Loading...
HomeMy WebLinkAboutContract 41722-A1 (2)rZeige 1 fr C AMENDMENT No. 1 WOW CIC TO CITY SECRETARY CONTRACT ` REAS , the City of 'Port Worth (CITY) and RJN, Inc., (ENG I NEi QR) made and entered into City secretary Contract No. 41722, (the CONTRACT) which was authorized by M&C C=24754 on the 1st day of March, 2011 in the amount of $259, 550 . 0®; and EAS , the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract Lxxxry (84) ; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter 1,nto the following agreement, which amends the CONTRACT: 1. ArcLicle I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated May 4, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $43,788.75. `, . fir' ti cle II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $303,338.75. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Page -1- OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX 6-12 P03:33 IN ?.-awrs--=minommmftrommtmorimmym.-- EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: APPROVAL RECOMMENDED: :S. � Frank Crumb, P.E. Director, Water Department ENGINEER RJN Group, Inc. 114 Arep Hugh Kelso Vice President DATE: _sr /=f�� APPROVED AS TO FORM AND LEGALITY: M&C: N/A Douglas W. Black Assistant City Attorney ATTEST: a_ J. `T-'per City Sec etary j'e� r FOB itz , 0000000o oho v, 44:744 a ! \140 � 00 0 0 0 0 2, gel 1ra Sit oti� C�"� 1 11 \0qh if)o Q cit b, an tsc`agdg Date: N/A OFFICIAL RECORD CITY SECRETARY FT. Wad`I'I-I, TX Page -2 : iroiuij;::: Excellence through Ownership May 4, 2012 ATTN: Mr. Robert Sauceda, Project Manager Fort Worth Water Department City of Port Worth 1000 Throckmorton Street Fort Worth, Texas 76102 RE: Submittal of REVISED Modified Contract Amendment No. 1 Contract L. (84) Sanitary Sewer Rehabilitation and Improvements Project City Project No. 01503, City Secretary No. C-24754 RJN Group File No. 18250200 Mr. Sauceda: www.rjn.com Please find attached, Modified Contract Amendment No. 1 to the Contract 84 Sanitary Sewer Rehabilitation and Improvements Project. This modified amendment request addresses the various City review comments received on prior amendment submittals, as well as to clarify specifically authorized increases in design scope for L-3040, L-4252 (upper portion re-route) and M-214. More specifically, this amendment addresses the following groups of tasks and items: 1) Cost impacts from changing the approved conceptual design plan of re-routing of laterals L4203, L-4135, and L4136 from heavily encroached backyard easements into Fairview, Robinwood, Brittain, and Beryl Streets. Since the original alignment which never surveyed (to save the City money on the re-route option), we had re -schedule the surveyor to shoot the missing information so we can produce rehabilitation designs for those laterals. This change impacted the following tasks noted in the modified LOE spreadsheet totaling $5,850.00 being requested. a) Project Management (Subtasks: 1.2.2, 1.2.5, and 1.2.6 for a total of $2,125.00) b) 2.0 Conceptual Design (Subtask: 2.2C for a total of $3,725.00) 2) Supplemental SUE work associated with the existing M-181B design footage along Springdale and N Beach Streets. Due to the increase in peak wastewater flows projected for this main, we needed to thoroughly assess utilities and utility crossings along M-181B and only the east side of N. Beach was previously investigated using Level B SUE. Therefore, we are requesting the collection of LEVEL A SUE for the remainder of N. Beach (west side) north of Belknap. It was determined that we need to de -hole a number of utilities including the existing 48-inch transmission water main at the Springdale intersection, two (2) crossing locations on the 48-inch storm sewer, one on the 60-inch storm sewer and a several more (2) to be used at storm sewer lateral/main crossings of the M-181B alignment in N. Beach Streets at our discretion for a total of six de -hole locations. Since we have 1 de -hole location with 1 6701 Brentwood Stair Road, Suite 100W • Fort Worth, TX 76112-3363.817.451.3500 • fax 817.451.3506 www.rjn.com Excellence through Ownership traffic control day budgeted already, the additional scope requires 5 more de -hole locations at $1,500.00 per each and 2 more traffic control days at $500.00/each for a total of $8,500.00 be included in the new amendment item costs. We also need to include the supplemental survey costs associate with documenting the new Level A SUE data being collected. This will be performed by a Gorrondona survey crew at a lump sum cost of $1,500.00. The aggregate supplemental SUE costs for this amendment item is $10,000.00. Therefore, the total cost of this amendment item is $11,840.00, including supplemental RJN labor, expenses, and a 10% subcontractor mark-up. 3) Cost (and Schedule) Impacts of Integrating New Wastewater Master Plan Design Flow Projections for M-181B. RJN's original scope of work required the design of M-181 B improvements using the 1998 Fort Worth Water Department (FWWD) Wastewater Master Plan which stated to install a 15-inch sewer main. This was confirmed by email to FWWD staff. However, we were directed to use the new FWWD Wastewater Master Plan ('WMP) flow projections which stated that this main should be a 24-inch line. RJN proceeded with the planning efforts to upsize M-181 B from 12-inch to a 24-inch as directed, but discovered that given the existing utilities in North Beach St., we would be unable to increase the size of M-181 B to a 24-inch. The new FWWMP recommendations for this area were revised and downsized to a 15 to 18 size pipe range. We were eventually provided with revised WWMP flow projections for M-181 B that we have used to size the proposed M-181 B improvements. The impacts of addressing the new WWMP flow projections in this project significant additional labor costs for an amendment item total of $5,180.00. 4) L-3040 Sewer Extension to from Station 8+70 to Station 6+00. During the conceptual design process, it was discovered that no existing manhole was located at Station 8+70 as records indicated. The City Field Operations group re -televised L-3040 which confirmed the no manhole existed at Stat. 8+70 and the downstream portion of the sewer line to Station 6+00 was in poor shape as well and it was approved by the PM to be added to the scope of work. This scope of work change resulted in the inclusion of another 270 LF of new sewer design footage in Honeysuckle Ave. Therefore, the total cost of this amendment item is $4,725.00, including a 10% mark-up. 5) L-3454 Section 2 Modified Design Plans (includes long service re-routes and supplemental M-214 Sewer Rehabilitation Design from Station 5+44 to Station 9+40). During the preliminary design process of L -3454, Section 2, it was discovered we could re-route that lateral to M-214 MH at Station 5+44 in Kearby St., allowing L-3454 to be abandoned in place in the Oncor ROW. This reroute plan requires the installation of 4 long sewer service re-routes. The abandonment of L-3454A line along Kearby St. is also recommended which requires the transfer of 3 services to the M-214 