Loading...
HomeMy WebLinkAboutContract 41723 (2)O T Y OF FORT WOE TH, TEXAS CITY SECRETARY CONTRACT NO, STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES This AGREEMENT is between the City of Fort Worth, a home -rule municipal corporation situated in Tarrant, Denton, Parker and Wise Counties, Texas (the "CITY"), and Baird, Hampton &; gown, Inc., (the "ENGINEER"), for a PROJECT generally described as: Sanitary Sewer Rehabilitation Contract 82. Article 1 Scope if Sou -vices A. The Scope of Services is set forth in Attachment A. Article II Compensation A. The FNGINEER's compensation is set forth in Attachment E. Article III Terms of Payment Payments to the ENGINEER will be made as follows: A. Invoice and Payment (1) The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. (2) The ENGINEER will issue monthly invoices for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. (3) Upon completion of services enumerated in Article I, the final payment of any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing, only that portion so contested will be withheld from payment, and the undisputed portion will be paid. The CITY will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the billing until mutually resolved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving 7-days' written= -notice to CITY, suspend services under this AGREEMENT until City of Fort Worth, Texas Standard Agreement for Engineering Related Deign Services PMO Official Release Date: 5.19.2010 Page 1 of 15 .41e4 :Le ism (A RY FT. WORTH, TX paid in full. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the CITY because of such suspension of services. Article IV Obligations of the Engineer Amendments to Article IV, if any, are included in Attachment C. A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The standard of care applicable to the ENGINEER's services will be the degree of skill and diligence normally employed in the State of Texas by professional engineers or consultants performing the same or similar services at the time such services are performed. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 2of15 Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the Contract Documents, nor shall anything in the Contract Documents or the agreement between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT If the ENGINEER makes on -site observation(s) of a deviation from the Contract Documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 3 of 15 (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and matenais; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents; that the final work will be acceptable in all respects that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. I. Minority and Woman Business Enterprise (M/WBE) Participation In accord with City of Fort Worth Ordinance No. 15530, as amended, the City has goals for the participation of minority business enterprises and woman business enterprises in City contracts Engineer acknowledges the M/WBE goal established for this contract and its accepted written commitment to M/WBE participation. Any misrepresentation of facts (other than a negligent City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 4 of 15 misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropnate work space in order to conduct audits in compliance with the provisions of this section The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. K. INSURANCE (1) ENGINEER'S INSURANCE a. Commercial General Liability — the ENGINEER shall maintain commercial general liability (CGL) and, if necessary, commercial umbrella insurance with a limit of not less than $1,000,000.00 per each occurrence with a $2,000,000.00 aggregate. If such Commercial General Liability insurance contains a general aggregate limit, it shall apply separately to this PROJECT or location. i. The CITY shall be included as an insured under the CGL, using ISO additional insured endorsement or a substitute providing equivalent coverage, and under the commercial umbrella, if any This insurance shall apply as primary insurance with respect to any other City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 5 of 15 insurance or self-insurance programs afforded to the CITY. The Commercial General Liability insurance policy shall have no exclusions by endorsements that would alter or nullify: premises/operations, products/completed operations, contractual, personal injury, or advertizing injury, which are normally contained within the policy, unless the CITY approves such exclusions in writing. ii. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability or commercial umbrella liability insurance maintained in accordance with this agreement. b Business Auto — the ENGINEER shall maintain business auto liability and, if necessary commercial umbrella liability insurance with a limit of not less than $1,000,000 each accident Such insurance shall cover liability arising out of "any auto', including owned, hired, and non -owned autos, when said vehicle is used in the course of the PROJECT. If the engineer owns no vehicles, coverage for hired or non -owned is acceptable. i ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the business auto liability or commercial umbrella liability insurance obtained by ENGINEER pursuant to this agreement or under any applicable auto physical damage coverage. c. Workers' Compensation —ENGINEER shall maintain workers compensation and employers liability insurance and, if necessary commercial umbrella liability insurance with a limit of not less than $100,000.00 each accident for bodily injury by accident or $100,000.00 each employee for bodily injury by disease, with $500,000.00 policy limit. i. ENGINEER waives all rights against the CITY and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by workers compensation and employer's liability or commercial umbrella insurance obtained by ENGINEER pursuant to this agreement. d. Professional Liability — the ENGINEER shall maintain professional liability, a claims -made policy, with a minimum of $1,000,000.00 per claim and aggregate The policy shall contain a retroactive date prior to the date of the contract or the first date of services to be performed, whichever is earlier. Coverage shall be maintained for a period of 5 years following the completion of the contract. An annual certificate of insurance specifically referencing this project shall be submitted to the CITY for each year following completion of the contract. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5,19,2010 Page 6 of 15 (2) GENERAL INSURANCE REQUIREMENTS a. Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be delivered to the CITY prior to ENGINEER proceeding with the PROJECT. b. Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, as its interests may appear. The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. c. Certificate(s) of insurance shall document that insurance coverage specified in this agreement are provided under applicable policies documented thereon. d. Any failure on part of the CITY to request required insurance documentation shall not constitute a waiver of the insurance requirements. e. A minimum of thirty (30) days notice of cancellation or material change in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable in the event of non-payment of premium Such terms shall be endorsed onto ENGINEER's insurance policies. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 1000 Throckmorton, Fort Worth, Texas 76102 g. Insurers for all policies must be authorized to do business in the State of Texas and have a minimum rating of A:V or greater, in the current A M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. Any deductible or self insured retention in excess of $25,000 00 that would change or alter the requirements herein is subject to approval by the CITY in wnting, if coverage is not provided on a first -dollar basis The CITY, at it sole discretion, may consent to alternative coverage maintained through insurance pools or risk retention groups. Dedicated financial resources or letters of credit may also be acceptable to the CITY. h. Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. i. The CITY shall be entitled, upon its request and without incurring expense, to review the ENGINEER's insurance policies including endorsements thereto and, at the CITY's discretion; the ENGINEER may be required to provide proof of insurance premium payments. j. Lines of coverage, other than Professional Liability, underwritten on a claims -made basis, shall contain a retroactive date coincident with or prior City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 7 of 15 to the date of the contractual agreement. The certificate of insurance shall state both the retroactive date and that the coverage is claims -made. k. Coverages whether written on an occurrence or claims -made basis, shall be maintained without interruption nor restrictive modification or changes from date of commencement of the PROJECT until final payment and termination of any coverage required to be maintained after final payments. I. The CITY shall not be responsible for the direct payment of any insurance premiums required by this agreement. m. Sub consultants and subcontractors to/of the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER. When sub consultants/subcontractors maintain insurance coverage, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 8 of 15 its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City Amendments to Article V, if any, are included in Attachment C. A. City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services The CITY will perform, at no cost to the ENGINEER such tests of equipment, machinery, pipelines and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights -of -way, and access necessary for the ENGINEER's services or PROJECT construction. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 9 of 15 D Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing matenals, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. Contractor Indemnification and Claims The CITY agrees to include in all construction contracts the provisions of Article IV E regarding the ENGINEER's Personnel at Construction Site, and provisions providing contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors for any claim arising out of, in connection with, or resulting from the engineering services performed City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 10 of 15 Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this Agreement. (4) Nothing contained in this section V.H shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER 1. CITY's Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY will ensure that Builders Risk/Installation insurance is maintained at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) The CITY will specify that the Builders Risk/Installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. K. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions Amendments to Article VI, if any, are included in Attachment C. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 11 of 15 A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B Reuse of Project Documents All designs, drawings specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure The ENGINEER is not responsible for damages or delay in performance caused by acts of God, strikes, lockouts, accidents, or other events beyond the control of the ENGINEER that prevent ENGINEER's performance of its obligations hereunder. D Termination (1) This AGREEMENT may be terminated only by the City for convenience on 30 days' written notice. This AGREEMENT may be terminated by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and does not commence correction of such nonperformance with in 5 days of written notice and diligently complete the correction thereafter. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) Out-of-pocket expenses for purchasing electronic data files and other data storage supplies or services; c.) The time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all termination expenses. The CITY'S approval will be obtained in writing prior to proceeding with termination services. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 12 of 15 E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEERs personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification In accordance with Texas Local Government Code Section 271.904, the ENGINEER shall indemnify, hold harmless, and defend the CITY against liability for any damage caused by or resulting from an act of negligence, intentional tort, intellectual property infringement or failure to pay a subcontractor or supplier committed by the ENGINEER or ENGINEER s agent, consultant under contract, or another entity over which the ENGINEER exercises control. G. Assignment Neither party shall assign all or any part of this AGREEMENT without the prior written consent of the other party H. Interpretation Limitations on liability and indemnities in this AGREEMENT are business understandings between the parties and shall apply to all the different theories of recovery, including breach of contract or warranty, tort including negligence strict or statutory liability or any other cause of action except for willful misconduct or gross negligence for limitations of liability and sole negligence for indemnification. Parties mean the CITY and the ENGINEER, and their officers, employees, agents, and subcontractors. I. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 13 of 15 J. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI B , VI D , VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. K. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 14 of 15 Article VII Attachments, Schedules, and Signatures This AGREI MENT, including its attachments and schedules, constitutes the entire AGRrFMEN T , supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. The following attachments and schedules are hereby made a part of this AGRFEMENT: Attachment A - Scope of Services Attachment B m Compensation Attachment C - Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E - Location Map Executed this the 1S`day of ATTEST: Marty Hendrix City Secretary in „41, � ;oon1r' n�s� FI *000000660Q,7 V -79 d *{AJ °®ff i 0 ev $>0 t, 4lititext.evv? FORM AND LEGALITY Assthaht dty'Atf&n ey ATTEST: '-:-\-(1\3 Contract Author 74ation Date City of Fort Worth, Texas Standard Agreement for Engineering Related Design Services PMO Official Release Date: 5.19.2010 Page 15 of 15 0(4 A o oe c()) EWA fa p , ® �j ,2011. CITY OF FORT WORTH By: C.7a- 'Ma 04‘‘Z- • Fernando Costa Assistant City Manager AP-P /AL RFCENDED, «*D4 S Frank Crumb, P.E. Director, Water Department BAIRD, HAMPTON & BROWN, INC Konstantine Bakintas P.E. Principal By: OFFICIAL d ECCRD CITY SECRETARY FT. WORTH, TX ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO.: 01501 ATTACHMENT A Scope for Enaineerina Desian Related Services for Water and/or Sanitary Sewer Improvements DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO.:01501 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. City of Fort Worth, Texas Attachment A PM0 Release Date: 08.27.2010 Page 1 of 17 SS Length Council Lateral (FT) District L-1957 358 2 L-1958 427 2 102 2 320 2 L-1960 142 2 381 2 1,257 2 421 2 977 2 L-2352 573 2 400 2 640 2 485 2 458 2 310 2 563 2 692 2 1,155 2 1,941 2 295 2 1,134 2 M-137 310 2 L-1959 L-2347 L-2473 L-2756 L-3587 L-3903 L-5581 L-7921 M-136 Total 13,341 City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 2 of 17 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO.: 01501 City of Fort Worth Water Department SANITARY SEWER REHABILITATION CONTRACT 82 ±13,341 LF Sanitary Sewer Rehabilitation Fort Worth, Texas Sewer Map No. Exist Size Prop. Size 2042-412 2042-416 6 8 2042-412 6 8 2042-412 6 8 2042-412 2042-412 2042-416 2042-416 2042-416 2042-420 2042-412 2042-412 2042-420 2042-416 2042-412 2042-416 2042-416 2042-416 2042-412 2042-412 2042-416 2042-416 2042-416 2042-412 6 8 6 8 8 8 8 8 8 8 8 8 6 8 6 8 6 8 6 8 6 8 6 8 6 8 6 8 10 15 8 15 6 15 6 15 6 15 Upstream End SSMH on the north side of 37th between Ellis & Main St. *50' north of 35th between Ross & Clinton S SMH on the south side of 35th between Houston & Ellis *320' south of 35th between Houston & Ellis S SMH on the south side of 35th between Houston & Clinton *250' north of 36th St. west of GCSF Railroad *50' north of 38th along the west side of GCSF Railroad SSMH ±70' south of Meacham Field Circle along the west side of N. Main St. SSMH *80' south of Aviation Way along the west side of N. Main St. *50' north of 34th between Main Street & Commerce St. S SMH on South side of NW 36th between Main and Commerce SSCO on north side of 38th St. between Main & Commerce SSMH *800' south of 38th St. along the east side of GCSF Railroad In alley *40' north of 34th St. between Commerce and Calhoun S SMH In alley *145' south of 38th St. between Clinton Ave. & Houston St. SSCO *270' south of Commander Way along west side of Main St. SSMH *780' north of falcon way & northeast of Gulfstream Rd S SMH In alley *100' south of 35th St. between Calhoun and GCSF Railroad S SMH In alley *165' north of 36th St. between Houston St. & Ellis Ave. SSMH on south side of 37th St. between Houston & Ellis SSMH along south side of 38th St. between Ross Ave. & Clinton Ave. SSMH along south side of 36th St. between Houston & Ellis Downstream End SSMH in alley *290' south of 37th St. between Ellis & Main St, S SMH on the south side of 36th between Ross & Clinton SSMH on the north side of 35th between Houston & Ellis S SMH on the south side of 35th between Houston & Ellis SSMH on the north side of 35th between Houston & Clinton *140' east of Calhoun along the lines of 36th St. adjacent to GCSF Railroad 3250' north of 36th St. west of GCSF Railroad SSMH *500' south of Meacham Field Circle along the west side of N. Main St. SSMH in Meacham Field Circle along the west side of N. Main St. SSMH adjacent to 35th St. ROW between Main St. & Commenrce St. SSMH in alley *400' south of 36th St. between Main & Commerce S SMH on north side of NW 37th between Main and Commerce ±30' west of SSMH *1250' south of 38th St. along the east side of GCSF Railroad In alley *100' south of 35th St. between Commerce and Calhoun SSMH In alley t145' south of 38th St. between Houston St & Ellis Ave SSMH *300' north of Commander Way along the west side of Main St. SSMH *100' north of Falcon Way *70' west of Gulfstream Rd SSMH In alley along north side of Long Ave. between Jones St & Calhoun St SSMH In alley *100' south of 35th St. between Calhoun and GCSF Railroad SSMH In alley *165' north of 36th St. between Houston St. & Ellis Ave. In alley *20' north of 37th St. between Houston & Ellis SSMH In alley *170' north of 36th St. between Houston & Ellis ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO.: 01501 WORK TO BE PERFORMED Task 1. Design Management Task 2. Conceptual Design Task 3. Preliminary Design Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7. ROW/Easement Services Task 8. Survey and Subsurface Utility Engineering Services TASK 1. DESIGN MANAGEMENT. ENGINEER shall ensure efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER shall manage change, ® communicate effectively ▪ coordinate internally and externally as needed, and ® proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team • Lead, manage and direct design team activities • Ensure quality control is practiced in performance of the work • Communicate internally among team members • Task and allocate team resources 1.2. Communications and Reporting • Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and clarify scope, understand CITY objectives, and ensure economical and functional designs that meet CITY requirements • Conduct review meetings with the CITY at the end of each design phase • Prepare invoices and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the Water Department • Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement and according to the City of Fort Worth's Schedule Guidance Document. • Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at the end of the project City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 3 of 17 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO.: 01501 ® Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design ® With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs and make changes necessary to meet their requirements, as part of the design scope. Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub -consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS ■ 18 MWBE reports will be prepared 5 meetings with city staff 18 monthly water department progress reports will be prepared 18 monthly project schedule updates will be prepared DELIVERABLES A. Meeting summaries with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule E Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly M/WBE Report Form and Final Summary Payment Report Form TASK 2. CONCEPTUAL DESIGN (30 PERCENT). The Conceptual Design shall be submitted to CITY per the approved Project Schedule. The purpose of the conceptual design is for the ENGINEER to ■ Study the project, ■ Identify and develop alternatives that enhance the system, ■ Present (through the defined deliverables) these alternatives to the CITY ■ Recommend the alternatives that successfully addresses the design problem, and ■ Obtain the CITY's endorsement of this concept. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 4 of 17 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO.: 01501 ENGINEER will develop the conceptual design of the infrastructure as follows. 2.1. Data Collection • In addition to data obtained from the CITY, ENGINEER will research proposed improvements in conjunction with any other planned future improvements that may influence the project • The ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including but not limited to; utilities, agencies (TxDOT and railroads), City Master Plans, and property ownership as available from the Tax Assessor's office. • The data collection efforts will also include conducting special coordination meetings with affected property owners and businesses as necessary to develop sewer re-routing plans. • The ENGINEER shall visit the project site and obtain the meter numbers and sizes on all existing meters to be replaced on the project and shall identify existing sample stations and fire line locations. 2.2. Geotechnical Investigations • ENGINEER shall advise the CITY of test borings and other subsurface investigations that may be needed for the project If the CITY determines that such borings or investigations are needed then the ENGINEER shall work with the CITY and CITY's geotechnical consultant to draw up specifications for such testing program The cost of such testing will be paid for by the CITY. 2.3. The Conceptual Design Package shall include the following: • Cover Sheet • Graphic exhibits and written summary of alternative design concepts considered, strengths and weaknesses of each, and the rationale for selecting the recommended design concept. Proposed phasing of any water and sanitary sewer work that is included in this project documented in both the project schedule and narrative form. • Documentation of key design decisions. Estimates of probable construction cost. • • ASSUMPTIONS • 0 Geotechnical borings are expected for this project. • 2 copies of the conceptual design package (30% design) will be delivered.. Report shall be letter sized and comb- bound with a clear plastic cover. Drawings will be 11X17 size fold outs bound in the report • DWF files created from design CAD drawings will be uploaded to the designated project folder in Buzzsaw City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 5 of 17 ATTACHMENTA DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO.: 01501 • ENGINEER shall prepare the meeting minutes of the Concept Review meeting and revise the report, if needed. • ENGINEER shall not proceed with Preliminary Design activities without obtaining written approval by the CITY of the Conceptual Design Package. DELIVERABLES A. Conceptual Design Package TASK 3. PRELIMINARY DESIGN (60 PERCENT). P reliminary plans and specifications shall be submitted to CITY per the approved Project S chedule ENGINEER will develop the preliminary design of the infrastructure as follows. 3.1. Development of Preliminary Design Drawings and Specifications shall include the following: • Cover Sheet • • • • • • • A Proiect Control Sheet, showing all Control Points, used or set while gathering data. Generally on a scale of not Tess than 1:400. The following information shall be indicated for each Control Point: Identified (existing City Monument #8901, PK Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descnptive location (i e. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). Overall proiect easement layout sheet(s) with property owner information. Overall proiect water and/or sanitary sewer layout sheets. The water layout sheet shall identify the proposed water main improvement/ existing water mains in the vicinity and all water appurtenances along with pressure plane boundaries, water tanks, pump stations, valves and fire hydrants. The sewer layout sheet shall identify the proposed sewer main improvement/existing sewer mains and all sewer appurtenances in the vicinity. Overall water and/or sanitary sewer abandonment sheet. Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc., in the same coordinate system as the Control Points. Bench marks per 1,000 ft of plan/profile sheet — two or more. Bearings given on all proposed centerlines, or baselines. Station equations relating utilities to paving, when appropriate. Plan and profile sheets which show the following proposed water and/or sanitary sewer plan/profile and recommended pipe size, fire hydrants, water service lines City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 6 of 17 • • ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO.: 01501 and meter boxes, gate valves, isolation valves, manholes existing meter n umbers and sizes that are to be replaced, existing sample locations, existing fire line locations existing utilities and utility easements, and all pertinent information n eeded to construct the project. Legal description (Lot Nos. Block Nos., and Addition Names) along with property ownership shall be provided on the plan ✓ iew • The ENGINEER shall make provisions for reconnecting all identifiable water and/or wastewater service lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of-way or utility e asement. When the existing alignment of a water and sanitary sewer main or lateral is changed provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main. • The following shall be applicable at all locations where it is necessary to relocate or reroute the existing private sanitary sewer service line due to the abandonment or realignment of the existing public sanitary sewer lateral or main: The CITY shall furnish the ENGINEER with a sample format of how the sewer service line reroute/relocation should be designed and submitted for construction. During design survey if a rod can be inserted through the cleanout to the bottom of the service line, the ENGINEER will obtain the flow line elevation and design the service line prior to advertising the project for bid. If the service flow line information cannot be obtained during design survey, the ENGINEER shall delay the design of the sewer service line until after a Quality Level A Subsurface Utility Engineering (SUE investigation has been performed) The Level A SUE will be performed; (1) by the ENGINEER if included in the fee proposal; or (2) by the CITY prior to bidding if the CITY determines that it is needed for satisfactory completion of the design; or (3) by the Contractor after the project has been bid, by means of a bid item to that effect. In all options, the ENGINEER shall propose appropriate de - hole locations in the project and collect flow line elevation and other applicable information of the sewer service line. The ENGINEER shall use this information to provide the design for the sanitary sewer service line to be rerouted or relocated Provide map showing location of new manhole construction at the end of existing sewer segments, 90 degree bends, or tee connections. Site survey or specific design plans for manhole construction is not included as part of the scope. The contract documents shall specify that it is the Contractor's responsibility to coordinate utility location, etc. manhole construction. The ENGINEER will prepare standard and special detail sheets for water line installation and sewer rehabilitation or replacement that are not already included in the D-section of the CITY s specifications. These may included connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. 3.2. Geotechnical Investigation • Soil investigations, including field and laboratory tests, borings, related e ngineering analysis and recommendations for determining soil conditions will be made. In addition to the above investigations, borings and appropriate field and City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 7of17 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO.: 01501 laboratory analysis will be made at reasonable intervals along the project alignment for the Contractor's use in determining soil conditions for preparing bids and a Trench Safety Plan. 3.3. Constructability Review • Prior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY s comments from the field visit and submit this information to the CITY in writing. 3.4. Utility Clearance • The ENGINEER will consult with the CITY's Transportation and Public Works Department Water Department, and other CITY departments, public utilities, private utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project. ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities and where known and possible consider potential future utilities in designs. The ENGINEER shall upload individual DWF files for each plan sheet of the approved preliminary plan set to the designated project folder in Buzzsaw for forwarding to all utility companies which have facilities within the limits of the project. The DWF files should be created directly from the CAD files as opposed to PDF files. 3.5. Traffic Control Plan • Develop a traffic control plan utilizing standard traffic reroute configurations posted as "Typicals' on the CITY s Buzzsaw website. The typicals need not be sealed individually, if included in the sealed contract documents. • Develop supplemental traffic control drawings as needed for review and approval by the Traffic Division of the Transportation and Public Works Department. These drawings shall be sealed by a professional engineer registered in the State of Texas. 3.6. Storm Water Pollution Prevention Plan For projects that disturb an area greater than one (1) acre, ENGINEER will prepare the Storm Water Pollution Prevention Plan (SWPPP) required for the Project for use by the Contractor during construction ENGINEER will prepare drawings and details for proposed SWPPP improvement that the Contractor must use during construction. Contractor will be responsible for filing the SWPPP with appropriate regulatory agencies, ASSUMPTIONS • 0 public meeting(s) will be conducted or attended during the preliminary design phase. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 8 of 17 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO.: 01501 • 0 borings at an average bore depth of feet each will be provided. • Traffic Control "Typicals" will be utilized to the extent possible. It is assumed an additional 2 project specific traffic control sheets will be developed for construction of facilities near Commander Wav & Main Street and facilities near Meachum Field Circle • 6 sets of 11X17 size plans will be delivered for the Constructability Review. • 2 sets of 22X34 size plans will be delivered for the Preliminary Design (60% design). • 2 sets of specifications will be delivered for the Preliminary Design (60% design). • DWF files created from design CAD drawings will be uploaded to the designated project folder in Buzzsaw. • The CITY's front end and technical specifications will be used. The ENGINEER shall supplement the technical specifications if needed. • 1 sets of 22X34 size drawings will be delivered for Utility Clearance. • ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. DELIVERABLES A. Preliminary Design drawings and specifications B. Utility Clearance drawings C. Traffic Control Plan D. Storm Water Pollution Prevention Plan E Estimates of probable construction cost F. Data Base listing names and addresses of residents and businesses affected by the project. TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows: • Draft Final plans (90%) and specifications shall be submitted to CITY per the approved Project Schedule Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Construction Documents (100%) to the CITY per the approved Project Schedule. Each plan sheet shall be stamped dated, and signed by the ENGINEER registered in State of Texas. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27,2010 Page 9 of 17 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO.: 01501 • The ENGINEER shall submit a final design estimate of probable construction cost with both the 90% and 100% design packages. This estimate shall use ONLY standard CITY bid items. ASSUMPTIONS • 8 sets of 11X17 size drawings and 2 sets of 22X34 size drawings and 2 specifications will be delivered for the 90% Design package. • A DWF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in Buzzsaw. • 2 sets of 22X34 size drawings and 2 specifications will be delivered for the 100% Design package. • A DWF file for the 100% Design will be created from design CAD drawings and will be uploaded to the project folder in Buzzsaw. • Estimated number of plan sheets (see Table below) Sheet No. Sheet Title 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Cover Sheet Sewer Legend & General Notes P roject Control Sheet P roject Easement Layout sheet 1 of 2 P roject Easement Layout sheet 2 of 2 Overall project sewer layout sheet Overall Sewer abandonment sheet P ew SSMH location map P lan & Profile sheet L-1957 Sta. 0+00 to 3+58 P lan & Profile Sheet L-1958 Sta. 0+00 to 4+25 P lan & Profile Sheet L-1959 Sta. 4+70 to 5+72 P lan & Profile Sheet L-1960 Sta. 5+72 to 8+91 P lan & Profile Sheet L-2347 Sta. 7+73 to 12+70 P lan & Profile Sheet L-2347 Sta. 12+70 to 17+70 P lan & Profile Sheet L-2347 Sta. 17+70 to 22+89 Plan & Profile Sheet L-2347 Sta. 44+57 to 48+74 P lan & Profile Sheet L-2347 Sta. 49+51 to 54+50 P lan & Profile Sheet L-2347 Sta. 54+50 to 59+21 P lan & Profile Sheet L-2352 Sta. 0+00 to 5+72 P lan & Profile Sheet L-2473 Sta. 0+00 to 4+00 P lan & Profile Sheet L-2473 Sta. 11+00 to 16+00 P lan & Profile Sheet L-2473 Sta. 16+00 to 17+39 Plan & Profile Sheet L-2756 Sta. 1+92 to 6+72 P lan & Profile Sheet L-3587 Sta. 0+00 to 4+58 P lan & Profile Sheet L-3903 Sta. 0+00 to 3+10 P lan & Profile Sheet L-5581 Sta. 0+00 to 4+00 Plan & Profile Sheet L-5581 Sta. 4+00 to 5+83 P lan & Profile Sheet L-7921 Sta. 2+08 to 5+50 P lan & Profile Sheet L-7921 Sta. 5+50 to 9+00 P lan & Profile Sheet M-136 Sta. 69+80 to 75+00 P lan & Profile Sheet M-136 Sta. 75+00 to 80+00 City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 10 of 17 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT 1182 CITY PROJECT NO.: 01501 32 Plan & Profile Sheet M-136 Sta. 80+00 to 85+00 33 Plan & Profile Sheet M-136 Sta. 85+00 to 90+00 34 Plan & Profile Sheet M-136 Sta. 90+00 to 95+00 35 Plan & Profile Sheet M-136 Sta. 95+00 to 100+00 36 Plan & Profile Sheet M-136 Sta. 100+00 to 105+00 37 Plan & Profile Sheet M-136 Sta. 105+00 to 110+00 38 Plan & Profile Sheet M-136 Sta. 110+00 to 115+00 39 Plan & Profile Sheet M-136 Sta. 115+00 to 115+68 40 Plan & Profile Sheet M-137 Sta. 0+00 to 3+10 41 Erosion Control Plan 1 42 Erosion Control Plan 2 43 Erosion Control Plan 3 44 Erosion Control Plan 4 45 Traffic Control Plan Main & Commander Way 46 Traffic Control Plan Main & Meacham Field Circle 47 Sanitary sewer details 48 Miscellaneous details 49 - 60 Traffic Control & Work Zone Details — (TxDOT & RXR) DELIVERABLES A. 90% construction plans and specifications. B. 100% construction plans and specifications. C. Detailed estimates of probable construction costs including summaries of bid items and quantities using the CITY's standard bid items and format. D. Original cover mylar for the signatures of authorized CITY officials. TASK 5. BID PHASE SERVICES. ENGINEER will support the bid phase of the project as follows. 5.1. Bid Support The ENGINEER shall upload all plans and contract documents onto Buzzsaw for access to potential bidders. • Contract documents shall be uploaded in a .xls file. • Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. • Plan Sets are to be uploaded to Buzzsaw in two formats, .pdf and .dwf files. The .pdf will consist of one file of the entire plan set. The .dwf will consist of individual files one for each plan sheet, and will be numbered and named in a manner similar to that of the plan set index. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27,2010 Page 11 of 17 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO.: 01501 • The ENGINEER shall sell contract documents and maintain a plan holders list on Buzzsaw from documents sold and from Contractor's uploaded Plan Holder Registrations in Buzzsaw. The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information The procedures shall include a log of all significant bidders questions and requests and the response thereto. The log shall be housed and maintained in the project's Buzzsaw folder titled Request for Information The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests in the form of addenda The ENGINEER shall upload all approved addenda onto Buzzsaw and mail addenda to all plan holders Attend the prebid conference in support of the CITY. • • • Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. When substitution prior to award of contracts is allowed in the contract documents, the ENGINEER will advise the CITY as to the acceptability of alternate materials and equipment proposed by bidders. Attend the bid opening in support of the CITY. • • • Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation is to be uploaded into the project's Bid Responses folder on Buzzsaw. Incorporate all addenda into the contract documents and issue conformed sets. • 5.2 Mylar Drawings • The ENGINEER shall submit a set of sealed conformed mylar drawings for record storage Record Drawings shall also be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall contain all associated sheets of the particular plan set Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: • I. TPW file name example — "W-1956_org47.pdf' where "W-1956" is the assigned file number obtained from the CITY, "_org' designating the file is of an original plan set, ' 47" shall be the total number of sheets in this file. Example: W-0053_org3.pdf and K-0320_org5.pdf City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 12 of 17 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO,: 01501 II. Water and Sewer file name example — `X-35667_org36.pdf' where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36' shall be the total number of sheets in this file. Example: X-12755_orgl8.pdf Both PDF and DWF files shall be uploaded to the project's Record Drawing folder in Buzzsaw. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number (817) 392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS • The project will be bid only once and awarded to one contractor. • 1 sets of construction documents will be sold to and made available on Buzzsaw for plan holders and/or given to plan viewing rooms_ 5 sets of 11X17 size and 5 sets of 22X34 size drawings plans and 10 specifications (conformed, if applicable) will be delivered to the CITY. • PDF and DWF files will be uploaded to Buzzsaw. 1 copy full size (22" x 34") mylar plans (conformed, if applicable) will be delivered to the CITY. DELIVERABLES A. Addenda B. Bid tabulations C. Recommendation of award D. Construction documents (conformed, if applicable) E Conformed mylar plans TASK 6. CONSTRUCTION PHASE SERVICES. ENGINEER will support the construction phase of the project as follows. 6.1 Construction Support City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 13 of 17 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO.: 01501 ® The ENGINEER shall attend the preconstruction conference. After the pre -construction conference the ENGINEER shall provide project exhibits and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. ® The ENGINEER shall visit the project site at monthly intervals as construction proceeds to observe and report on progress. As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents review change orders, and make recommendations as to the acceptability of the work. ® The ENGINEER shall attend the `Final" project walk through and assist with preparation of final punch list. • ASSUMPTIONS • • 3 RFI's are assumed. 1 Change Orders are assumed. DELIVERABLES A. Public meeting exhibits B. Response to Contractor's Request for Information C. Review of Change Orders D. Review of shop drawings E Final Punch List items F. Record Drawings TASK 7. ROW/EASEMENT SERVICES. ENGINEER will support and perform activities related to ROW and land as outlined below, per scoping direction and guidance from the CITY's Project Manager. 