Loading...
HomeMy WebLinkAboutContract 41722 (2)CITY SECRETARY MY OF I; 1T WORTH, T h CASCtON TA T Ma sum)AR=) ACC EEMENTi FON k_N GINIENRIN G RELATED DESIGN SERVICES This AGREEMENT is between the City of Fort Worth, a home -rule municipal corporation situated in Tarrant, Denton, Parker and Wise Counties, Texas (the "CITY"), and RJN Group, Inc., (the "ENGINEER"), for a PROJECT generally described as: Sanitary Sewer Rehabilitation, Contract I,XXXIV (84). Article II Se A ip, m SSMceS A. The Scope of Services is set forth in Attachment A. Article II Comp: nsatirn A. The ENGINEER's compensation is set forth in Attachment B. Article ill Terms of Payment Payments to the ENGINEER will be made as follows' A. Invoice and Payment (1) The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. (2) The ENGINEER will issue monthly invoices for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. (3) Upon completion of services enumerated in Article I, the final payment of any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The CITY will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the billing until mutually resolved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving 7 days' written notice to CITY, suspend services under this AGREEMENT until City of Fort Worth, Texas Standard Agreement forEngineering Related Design Services PMO Official Release Date: 5.19.2010 Page 1 of 15 paid in full. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. Article IV Obligations of the Engineer Amendments to Article IV, if any, are included in Attachment C. A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement providing professional engineering consultation and advice and furnishing customary services incidental thereto. Standard of Care The standard of care applicable to the ENGINEER's services will be the degree of skill and diligence normally employed in the State of Texas by professional engineers or consultants performing the same or similar services at the time such services are performed. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution These conditions and cost/execution effects are not the responsibility of the ENGINEER City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 2 of 15 D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the Contract Documents, nor shall anything in the Contract Documents or the agreement between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT If the ENGINEER makes on -site observation(s) of a deviation from the Contract Documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 3 of 15 (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs competitive bidding procedures and market conditions time or quality of performance by third parties; quality, type, management or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule Therefore the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents, that the final work will be acceptable in all respects that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances, or that there are not other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. I. Minority and Woman Business Enterprise (M/WBE) Participation In accord with City of Fort Worth Ordinance No. 15530, as amended, the City has goals for the participation of minority business enterprises and woman business enterprises in City contracts Engineer acknowledges the M/WBE goal established for this contract and its accepted written commitment to M/WBE participation. Any misrepresentation of facts (other than a negligent City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 4 of 15 misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not Tess than three (3) years J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents papers and records of the ENGINEER involving transactions relating to this contract ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. K. INSURANCE (1) ENGINEER'S INSURANCE a. Commercial General Liability — the ENGINEER shall maintain commercial general liability (CGL) and if necessary, commercial umbrella insurance with a limit of not less than $1,000,000.00 per each occurrence with a $2 000,000.00 aggregate. If such Commercial General Liability insurance contains a general aggregate limit it shall apply separately to this PROJECT or location. i. The CITY shall be included as an insured under the CGL, using ISO additional insured endorsement or a substitute providing equivalent coverage, and under the commercial umbrella, if any This insurance shall apply as primary insurance with respect to any other City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 5of15 insurance or self-insurance programs afforded to the CITY. The Commercial General Liability insurance policy shall have no exclusions by endorsements that would alter or nullify: premises/operations, products/completed operations, contractual, personal injury or advertizing injury, which are normally contained within the policy, unless the CITY approves such exclusions in writing. ii ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained in accordance with this agreement. b Business Auto — the ENGINEER shall maintain business auto liability and, if necessary commercial umbrella liability insurance with a limit of not Tess than $1,000 000 each accident. Such insurance shall cover liability arising out of ' any auto', including owned, hired and non -owned autos, when said vehicle is used in the course of the PROJECT If the engineer owns no vehicles, coverage for hired or non -owned is acceptable. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by ENGINEER pursuant to this agreement or under any applicable auto physical damage coverage. c. Workers' Compensation —ENGINEER shall maintain workers compensation and employers liability insurance and, if necessary commercial umbrella liability insurance with a limit of not less than $100,000.00 each accident for bodily injury by accident or $100,000.00 each employee for bodily injury by disease with $500,000 00 policy limit. i ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by workers compensation and employer's liability or commercial umbrella insurance obtained by ENGINEER pursuant to this agreement. d. Professional Liability — the ENGINEER shall maintain professional liability a claims -made policy, with a minimum of $1,000,000.00 per claim and aggregate The policy shall contain a retroactive date prior to the date of the contract or the first date of services to be performed, whichever is earlier. Coverage shall be maintained for a period of 5 years following the completion of the contract. An annual certificate of insurance specifically referencing this project shall be submitted to the CITY for each year following completion of the contract. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5,19.2010 Page 6 of 15 g. (2) GENERAL INSURANCE REQUIREMENTS a. Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be delivered to the CITY prior to ENGINEER proceeding with the PROJECT. b. Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, as its interests may appear. The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. c. Certificate(s) of insurance shall document that insurance coverage specified in this agreement are provided under applicable policies documented thereon. d. Any failure on part of the CITY to request required insurance documentation shall not constitute a waiver of the insurance requirements. e. A minimum of thirty (30) days notice of cancellation or material change in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable in the event of non-payment of premium Such terms shall be endorsed onto ENGINEER's insurance policies. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 1000 Throckmorton, Fort Worth, Texas 76102 f. Insurers for all policies must be authorized to do business in the State of Texas and have a minimum rating of A:V or greater, in the current A M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. Any deductible or self insured retention in excess of $25,000.00 that would change or alter the requirements herein is subject to approval by the CITY in writing, if coverage is not provided on a first -dollar basis. The CITY, at it sole discretion, may consent to alternative coverage maintained through insurance pools or risk retention groups. Dedicated financial resources or letters of credit may also be acceptable to the CITY. h. Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. The CITY shall be entitled, upon its request and without incurring expense, to review the ENGINEER's insurance policies including endorsements thereto and, at the CITY's discretion; the ENGINEER may be required to provide proof of insurance premium payments. j. Lines of coverage, other than Professional Liability, underwritten on a claims -made basis, shall contain a retroactive date coincident with or prior City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 7 of 15 to the date of the contractual agreement. The certificate of insurance shall state both the retroactive date and that the coverage is claims -made. k. Coverages, whether written on an occurrence or claims -made basis, shall be maintained without interruption nor restrictive modification or changes from date of commencement of the PROJECT until final payment and termination of any coverage required to be maintained after final payments. I. The CITY shall not be responsible for the direct payment of any insurance premiums required by this agreement. m. Sub consultants and subcontractors to/of the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER When sub consultants/subcontractors maintain insurance coverage, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at City of Fort Worth, Texas Standard Agreement for Engineenng Related Design Services PMO Official Release Date: 5.19.2010 Page 8 of 15 its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City Amendments to Article V, if any, are included in Attachment C. A. City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines and other components of the CITY s facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights -of -way, and access necessary for the ENGINEER's services or PROJECT construction. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5,19,2010 Page 9 of 15 D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification and Claims The CITY agrees to include in all construction contracts the provisions of Article IV E regarding the ENGINEER's Personnel at Construction Site, and provisions providing contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers employees and subcontractors for any claim arising out of, in connection with, or resulting from the engineering services performed. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 10 of 15 (3) Only the CITY will be the beneficiary of any undertaking by the ENGINEER " (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this Agreement (4) Nothing contained in this section V.H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. I. CITY's Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY will ensure that Builders Risk/Installation insurance is maintained at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) The CITY will specify that the Builders Risk/Installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. K. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions Amendments to Article VI, if any, are included in Attachment C. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 11 of 15 Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure The ENGINEER is not responsible for damages or delay in performance caused by acts of God, strikes lockouts, accidents, or other events beyond the control of the ENGINEER that prevent ENGINEER's performance of its obligations hereunder. D. Termination (1) This AGREEMENT may be terminated only by the City for convenience on 30 days' written notice. This AGREEMENT may be terminated by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and does not commence correction of such nonperformance with in 5 days of written notice and diligently complete the correction thereafter. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) Out-of-pocket expenses for purchasing electronic data files and other data storage supplies or services; The time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all termination expenses. The CITY'S approval will be obtained in wnting prior to proceeding with termination services. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date 5 19 2010 Page 12 of 15 E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification In accordance with Texas Local Government Code Section 271.904, the ENGINEER shall indemnify, hold harmless, and defend the CITY against liability for any damage caused by or resulting from an act of negligence intentional tort intellectual property infringement or failure to pay a subcontractor or supplier committed by the ENGINEER or ENGINEER s agent, consultant under contract, or another entity over which the ENGINEER exercises control. G. Assignment Neither party shall assign all or any part of this AGREEMENT without the prior written consent of the other party. H. Interpretation Limitations on liability and indemnities in this AGREEMENT are business understandings between the parties and shall apply to all the different theories of recovery, including breach of contract or warranty, tort including negligence, strict or statutory liability, or any other cause of action except for willful misconduct or gross negligence for limitations of liability and sole negligence for indemnification. Parties mean the CITY and the ENGINEER, and their officers, employees, agents, and subcontractors. I. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 13 of 15 J. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F , VI.B. VI D , VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. K. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law ordinance, or regulation, whether it be by itself or its employees. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 14 of 15 Article VII Attachments, Schedules, and Signatures This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment Attachment Attachment Attachment Attachment A - Scope of Services B e Compensation C e Amendments to Standard Agreement for Engineering Services D - Project Schedule E - Location Map Executed this the 3C1day of -A , 2011. • A [1 EST: Marty Hendrix City Secretary R s&iS . nt City ATTEST: P a 9 Pot v-o t`ro .001, p P(44 0 FORM W. ttaarnei-Y _-c o r W 00000o00 • 54 Contract Authorization Dato City of ort V4Tiffl Texas Standard Agree;'€ent for Enginee iriv Related Design Serer' P -4 1 Of:.la Release Date: 5. it:.2u {0} Pace 15 & 1 CI • . O[ FORT WORTH R:7"-A144ssynd • Fernando Costa Assistant City Manager APR AL REC !y4ENDED 1 itAmr% S. Frank Crumb, P.E. Director, Water Department RJN Group, Inc. Peter Lai, P.E. Vice President OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT 84 CITY PROJECT NO.: 01503 ATTACHMENT A Scope for Engineering Design Related Services for Water and/or Sanitary Sewer Improvements DESIGN SERVICES FOR SANITARY SEWER REHABILIATION CONTRACT LXXXIV (84) CITY PROJECT NO.: 01503 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. Main/Lateral Upstream Downstream Length Existing Pipe Prop Pipe Station Station Size . Size L03040 10+55 8+70 186 6 8 This line is in Honeysuckle Ave. from the Seaman St. intersection, moving west towards Robinwood Dr. L03043 I 1+66 I 0+00 I 90 I 8 I 8 This line is located in Yucca Ave. from the Belknap/Beach St. intersection, moving west towards Primrose Ave. L03452 I 3+20 I 0+00 I 319 I 6 I 8 This line is located in Selma St. from the M-214 alignment, moving west towards Brittain St. L03452A I 0+71 I 0+00 I 71 I 6 I 8 This line is located in Selma St. from the M-214 alignment (located 3 houses west of Calloway & Springdale intersection), moving east towards N. Beach St. L07409 I 2+35 I 0+00 I 236 I 6 I 8 This line is located in Selma St. from L03454 at the Brittain St. intersection, east U/S towards N. Beach St. L03454 I 5+88 I 0+00 I 367 I 8 I 8 This line is located in Brittain St. from the Springdale Rd. intersection, moving north towards Hollis St. L03454 I 11+55 I 7+88 I 579 I 8 I 8 This line is located in an Oncor ROW from the Beryl St. intersection, moving southwest towards Brittain St. L04135 I 6+75 I 0+00 I 677 I 6 I 8 This line is located in an easement/alley from Hollis St. north towards Selk Ave., between Brittain & Fairview L04136 I 6+75 I 0+00 I 678 I 6 I 8 This line is located in an easement/alley from Hollis St. north towards Selk Ave., between Brittain & Beryl L04203 I 6+77 I 0+00 I 679 I 6 I 8 This line is located in an easement/alley from Hollis St. north towards Selk Ave., between Robinwood & Fairview L04252 I 13+34 I 0+00 I 1,341 I 6 I 8 This line is located in an easement/alley from Hollis St. north thru Springdale Park, then west behind a used car business located just west of David Dr. and 28th St. intersection L05105 6+00 I 0+00 602 8 I 8 This line is located in the north parkway of 28'h St. from Elinor St., west U/S towards Fairview St. M00181B I 207+76 I 147+52 I 6,010 I 12 I 15 This line is located Springdale Rd. from Riverside Dr. west to N. Beach St., then turning south in N. Beach St. to Belknap St. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 1of14 r M00214 I 5+45 I 0+00 I 550 I ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT 84 CITY PROJECT NO.: 01503 10 I 10 This line is located in an easement located 3 houses west of the Calloway & Springdale Rd. intersection), moving nort1M002140018I13 loci42 4i9 Springdale RO+t19 elmalSt. I 10 1,232 I 10 This line is located in Elinor St. starting at from 28`" St. traveling north (U/S) to the City Limit line located east of N. Beach St. Task 1. Task 2. Task 3. Task 4. Task 5. Task 6. Task 7. Task 8. WORK TO BE PERFORMED Design Management Conceptual Design Preliminary Design Final Design Bid Phase Services Construction Phase Services ROW/Easement Services Survey and Subsurface Utility Engineering Services TASK 1. DESIGN MANAGEMENT. ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER shall manage change, • communicate effectively, • coordinate internally and externally as needed, and • proactively address issues with the CITY s Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team • Lead, manage and direct design team activities • Ensure quality control is practiced in performance of the work • Communicate internally among team members • Task and allocate team resources 1.2. Communications and Reporting • Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and clarify scope, understand CITY objectives, and ensure economical and functional designs that meet CITY requirements • Conduct review meetings with the CITY at the end of each design phase • Prepare invoices and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the Water Department City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 2 of 14 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT 84 CITY PROJECT NO.: 01503 • Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement and according to the City of Fort Worth's Schedule Guidance Document. • Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at the end of the project Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs ENGINEER shall work with regulatory authorities to obtain approval of the designs and make only the changes necessary to meet their requirements in effect on September 1, 2010 as part of the design scope. • • Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of Its sub -consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS • • • • 12 MWBE reports will be prepared 4 meetings with city staff 12 monthly water department progress reports will be prepared 12 monthly project schedule updates will be prepared DELIVERABLES A. Meeting summaries with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly M/WBE Report Form and Final Summary Payment Report Form TASK 2. CONCEPTUAL DESIGN (30 PERCENT). The Conceptual Design shall be submitted to CITY per the approved Project Schedule. The purpose of the conceptual design is for the ENGINEER to City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 3 of 14 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT 84 CITY PROJECT NO.: 01503 • Study the project, • Identify and develop alternatives that enhance the system, ■ Present (through the defined deliverables) these alternatives to the CITY • Recommend the alternatives that successfully addresses the design problem, and ■ Obtain the CITY's endorsement of this concept. ENGINEER will develop the conceptual design of the infrastructure as follows. 2.1. Data Collection • In addition to data obtained from the CITY, ENGINEER will seek to identify and obtain proposed improvements that may influence the project. • The ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including but not limited to; utilities, agencies (TxDOT and railroads), neighboring Cities and property ownership, as available from the Tax Assessor's office. 2.2. Geotechnical Investigations • ENGINEER advises the CITY that up to three (3) test borings and other subsurface investigations are needed for the N. Beach St. project location. If the CITY determines that such borings or investigations are needed, then the City will direct its geotechnical consultant to perform the number of test bores authorized by this agreement under the City s annual geotechnical contract. The City's geotechnical firm shall provide a detailed geotechnical report including soil test results and graphs to the Engineer. The soils report shall also provide a summary of the structural load bearing capabilities of the existing soil and make recommendations regarding excavation and trench safety; embedment and backfill; and dewatering, if applicable. The Engineer agrees to work with the CITY's geotechnical consultant to draw up specifications for such testing program. The cost of such testing will be paid for by the CITY. 2.3. The Conceptual Design Package shall include the following: • Cover Sheet • Graphic exhibits and written summary of alternative design concepts considered, strengths and weaknesses of each, and the rationale for selecting the recommended design concept. • Proposed phasing of any sanitary sewer work that is included in this project documented in both the project schedule and narrative form. • Documentation of key design decisions. • Estimates of probable construction cost. ASSUMPTIONS • Three (3) Geotechnical borings are expected for this project. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 4 of 14 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT 84 CITY PROJECT NO.: 01503 • Two (2) Copies of the conceptual design package (30% design) will be delivered.. Report shall be letter sized and comb- bound with a clear plastic cover. Drawings will be 11 x 17 size fold outs bound in the report • DWF files created from design CAD drawings will be uploaded to the designated project folder in Buzzsaw • ENGINEER shall prepare the meeting minutes of the Concept Review meeting and revise the report, if needed. • ENGINEER shall not proceed with Preliminary Design activities without obtaining written approval by the CITY of the Conceptual Design Package. DELIVERABLES A. Conceptual Design Package TASK 3. PRELIMINARY DESIGN (60 PERCENT). P reliminary plans and specifications shall be submitted to CITY per the approved Project S chedule ENGINEER will develop the preliminary design of the infrastructure as follows. 3.1. Development of Preliminary Design Drawings and Specifications shall include the following: • Cover Sheet • Overall project sanitary sewer layout sheets. The sewer layout sheet shall identify the proposed sewer main improvement/existing sewer mains and all sewer appurtenances in the vicinity. • Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, bends, cleanouts, etc., in the same coordinate system as the Control Points/Bench marks • Bench marks per 1,000 ft of plan/profile sheet — two or more. • Bearings given on all proposed centerlines, or baselines. • Station equations relating utilities to paving, when appropriate. • Plan and profile sheets which show the following: proposed sanitary sewer plan/profile and recommended pipe size, manholes, cleanouts and service laterals that are to be replaced, existing utilities and utility easements, and all pertinent information needed to construct the project. Legal description (Lot Nos., Block Nos , and Addition Names) along with property ownership shall be provided on the plan view. • The ENGINEER shall make provisions for reconnecting all identifiable wastewater service lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of-way or utility easement. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 5 of 14 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT 84 CITY PROJECT NO.: 01503 • The ENGINEER will prepare standard and special detail sheets as needed for sewer rehabilitation or replacement that are not already included in the D-section of the CITY's specifications. These may included connection details between various parts of the project, tunneling details, boring and jacking details, details unique to the construction of the project, trenchless details, and special service lateral reconnections. 