main in Kearby St. The City of Fort Worth Water Department PM approved the replacement of this portion of M-214 in Kearby St. under this modified scope of work, resulting in the inclusion of another 75 LF of new sewer design footage in Kearby St.. Therefore, the total cost of this amendment item is $2,898.75, including a 10% mark-up. 6) L-4252 Sewer Re-route and Extension to U4250R * ® MH Sta. 13+05. During the conceptual design process, it was decided to re -reroute the upper portion of L-4250 so that 6701 Brentwood Stair Road, Suite 100W • Fort Worth, TX 76112-3363.817.451.3500 • fax 817.451.3506 -I 99COL.1fl Excellence through Ownership 7) www.rin.com the portion of this lateral in the local City Park could be abandoned in place. One of the property owners would not allow the surveyor on site which prevented the collection of critical survey data (specifically, MH @ 10+63 was not shot). The amendment seeks compensation for the 380 LF extension portion of this line that includes a supplemental survey field visit to collect the missing survey on that restricted property. This scope of work change resulted in the inclusion of another 380 LF of new sewer design footage in an existing easement and in David St. Therefore, the total cost of this amendment item is $6,650.00, including a 10% mark-up. North Beach Street Traffic Control Study: Given the heavy traffic loads along N. Beach St. within our project limits, we have determined that a full traffic study will be required by the Fort Worth Transportation group to evaluate lane closure plans that will be developed for the construction traffic control plans needed for this project location. This effort includes traffic count collection ($2,200.00), data analysis, and coordination. Therefore we are seeking $4,995.00 in amendment item costs, including a 10% mark-up of subcontractor costs. 8) Supplemental Parks and Community Services Department (PACSD) Coordination: Upon further consideration after the review of the preliminary re-route plan of the upper portion of L-4252, the City of Fort Worth Water Department PM abandoned the re-route option and directed the trenchless replacement of the existing line through the PACSD park property. Given that we have to dig up and replace an existing manhole in the park, we anticipate additional work being required to secure the "permit" from PACSD for the project work. Therefore we are seeking $1,650.00 in amendment item costs. Contract Amendment No. 1 costs are summarized in the table below: Amendment Item Description Total Cost 1. Cost impacts from Conceptual Design Changes for L-4203, L-4135 and L-4136 Sewer Line Relocations: 2. Supplemental SITE work for M-181B along Springdale and N. Beach: 3. Cost Impacts of New WWIVIP Design Flow Projections: 4. L-3040 - 270 LF Sewer Extension: 5. L-3454 Section 2 Modified Design Plans (M-214 Replacement): 6. L-4252 Sewer Re-route and Extension to L-4250R* �a�. MH Sta. 13+05: 7. North Beach Street Traffic Control Study: 8. Supplemental PACSD Coordination for Permitting L-4252 Rehab: Total Amendment No. 1 Fee Request: $ 5,850.00 $ 11,840.00 $ 5,180.00 $ 4,725.00 $ 2,898.75 $ 6,650.00 $ 4,995.00 $ 1,650.00 $ 43,788.75 6701 Brentwood Stair Road, Suite 100W • Fort Worth, TX 76112-3363.817.451.3500 • fax 817.451.3506 rin rou Excellence through Ownership Therefore, a summary breakdown of Amendment No. 1 compensation is as follows: Labor Expenses TOTAL . RJN Group, Inc.: $27,496.75 $1,174.50 $ 28,671.25 *Spooner & Assoc.: $ 2,917.50 tGorrondona & Assoc.: $ 10,000.00 tGRA� M (Traffic Study — new sub): $ 2,200.00 Note * Subcontractors are all certified CBE firms Amendment No. 1 Total: $ 43,788.75 www.ron.com The $15,117.50 in MIWBE services identified above represents approximately a thirty-five percent (34.52%) participation level in the project associated with Amendment No. 1. Overall, Amendment No. 1 represents nearly a seventeen percent (16.87%) increase in the total contract value to date. For your convenience, a summary of the total project fees are as follows: Contract Item Fee Original Contract Amount $ 259,550.00 Amendment No. 1 $ 43,788.75 Amended Contract Value $ 303,338.75 Please do not hesitate to contact us should you have questions or need any background information concerning this matter. Thank you for your time and consideration. Sincerely, Chris Brooks, P E., Senior Project Manager ATTACHMENTS CC: Tony Sholola, P.E., FWWD, City of Fort Worth Hugh Kelso, Regional Manager -Vice President, RJN Group Peter Lai, Vice President, RJN Group 6701 Brentwood Stair Road, Suite 100W • Fort Worth, TX 76112-3363.817.451.3500 • fax 817.451.3506 ID Task No. rjngrou.p Task Description Rat - 30 1.0 roLeot Manaaem • Original Contract Budget and Future Ap, oved Amendments Total Hrs Labor Costs Direct Costs 1.1 Managina the Team 1.1.1 QA/QC 1.2 .o muricat�h(i'ns �Re�ejlti 1.2.1 Pre- esi_n Coordination Meetina uarterly ojoct Update Meetings 5 hrs /ea 1.2.3 Design Submittal Review Meetings (Prelim & Final only ae 1.5 hrs/ea.) 1.2.4 Prepare Baseline Schedule !Fri 2 5 Prepare Monthly Progress Reports with Schedule 1 2 6 Prepare Monthly MWBE Reports 5 4.5 10 6 5 18 20 $990.00 $635.00 $1,700.00 $1,125.00 $885.00 $2,430.00 $2,210.00 '1&g sioo.d $50.d. $35,0C- $180.0r • $0,0i. $0.0( EXHIBIT B-2 Level of Effort Spreadsheet (Task/Hour Breakdown) - MODIFIED CONTRACT AMENDMENT NO. 1 Design Services for Sanitary Sewer Rehabilitation Contract LXXXIV (84) City Project No. 01503 Total Costs 10011 $1,090.de' 0 $685.di 0 $1, 735.0. $1,305.0. 0 $885.0 . 0 $2,430.001 0 $2,210.0. Project Director $205 Project Manager $170 -T0 0 0 0 Labor hours) Project Engineer $105 $95 $85 0 0 0 0 REVISED Amendment No. 1 (A) EIT CADD Administrative Total Labor Cost $65 MWBE Non-MWBE Ex -nse Subconsultant Travel Reproduction Total Expense Cost Task Sub Totals May 4, 2012 AMENDED BUDGET TASK 10% sub SUB TOTALS mark-up 31! 2.2 2,2A 228 010 2 2C Condesitf atAs�r�At (30-Percent ) Data Collection Subsurface Utility Engineering (Level B Beach Level C Vij1dale/ 28th St.' Supplemental SUE with Survey In westslde of Beath (Level A only on W. Beach (extra deholea)) Addressing Cost Impacts of Integrating New WWMP Design flows Into projeot (they were wrong and changed) 03 14 15 0 $9,805,00 $1.520.001 $1,705.0 01 $0.001 $ 150.0 $12,187.0 $0,0 $22142 00 $1.670.0s 0 $13,892.0. 0 $o,o 0 0 $0.00 $0 00 2.3 3 0 T.1 $1A Recovery of colts - soope change impacts (reverting back from re-route plans previously approved by PM) Design Drawings Prelim n�i -beft-ral Retrial Prelimina7 Des4 jn Dra) I) s 1rollminary Design Drawings - L-3040 Extenalon (total design of 270 LF) 0 $0 00 60 00 3 16 Prollminary Dw ign for Addttlonal M-214 Design to Kearby St due to L-3454 ra-route 64 -1025 928 0 0 $6,580.Oc $07,703.0 $86 :860.0 $0, 0 $0 00 $0.00 $0 00 $6,580.00 $0 00 0 11, 0 :' I 0 0 0 0 1 4 25 0 7 0 0 0 0 0 0 1 1 0 12 le 8 4 0 ilr 0 i t;270 $o $0 $1•0:069 ...._...........'so $0 $0 $770 $10,000 $0 SO $0 $430 $45 $10.476 $o $oo $0 $70 $0 $0 g1 0.745 $41.887 00 $0 $1,670.00 $0 $13,892.00 $0.00 $0 $10,070 $10,840 $10,840.00 $1,000.00 0 0 0 0 0 0 $4, 820 $0 $0 $3,880 $01 0 00 $380 $ 0 S.100 $0 $45 $45 $5,180 $5.18000 S0 t08,369.00" $87.010.0(1 0 12 5 ....... 