7.1. Right -of -Way Research • The ENGINEER shall determine rights -of -way, easements needs for construction of the project. Required temporary and permanent easements will be identified based on available information and recommendations will be made for approval by the CITY. 7.2. Right-of-Way/Easement Preparation and Submittal. • The ENGINEER shall prepare documents to be used to obtain right-of-way and permanent and/or temporary easements required to construct the improvements. City of Fort Worth, Texas Attachment A PMO Release Date: 08,27.2010 Page 14 of 17 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO.: 01501 • The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM for real property acquisition • The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. 7.3. Temporary Right of Entry Preparation and Submittal • Prior to construction the ENGINEER shall prepare and submit Temporary Right of Entry documents for landowners to CITY PM for real property acquisition. It is assumed that letters will only be required for land owners adjacent to temporary construction easements or who are directly affected by the project and no easement is required to enter their property. The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. • ASSUMPTIONS • 25 Easements or right-of-way documents will be necessary. • 50 Temporary right -of -entry documents will be necessary. • Right -of -Way research and mapping includes review of property/right-of-way records based on current internet based Tarrant Appraisal District (TAD) information available at the start of the project and available on -ground property information (i.e. iron rods, fences, stakes, etc.). It does not include effort for chain of title research parent track research, additional research for easements not included in the TAD, right-of-way takings easement vacations and abandonments, right-of-way vacations, and street closures. DELIVERABLES A Easement exhibits and meets and bounds provided on CITY forms. B. Temporary Right of Entry Letters TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES ENGINEER will provide survey support as follows. 8.1. Design Survey • ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, trees (measure caliper, identify overall canopy and have qualified arbonst identify species of trees), and other features relevant to the final plan sheets Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 15 of 17 ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT tI82 CITY PROJECT NO.: 01501 ® The minimum survey information to be provided on the plans shall include the following: A Project Control Sheet showing ALL Control Points, used or set while gathering data Generally on a scale of not less than 1:400: The following information about each Control Point, a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base Z coordinate on CITY Datum only. c. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). Coordinates on all P.C.'s, P.T.'s, P.I. s, Manholes, Valves, etc., in the same coordinate system, as the Control. No less than two horizontal bench marks, per line or location. Bearings given on all proposed centerlines, or baselines. Station equations relating utilities to paving, when appropriate. 8.2. Temporary Right of Entry Preparation and Submittal • Prior to entering property, the ENGINEER shall prepare and submit Temporary Right of Entry for landowners to CITY PM. The documentation shall be provided in conformance with the checklists and templates available on the CITY's Buzzsaw site. ASSUMPTIONS ® Topographic survey at intersection will include no more than 100 ft. in each direction DELIVERABLES A. Copies of field survey data and notes signed and sealed by a licensed surveyor. B. Drawing of the project layout with dimensions and coordinate list. ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES Additional Services not included in the existing Scope of Services - CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services if needed, upon the CITY's written request Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: City of Fort Worth, Texas Attachment A PMO Release Date: 0B.27.2010 Page 16 of 17 • • • • • . • • ATTACHMENT A DESIGN SERVICES FOR SANITARY SEWER REHABILITATION CONTRACT #82 CITY PROJECT NO.: 01501 S egotiation of easements or property acquisition including temporary right -of - e ntries. Services related to development of the CITY's project financing and/or budget. S ervices related to disputes over pre -qualification, bid protests, bid rejection and re -bidding of the contract for construction. Construction management and inspection services Periodic site visits during construction phase Design phase public meetings Performance of materials testing or specialty testing services. Services necessary due to the default of the Contractor. Services related to damages caused by fire, flood, earthquake or other acts of God. Services related to warranty claims, enforcement and inspection after final completion. Services related to submitting for permits (ie.TxDOT, railroad, etc...) S ervices related to Subsurface Utility Engineering Levels A, B, C or D Services related to Survey Construction Staking S ervices related to acquiring real property including but not limited to e asements, right-of-way, and/or temporary right -of -entries. S ervices to support, prepare document, bring, defend or assist in litigation u ndertaken or defended by the CITY. Construction Shop drawing review, samples and other submittals submitted by the contractor. Performance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth, Texas Attachment A PMO Release Date: 08.27.2010 Page 17 of 17 ATTACHMENT B COMPENSATION Design Services for Sanitary Sewer Rehabilitation Contract 82 City Project No. 01501 I. Compensation A. The ENGINEER shall be compensated a total lump sum fee of $ 197.608 as summarized in Exhibit B 1 — Engineer Invoice and Section IV — Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item III. of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER 111. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Water Department monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B PMO Official Release Date: 5,19.2010 Page 1 of 14 ATTACHMENT B COMPENSATION Design Services for Sanitary Sewer Rehabilitation Contract 82 City Project No. 01501 IV. Summary of Total Project Fees Firm Primary Responsibility P rime Consultant Baird, Hampton, & Civil Engineering Design Brown, Inc. Services Baird, Hampton, & (10%)Sub-Consultant Brown, Inc. Administration Baird, Hampton, & Surveying Services Brown, Inc. P roposed M/WBE Sub -Consultants VRX, Inc. Engineering Design Services DJ's Print & Promo Printing/Reproduction Services N on-M/WBE Consultants Project Number & Name Sanitary Sewer Rehabilitation Contract #82 City M/WBE Goal = 23 % City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 2 of 14 TOTAL Fee Amount $103,275 52.3% $4,833 2.4% $41,170 20.8% $45,180 22.9% $3,150 1.6% $197, 608 100% Total Fee M/WBE Fee I M/WBE % 197,608 $ 48,330 24% Consultant Committed Goal = 24 % EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Design Services for Sanitary Sewer Rehabilitation Contract 82 City Project No. 01501 Professional Services Payment Request Project Manager: Project: Sanitary Sewer Rehabilitation Contract #82 City Project #: 01501 City Sec Number: J Name: (Baird, Hampton, & Brown, Inc. Consultant's PM: Vendor Invoice #: Payment Request #: From Date: To Date: Invoice Date: Konstantine Bakintas, PE 'Liam Conlon 1 Consultant Instructions: Summary Fill in green cells including Invoice Number, From and To Dates and the included worksheets. When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Projects folder. email: kbAbhbinc.com Office Address 6300 Ridglea Place, Suite 700, Fort Worth, TX 76116 Telephone: (817) 338-1277 Fax: (817)338-9245 LOCK UNLOCK Agreement Agreement Amendment Amount to Completed Percent ($) Invoiced Current Sheet FAC and Work Type Description Amount Amount Date Amount Completed Previously Invoice Work Type 1 Sanitary Sewer $197.608.00 $197.608.00 Work Type 2 Work Type 3 Work Type 4 Work Type 5 Work Type 6 Remaining Balance $197,608.00 Totals This Payment Request $197.608.00 $197.608.00 $197.608.00 Overall Percentage Complete: City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 3 of 14 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Design Services for Sanitary Sewer Rehabilitation Contract 82 City Project No. 01501 Professional Services Payment Request Project ManagerLiam Conlon Project: Sanitary Sewer Rehabilitation Contract #82 City Project #: 01501 Work Type Desc: Sanitary Sewer F/A/C: City Sec Number: Purchase Order: Company Name: Baird, Hampton, & Brown, Inc. Consultant's PM: Konstantine Bakintas, PE Vendor Invoice #: Payment Request #: From Date: To Date: Invoice Date: Pay Items 31 - Conceptual Design 51 - Preliminary Survey 32 - Preliminary Design 33 - Final Design Description Totals This Unit: City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 4 of 14 email: Office Address: Telephone: Fax: Consultant Instructions: Fill in green cells including Percent Complete and Invoiced Previously Quanities When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. kb@bhbinc.com 6300 Ridglea Place, Suite 700, Fort Worth, TX 76116 (817) 338-1277 (817) 338-9245 Agreement Amendment Amount Number $451729.0C $45t180.0C $91,457.0C $15.242.0C Amendment Amount Agreement Amount to Completed Date Amount $45,729.0C $45,180.0C $91,457.0C $15,242.0C $197 608.00 $197 608 00 Overall Percentage Complete: Percent ($) Invoiced Current Completed Previously Invoice 1 1 Remaining Balance $45.729.0C- $45,180.0C $91,457.0C $15.242.0C $197.608 00 EXHIBIT "B-2" M/WBE Summary (Supplement to Attachment B) Design Services for Sanitary Sewer Rehabilitation Contract 82 City Project No. 01501 Task Task 1 — Design Management Task 2 — Conceptual Design Task 3 — Preliminary Design Task 4 — Final Design Task 5 — Bid Phase Services Task 6 — Construction Phase Services Task 7 — ROW/ Easement Services Task 8 — Survey Services Task 9 — Permitting Services 10% Sub -consultant Administration Total M/WBE Consultant VRX, Inc DJ's Print & Promo Total Non-M/WBE Consultant Total City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 5 of 14 Total Fee 7,775 31,030 56,570 27,990 14,595 4,365 3,955 41,220 5.275 4,833 197,608 Services Provided Civil Engineering Design Printing/Reproduction Services Services Provided M/WBE Fee 0 10,100 14,925 13,075 9,105 1,100 25 0 0 0 48,330 % M/WBE Fee $ 45,180 $ 3,150 $ 48,330 Fee 0% 32.6% 26.4% 46.7% 62.4% 25.2% 0% 0% 0% 0% 24% EXHIBIT "B-3" Hourly Rate Schedule (Supplement to Attachment B) Design Services for Sanitary Sewer Rehabilitation Contract 82 City Project No. 01501 Baird, Hampton, & Brown, Inc. Hourly Rate Schedule May 1, 2009 S rincipal Project Manager S enior