3.2. Geotechnical Investigation • Soil investigations, including field and laboratory tests, borings, related engineering analysis and recommendations for determining soil conditions will be made by the City of Fort Worth's Geotechnical Sub -consultant and paid by the City under its annual geotechnical contract. In addition to the above investigations, borings and appropriate field and laboratory analysis will be made at reasonable intervals along the project alignment for the Contractor's use in determining soil conditions for preparing bids and a Trench Safety Plan. 3.3. Constructability Review • Prior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY s comments from the field visit and submit this information to the CITY in writing. 3.4. Utility Clearance • The ENGINEER will consult with the CITY's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities and where known and possible consider potential future utilities in designs. • The ENGINEER shall upload individual DWF files for each plan sheet of the approved preliminary plan set to the designated project folder in Buzzsaw for forwarding to all utility companies which have facilities within the limits of the project The DWF files should be created directly from the CAD files as opposed to PDF files. 3.5. Traffic Control Plan • Develop supplemental traffic control drawings as needed for review and approval by the Traffic Division of the Transportation and Public Works Department. These drawings shall be sealed by a professional engineer registered in the State of Texas. If appropriate, the traffic control plan will be developed utilizing standard traffic reroute configurations posted as "Typicals" on the CITY's Buzzsaw website. The "Typicals' need not be sealed individually, if included in the sealed contract documents. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 6 of 14 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT 84 CITY PROJECT NO.: 01503 3.6. Storm Water Pollution Prevention Plan • For projects that disturb an area greater than one (1) acre, ENGINEER will prepare the Storm Water Pollution Prevention Plan (SWPPP) required for the Project for use by the Contractor during construction ENGINEER will prepare drawings and details for proposed SWPPP improvement that the Contractor must use during construction. Contractor will be responsible for filing the SWPPP with appropriate regulatory agencies. ASSUMPTIONS • • design pheca. • Three (3) borings at an average bore depth of approximately 15 feet each will be provided. • Traffic Control "Typicals" will be utilized to the extent possible. It is assumed an additional three (3) project specific traffic control sheets will be developed for the Yucca Ave/Belknap St intersection, the 28th St. location and along N. Beach St • Two (2) sets of 11x17 size plans will be delivered for the Constructability Review. • Two (2) sets of 11x17 size plans will be delivered for the Preliminary Design (60% design). • Two (2) sets of specifications will be delivered for the Preliminary Design (60% design). • DWF files created from design CAD drawings will be uploaded to the designated project folder in Buzzsaw. • The CITY's front end and technical specifications will be used. The ENGINEER shall supplement the technical specifications if needed. • Ten (10) sets of 11x17 size drawings will be delivered for Utility Clearance. • ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. DELIVERABLES A. Preliminary Design drawings and specifications B. Utility Clearance drawings C. Traffic Control Plan D. Storm Water Pollution Prevention Plan E Estimates of probable construction cost City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 7 of 14 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT 84 CITY PROJECT NO.: 01503 TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: • Draft Final plans (90%) and specifications shall be submitted to CITY per the approved Project Schedule. • Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Construction Documents (100%) to the CITY per the approved Project Schedule. Each plan sheet shall be stamped dated, and signed by the ENGINEER registered in State of Texas. • The ENGINEER shall submit a final design estimate of probable construction cost with both the 90% and 100% design packages. This estimate shall use ONLY standard CITY bid items. ASSUMPTIONS Two (2) sets of 11x17 size drawings and two (2) sets of specifications will be delivered for the 90% Design package. • A DWF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in Buzzsaw. Two (2) sets of 11x17 size drawings and two (2) sets of specifications will be delivered for the 100% Design package. • A DWF file for the 100% Design will be created from design CAD drawings and will be uploaded to the project folder in Buzzsaw. • The final sheet list is anticipated to include a cover/index, general notes, overall layout with control point locations, Real Property (easement and ROE) table, SWPPP Traffic Control plan sheets, approximately 44 plan/profile sheets, standard and special detail sheets • DELIVERABLES A. 90% construction plans and specifications. B. 100% construction plans and specifications. C. Detailed estimates of probable construction costs including summaries of bid items and quantities using the CITY's standard bid items and format. D. Original cover mylar for the signatures of authorized CITY officials. TASK 5. BID PHASE SERVICES. ENGINEER will support the bid phase of the project as follows. 5.1. Bid Support City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 8 of 14 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT 84 CITY PROJECT NO.: 01503 • The ENGINEER shall upload all plans and contract documents onto Buzzsaw for access to potential bidders. • Bid Package Contract documents shall be uploaded in an *.xls file. • Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. • Plan Sets are to be uploaded to Buzzsaw in two formats, *.pdf and *.dwf files. The *.pdf will consist of one file of the entire plan set. The *.dwf will consist of individual files one for each plan sheet, and will be numbered and named in a manner similar to that of the plan set index. • The ENGINEER shall sell contract documents and maintain a plan holders list on Buzzsaw from documents sold and from Contractor's uploaded Plan Holder Registrations in Buzzsaw. • The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information The procedures shall include a log of all significant bidders questions and requests and the response thereto The log shall be housed and maintained in the project's Buzzsaw folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidder's questions and requests, in the form of addenda The ENGINEER shall upload all approved addenda onto Buzzsaw and mail addenda to all plan holders • Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. • When substitution prior to award of contracts is allowed in the contract documents, the ENGINEER will advise the CITY as to the acceptability of alternate materials and equipment proposed by bidders. • Attend the bid opening in support of the CITY. Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation is to be uploaded into the project's Bid Responses folder on Buzzsaw. • Incorporate all addenda into the contract documents and issue conformed sets. • The ENGINEER shall submit up to two (2) TxDOT permits through the TxDOT — Utility Installation Review (UIR) System at https://apps.dot.state.tx.us/UIRPRO/uclnt/ucLoain.asp . City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 9 of 14 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT 84 CITY PROJECT NO.: 01503 5.2 Mylar Drawings • The ENGINEER shall submit a set of sealed conformed mylar drawings for record storage. • Record Drawings shall also be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set Each PDF and DWF file shall contain all associated sheets of the particular plan set Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org' designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053_org3.pdf and K-0320_org5.pdf II. Water and Sewer file name example — "X-35667_org36.pdf' where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36' shall be the total number of sheets in this file. Example: X-12755 orgl8.pdf Both PDF and DWF files shall be uploaded to the project's Record Drawing folder in Buzzsaw. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number (817) 392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS • • • • The project will be bid only once and awarded to one contractor. Forty-five (45) sets of construction documents will be sold to and made available on Buzzsaw for plan holders and/or given to plan viewing rooms Two (2) sets of full size and Ten (10) sets of 11x17 size drawings plans and ten (10) specifications (conformed, if applicable) will be delivered to the CITY PDF and DWF files will be uploaded to Buzzsaw. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 10 of 14 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT 84 CITY PROJECT NO.: 01503 • 1 copy full size (22" x 34") mylar plans (conformed, if applicable) will be delivered to the CITY. DELIVERABLES A. Addenda B. Bid tabulations C. Recommendation of award D. Construction documents (conformed, if applicable) E Conformed mylar plans TASK 6. CONSTRUCTION PHASE SERVICES ENGINEER will support the construction phase of the project as follows. 6.1 Construction Support • The ENGINEER shall attend the preconstruction conference. • After the pre -construction conference, the ENGINEER shall provide project exhibits and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. • The ENGINEER shall visit the project site at requested intervals as construction proceeds to observe and report on progress. • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents and the review of one change order. • The ENGINEER shall attend the "Final" project walk through and assist the City with the determination of a final punch list. ASSUMPTIONS • One (1) Change Orders are assumed. • Two (2) Site Visits are assumed. DELIVERABLES A. Public meeting exhibits B. Review of One Change Order TASK 7. ROW/EASEMENT SERVICES. ENGINEER will support and perform activities related to ROW and land as outlined below, per scoping direction and guidance from the CITY's Project Manager. City of Fort Worth Texas Attachment A PMO Release Date: 08.27.2010 Page 11 of 14 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT 84 CITY PROJECT NO.: 01503 7.1. Right -of -Way Research • The ENGINEER shall determine rights -of -way, easements needs for construction of the project 7.2. Easement and Temporary Right of Entry Preparation and Submittal. • The ENGINEER shall prepare documents to be used to obtain permanent and/or temporary easements, including Temporary Right of Entry (TROE) agreements, required to construct the improvements. The ENGINEER shall submit the easement and TROE documents to CITY PM for real property acquisition • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. • • ASSUMPTIONS • Approximately six (6) Easements documents may be necessary. • Approximately one hundred fifteen (115) Temporary right -of -entry documents will be necessary. Right -of -Way research and mapping includes review of property/right-of-way records based on current Internet based Tarrant Appraisal District (TAD) information available at the start of the project and available on -ground property information (i.e. iron rods, fences, stakes, etc ). It does not include effort for chain of title research, parent track research, additional research for easements not included in the TAD, right-of-way takings, easement vacations and abandonments, right-of-way vacations, and street closures. DELIVERABLES A. Easement exhibits and meets and bounds provided on CITY forms. B. Temporary Right of Entry Letters TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. ENGINEER will provide survey support as follows. 8.1. Design Survey • ENGINEER will perform field surveys along road right of way and easements, plus adjacent private property areas as needed to collect sufficient horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities structures, and trees 6-inches and larger (measure caliper, identify overall canopy and if possible identify species of trees), and other features relevant to the final plan sheets City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 12 of 14 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT 84 CITY PROJECT NO.: 01503 • The minimum survey information to be provided on the plans shall include the following: Control Points, used or set while gathering data. The following information about each Control Point; a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. c. Descriptive Location (Ex Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Cleanouts Vaivos, etc., in the same coordinate system, as the Control Points/Bench Marks. No less than two horizontal bench marks, per line or location. 8.2. Subsurface Utility Investigation Subsurface Utility investigations (SUE) Quality Level B at a minimum, including field identification (marking) are required on this project along N. Beach St. If the ENGINEER determines that a Level A SUE needs to be conducted; (1) the ENGINEER will authorize up to two (2) de -holes to be performed. In all options, the ENGINEER shall propose appropriate de -hole locations in the project and collect flow line elevation and other applicable information of the utilities located by the SUE investigation. The ENGINEER shall use this information to provide the design for the sanitary sewer service line to be rerouted or relocated. ASSUMPTIONS • Topographic survey at an intersection will include no more than 25 ft. in each direction on side streets to document the curb returns at an intersection. • A SUE Level B investigation is required in N. Beach St. DELIVERABLES A. Copies of field survey data and notes signed and sealed by a licensed surveyor. B. Drawing of the project layout with dimensions and coordinate list. ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existina Scone of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 13 of 14 • • • • • • • • • • • ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT 84 CITY PROJECT NO.: 01503 S ervices related to development of the CITY's project financing and/or budget. • Services related to disputes over pre -qualification, bid protests bid rejection and re -bidding of the contract for construction. Construction management and inspection services Periodic site visits above budgeted levels during construction phase Additional design phase public meetings S erformance of materials testing or specialty testing services. S ervices necessary due to the default of the Contractor. S ervices related to damages caused by fire, flood, earthquake or other acts of God. S ervices related to warranty claims, enforcement and inspection after final completion. S ervices related to submitting for permits (ie.TxDOT, railroad, etc...) S ervices related to Subsurface Utility Engineering Levels A, B, C or D Services related to Survey Construction Staking S ervices related to acquiring real property including but not limited to easements right-of-way, and/or temporary right -of -entries, including n egotiation with property owners S ervices to support, prepare, document, bring, defend, or assist in litigation u ndertaken or defended by the CITY. Construction Shop drawing review, samples and other submittals submitted by the contractor. Performance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 14 of 14 ATTACHMENT B COMPENSATION Design Services for Sanitary Sewer Rehabilitation Contract LXXXIV (84) City Project No. 01503 Lump Sum Project I. Compensation A. The ENGINEER shall be compensated a total lump sum fee of $259.550 as summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor matenais, supplies, and equipment necessary to deliver the services. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item III of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Water Department monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B PMO Official Release Date: 5,19.2010 Page 1 of 7 B-1 ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility P rime Consultant RJN GROUP, INC. Design Consultant P roposed M/WBE Sub -Consultants S pooner and Topographic Survey and Associates, Inc. (SAI) Easements Gorrondona & Subsurface Utility Engineering Associates, Inc. (GAI) (SUE) Non-M/WBE Consultants N/A N/A Project Number & Name City Project No 01503 - Sanitary Sewer Rehabilitation Contract LXXXIV (84) City M/WBE Goal = 24.0% City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 2 of 7 Fee Amount $188,552.00 72.65% $58,911.00 22.70% $12,087.00 4.65% $0.00 0.00% TOTAL $259,550.00 Total Fee $259.550.00 M/WBE Fee $70,998.00 100% M/WBE % 27.35% Consultant Committed Goal = 27.35% B-2 EXHIBIT ` B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across work types and work phases. City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 3 of 7 Professional Services Payment Request Project Manager. Project: Sanitary Sewer Rehabiliation Contract LJOCXN (84) City Project #: 01503 City Sec Number. Purchase Order: C-24754 Company Name: RJN GROUP, INC. Consultant's PM: Vendor Invoice #: Payment Request #: From Date: To Date: Invoice Date: Sheet Sewer Invoice Chris Brooks, P:E. (SEWER email: Office Address: Telephone: Fax: FAC and Work Type Description Totals This Payment Request EXHIBIT B-1 Robert Sauceda Consultant