Loading...
HomeMy WebLinkAboutContract 41745-A2 (2)A E,ND ENT No. 2 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Burgess and Niple, Inc., (ENGINEER) made and entered into City secretary Contract No. 41745, (thc CONTRACT) which was authorized by MSC Cc=324857 on the 12th day of April, 2011 in the amount of $130,793.00; and ";6V'it SECRE,At3V CONTRACT WI. ��iS /77c�� WHEREAS, the CONTRACT was subsequently revised by Amendment Number 1 in the amount of $26,907.00 which was administratively authorized on July 20, 2012; and WHER . , the CONTRACT involves engineering services for the following project: Water and sa itary Sewer Replacement Contract 2010 STM E. WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFOT, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated October 10, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $7,750.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $165, 530. 00 . 12 P02 : 33 IN Page -1 OFFICIAL RECORk MY SECRETARY FT. WORTH TX O All other provisions of the Contract, which are not expressly amended hone i n , shall remain in full force and effec;t . EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort W rth Fernando Costa Assistant City Manager DATE: l -,r f S�AZ APPROVAL RECOMMENDED z (7,/ S. Frank Crumb, P .; .( Director, Water Department APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney ry J. Kayser City Secretary ENGINEER Burgess & Niple, Inc. Steven D. Sanders, P.E. Vice President DATE: ti &site H&C: N/A Date: N/A eatitua #4.(4.0,000F0430P3 47 0 AY a a ►� oer kki(-_,/orm j if )E` 6ci;aP i1f`� 11 Page -2 BURGESS & NIPLE 395o Fossil Creek Blvd. I Suite 210 I Fort Worth, TX 76137 1817.306.1444 October 17, 2012 Mr. Robert Sauceda Project Manager City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Re: Scope of Work Revision Reauest WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2010, STM-E City Project No. 01494; B&N No. PR50285 Water Project No. P253 531200 607170149431 Sewer Project No. P258 531200 707170149431 Proposed Amendment No. 2 to City Secretary Contract No. 41745 Mr. Sauceda: This letter is our formal request for a Scope of Work Revision for engineering services. Justification After Preliminary Design of the two (2) sanitary sewer rehabilitation projects associated with Amendment No. 1 we determined that a different alignment was necessary. See the attached project location map. Changes to the project Scope of Work is as follows: Burgess & Niple will design the reroute of M-169 from STA 13+73 at the intersection of Calmont Avenue & Clover Lane to STA. 0+59.51. Rather than going along I-30, it will be rerouted along Clover Lane and Birchman Avenue. This will avoid the two conflicts with the 72" arch storm drain. The main will be resized to allow for some flow that cannot be rerouted. This Amendment No. 2 is needed for Conceptual Design and Preliminary Design only. Effort already in Amendment No. 1 for Final Design and Construction Administration will be utilized for this new alignment. Based upon this scope of work, the additional design cost proposed for Amendment No. 2 is $7.750.00. See the attached Level of Effort Spreadsheet. CELEBRATING I 0 0 YEARS 1912 - 2012 burgessniple.com October 17, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2010, STM-E Proposed Amendment No. 2 to City Secretary Contract No. 41745 P age 2 P ROJECT FEE DETAILS Contract Item Description Original Contract City Sec'y Contract # 41745 Amendment No. 1 Fee Water and SS Repl Contract 2010, STM-E $130,793.00 Revised Scope of Work $26,987.00 P roposed Amendment No 2 Revised Scope of Work REVISED TOTAL PROJECT FEE $7.750.00 $165.530.00 P ROJECT TIME DETAILS I also request that an additional 20 working days (28 calendar days) be added to the schedule for survey and design after this amendment is approved by the City. P lease let me know if you have any questions or need additional information concerning this request. Respectfully submitted, Burgess & Niple, Inc. TBPE FIRM REGISTRATION NO. F-10834 Olga/ b• MA16441 William D. Wendland, P.E. Associate Director Fort Worth Municipal Projects Section Attachments P:IPR50285IPM1CONTRACTICOICO-21PR50285_Amendment 2_WDW_20121017.docx burgessniple.com • PLOTTED. 