Engineer Engineer — PE Engineer — EIT S enior Designer Designer CADD / Drafter Clerical S enior Land Surveyor — RPLS Land Surveyor — RPLS S urvey Tech / Research Conventional — 2 Person Field Crew Robotics — 1 Person Field Crew Robotics — 2 Person Field Crew GPS — 1 person Field Crew GPS — 2 person Field Crew GPS — 3 person Field Crew City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 6 of 14 $ 175.00 $ 150.00 $ 125.00 $ 100.00 $ 85.00 $ 90.00 $ 80.00 $ 60.00 $ 50.00 $ 135.00 $ 110.00 $ 85.00 $ 105.00 $ 105.00 $ 135.00 $ 130.00 $ 150.00 $ 170.00 EXHIBIT "B-4A" Total Fee Summary and Design fee Breakdown (Supplement to Attachment B) Design Services for Sanitary Sewer Rehabilitation Contract 82 City Project No. 01501 Summary of Total Fee Service Description Sewer ( Water Total Engineering — Design Services $ 152,428 $ 0.00 $ 152,428 Surveying Services $ 45,180 $ 0.00 $ 45,180 Total I $ 197,608 $ 0.00 $ 197,608 1. Total Sewer Fee (Less Survey Fees) Breakdown by Concept, Preliminary, and Final Design a. Concept (30%) _ (Total Sewer Fee — Survey Fee) X (0.3) _ $ 45,729 b. Preliminary (60%) _ (Total Sewer Fee — Survey Fees) X (0.6) _ $ 91,457 c. Final (10%) _ (Total Sewer Fee — Survey Fees) X (0.1) _ $ 15,242 Total I $ 152,428 1 1. Total Water Fee (Less Survey Fees) Breakdown by Concept, Preliminary, and Final Design a. Concept (30%) = Total Water Fee — Survey Fee) X (0.3) _ b. Preliminary (60%) _ (Total Water Fee — Survey Fees) X (0.6) _ c. Final (10%) _ (Total Water Fee — Survey Fees) X (0.1) _ Total City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19,2010 Page 7 of 14 $ 0.00 $ 0.00 $ 0.00 $ 0.00 Task No. Task Description 1.0 Project Mnment 1.1 Mar+ta �Ineeam 1.1.1 .urnaai Toam--Meet s 1.1.2 QA/QC 1.2 ig {%t ►cg1t `7s arl /3Foj jn9 1.2.1 Pre- es,, p toorainatlon Meeting 1.2.2 Quarter( Project Uotjate Meetings 1.2.3 1, 4 1'5 fi 1. .6 PJ p Je 1.2.7 nvois+nq I rij3 fivj9 rrogyess eports on MWB Reports Basis for Hour EstimetA Unit Project Director $175 8 16 Monthly 4 Ea 1 Ea 6 Ea 1 Ea 18 Mopihl Monthly 18 Monthly 16 Monthly 2.0 ;oncen ,aI Design (30-Percent) 2.1 )ata Collection ,ommunication and coordinate with other 2.2 �encies and City Departments 2.3 l�ity Review Meeting 2.4 3oncq trual Design Package 2.4.1 over Sheet Develop Plan Sheets With Conceptual 2.4.2 LaWput Develop Conceptual Estimate of Probable 2.4.3,onstruction Cost Submit Conceptual Design to City for 2.4.4 eview ;onduct Review Meeting w/City Develop 2.4.5 Minutes and action Items ?ece+ve-P eFm4ssi€41-to-Proceed-with- 2.4.6 P-reliminapi-Design 3.0 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10. 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 'reliminayy Desiar1 f 60 Pe cerltl )evelopment of Preliminary Design )rawinci and SppcIfications Zevise Lover Sheet )evelop Index )evelop General Notes )evelop Project Control and Monument _heet on City Datum Develop Project Easement and R.O.W.. heet evelop Overall Sewer Laxout Sheets evelop Plan and Profile Sheets Prepare Standard and Special Detail Sheets pevelcw Prelimina Spaci ications Develop Prliminary Estimates of Probable Construction Cost Constructibiltv Review with City Meet on-site�with hhRCj C:onsu)f wi h ther i i eparf'ment and there c`ps Utlity\ Locations Develc gtatnd�rd Traffic Control Plans Develo.Q0VPPP Plan Sheet Develop S'WPPP Plan conduct Reviiiew ee mg w% i • eve op Minutes and action Items Receive-Permission-to-P-roGeed-with-Fin al n 35 1 Ea Ea Ea Ea Sheet Ea Ea Ea Ea 1 1 1 1 1 1 1 35 20 2 2 1 Ea Ea Ea Ea Sheet Sheet Sheet Sheet Ea Ea Ea Ea Ea Ea sheet sheet Ea Ea Ea Ea 6 EXHIBIT B4B - Level of Effort Supplement TASK/HOUR BREAKDOWN Design Services for Sanitary Sewer Rehabilitation Contract 82 City Proiect No. 01501 Labor 'hours) Project Project Manager Engineer $175 16 2 12 2 1 $125 24 4 4 4 4 EIT/CADD $85 0 Survey I Administrative $150 0 01 241 801 781 0i 8 16 8 4 12 1 1 1 1 6 40 60 2 6 8 1 2 4 01 311 1621 1871 4.0 Final Desjnf 4.1 Dev9ipp o Final Plans Develop 90% Final Estimates of Probable 4.2 Construction Cost Develop 90% Final Construction 4.3 Specifications 4.4 {ovi 5.0 !Bid Phase 60 1 Sheet Ea Ea Ea I I 1 1 1 4 4 4 1 2 8 4 8 24 24 40 72 2 £= 16 2 16- 16 2 5 4 1 2 8 2 4 8 16 4 12 2 4 8 18 8 ;;50 8 8 Total Labor Cost $7,600 $0 $01 $1,400 $0 $850 $2,600 $850 $1,000 $500 $400 $0 Expense Subconsultant MWBE I Non-MWBE $01 S0 Travel $1751 Reproduction MWBE $0 525, $1 Stt 0 $20,830 $4,080 S2,200 $300 S0 $295 $11,150 $1.780 $175 $8501 $0 $10,0001 $01 $100_ Total Expense Task Sub Total Cost $175 $7,775 S0 S0 S0 S0 S1,400 SO $25 $150 $0 S0 $875 $2,750 $850 $1,000 S500 S0 $400 S0 S0 $100 S10.000 $50 $25 S25 561 541 0 40 40 4 6 2 12 8 0 $41,570 SO $85 $500)1 $845 $1,355 $1,355 $5,215 1 1 $11,8201 $2,710 $3,7101 $2,030 $600 $1,7001 $3,7101 S1,3551 $2,530 S0 $850 $0 0 $14,915 $11,200 $1,185 $2,530 $14,500] $0 $10,200 $31,030 $50 $4,130 S0 $0 S10,000 S0 $2,200 $300 S10,000 $295 $0 $11,150 S0 $1,780 $125 $300 $25 $875 $0 $0 $75 $425 $14.500 $50 $25 $0 $12,500 )12.500 S0 S0 $575 $15,000 S14,500 S0 $0 $0 $56,570 S14,500 $85 $500 $845 $0 $1.355 SO S0 S0 $1,355 $5,215 $11,820 $0 $2,710 $0 $3,710 S0 $200 $50 $0 $2,030 $800 $1,250 S0 $0 $0 $0 S0 $1,700 $3,710 $1,355 $2,530 $225 $225 $25 $875 S0 $0 $13,075 S12,500 $27,990 $23,700 $0 $1,185 $0 $2,530 S575 $575 0 6 23 4 0 24_ $5,465 $8,180 S0 $25 5925 $9,130 S14.595 City of Fort Worth, TexasAttachment B - Level of Effort SupplementPMO Official Release Date: 5.19.2010 1 of 2 Task No. Task Description 5.1 ffq-iipptY1 Upload Plans & Specifications into Buzsaw 5.2 in PDF Format Sell Contract Documents and Maintain 5.3 Plan Holders List Receive, log and respond to all bidders 5.4 tiestions and re,uest l5evelop addends and upload 5.5 addendas in Buzsaw 5.6 Attend Bid Qpipinp Tabulate and Review Bids Received, 5.7 *late and make Recommendations 5.8 y+pr Drawing 5.9 6ubnai�wings 6.0 6.1 Conplruction SuprQft 6.1.1 Attend Precons}ruction Conference 6.1.2 6.1.3 6.1.4 6.1.5 6.1.6 6.1.7 6.1.8 6.1.9 Construction Phase Services Develop Pro/ect Exhibits Attend Public Meetino P-ro' sits Submittal Review (None� Request for Information/Change Order Review None) Final Walk ThrpQ ah Record Drawl ps (None) Construction !urvey (none) Basis for Hour Estimate 60 Unit Ea Ea Ea Ea Ea Ea Ea Sheet IProject I Project Director , Manager 1 $174 $175 1 32 1 1 Ea Sheet Ea Ea Ea Ea Ea EXHIBIT B4B - Level of Effort Supplement TASK/HOUR BREAKDOWN Design Services for Sanitary Sewer Rehabilitation Contract 82 City Proiect No. 01501 Labor/hours) EIT/CADD I Survey $85 $150 Project Engineer $125 Administrative $50 2 2 1 1 4 4 4 4 4 1 10 2 4 2 2 4 16 Total Labor Cost $0 $840 $1,300 $850 $850 $250 $1,075 $300 $0 Expense Subconsultant MWBE Non-MWBE Travel Reproduction MWBE Total Expense Task Sub Total Cost $8,180 $8,180 $0 $840 SO $1,300 SO $850 $0 $850 $25 $275 SO $925 SO $1,075 $1,225 SO 4 4 $3,165 $0 $60011 $76511 $6001 $0 $0 $0 S1,200I $0 $o 7.0 7.1 7.2 7.3 ROW/Easement Services Riqht-of-Way Research /None) Right-of-Way/Easement Preparation and Submittal /Temporary Right of Entry Submittal (None Ea Ea Ea 8.0 8.1 8.2 8.3 8.4 8.5 9.0 9.1 9.2 9.3 SurYVV Develop and submit Right of Entry letter for Survgy Conduct S urvQ�( P�9)?,are Base M.f� (mepp�la((y�) iglif of entry Submittal (Non& onsfruction Survey None' LT ermitting xDOT ailroad irport Totals 13341 13341 Ea LF LF LF Ea Ea Ea 16 16 $3,930 $0 $3,930 $0 SO $0 $100 $1,1001 $1.200 31.10i $1� $25 S50 20 162 160 2 8 100 160 ff 60 2 4 $0 $0 $0 $1,100 $4,365 $1,100 $25 $625 $0 $765 $25 $625 $0 $0 $0 $0 SO $0 $50 S1,250 SO $0 $o $o $251 $25 $25 $0 $3,955 $0 $25 $3,955 SO SO $41,170 $270 $33,675 $6,275 $950 $0 $0 0 $50 $01 $50 $50 $41,220 $0 $270 $50 $33,725 $0 $6,275 $0 $950 $0 $0 24 10 $5,250 119 1 8 8 403 4 24 507 1 176 1 36 $1,690 S1,6901 $1,870 $143,895 0 0 $25 $0I $25 $0 $5501 $5,275 SO $1,690 SO $1690 $25 $1.895 $48,880 $192,775 Pro'l�ect Summawy iota! Hours Total Labor Total Exp ose MWBE Subconsultant Non-MWBE Subconsultant 10% Subconsultant Markup MWBE Partici {{i�Vion Total Proiecftost 9 $143 �5 $48\80 $48.3 0 SO /244.5833% $197,608 City of Fort Worth, TexasAttachment B - Level of Effort SupplementPMO Official Release Date: 5.19.2010 2 of 2 EXHIBIT "B-5" (Supplement to Attachment B) Design Services for Sanitary Sewer Rehabilitation Contract 82 City Project No. 01501 Summary of Total Fee Description of Service 1 Sewer 1 Water 1 Total Surveying Fee Easements Total City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 8 of 14 $ 41,170 $ 3,930 0.00 0.00 $ 45,100 $ 0.00 $ $ 41,70 $ 3,930 45,100 EXHIBIT "B-6" (Supplement to Attachment B) Design Services for Sanitary Sewer Rehabilitation Contract 82 City Project No. 01501 Sets Task 1 — Design Management $/Sheet I Sheets Total Task 2 — Conceptual Design (30%) $ 100.00 Written Summary 2 15 Graphic Exhibits Color 2 45 Graphic Exhibits B&W 1 2 45 Task 3 — Preliminary Design (60%) 11X17 Plan Set 2 Specifications 2 Constructability Review 6 Utility Clearance (by Autodesk Buzzsaw) 1 Task 4 — Final Design (90%) Draft Final Plans (90%) 11X17 8 Draft Final Plans (90%) 22X34 2 Draft Final Specifications (90%) 2 Final Drawings (100%) 22X34 2 Final Specifications and Contract (100%) 2 Task 5 — Bid Phase Services Bid Project (through Autodesk Buzzsaw) Construction Documents 22X34 5 Construction Documents 11X17 5 Conformed Specifications 1 10 Scan to PDF 1 1 Task 6 — Construction Phase Services Scan to PDF Record Drawings Mylar 22X34 $ 425.00 60 250 60 1 $ 575.00 60 60 250 60 250 $ 925.00 60 60 250 60 $ 1,100.00 1 1 60 60 Task 7 — ROW/ Easement Services $ 25.00 Easement Documents 20 3 TROE Documents 1 50 Task 8 — Survey Services Task 9 — Permitting Services $ 3,150.00 City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 9 of 14 EXHIBIT "B-7A" Opinion of Probable Construction Costs — Project Summary (Supplement to Attachment B) Design Services for Sanitary Sewer Rehabilitation Contract 82 City Project No. _ 01501 Water Improvements $ Sewer Improvements $ Total City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19,2010 Page 10 of 14 Project Total 0 1,448,000 $ 1,448,000 Percent Total 0% 100% 100% SanitTry Sewer Improvem ants PAY BID TOTAL ITEM ITEM QUANTITY UNIT EXHIBIT "B-7B" Opinion of Probable Construction Costs - Project Summary (Supplement to Attachment B) Design Services for Sanitary Sewer Rehabilitation Contract 82 City Project No. 01501 ITEM DESCRIPTION L-1957 L-1958 L-1959 L-1959 L-1960 L-2347 UNIT TOTAL sta. 0+00 to 3+58 sta. 0+00 to 4+26 sta. 4+70 to 6+72 sta. 5+72 to 8+91 sta. 4+97 to 6+28 sta. 