Instructions: Summary Fill in green cells including Invoice Number, From and To Dates and the included worksheets. When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. cbrookserin.com, 6701 Brentwood Stair Road, Suit e 100W Fort Worth, Texas 76112-3363 817-451-3500 817-451-3506 Agreement Amendment Amount Amount $259,550.001 $0.00 $259,550.00 Agreement Amount to Completed Percent Date Amount Completed $259,550.0C_ $0.00 $0.00 $259,550.00 $0.00 Overall Percentage Complete: 0.00000000% LOCK 1 " UNLOCK ($) Invoiced Current Previously Invoice $0.00 $0.00 $0.00 $0,00 Remaining Balance $259,550.00 $259,550.00 Professional Services Payment Request Project: City Project*: Work Type Desc: F/A/C: City Sec Number: Purchase Order: 0 EXHIBIT B-1B Project Manager. Robert Sauceda Sanitary Sewer Rehabiliation Contract LXXXIV (84) 01503 SEWER C-24754 Company Name: RJN GROUP, INC. Consultant's PM: Vendor Invoice #: Payment Request #: From Date: To Date: Invoice Date: Pay Items 31 - Conceptual Design 32 - Preliminary Design 33 - Final Design 51 - Preliminary Survey Submttted by. Chris Brooks, P.E. 0 0 0 0 0 Description Totals This Unit: Consultant Instructions: Fill In green cells including Percent Complete and Invoiced Previously Quanities When your invoice Is complete, save and close, start Buusaw and Add your invoice to the Consultant folder within Project's folder. email: cbrooks@dn.com Office Address: 6701 Brentwood Stair Road, Suite 100W Fort Worth, Texas 76112-3363 Telephone: 817-451-3500 Fax: 817-451-3506 Agreement Amendment Amendment Amount Number Amount $60,192.00 5120,383.00 $20,064.00 $58,911.00 $259 550,00 Agreement Amount to Date 560,192.0C 5120,383.0C $20,064.0C $58,911.0C $0.0C 50.0c $0.0C $0.0C $0.0C $0.0C $0.0C $0.00 $0.00 $259,550.00 Overall Percentage Complete: Completed Amount $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Percent ($) Invoiced Completed Previously 0,00000000% $0.00 Current Remaining Invoice Balance $0.00 $60,192.00 $0.00 $120,383.00 $0.00 $20,064.00 $0.00 $58,911.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0,00 5259 550,00 EXHIBIT "B-2" ENGINEER LEVEL OF EFFORT (Supplement to Attachment B) Insert level of effort following this page. City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 4 of 7 rjnnzroup IID Task Task Description No. Rate 301.0 - ProlectManagement 1.1 Mana9mq the Team 1.1.1 QA/QC 12 Communications and Reporting 1.2.1 Pre -Design Coordination Meeting Quarterly Project Update Meetings 1.2.2 (2.5 hrs /ea) Design Submittal Review Meetings 1.2.3 (Prelim 4 Final only (a? 1.5 hrs/ea./ 1.2.4 Prepare Baseline Schedule Prepare Monthly Progress Reports with 1.2,5 Schedule 1.2.6 Prepare Monthly MWBE Reports 111311Wr Conceptual Design (30-Percent) 2.1 Data Collection Subsurface Utility Engineering (Level B 2.2 Beach, Level C Springdale/ 28th St.) 2.3 Design Drawings 32 3.0 Preliminary Design (60 Percent] - 3.1 Preliminary Design Drawings Geotechnical Investigation/Pavement 3.2 Desig2n(Geotech - 3 bores in Beach St) 3.3 Constructabikty Review 3.4 Utah( Clearance 3.5 Traffic Control Plan 3.6 Construction Estimate r 4.0 Final Design Final Draft (90%) Construction Plans and 4.1 Specifications 42 Final (100%) Plans and S2wcifications 4.3 Construction Estimates (90% and 100%) (a1s.0 - 5.1 52 5.30 5.40 las 6.0 6.1 Bid Phase Sell Contract Documents and Maintain Plan Holders List Issue Addenda (1) Attend Bid Opening (1) Tabulate Bids and Recommend Award Cons. Construction Phase Services Attend Preconstruction Conference Public Meeting 8 Provide Exhibits 7�o' 42 7.1 R ROW/Easement semen t Services . escarch Right-of-Way/Easement Preparation and 42 7.2 Submittal (6) 42 7.3 Temporary Right of Entry Preparation (115) I50 8.0 ' Survey. ! � • 51 8.1 DesignSurvey(avq53.95/LF) 1 19.0 Permitting 33 9.1 SWPPP 33 9.2 Oncor (11 32 9.3 City of fort Worth Parks Coordination MWRE Sub -Consultants: 3 3 1 4 12 21 6 Project Project Director Manager $205 $170 10 38.5 4 1 0 2.5 EXHIBIT B-2 Level of Effort Spreadsheet - TASK/HOUR BREAKDOWN Design Services for Sanitary Sewer Rehabilitation Contract LXXXIV (84) City Project No. 01503 Labor(hours) ( Project i Total Labor En meet Ef7 CADD Administrative Cost A $i DS $95 $85 $65 2 "0 0 18 $9,975 el 0 0 $990 2 0 0 1635 10 0 0 0 $1,700 0 0 0 $1,125 - 2 22) 14 0 6 111 6 12 20i 2 2 8 69.5 56 2 1.5 1 6 3 4 4 12 26 8 0 6 2 16 24 $885 6 $2.430 12 $2210 Subconsuham MWBE SO Expense Travel Non-MWBE S0 Reproduction $365 ' SO 1100 $50i 535 $180 3 $9,80$ 0 $1,520 $12,087 0 $1,705 $12,087 3 $6,580 92I 52 777.5 70 30 750 2 01 4 12) 4 2 0.51 0 1 14 24 41 4 12 $97,793 S0 8 $86860 0 S1,100 $1.528 1 5740 3 $6,050 11.5151 4I 48 28 16 4 70 40 24 6 43 152 25 102 16 50 2 0 6 1 1 29 2 1 4 . 1 2 0 0 2 0 40 24 1 20 65 - $38,995 � 5 0 $23.83 $13.39 $17701 $3.410 16 $1.505 2 $595 $405 1 $905I 1;o50 $440 0 1 0 Totals - 48 Spooner & Associates, Inc Survey and Easements Gorrondona & Associates, Inc: SUE Services C84 FINAL LOE BUDGET 5l 3Sti) 2 0.5 3 13 0 1 1 2 0.5 4 20 2 4 6 18 8 4 0 11 „ 14 8 41 8� 8 4 6 0 3 0 0 203 '. 2183 - ' 161.5 158,911 $12,087 $70,998 4OJI 995:51 • 4 .13 1 2 SD 1250 5150 Total Expense Cost Task Sub Totals 3365 - $10,340 $100 S1,090 $50 S685 $35 $1,735 1180 $1.305 50 $885 $0 12.430 $0 52210 S0 112,337 $150 $22.142 $1,670 $100 512,187 313,892 S0 $6,5800 30 $50 $5251 $575 $98.368 $150 5150 $87,010 $0 S0 $0 $50 S50 $50 S0 S0 $50 $50 $1.610 21 " $6,1651 4 $640 $615 10 16 $4,910 2 0 $1.950 2 $11950 20 - 6 - $6,600) 16 4 $4,105 i $119201 1, $579 146f $176,7431 Date: 18-Mar-11 S0 15,200 S0 55200 SO S53.711 $53,711 50 $70,998 . S0 13,615 LF of Design 44 plan sheets anticipated MWBE GOAL Set at 24% $110 $30 S80 $0 $100 5150 $25 $25 5250 5250 50 $2,750 $2,800 $250 $250 $2.500 52,550 $0 $1.100 $1,678 $765 $6,300 $1,515 541,79955 $24.085 S15,940 $1.770 S0 150 ' 53,460 $0 $1,505 $0 $595 $50 5455 $0 $905 SO $110 $2,160 $30 1470 690 $0 $1,705 325 ,.. SS SdO,... . S11r705 $640 $75 3175 $150 $151 $25 $15) 39351' ' 13,775 15,290 15,905 $250 . $5,160 153,711 $55,661 $53,711 $55,661 3220 $165 $40 $15 575,70E Project Summary Total Hours Total Labor Total Expense MWBE Subconsultant Non-MWBE Subconsultant 10% Sub Markup MWBE Participation Total Project Cost $6,820 $4,270 11.960 $590 $252,450 1.773 $176,743 575,708 $70,998 $0 $7,100 27.35% 1259,550 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PM() Otfidai Rntea,e Onto' 510 7010 4 EXHIBIT "B-3" ENGINEER OPINION OF PROBABLE CONSTRUCTION COST (Supplement to Attachment B) City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19,2010 Page 5 of 7 EXHIBIT B-3 Engineers Opinion of Probable Construction Cost Sanitary Sewer Rehabilitation Contract 84 - City Project No. 01503 Bid Item No. Description Sewer Line Replacement and Rehabilitation 00222 Pipe 6-inch to 8-inch - Enlargement HPDE - Install Pipe 8-inch to 8-inch - Enlargement HPDE - Install Pipe 10-inch to 15-inch - Enlargement HPDE - Install 00225 Pipe - Sag Adjustment for Pipe - Rehab (all pipes) 00350 Pipe - Sewer 8-inch SDR 26 (All depths) - Install Pipe - Sewer 15-inch SDR 26 (All depths) - Install Pipe - Sewer 10-inch SDR 26 (All depths) -- Install 00354 Sewer Service - 4-inch - Install (all pipe materials) 00355 Sewer Service - 4-inch Service Tap -- Install 00961 Sewer Service - 4-inch Tap to HDPE Pipe 'Install 00356 Sewer Service - 4-inch - 2 Way Clean Out - Install 00206 Manhole - Remove 00213 Manhole - Std. 4-ft Diam (to 6-ft Depth) - Install 00214 Manhole - Std. 4-ft Diam - Added Depth (over 6-ft depth) - Install 00212 Manhole - Paint & Coating - Interior Protective Coating - Instal 00198 Collar-Manhole-32 inch Frame & Cover - Install 00217 Manhole -Vacuum Test -- Services 00218 Manhole -Watertight Insert - Install 00443 Pavement-2-inch Min. HMAC on 2/27 Concrete Base (STR-028) - Install 00442 Pavement-2-inch Min. HMAC on 6 inch Flex Base -Temporary - Instal: Pavement-2-inch Min. HMAC on 5-inch Reinforced Concrete Pavement over 2/27 Concrete Base (STR-029) - Install Pavement-6-inch Min Reinforced Concrete Pavement over 2/27 Concrete Base (STR- 031) - Install 00644 Curb & Gutter as Directed by Inspector - Replace 00202 Inspection-Preconstruction Cleaning & TV - Study 00201 Inspection -Post Construction Cleaning & TV - Study 00542 Dehole-Exploratory Excavation - Study 00147 Top Soil - Install (6-inches) 00137 Grass Sod - Install 00493 Subgrade - Crushed Limestone for Misc. Placement - Install 00637 Concrete - Type B _ Install 00639 Concrete - Type E _ Install 01189 Signal -Traffic Control -Design & Provide - Install 00100 Storm Water Pollution Prevention Plan > 1 Ac SWPPP - Install 00372 Trench Safety System 5-ft Depth - Install Subtotal Total Project Cost Unit LF LF LF LF LF LF LF LF EA EA EA EA EA VF VF EA EA EA LF LF LF LF LF LF LF EA CY SY CY CY CY LS LS LF Unit Price (S) Quantity Estimated Cost (5) 75.00. 