10/17/2012 43349 c 0. E i ID c lI II 0- . , c W (hrr.' It R `1 1 J II t Holt otor or.n Sunni/ A ]'I4 Twin: VOL - V NVaN60uWat pouatj BIRCHMAN AVE. CALMONT AVE. f —.n Jr 4- 1 Borr « He .1N S. rye:.- 74u r I j � nl r1I I PROP SS. I INF Parrett HOII,n24..ORn Survey A - 796 ALIGNMENT BE REROUTED 0 PROP SS. LINE r WEST FREEWAY FRONTAGE P K 69477429661 E: 2306020.7014 LEY. 072411 1 2 A 3 A REVISIONS OCOCRPTew PREtMit ARY - FOR RE✓IEN ONLY These dacvnents ore for Desgn Revels and not intended for Construction. Bddely, or Parrott Wrpo:c$ thcy rcre Pfrpo'rd by, or order the supervision of: *thorn D. Wmdbnd P.E / 67958 Dole. 49-TO- I? 04TE CONSTRUCTION NOTES NOTE. CONTRACTO'. SHALL PROTECT ALL COSTING TREES. FENCES_ RETMNWC WALLS M4J STRUCTURES' UNLES OIMER CC NOTED NOTE. ALL u1RCCT RAD. SMALL BE IO' AND ALL DRIVEWAY RAW 'JHA.1 BC S. UNLESS OTKRCSE NOTED. NOTE, CONTRACTOR SMALL RELOCATE 00'11NL RNCc^ AS NOTED TO ONE Fill W PROPOSED it CRT W WAY, THE CONTRACTOR -nML CONTACT ME FOLOW %C AT LEAST 46 Mac Nng1 TO EXCAVATING AT [ACM LOCATION. At&T 1-800-078-8711 FORT WORTH NAT& &CPT -FELD (YCKAOON.S (817) 611-8296 FLAT WORN T&PV (017) 671-6100 ATUOS ENERGY (ei>) 215-4346 ONCCR GAS Al RECTOC (617) 215-62I4 TXu ENERGY I-100-233-2111 S8C TELEPHONE om 336-6419 CHMTER Cato (et) SW-6172 cAr 3M3 All OTINH FAOUTIE5 1-600-oIG-TC 8 E- rn 0 0 HORIZONTAL g VERTICAL CONTROL U CONTROL POINT j12 CONTROL POINT j23 CONTROL POINT j26 cd cS z Q U L:l U a'N F z N. 6952921.0292 C 23131:043s24 Etzv 430613 DOE / 656r GlY PROJECT /D04 WATER PROJECT / P251-5J1200-6077707494J1 SEWER PRQIECf / P258-53I200->07170fa94Jl X- 21.386 C.WPED IN$ N. GS544131524 C 231193b2100 ncv rn >24 CITY OF FORT WORTII, TEXAS WATER DEPARTMENT WATER AND SAN. SEWER REPLACEMENT CONTRACT 2010, STM-E OVERVIEW SEWER LINES D; E; AND r CONCEPTUAL SEWER PLAN CALMONT AVENUE BURGESS & NIPLE MOO FOUL CRUD( !Yt.SIAMM 210 PIOC IBM ao 4444 TIM MIA PFLOf ONTO/ N0. F50 W OEJGNED: AMA SCALE. OATS. DRAWN- Jute I-ROO' 10/02/12 SHEET 1 of 7 a FORT WoK-i'H Task No. Task Description 31 Conceptual Design (30%) 32 Preliminary Design (60%) 33 Final Design (90%and 100%1 51 Preliminary Survey 80 Construction Totals Basis for Hour Estimate Unit Attachment B - Level of Effort Supplement TASK/HOUR BREAKDOWN Design Services for Sanitary Sewer Rehabilitation Contract # 2010 STM-E, Amendment #2 City Project No. 01494 Project Director $220 0 0 0 0 0 0 Project Manager $201 2 Labor (hours) Senior Project CADD Designer_ Enaineer $143 $112 $88 0 8 0 8 0 28 0 0 0 0 0 o 6 0 6 o o 0 6 10 0 36 0 0.00% 100.00% Water Sewer Total Engineering $ - $ 6,250.00 $ 6.250.00 Surveying $ - $ 1.500.00 $ 1,500.00 Total $ - $ 7,750.00 $ 7.750.00 BREAKDOWN OF WATER AND SEWER FEES (LESS SURVEY FEES) Total Water Fee (less survey fee) Breakdown by Concept. Preliminary and Final Desion Concept (30%) = (Total Water Fee — Water Survey Fee) x (0.3) Preliminary (60%) = (Total Water Fee — Water Survey Fee) x (0.6) Final (10%) = (Total Water Fee — Water Survey Fee) x (0.1) Total Sewer Fee (less survey fee) Breakdown by Concept, Preliminary and Final Desion Administrative Total Labor $97 0 $1.298 0 $4.744 $0 0 SO SO 0 50 $1.500 0 $0 $0 0 56,042 $1,500 Cost TOTALS IN MSC $ $ $ $ $ $ $ $ Concept (30%) = (Total Sewer Fee — Sewer Survey Fee) x (0.3) ('REVISED] $ 1,875.00 $ 1,373.00 Preliminary (60%) = (Total Sewer Fee — Sewer Survey Fee) x (0.6) [`REVISED] $ 3,750.00 $ 4,877.00 Final (10%) = (Total Sewer Fee — Sewer Survey Fee) x (0.1) ('REVISED] $ 625.00 $ - $ 6.250.00 $ 6.250.00 $ 6,250.00 $ 6,250.00 P;\PR{5QQ28 PM\CONTRACT\CO\CO-2\01494 2010 STM-E - ADD#2 - Attachment B LOE 20121017.xlsx t"4 Level xo� �ca Release�Da�tteo�S�ig�l��nent Subconsultant Expense MWBE Non-MWBE. SO SO S0 S0 519 S0 S0 S0 SO $01 S0 $01 $19 BURGESS & NIPLE Engineers • Planners Total Expense Task Sub Total Travel Reproduction Cost $0 $0 535 $58 $0 $0 $0 $1.650 $0 $0 535 51,708 Project Summary Total Hours Total Labor Total Expense MWBE Subconsultant Non-MWBE Subconsultant 10°h Subconsultant Markup MWBE Participation MWBE Goal Total Project Cost $1,298 $4.802 $0 $1,650 $0 $7,750 46 56.042 S1.708 $1.500 $35 $154 19.4% 17.0% $7,750