LESS SURVEY FEES)
Total Water Fee (less survey fee) Breakdown by Concept. Preliminary and Final Desion
Concept (30%) = (Total Water Fee — Water Survey Fee) x (0.3)
Preliminary (60%) = (Total Water Fee — Water Survey Fee) x (0.6)
Final (10%) = (Total Water Fee — Water Survey Fee) x (0.1)
Total Sewer Fee (less survey fee) Breakdown by Concept, Preliminary and Final Desion
Administrative Total Labor
$97
0 $1.298
0 $4.744 $0
0 SO SO
0 50 $1.500
0 $0 $0
0 56,042 $1,500
Cost
TOTALS IN
MSC
$ $
$ $
$ $
$ $
Concept (30%) = (Total Sewer Fee — Sewer Survey Fee) x (0.3) ('REVISED] $ 1,875.00 $ 1,373.00
Preliminary (60%) = (Total Sewer Fee — Sewer Survey Fee) x (0.6) [`REVISED] $ 3,750.00 $ 4,877.00
Final (10%) = (Total Sewer Fee — Sewer Survey Fee) x (0.1) ('REVISED] $ 625.00 $ -
$ 6.250.00 $ 6.250.00
$ 6,250.00 $ 6,250.00
P;\PR{5QQ28 PM\CONTRACT\CO\CO-2\01494 2010 STM-E - ADD#2 - Attachment B LOE 20121017.xlsx
t"4 Level xo�
�ca Release�Da�tteo�S�ig�l��nent
Subconsultant
Expense
MWBE Non-MWBE.
SO SO S0
S0 519
S0 S0
S0 SO
$01 S0
$01 $19
BURGESS & NIPLE
Engineers • Planners
Total Expense Task Sub Total
Travel Reproduction Cost
$0 $0
535 $58
$0 $0
$0 $1.650
$0 $0
535 51,708
Project Summary
Total Hours
Total Labor
Total Expense
MWBE Subconsultant
Non-MWBE Subconsultant
10°h Subconsultant Markup
MWBE Participation
MWBE Goal
Total Project Cost
$1,298
$4.802
$0
$1,650
$0
$7,750
46
56.042
S1.708
$1.500
$35
$154
19.4%
17.0%
$7,750