700 52,500 85.00 457 38,845 115.00 2505 288,075 90.00 120 10,800 60.00 4,668 280,080 100.00 3,505 350,500 75.00 1,782 133,650 30.00 2,300 69.000 950.00 70 66500 750.00 45 33,750 250.00 115 28,750 48.00 500 24,000 2,500.00 48 120,000 160.00 145 23,200 165.00 190 31,350 350.00 48 16,800 200.00 48 9,600 100.00 48 4,800 45.00 6,595 296,775 10.00 1,000 10,000 50.00 250 12,500 55.00 750 30.00 1,000 3.00 13,615 2.25 13,615 1,000.00 1 20.00 200 9.00 5,000 50.00 20 150.00 10 150.00 10 30,000.00 1 20,000.00 1 2.00 13,615 Subtotal 10% Contingency 41,250 30,000 40,845 30,634 1,000 4,000 45,000 1,000 1,500 1,500 30,000 20,000 27,230 1,785,214 178,521 1,963,735 Conceptual Cost Estmate_03-18-11_Final RJN Project No. 18-2502-00 3/18/2011 EXHIBIT "B-3A' ENGINEER OPINION OF PROBABLE CONSTRUCTION COST (Supplement to Attachment B) FEE SUMMARY Sanitary Sewer Rehabilitation Contract 84 City Project No. 01503 SANITARY SEWER DESIGN Engineer's Opinion of Probable Construction Cost = BASIC SERVICES Conceptual through Final Design Construction SUBTOTAL BASIC SERVICES SPECIAL SERVICES Topographic Surveys (13,615 LF at $3.95 per foot) Easements (2 at $1,100/ea. and 4 at $750/ea.) Level B SUE Investigation (N. Beach) (2660 LF at $4.54 per foot, including 1 de -hole & traffic control) Printing SUBTOTAL SPECIAL SERVICES TOTAL SANITARY SEWER DESIGN FEE _ (Fee represents approximately 12.44% of construction cost estimate) Consultant RJN Group, Inc. M/WBE PARTICIPATION SUMMARY Prime Responsibilities Fee $1,963,735.00 $ 182,617.00 $ 2,160.00 $ 184, 777.00 $ $ $ 53, 711.00 5,200.00 12,087.00 $ 3,775.00 $ 74, 773.00 $ 259,550.00 M/WBE Engineering & Project Mgmt. $ 259,550.00 $70,998.00 Proposed M/WBE Subconsultants Spooner and Associates, Inc. Gorrondona and Associates, Inc. City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19,2010 Page 6of7 Services Survey & Easements Level B SUE Fees $ 58,911.00 $ 12,087.00 TOTAL: $70,998.00 (%) 27.35% % of Total Fee 22.70% 04.65% 27.35% B-6 EXHIBIT "B-3B" ENGINEER OPINION OF PROBABLE CONSTRUCTION COST (Supplement to Attachment B) TOTAL FEE SUMMARY — DESIGN FEE BREAKDOWN Sanitary Sewer Rehabilitation Contract 84 City Project No. 01503 SUMMARY OF TOTAL FEE Service Description Engineering and Additional Services (includes N. Beach St. SUE) Surveying Fees (includes easements) BREAKDOWN OF SEWER FEES Service Description Conceptual Design (30%) _ Preliminary Design (60%) _ Final Design (10%) _ TOTAL: TOTAL: Sewer Total $ 200,639.00 $ 58,911.00 $ 259, 550.00 Sewer Total $ 60,192.00 $ 120, 383.00 $ 20, 064.00 $ 200,639.00 (Total Sewer Fee (less survey fees) Breakdown by Conceptual, Preliminary and Final Design Phases) City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 7 of 7 B-7 LAHttit t K-3 Engineers Opinion of Probable Construction Cost Sanitary Sewer Rehabilitation Contract 84 - City Project No. 01503 Bid Item No. Description Sewer Line Replacement and Rehabilitation 00222 Pipe 6-inch to 8-inch - Enlargement HPDE -- Install Pipe 8-inch to 8-inch - Enlargement HPDE -- Install Pipe 10-inch to 15-inch - Enlargement HPDE Install 00225 Pipe - Sag Adjustment for Pipe - Rehab (all pipes) 00350 Pipe - Sewer 8-inch SDR 26 (All depths) -- Install Pipe - Sewer 15-inch SDR 26 (All depths) - Install Pipe - Sewer 10-inch SDR 26 (All depths) - Install 00354 Sewer Service - 4-inch - Install (all pipe materials) 00355 Sewer Service - 4-inch Service Tap -- Install 00961 Sewer Service - 4-inch Tap to HDPE Pipe 'Install 00356 Sewer Service - 4-inch - 2 Way Clean Out - Install 00206 Manhole - Remove 00213 Manhole - Std. 4-ft Diam (to 6-ft Depth) - Install 00214 Manhole - Std. 4-ft Diam - Added Depth (over 6-ft depth) - Install 00212 Manhole - Paint & Coating - Interior Protective Coating - Instal 00198 Collar-Manhole-32 inch Frame & Cover - Install 00217 Manhole -Vacuum Test - Services 00218 Manhole -Watertight Insert - Install 00443 Pavement-2-inch Min. HMAC on 2/27 Concrete Base (STR-028) - Install 00442 Pavement-2-inch Min. HMAC on 6 inch Flex Base -Temporary - Instal' Pavement-2-inch Min. HMAC on 5-inch Reinforced Concrete Pavement over 2/27 Concrete Base (STR-029) ... Install Pavement-6-inch Min Reinforced Concrete Pavement over 2/27 Concrete Base (STR- 031) - Install 00644 Curb & Gutter as Directed by Inspector -' Replace 00202 inspection-Preconstruction Cleaning & TV - Study 00201 Inspection -Post Construction Cleaning & TV - Study 00542 Dehole-Exploratory Excavation - Stud) 00147 Top Soil - Install (6-inches) 00137 Grass Sod -- Install 00493 Subgrade - Crushed Limestone for Misc. Placement - Instal' 00637 Concrete - Type B - Install 00639 Concrete - Type E -- Install 01189 Signal -Traffic Control -Design & Provide -- Install 00100 Storm Water Pollution Prevention Plan > 1 Ac SWPPP - Install 00372 Trench Safety System 5-ft Depth - Install Subtotal Total Project Cost Unit LF LF LF LF LF LF LF LF EA EA EA EA EA VF VF EA EA EA LF LF LF LF LF LF LF EA CY SY CY CY CY LS LS LF Unit Price (5) Quantity Estimated Cost (5) 75.00 700 52,500 85.00 457 38,845 115.00 2505 288,075 90.00 120 10,800 60.00 4,668 280,080 100.00 3,505 350,500 75.00 1,782 133,650 30.00 2,300 69,000 950.00 70 66,500 750.00 45 33,750 250.00 115 28,750 48.00 500 24,000 2,500.00 48 120,000 160.00 145 23,200 165.00 190 31,350 350.00 48 16,800 200.00 48 9,600 100.00 48 4,800 45.00 6,595 296,775 10.00 1,000 10,000 50.00 250 12,500 55.00 750 30.00 1,000 3.00 13,615 2.25 13,615 1,000.00 1 20.00 200 9.00 5,000 50.00 20 150.00 10 150.00 10 30,000.00 1 20,000.00 1 2.00 13,615 Subtotal 10% Contingency 41,250 30,000 40,845 30,634 1,000 4,000 45,000 1,000 1,500 1,500 30,000 20,000 27,230 1,785,214 178,521 1,963,735 ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for Sanitary Sewer Rehabilitation Contract LXXXIV (84) City Project No. 01503 <List any changes to the Standard Agreement> 1. NONE City of Fort Worth, Texas Attachment C PMO Release Date: 05.19,2010 Page t of Detailed Template - Project Template (Use This One) - 01-12-09 Print Date: Fri 3/18/11 Project 01503 - Sanitary Sewer Rehabilitation Contract LXXXIV (84)_Baseline ID Task Name 1 1 - Project 2 1.20 - Project Agreement 3 1.20.20 - Project / Contract Agreement 4 Issue Date - Design Notice To Proceed 5 1.30 - Design 1.30.31 - 30% Conceptual Design Pre -design Coordination (Kick-off) Meeting SUE Investigation - N. Beach St Prepare 30% Conceptual Plans 10 30% Conceptual Plan Submittal 11 Review 30% Conceptual Plan(CoFW) 12 Hold Conceptual Design Review Meeting 13 1.30.32 - 60% Preliminary Design 14 Geotechnical Investigations (if needed) 15 Prepare 60% Preliminary Plans and Specifications 16 1 60% Preliminary Plan and Specification Submittal 17 Submit 60% Preliminary Plans and Specs to Utilities (Utility Coordination) 18 Review 60% Preliminary Plans and Specifications (CoFW) 19 Hold Preliminary Design Review Meeting (Constructibility Review) 20 1.30.33 - 90% Final Design 21 Prepare 90% Final Hans and Specifications 22 90% Final Plan and Specification Submittal 23 Review 90% Final Plans and Specifications (CoFW) 24 Incorporate Final Comments and Submit Final Plans and Specifications 25 Approve Final Plans and Specifications and Route for Signitures 26 Design Complete 27 1.40 - ROW/Land Critical Critical Split Critical Progress Task Split Task Progress Duration l Start j I Finish 575 days Mon 3/21/11 Fri 6/14/13 0 days Mon 3/21/11 Mon 3/21/11 0 days Mon 3/21/11 Mon 3/21/11 0 days Mon 3/21/11 Mon 3/21/11 220 days Mon 3/21/11 Fri 1/27/12 43 days Mon 3/21/11 Wed 5/18/11 0 days Mon 3/21/11 Mon 3/21/11 10 days Mon 3/28/11 Fri 4/8/11 18 days Wed 3/30/11 Fri 4/22/11 2 days Thu 4/28/11 Fri 4/29/11 10 days Mon 5/2/11 Fri 5/13/11 1 day Wed 5/18/11 Wed 5/18/11 95 days Wed 6/1/11 Wed 10/12/11 20 days Wed 6/1/11 Tue 6/28/11 62 days Mon 6/13/11 Wed 9/7/11 2 days Tue 9/6/11 Wed 9/7/11 5 days Thu 9/8/11 Wed 9/14/11 25 days Thu 9/8/11 Wed 10/12/11 1 day Wed 10/12/11 Wed 10/12/11 71 days Mon 10/17/11 Fri 1/27/12 20 days Mon 10/17/11 Fri 11/11/11 2 days Thu 11/10/11 Fri 11/11/11 18 days Mon 11/14/11 Fri 12/9/11 18 days Mon 12/12/11 Fri 1/6/12 14 days Mon 1/9/12 Thu 1/26/12 3 days Wed 1/25/12 Fri 1/27/12 189 days Mon 3/28/11 Tue 12/20/11 Baseline Baseline Split Baseline Milestone 0 Milestone Summary Progress Summary FORT WORTH Total Slack % Complete .12012 _ 12013 _V1ar'Aprta_Jura_Jull u.1_e_Oct' o1_e'Jan! e_MarAeril_a_JuntJulI u_1 e °cit.pie 