7+73 to10+32 PRICE AMOUNT QTY AMOUNT QTY AMOUNT. QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT 1 BID-00470 24 EA Pavement -Traffic Permit for Utility Streed Cut - Install 100 2,400 1 100 1 100 1 100 1 100 1 100 2 BID-00202 13,341 LF Inspection-Preconstrudion Cleaning & TV - Study 4 53,364 358 1 432 427 1 708 102 408 320 1,280 142 568 381 1,524 3 BID-00099 22 LS Storm Water Pollution Prevention Plan < 1 Acre 250 5,500 1 250 1 250 1 250 1 250 1 250 1 250 Install 4 BID-01189 21 LS Signal -Traffic Control - Design & Provide - Install 500 10,500 1 500 1 500 1 500 1 500 1 500 1 500 5 BID-00127 740 LF Fence - Remove 5 3,700 - - - - - - - - 6 BID-00121 15 LF Wall -Aluminum - Remove 5 75 - - - - - - - 7 BID-00424 290 LF Curb & Gutter- Remove 5 1,450 20 100 10 50 10 50 10 50 20 100 - 8 BID-00402 1,280 SF Driveway - Remove 3 3,640 150 450 150 450 210 630 450 1,350 - - 9 BID-00093 550 SF Rip Rap - Remove 3 1,650 - - - - - - 10 BID-00206 43 EA Manhole - Remove 500 21,500 1 500 1 500 2 1,000 - 2 1,000 1 500 11 BID-00372 3,855 LF Trench Safety System 5 Foot Depth - Install 2 7,710 - - - - - - 30 60 12 - BID-00121 - 1,208 LF Pipe-Sewer-4 InchSDR3S (All Depths) - Install 25 30,188 180 4,500 270 6,750 - 165 4,125 - - - 13 BID-00121 480 LF Pipe-Sewer-6 InchSDR35 (All Depths) - Install 30 14,400 - - - - 23 675 14 BID-00351 8,506 LF Pipe-Sewer-8 InchSDR35 (All Depths) - Install 35 297,710 358 12,530 427 14,945 102 3,570 320 11,200 142 4,970 381 13,335 15 BID-00268 4,835 LF Pipe-Sewer-15 Inch-SDR35 (All Depths) - Install 45 217,575 - - - - - 16 BID-00213 52 EA Manhole -Std 4 Ft Diam-(to 6 Ft Depth) -Install 2,500 130.000 1 2,500 2 5.000 2 5,000 2 5,000 2 5,000 1 2,500 17 - BID-00214 26 VF Manhole-Std 4 Ft Diam-Added Depth (Over 6 Ft 125 3,250 - - - - - Depth) - Install 18 BID-00218 52 EA Manhole-Watertightlnsert - Install 100 5,200 1 100 2 200 2 200 2 200 2 200 1 100 19 BID-00196 52 EA Collar -Manhole -Install 300 15,600 1 300 2 600 2 600 2 600 2 600 1 300 20 - 81D-00355 120 EA Sewer-Service-4 Inch Service Tap - Install 400 48,000 12 4,800 18 7,200 11 4,400 - - 21 BID-00361 58 Sewer-Service-6 Inch Service Tap - Install 600 34,800 - - - - - - - 3 1,800 22 BID-00356 120 EA Sewer-Service-4 Inch-2-Wav Clean Out - Install 150 18.000 12 1,800 18 2.700 - 11 1:650 - - - 23 BID-00362 58 EA Sewer-Service-6 Inch-2 Way Clean Out - Install 175 10,150 - - - - - 3 525 24 BID-00430 1,627 SY Pavement Asphalt -Install 45 73,215 35 1,575 10 450 115 5,175 10 450 160 7,200 - - 25 BID-00415 995 SY Alley - Install (Concrete) 45 44,775 - - - - - - - - 26 BID-00530 156 SF Walk-4 Ft - Install 8 I 1,248 - - - 32 256 - 32 256 - 27 BID-00423 290 LF Curb & Gutter -Install 25 7,250 20 500 10 250 10 250 10 250 20 500 28 B10-00401 1,280 SF Driveway - Install 5 6,400 - 150 750 150 750 210 1,050 450 2,250 - - 29 810-00137 18,657 SY Grass -Sod -Install 10 186,570 547 5,470 675 6,750 10 100 500 5,000 10 100 635 6,350 30 BID-00128 53 LF Fence -Chain Link - Install 25 1,325 - - - - - 31 BID-00129 60 LF Fence -Privacy -Install 30 1,800 - - - - - - - 32 B10-00121 - 15 LF Wall -Aluminum - Install 50 750 - - - - - - - - - - 33 BID-00097 550 SF Rip Rap-6 Inch - Install 6 3,300 - 34 - BID-00493 110 CY Subgrade-Crushed Limeston ForMisc. Placement- 25 2,750 5 125 5 125 5 125 5 125 5 125 5 125 Install 35 B1D-00840 110 CY Fill Material -Ballast Stone - Install 15 1,650 5 75 5 75 5 75 5 75 5 75 5 75 36 BID-00217 52 EA Manhole -Vacuum Test - Services 200 10,400 1 200 2 400 2 400 2 400 2 400 1 200 37 BID-00201 15,029 LF Inspection -Post Construction Cleaning & TV - Study 2.5 37,571 538 1,345 697 1,743 102 255 485 1,213 142 355 404 1,009 City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 - Page 11 of 14 Subtotal= 1,315,566 38,702 51,496 19,514 38,548 25,899 29,828 Contingency (10%) 132,434 3.898 5,205 1,986 3,953 2,601 3,072 Total= 1,448,000 42,600 56,700 21,500 42,500 28.500 32,900 EXHIBIT "B-7B" Opinion of Probable Construction Costs - Project Summary (Supplement to Attachment B) Design Services for Sanitary Sewer Rehabilitation Contract 82 City Project No. 01501 Sanitary Sewer Improvements L-2347 L-2347 L-2347 PAY BID TOTAL UNIT TOTAL sta. 10+32 to 22+89 sta. 44+67 to 48+74 sta. 49+61 to 69+21 ITEM ITEM QUANTITY UNIT ITEM DESCRIPTION PRICE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT 1 BID-00470 24 EA Pavement -Traffic Permit for Utility Streed Cut - Install 2 BID-00202 13,341 LF Inspection-Preconstruction Cleaning & TV - Study 3 BID-00099 22 LS Storm Water Pollution Prevention Plan < 1 Acre - Install 4 BID-01189 21 LS Signal -Traffic Control - Design & Provide - Install 5 BID-00127 740 LF Fence - Remove 6 BID-00121 15 LF Wall -Aluminum - Remove 7 BID-00424 290 LF Curb & Gutter - Remove 8 BID-00402 1,280 SF Driveway - Remove 9 BID-00093 550 SF Rip Rap - Remove 10 BID-00206 43 EA Manhole - Remove 11 81D-00372 3,855 LF -Trench Safety System 5 Foot Depth - Install 12 BID-00121 1,208 LF Pipe-Sewer-4 Inch-SDR35 (AII Depths) - Install 13 BID-00121 480 LF Pipe-Sewer-6 Inch-SDR35 (All Depths) - Install 14 BID-00351 8,506 LF Pipe-Sewer-8 Inch-SDR35 (AII Depths) - Install 15 BID-00268 4,835 LF Pipe-Sewer-15 Inch-SDR35 (All Depths) - Install 16 BID-00213 52 EA Manhole -Std 4 Ft Diam-(to 6 Ft Depth) -Install 17 BID-00214 26 VF Manhole-Std 4 Ft Diam-Added Depth (Over 6 Ft Depth) - Install 18 BID-00218 52 EA Manhole -Watertight Insert - Install 19 BID-00196 52 EA Collar -Manhole - Install 20 81D-00355 120 EA Sewer-Service-4 Inch Service Tap - Install 21 BID-00361 58 Sewer-Service-6 Inch Service Tap - Install 22 BID-00356 120 EA Sewer-Service-4 Inch-2-Way Clean Out - Install 23 BID-00362 58 EA Sewer-Service-6 Inch-2 Way Clean Out - Install 24 BID-00430 1,627 SY Pavement Asphalt -Install 25 BID-00415 995 SY Alley - Install (Concrete) 26 BID-00530 156 SF Walk-4 Ft - Install 27 BID-00423 290 LF Curb & Gutter - Install 28 BID-00401 1,280 SF Driveway - Install 29 BID-00137 18,657 SY Grass -Sod - Install 30 BID-00128 53 LF Fence -Chain Link - Install 31 BID-00129 60 LF Fence -Privacy - Install 32 BID-00121 15 LF Wall -Aluminum - Install 33 BID-00097 550 SF Rip Rap-6 Inch - Install 34 BID-00493 110 CY Subgrade-Crushed Limeston For Misc. Placement - Install 35 B1D-00840 110 CY Fill Material -Ballast Stone - Install 36 B1D-00217 52 EA Manhole -Vacuum Test - Services 37 BID-00201 15,029 LF Inspection -Post Construction Cleaning & TV - Study City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 12 of 14 i 100 2,400 1 100 4 53364 1,257 5028 250 5.500 1 250 500 10.500 1 500 5 3,700 - 5 75 5 1,450 20 100 3 3,840 - - 3 1,650 - 400 1,200 L-2352 L-2473 sta. 0+00 to 6+72 sta. 0+00 to 4+00 QTY AMOUNT QTY AMOUNT - 2 200 - 1 100 421 1,684 977 3.908 573 2,292 400 1,600 1 250 1 250 1 250 1 250 1 500 1 500 1 500 10 50 - - 500 21,500 1 500 2 1,000 2 1,000 - 1 500 2 7,710 - 340 680 - - - - 25 30,188 - - - - 30 14,400 23 675 15 450 8 225 70 2,100 35 297,710 1,257 43,995 421 14,735 977 34,195 573 20,055 45 217,575 - - - 2,500 130,000 2 5.000 2 5,000 2 5,000 2 5,000 125 3,250 1 125 2 250 100 5,200 2 200 2 200 2 200 2 300 15,600 2 600 2 600 2 600 2 400 48,000 - - - - - 600 34,800 3 1,800 2 1,200 1 600 7 150 18.000 - - - 175 10,150 3 525 2 350 1 175 7 45 73:215 45 2,025 - 90 4,050 - 45 44,775 - - 315 8 1,248 - - - - 25 7,250 20 500 - 10 250 - 5 6,400 - - - - 10 186.570 2.030 20,300 635 6,350 1,495 14,950 640 25 1,325 - - - - 30 1,800 - - - - - - - 50 750 - - - - 6 3,300 - 400 2.400 - 200 600 4,200 1,225 14,175 I 6,400 25 2,750 5 125 5 125 5 125 5 125 15 1,650 5 75 5 75 200 10,400 2 400 2 400 2.5 37,571 1,280 3,199 436 1,090 Subtotal= 1,315,566 Contingency (10%) 132,434 Total= 1,448,000 85,897 38,414 8,603 3,886 94,500 42,300 5 75 5 75 2 400 2 400 985 2,461 643 1,608 69,214 59,955 6,986 6,046 76,200 66,000 1 500 45 225 150 450 1 500 200 400 60 1,800 400 14,000 2 5,000 1 125 2 200 2 600 6 3,600 6 1,050 165 7,425 150 750 480 4,800 30 750 45 1,350 5 125 5 75 2 400 460 1,150 47,225 4,775 52,000 _Sanitary Sewer Improvements _ PAY BID TOTAL ITEM ITEM QUANTITY UNIT ITEM DESCRIPTION EXHIBIT "B-7B" Opinion of Probable Construction Costs - Project Summary (Supplement to Attachment B) Design Services for Sanitary Sewer Rehabilitation Contract 82 City Project No. 01501 L-2473 L-2756 L-3587 UNIT TOTAL sta. 11+00 to 17+39 sta. 1+92 to 6+72 sta. 0+00 to 4+58 PRICE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT 1 1 BID-00470 24 EA Pavement -Traffic Permit for Utility Streed Cut - Install 100 2 BID-00202 13,341 LF Inspection-Preconstruction Cleaning & TV - Study Storm Water Pollution Prevention Plan < 1 Acre - Install Signal -Traffic Control - Design & Provide - Install Fence - Remove Wall -Aluminum - Remove Curb & Gutter - Remove Driveway - Remove Rip Rap - Remove Manhole - Remove Trench Safety System 5 Foot Depth - Install Pipe-Sewer-4 InchSDR35 (All Depths) - Install Pipe-Sewer-6 Inch-SDR35 (All Depths) - Install Pipe-Sewer-8 Inch-SDR35 (All Depths) - Install Pipe-Sewer-15 Inch-SDR35 (All Depths) - Install 3 BID-00099 22 LS 4 BID-01189 21 LS 5 BID-00127 740 LF 6 BID-00121 15 LF 7 BID-00424 290 LF 8 BID-00402 1,280 SF 9 BID-00093 550 SF 10 BID-00206 43 EA 11 BID-00372 3,855 LF 12 BID-00121 1,208 LF 13 BID-00121 480 LF 14 BID-00351 8,506 LF 15 BID-00268 - 4,835 LF 16 BID-00213 52 EA Manhole -Std 4 Ft Diam-(to 6 Ft Depth) -Install 17 BID-00214 26 VF 18 BID-00218 52 EA 19 BID-00196 52 EA 20 BID-00355 120 EA 21 BID-00361 58 22 BID-00356 120 EA 23 BID-00362 58 EA 24 BID-00430 - 1,627 SY 25 8ID-00415 995 SY 26 BID-00530 156 SF 27 BID-00423 290 LF 28 BID-00401 1,280 SF 29 BID-00137 18,657 SY 30 BID-00128 53 LF 31 BID-00129 60 LF 32 BID-00121 15 LF 33 BID-00097 550 SF 34 BID-00493 110 CY 35 BID-00840 110 CY 36 BID-00217 52 EA 37 BID-00201 15,029 City of Fort Worth, Texas Attachment B PMO Official Release Date: 5,19.2010 Page 13 of 14 Manhole-Std 4 Ft Diam-Added Depth (Over 6 Ft Depth) - Install Manhole -Watertight Insert - Install Collar -Manhole - Install Sewer-Service-4 Inch Service Tap - Install Sewer-Service-6 Inch Service Tap - Install Sewer-Service-4 Inch-2-Way Clean Out - Install Sewer-Service-6 Inch-2 Way Clean Out - Install Pavement Asphalt - Install Alley - Install (Concrete) Walk-4 Ft - Install Curb & Gutter - Install Driveway - Install Grass -Sod - Install Fence -Chain Link - Install Fence -Privacy - Install Wall -Aluminum - Install Rip Rap-6 Inch -- Install Subgrade-Cnished Limeston For Misc. Placement - Install Fill Material -Ballast Stone - Install Manhole -Vacuum Test - Services LF Inspection -Post Construction Cleaning & TV - Study 