0 $0 001 0 .0 JA Q •1 a 1'2 0 $8,310 $2,350 3 1C IPrelmmnary Design of 380 LF of L-4252 Realignment to L-4250 (David St I Geotechnical Investigation/Pavement Design(Geotech - 3 bores in Beach St. by City Annual Contractor) Constructabilitv Review Uti10,, Clearance Traffic Control Plan Construction Estimate Final Design 0 10 8 7 60 12 Final Draft (90%) Construction Plans and ,cifications f-iria11100%1Plertr8 si Sneicifrelms.��,, F'lension (dasifa toe) eetlm`Irt l 1 f lnal Plans and Speclfloattona for a .1 2B additional 75 LF of M-214 Design In Eleryl St with L-3454 Re-route 380 241 134 0 0 $0 00 $1.528. $1.515.0 O[(,00S 00 $23,835.00 $13 390.00 $0.00 $0 0C $150. $25 $250. 0.00 $2.48b 00 $0 00 0 $1,100.0s 0 $1 678. gs165. $6, 300. 0 0 4 0 0 0 0 4-5- 0 3 0 0 0 0 -T1 0 d 0 0 0 0 4. 0 J41,705.000 0. 5 5.5 6 $250.00 $24,085.0 $2,550.06 $15,940.dl $0.0 L $0.00 $00 on $0 00 0 0 0 0 0 1 0 0 15 0 0 12 0 1 0 0 0 0 0 0 _ 0 0 155 0 0 t a 0 8 0 0 1 ?,d50 $0 $2,200 40 50 $0 $.450f..... $30 0 $0 $0 $0 $0 $0 $1401 $2,520 $0 $40 $40 $3, 725 1911,6 00 $0 S6,580.00 810,830 2,300 slo0i,ioa 00 $137,010.00 $2,300 00 $,E11,0 5f1L0 00 $0 $0 $30 $0 $50 $0 $80 $0 $2,730 $0 $2,730 00 $1,100.00 TOTAL AMENDMENT BUDGETS $11,840,00 $0.00 $6,180 00 $J $o $� $d $ $0 $0 $ $sss.00 $UI $UI $� $� $0 $6,300.00 ULU -'G2,200 , $4,700 1` $235 00 �'"'$4,ens D5 $0 $0 $0 $0 $0 $0 $0 1,515.00 $3.705 $0 1 1 $710 $0 S(1 (, (1 'lit) 42C Final Plans and Specifications of 380 LF of L 4252 Design Realignment to David Si and L- 4250 0 $0 00 $0 001 $0 00 0 2 2 4 $1,510 $0 1OD Final Design • Service Re-route Plans for L- 3454 (Oncorl (based an 4 late ei) $1$Qlaervlce) 14.3 !Construction Vi‘nates (90% and 100%) 5.1 •Sell Con IMCI L OcJA. lift is Nlairnia( Plan 0 14 Holders List 5.2 Issue Addenda (1) 5.30 Attend Bid Opening (1) 5.40 Tabulate Bids and Recommend Award 38 20 6 3 7 $000 $1,770.004 $1,505.00 $595.QQ $405.0 $905.00 $ (1 00 so.oc4 $00 0 $1,770.4 o UAW $1,505.00 0 $595.09 0 $455.00 0 $905.00 0 0 l l 0 0 0 0 0 15 0 0 0 Li (1 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $468 so 4,u $0 S0 S0 $0 $0 So $0 S0 $0 $0 $0 $0 SO $ 0 $00 $0 $J $40 ,0 $145 $0 $J $60 $235 $3,040 $0 $d) $1,088 $45,734 50 $24, 085.00 $151940.00, $1,087,60 $50 $50 $700 $700.00 $.0 $0 $25 $25 $1,63! So 7(U $0 $0 $0 $0 $,50 $o so $d so $0 $20 sot au. $0 $0 $0 $0 $,70 $oj su $0 $6 $0 $0 $1,535 00 $557 $557 00 $0 $1,770.00 SU yld.�t l Q $0 $1,505.00 $0 $595.00 $0 $455.00 $0 $905.00 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 5.19.2010 1 of 2 ID Task No. rjngroup Task Description Patel 83 0.0 Construction Phase Services 6.1 Attend Preconstruction Conference 6.2 Attend Public Meeting & Provide Exhibits ,1•0 . OWlEasement Services„ 42 7.1 Right -of -Way Research 42 7 2 Right-of-Way/Easement Preparation and Submittal (6) 42 7.3 Temporary Right of Entry Preparation (115) 5118.1 8.1 51 8.1A 51 8 1B 1 8.1C 0 33 9.1 3319.2 83 9.4 32 9.3 Note:* Survey Desiv`r Surveylava $3.95/LF1 Supplemental purvey R Procertalnp - L-3040 Extension (270 LF) Supplemental Survey and Processing of Additional 75 LF of M-214 Design In Beryl St. with L-3454 Re-route SURVEY PROCESSING of Supplemental Survey (380 LF) of L-4252 Realignment to David S1 (L-4250) Permitting SWPPP Oncor 1 TXD6 (two permits1 City of Fort Worth Parks Coordination Totals Original Contract Budget and Future AppTved Amendments Total Hrs Labor Costs Direct Costs le 3 15 6 $2 0b0). S440.0 $1,610.00l $110 f� $30.0 $80.0 Se :.0 d 54 $640.0. $0.0. $640.0 Level of Effort Spreadsheet (Task/Hour Breakdown) - MODIFIED CONTRACT AMENDMENT NO. 1 Design Services for Sanitary Sewer Rehabilitation Contract LXXXIV (84) City Project No. 01503 Total Costs $2 100.Q $470.00 $1,690.00 $615.0$5,290.0s $5,905.0 54 $4, 910.0 ' $250.0 s $5,160.0 it 0 0 0 tAtc $0.0 $0 00 $0 00 rig, 53.710.80 $0 0 $0 00 Project Director $205 Project Manager $170 Labor hours) Project Engineer $105 o 0 0 0 0 0 0 0 $55.660.8 . 