'Jame MarAprl.a Jun 0 days 0% W------- - 413 days 413 days 413 days 305 days 467 days 575 days 560 days 550 days 535 days 535 days 425 days 416 days 503 days 408 days 408 days 428 days 408 days 428 days 156 days 406 days 406 days 136 days 136 days 136 days 135 days 259 days Project Summary Critical Split Critical Progress Task Split Task Progress 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1 $. vnalmicr V Wilnattair r.l (0 r— C� Baseline Baseline Split Baseline Milestone Milestone Summary Progress Summary Project Template - 01503 - Sanitary Sewer Rehabilitation Contract LXXXIV (84)_Baseline Page 1 of 3 Detailed Template - Project Template (Use This One) - 01-12-09 Print Date: Fri 3/18/11 Project: 01503 - Sanitary Sewer Rehabilitation Contract LXXXIV (84)_Baseline ID Task Name 28 1.40.41 - Right-of-Way/Land Costs 29 Prepare Right Of Way (ROW) Documents 30 1.40.44 -Permits 31 Identify Required Permits 32 Prepare and Submit Permits 33 Review and Approve Permits 34 1.50 - Survey 35 1.50.51 -Preliminary Survey 36 Topographic (Field) Survey 37 1.60 - Public Involvement 38 1.60.60 - Public Meetings 39 Public Meeting - (Pre- Construction) 40 1.80.1 -Construction 41 1.80.80.1 - Project Management 42 Construction Project Management 43 1.80.8.1 - Construction Advertisement 44 1.80.81.10.1 - Bid Preparation and Advertisement Bid Package Preparation Start Advertisement Advertisement Period Pre -Bid Meeting Issue Addenda (As needed) 50 Bid Opening - Review Bids - Bid Tabulations and Select Contractor 51 1.80.8120.1 - Contract Award 52 MWBE Submittal 53 Review and Approve MWBE Submittal 54 M8C Process 45 46 47 48 49 Critical Critical Split Critical Progress Task Split Task Progress I Duration Start 1 20 days Mon 10/17/11 20 days 189 days 20 days 30 days 45 days 55 days 55 days 55 days 1 day 1 day 1 day 355 days 220 days 220 days 121 days Mon 10/17/11 Mon 3/28/11 Mon 3/28/11 Mon 9/5/11 Mon 10/17/11 Mon 3/28/11 Mon 3/28/11 Mon 3/28/11 Thu 7/19/12 Thu 7/19/12 Thu 7/19/12 Mon 1/30/12 Mon 1/30/12 Mon 1/30/12 Mon 1/30/12 35 days Mon 1/30/12 8 days Mon 1/30/12 0 days Thu 2/9/12 26 days Thu 2/9/12 0 days Thu 3/1/12 10 days Thu 3/1/12 2 days Thu 3/15/12 86 days Mon 3/19/12 5 days Mon 3/19/12 10 days Mon 3/26/12 60 days Mon 4/9/12 Fri 11/11/11 406 days 0% Fri 11/11/11 406 days 0% Tue 12/20/11 165 days 0% Fri 4/22/11 259 days 0% Fri 10/14/11 165 days 0% Tue 12/20/11 165 days 0% Fri 6/10/11 408 days 0% Fri 6/10/11 408 days 0% Fri 6/10/11 408 days 0% Thu 7119/12 232 days 0% Thu 7/19/12 232 days 0% Thu 7/19/12 232 days 0% Fri 6/14/13 0 days O% Wed 12/5/12 135 days 0% Wed 12/5/12 135 days 0% Wed 7/18/12 59 days 0% Fri 3/16/12 135 days 0% Wed 2/8/12 135 days 0% Thu 2/9/12 321 days 0% Thu 3/15/12 321 days 0% Thu 3/1/12 122 days 0% Wed 3/14/12 322 days 0% Fri 3/16/12 320 days 0% Wed 7/18/12 8 days 0% Fri 3/23/12 69 days 0% Fri 4/6/12 69 days 0% Fri 6/29/12 9 days 0% Baseline Baseline Split Baseline Milestone O Milestone • Summary Progress Summary Project Summary Critical Split Critical Progress Task Split Task Progress FORT WORTH Finish Total Slack ' % Complete 12012 4_2013 v1ar±Aprl a JunlJulLui. e Oc(�oJ_e JartLe MarApr(_aJur.0ul _u Le_ Qd:_ole.IJa l.e_Ma Apr ,a Jun! c= T Baseline Baseline Split Baseline Milestone Ci Milestone Summary Progress Summary Project Template - 01503 - Sanitary Sewer Rehabilitation Contract LXXXIV (84)_Baseline Page 2 of 3 Detailed Template - Project Template (Use This One) - 01-12-09 Print Date: Fri 3/18/11 Project: 01503 - Sanitary Sewer Rehabilitation Contract LXXXIV (84)_Baseline ID Task Name 55 56 57 59 60 61 62 Execute Contract Documents Issue Construction Notice To Proceed 1.80.82.1 - Pre -Construction Activities Pre -Construction Meeting Submittals and Approvals Start Construction 1.80.83.1 -Construction Contract Construction 1.80.85.1 -Inspection Services Final Inspection 8 Acceptance Letter Duration 10 days Start Mon 7/2/12 0 days Wed 7/18/12 Wed 7/18/12 8 days 0% 13 days Wed 7/18/12 Mon 8/6/12 5 days 0% 1 day Wed 7/18/12 Wed 7/18/12 17 days 0% 10 days Wed 7/18/12 Tue 7/31/12 8 days 0% 0 days Mon 8/6/12 Mon 8/6/12 5 days 0% 211 days Mon 816/12 Fri 5/31/13 5 days 0% 211 days Mon 8/6/12 Fri 5/31/13 5 days 0% 10 days Mon 6/3/13 Fri 6/14/13 0 days 0% 10 days Mon 6/3/13 Fri 6/14/13 0 days 0% FORT WORTH Finish I Total Slack I % Complete 12012 12013 viarAprLa_JunJJ.uitu e Qct! o1e Jani_e_MargprI aJurilJUiI u1e lOctLp1 eiianj_e_MarAprj_a Jun! Mon 7/16/12 9 days 0% W Critical Baseline Project Summary Baseline Critical Split Baseline Split Critical Split Baseline Split Critical Progress Baseline Milestone 0 Critical Progress Baseline Milestone Task Milestone ♦ Task Milestone Split Summary Progress ,. ii Split Summary Progress c. Task Progress Summary valasigia===mv Task Progress Summary n • cz- Project Template - 01503 - Sanitary Sewer Rehabilitation Contract L)O C V (84)_Baseline Page 3 of 3 FORTWORTN SANITARY SEWER REHABILITATION CONTRACT 84 ATTACHMENT E %%ATER 0 ENRO. m L-2-220 L4366R-" 1JII I11II Legend clot Basin Boundary Council District Existing Sanitary Sewer Sanitary Sewer Rehabilitation L 3.029 L-302,1 L-3022 M-181B 1-5105 L5105 L-4136 L-7409 L3'452s2: L-3452A M-181 B L-3053 L-3040 �.�.• !ma�� L-3043 DRAINAGE AREA: BIG FOSSIL SUB AREA: BF03_03 COUNCIL DISTRICT 4 NMI FORT WORTH SANITARY SEWER REHABILITATION CONTRACT 84 ATTACHMENT E WATER L•-2573 4366R L-2644 L-2395 L;2636R' L-2636 L-2442 Legend m Basin Boundary 11111 Council District Existing Sanitary Sewer BM Sanitary Sewer Rehabilitation L-2296 Lr 25719 L;26'.5 DRAINAGE AREA: BIG FOSSIL SUB AREA: BF03 03 COUNCIL DISTRICT 4 U Ca te of th COUNCIL. ACTION: Approved on 3/1/2011 - Ord. No. 19567-03-2011 Worthy Texas` FORT WORTII ... -:nifa DATE- 3/1/2011 REFERENCE NO.: **C-24754 LOG NAME- 60SS84-RJN CODE- C TYPE- CONSENT PUBLIC HEARING: NO SUBJECT: Authorize an Engineering Agreement in the Amount of $259,550 00 with RJN Group, Inc., for Sanitary Sewer Rehabilitation, Contract 84 on North Beach Street, Springdale Road, Brittain Street and Elinor Street and Adopt Appropriation Ordinance (COUNCIL DISTRICT 4) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of $273,550.00 from the Water and Sewer Fund to the Sewer Capital P rojects Fund; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the S ewer Capital Projects Fund in the amount of $273,550 00 from available funds; and 3. Authorize the City Manager to execute a contract in the amount of $259,550.00 with RJN Group, Inc., for Sanitary Sewer Rehabilitation, Contract 84 on North Beach Street, Springdale Road, Brittain Street and Elinor Street. DISCUSSION: This project consists of the preparation of plans and specifications for the replacement of the deteriorated sanitary sewer mains located on the following streets: S treet From To N orth Beach Street Belknap Street Springdale Road S pringdale Road North Riverside Drive North Beach Street Brittain Street Springdale Road Selma Street Elinor Street NE 28th Street North Beach Street RJN Group, Inc., proposes to perform the design work for a lump sum fee of $259,550.00. City staff considers this fee to be fair and reasonable for the scope of services proposed. RJN Group, Inc., is in compliance with City's M/WBE ordinance by committing to 27 percent M/WBE participation. The City's goal on this project is 24 percent. In addition to the contract amount, $14,000.00 is required for project management, real property acquisition and utility coordination. The project is located in COUNCIL DISTRICT 4. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations, and adoption of the attached appropriation ordinance, funds will be available in the current capital budget as appropriated, of the Sewer Capital Projects Fund and the current operating budget as appropriated of the Water and Sewer Fund Logname: 6040610C01-SJLOUIS Page 1 of 2 TO Fund/Account/Centers 1&2) P258 476045 7041701503ZZ 219258 511010 704170150330 21_P258 531200 704170150331 2)9258 531200 704170150332 2)P258 531200 704170150333 2) P258 53120.0 704170150351 2)P258 531350 704170150373 2)9258 541100 704170150341 $273,550.00 $8,000. 00 $58,125.65 $116,251.35 $19 375.20 $65 797.80 $2, 000.00 $4,000_ . 00 FR®M FuncuAccounvicetr__s 1)PE45 538040 0709020 3j P258 531200 7041701501 3) P258 531200 7041701504 31P 58 5312007041701501 3LP2 58 531200 7041701502 Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: Fernando Costa (6122) S. Frank Crumb(8207) Roberto Sauceda (2387) ATTACHMENTS 60SS84-RJN AO.doc 60SS84-RJN MAP 01.pdf 603384-RJN MAP 02.pdf 273.550.00 $58 125.65 $ 116.251.35 41_9L375.20 65 797.80 Logname: 6040610C01-SJLOUIS Page 2 of 2