0 $0,00 $0 00 S170,743.00 $' 0.8• $202.480.80 0 0 0 0 0 0 0 05 0 0 0 0 0 0 0 0 0 0 EIT CADD Administrative $95 $85 $65 0 0 0 0 0 0 0 0 0 15 0 0 0 0 n 0 0 0 0 0 0 0 0 0 15 REVISED Amendment No. 1 (A) 1 Total Labor I Cost Item 8.1C includes an additional $1000 of T&M surveying cost to revisit property off of David St. (L-4252) once City secures property owner's permission to access property that was restricted previously M/WBE Sub -Consultants: Spooner & Associates, Inc: Survey and Easements Gorrondona & Associates, Inc: SUE Services GRAM Traffic NTX - traffic services C84 Modified 2 RFINAL LOE BUDGET - AMENDMENT NO. 1 Turquoloe Tan Gold Orktal Revised 58,911 $61,829 $12,087 $33,549 $0 $2,200 $70,998 $97,578 Date: Amend No. 1 $2, 917.50 $10,000.00 $2, 200.00 $15,117.50 Amnd # 1 M/WBE Particip. Level is Original MWBE GOAL Set at 24% 4-May-12 $0 $0 $0 Exhsnse Subconsultant MWBE1Non-MWBE $o $0 $0 $0 $0 $0 $0 $0 $0 :1.055 00 $0 3170 $0 '.0.b40 $25, 070 $0 o Travel Reproduction $e $0 $0 $0 $0 $0 Total Expense Cost $0 $0 $0 $0 $0 $0 $0 SO $0 S0 SO Task Sub Totals AMENDED BUDGET TASK 10% sub SUB TOTALS mark-up $0 32,100, 00 $0 $470.00 $0 $1,690,00 0 40 $0 $5,905.00 $0.00 S0 ,017,50 $0 $945 $1,710 50 tP 50 $0 $15.117 50 $0 S0 $0 $0 $0 $0 $0 $d $ $0 $150.00 13,506 LF of Design 44 plan sheets anticipated INCLUDES ADDITIONAL PACBD $ FOR CROSSING THE PARK WITH A NEW LINE $100 $0 338 $41 $22 $10 $895.00 $0 $3,018 $0 $0 $0 $983 50 $0 $0 $0 80 $ S329.50 $16,292.00 $42,202.00 10% sub Mark-up % sub Mark-up Check $259, 550 $0 $t� ...... _._ $ i 0 $10 $1,650 ORIGINAL PROJECT BUDGET: 34.52% I,ro,pl/, imour 1mr I H Total Labor Total Exotjf se/ MWBE Subconsultant Non-MWBE Subconsultant 10% Sub Markup MWBE Participation Total Project Cost Adjustments to Old Administrative Tasks due to schedule delays (4 months assumed) & cost impacts from modifying the PM approved conceptual plan to eliminate re-routing of L-4135, L-4136, L-4203, & more of L-4252 Supplemental SUE work (Levels A & B) in Beach St & a little of Springdale for M-181B Cost Impacts from Request to use new WWMP Peak Flows (which were wrong and changed) Lime Green 75 LF of Additional M-214 Design in Kearby St. (survey/prelim/final) and final design of 4 service re-routes from L-3454 (Oncor ROW) so that this segment can be abandoned Light Blutill 380 LF of Additional Design for the L-4252 re-route to L-4250 in David St. (survey/prelim/final) Pink 270 LF Extension of L-3070 (survey/prelim/final) New tasks Traffic Control Study Yellow New tasks for TxDOT Permitting 7.009.5 $7162 ``713 $92.Ob0 $86 116 $150 $8.627 $303 $1,732 $5,160.00 $3.973 $59,033.30 $0 $1,153 $600 $2,214 $10 $1,850 $55,660.801 $1,153 00 $805 50 $2,214 00 $8,470.00 9 270.00 , 1, 960.00 $0.00 $2,240 00 $294,712 80 $8,828.56 $0.00 TOTAL AMENDMENT BUDGETS $94 50 54,725 00 $26 26 $2, 898 76 $303,339.35 net Check $171 00 $0.00 $0.00 $1,526.75 $1,526.75 $42,262.00 $43, 788.75 $8,860.00 $0.00 $1,660.00 $43, 788.75 -$15,117.50 $28,671.25 -1,174.50 27,496.75 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 5.19.2010 2 of 2