2,400 2 200 4 53,364 640 2 560 485 250 5.500 1 250 1 500 10,500 1 500 1 5 3,700 500 2,500 5 75 5 1,450 10 50 3 3,840 1 150 450 3 1,650 500 21,500 1 500 2 7,710 150 300 I 25 30,188 - I 30 14,400 83 2,475 I 35 297,710 640 22,400 I 45 217.575 2,500 130,000 2 5,000 125 3,250 100 5,200 2 300 15,600 2 400 48,000 - 600 34,800 11 150 18,000 - 175 10,150 11 45 73,215 25 45 44,775 160 8 1.248 10 25 7,250 10 5 6,400 150 10 186,570 760 25 1.325 2 30 1,800 - 50 750 6 3.300 25 2,750 5 15 1,650 5 200 10,400 2 2.5 37,571 723 Subtotal= 1,315,566 Contingency (10%) 132,434 Total= 1.448,000 2 40 30 485 2 1,940 250 500 458 1 1 1,832 250 500 1.000 1 500 80 360 720 135 3,375 900 - 16.975 458 16,030 5,000 2 5,000 1 125 200 2 200 2 200 600 2 600 2 600 18 7,200 6,600 3 1,800 18 2,700 1,925 3 525 - 1,575 - - - 7,200 - - 85 3,825 80 - 250 - - - - 750 - 7,600 810 8,100 680 6,800 50 - 1 - 125 5 125 75 5 400 2 400 1,806 515 1,288 75 1 1 1 5 125 5 75 2 400 593 1,483 66,421 39,883 51,615 6,679 4,018 5,186 73,100 1 1 43,900 56,800 L-3903 L-5581 sta. 0+00 to 3+10 sta. 0+00 to 5+63 QTY AMOUNT QTY AMOUNT 1 100 310 1,240 1 250 1 500 30 150 L-7921 sta. 2+08 to 9+00 QTY AMOUNT 1 100 1 100 563 2,252 692 2,768 1 250 1 250 1 500 1 500 20 100 20 100 150 450 1 500 1 500 200 400 20 600 310 10,850 563 19,705 1 2,500 2 5,000 1 100 1 300 35 1,575 20 500 515 5,150 1 25 5 125 5 75 1 200 310 775 2 250 2 1,000 53 1,575 692 24,220 2 5,000 i 2 200 2 200 ', 2 600 2 600 2 1,200 7 4,200 2 350 7 1,225 35 1,575 45 2,025 50 2,250 - 20 500 - - 840 8,400 1,085 10,850 150 900 5 125 5 125 5 75 5 75 2 400 2 400 583 1,458 ' 745 1,861 25,015 48,140 56,974 2,585 4,861 5,726 27,600 53.000 62,700 Sanitary Sewer Improvem rots PAY BID TOTAL ITEM ITEM QUANTITY UNIT ITEM DESCRIPTION EXHIBIT "B-7B" Opinion of Probable Construction Costs - Project Summary (Supplement to Attachment B) Design Services for Sanitary Sewer Rehabilitation Contract 82 City Project No. 01501 M-136 M-136 M-136 M-136 M-137 UNIT TOTAL sta. 69+80 to 81+36 sta. 81+35 to 100+76 sta. 100+76 to 103+71 sta. 104+35 to 115+68 sta. 0+00 to 3+10 PRICE AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT 1 BID-00470 24 EA Pavement -Traffic Permit for Utility Streed Cut - Install 100 2,400 2 200 5 500 2 BID-00202 13,341 LF Inspection-Preconstruction Cleaning & TV - Study 4 53,364 1,155 4.620 - 1.941 7,764 295 1,180 3 BID-00099 22 LS Storm Water Pollution Prevention Plan < 1 Acre - 250 5.500 1 250 1 250 1 250 Install 4 BID-01189 21 LS Signal -Traffic Control - Design & Provide - Install 500 10,500 1 500 1 500 1 500 5 BID-00127 740 LF Fence - Remove 5 3,700 15 75 150 750 - - 6 81D-00121 15 LF Wall -Aluminum - Remove 5 75 15 75 - - - 7 BID-00424 290 LF Curb & Gutter- Remove 5 1,450 - 100 500 - - 8 BID-00402 1,280 SF Driveway - Remove 3 3,840 - 9 BID-00093 550 SF Rip Rap - Remove 3 1,650 - 10 BID-00206 43 EA Manhole - Remove 500 21,500 5 2.500 I 10 5,000 1 500 11 81D-00372 3,855 LF Trench Safety System 5 Foot Depth -Install 2 7,710 560 1,120 I 515 1,030 400 800 12 BID-00121 1,208 LF Pipe-Sewer-4 InchSDR35 (All Depths) - Install 25 30,188 90 2,250 83 2,063 105 2,625 13 BID-00121 480 LF Pipe-Sewer-6 InchSDR35 (All Depths) - Install 30 14,400 45 1,350 53 1,575 -- 14 BID-00351 8,506 LF Pipe-Sewer-8 Inch-SDR35 (All Depths) - Install 35 297,710 - - - - 15 BID-00268 4,835 LF Pipe-Sewer-151nch-SDR35(All Depths) -Install 45 217,575 1,155 51,975 1,941 87,345 295 13,275 16 BID-00213 52 EA Manhole -Std 4 Ft Diam-(to 6 Ft Depth) -Install 2,500 130,000 5 12,500 10 25,000 1 2,500 17 BID-00214 26 VF Manhole-Std 4 Ft Diam-Added Depth (Over 6 Ft 125 3,250 2 250 7 875 2 250 Depth) - Install 18 BID-00218 52 EA Manhole -Watertight Insert - Install 100 5:200 5 500 10 1,000 1 100 19 BID-00196 52 EA Collar -Manhole - Install 300 15,600 5 1,500 10 3,000 1 300 20 BID-00355 120 EA Sewer-Service-4 Inch Service Tap - Install 400 48:000 12 4:800 11 4,400 14 5.600 21 BID-00361 58 Sewer-Service-6 Inch Service Tap - Install 600 34,800 6 3,600 7 4:200 - 22 BID-00356 120 EA Sewer-Service-4 Inch-2-Way Clean Out - Install 150 18,000 12 1,800 11 1.650 14 2,100 23 610.00362 58 EA Sewer-Service-6Inch-2Way Clean Out -Install 175 10,150 6 1,050 7 1,225 - 24 BID-00430 1,627 SY Pavement Asphalt - Install 45 73,215 - - 225 10,125 25 810.00415 995 SY Alley - Install (Concrete) 45 44,775 - - 220 9,900 26 BID-00530 156 SF Walk-4 Ft - Install 8 1,248 - 50 400 27 BID-00423 290 LF Curb & Gutter - Install 25 7.250 100 2,500 28 BID-00401 1,280 SF Driveway - Install 5 6,400 - - - 29 BID-00137 18,657 SY Grass -Sod - Install 10 186,570 1.925 19250 2,685 26,850 30 BID-00128 53 LF Fence -Chain Link - Install 25 1,325 15 375 5 125 31 BID-00129 60 LF Fence -Privacy -Install 30 1,800 15 450 - - 32 BID-00121 15 LF Wall -Aluminum - Install 50 750 15 750 - 33 BID 00097 550 SF Rip Rap-6 Inch - Install 6 3,300 - 34 BID-00493 110 CY Subgrade-Crushed Limeston ForMisc. Placement- Install 25 2,750 5 125 5 125 5 35 - BID-00840 110 CY Fill Material -Ballast Stone - Install 15 1,650 36 BID-00217 52 EA Manhole -Vacuum Test- Services 200 10,400 2 200 1 100 1,134 4,536 310 1,240 1 250 1 250 1 500 30 150 10 50 20 60 3 1,500 2 1,000 760 1,520 300 600 135 3,375 45 1,125 1,134 51,030 310 13,950 3 7,500 2 5,000 6 750 2 250 3 300 2 200 3 900 2 600 18 7,200 6 2,400 18 2,700 6 900 ® 752 33,840 35 1,575 32 256 - - 30 750 10 250 20 100 490 4,900 ' 760 7,600 450 4,500 125 - 5 125 5 125 5 75 5 75 5 75 5 75 5 75 5 1,000 10 2,000 1 200 3 600 2 400 37 BID-00201 15,029 LF Inspection -Post Construction Cleaning & TV - Study 2.5 37,571 1,290 3,225 2,076 5,190 400 1,000 1,269 3,173 355 888 Subtotal= 1,315.566 Contingency (10%) 132,434 Total= 1,448,000 City of Fort Worth, Texas Attachment B PMO Official Release Date: 5.19.2010 Page 14 of 14 116.165 205,917 36,280 128,830 35.638 11,635 20,684 3,720 12,971 3,663 127.800 226.600 40,000 141,800 39,300 ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for Sanitary Sewer Rehabilitation Contract 82 City Project No. 01501 No Changes City of Fort Worth, Texas Attachment C PMO Release Date: 05.19.2010 Page 1 of 1 ID 1 2 3 4 5 6 7 nr 8 9 10 11 12 1 13 14 (or 15 nr 16 17 18 19 CC Cr Cr 20 rig 21 [.] 22 /2 23 25 Cr. 26 N. 27 28 29 30 EE 31 0 32 33 34 35 J 36 Task Name Duration Start Project Template (Use This One) - 5-31-2010 831 days Thu 7/1/10 Project Planning 20 days Thu 7/1/10 Program/Project Planning 20 days Thu 7/1/10 Wed 7/28/10 Planning 20 days Thu 7/1/10 Wed 7/28/10 Project Agreement 106 days Mon 8/2/10 Mon 12/27/10 Program/Project Contract Agreement 106 days Mon 8/2/10 Mon 12/27/10 Project Start 0 days Mon 8/2/10 Mon 8/2/10 Select Consultant / Negotiate Fee & Scope 40 days Fri 8/6/10 Thu 9/30/10 M&C Process - Design 60 days Tue 10/5/10 Mon 12/27/10 Design 430 days Thu 12/30/10 Thu 8/23/12 Design 271 days Tue 1/18/11 Tue 1/31/12 Overall Design 271 days Tue 1/18/11 Tue 1/31/12 30% Conceptual Design 77 days Thu 12/30/10 Mon 4/18/11 Issue Design Notice To Proceed 0 days Thu 12/30/10 Thu 12/30/10 Prepare 30% Conceptual Plans 60 days Mon 1/3/11 Fri 3/25/11 30% Conceptual Plan Submittal 0 days Mon 3/28/11 Mon 3/28/11 Review 30% Conceptual Plan(CFW) 14 days Tue 3/29/11 Fri 4/15/11 Hold Project Meeting 1 day Mon 4/18/11 Mon 4/18/11 60% Preliminary Design 134 days Tue 4/19/11 Fri 10/21/11 Prepare 60% Preliminary Plans and Specifications 120 days Tue 4/19/11 Mon 10/3/11 60% Preliminary Plan and Specification Submittal 0 days Wed 8/10/11 Wed 8/10/11 Review 60% Preliminary Plans and Specifications (CF 14 days Tue 10/4/11 Fri 10/21/11 Submit Plans and Specs to Utilities 5 days Tue 10/4/11 Mon 10/10/11 Hold Project Meeting 1 day Wed 8/31/11 Wed 8/31/11 90% Final Design 219 days Mon 10/24/11 Thu 8/23/12 Prepare 90% Final Plans and Specifications 60 days Mon 10/24/11 Fri 1/13/12 90% Final Plan and Specification Submittal 0 days Wed 12/14/11 Wed 12/14/11 Review 90% Final Plans and Specifications (CFW) 17 days Mon 1/16/12 Tue 2/7/12 Incorporate Final Comments and Submit Final Plans a 15 days Fri 1/6/12 Thu 1/26/12 Approve Final Plans and Specifications and Route for 10 days Wed 2/8/12 Tue 2/21/12 Hold Project Meeting 1 day Thu 1/5/12 Thu 1/5/12 Design Complete 0 days Thu 8/23/12 Thu 8/23/12 ROW/Land 257 days Tue 4/5/11 Wed 3/28/12 Right-of-Way/Land Costs 20 days Mon 4/18/11 Fri 5/13/11 Land Costs 20 days Mon 4/18/11 Fri 5/13/11 Negotiations/Easements/Legal Fees 217 days Tue 4/5/11 Wed 2/1/12 Finish Project: Sewer Rehab Contract 82 Date: Tue 1/18/11 Task Split Progress Milestone Summary I 11 1 I 1L. ,)un Thu 9/5/13 Wed 7/28/10 2nd Half Jul I Auo I Seo I Oct I Nov I Dec ' 11 1 110 111 1 I I 111011 1 111 ■ 1 1 I III 11,1, .1 111 1 I . ■ 812 .i► Rolled Up Task f ::::=:::=:=__= :=:= ::::j Project Summary Rolled Up Split External Milestone Rolled Up Milestone O Deadline Rolled Up Progress 1 , 1 - 1 External Tasks 1st Half Jan I Feb I Mar I Aor 1 1 11 11 III . 11111 • Page 1 ID 0 37 n 38 in 39 Q 40 B' 41 In 42 In 43 0 44 45 46 47 48 i-] 49 50 51 53 54 LI 55 A 57 58 59 60 13 61 62 63 64 65 66 n 67 68 69 70 71 72 Task Name PM Meeting with ROW Prepare Right Of Way (ROW) Documents Assign Land Agent/Appraisals Review Appraisals and Prepare First Offer Present First Offer and Negotiation/Acceptance Perioc Prepare Second Offer (If Needed) Present Second Offer and Negotiation/Acceptance Pe Prepare & Deliver Condemnation Packet (If Needed) Condemnation Period (If Needed) Facility/Building Purchase M&C Process - Building/Land Purchase Finalize Land/Building Purchase Real Property Complete Permits Identify Required Permits Prepare and Submit Permits Review and Approve Permits Environmental Identify Environmental Issues Prepare and Submit EID Review and Approve EID Survey Preliminary Survey Initial Field Survey Topographic (Field) Survey Construction Staking Staking Public Involvement Public Meetings Hold Public Meeting - Design Hold Public Meeting - Pre -Construction Utilities Private Utility Relocation Costs Review Plans and Specs - Utilities Utility Relocation Utility Coordination/Clearance Project: Sewer Rehab Contract 82 Date: Tue 1/18/11 Task Split Progress Milestone Summary Duration 1 day 20 days 42 days 10 days 20 days 11 days 20 days 10 days 75 days 116 days • 41 1 , , II III 61 days 22 days 0 days 228 days 41 days 82 days 105 days 248 days 41 days 82 days 125 days 528 days 30 days 25 days 20 days 126 days 126 days 257 days 257 days 1 day 1 day 263 days 158 days 41 days 71 days 138 days Rolled Start Tue 4/5/11 Wed 4/6/11 Mon 5/16/11 Wed 7/13/11 Wed 7/27/11 Wed 8/24/11 Thu 9/8/11 Thu 10/6/11 Thu 10/20/11 Wed 8/24/11 Wed 8/24/11 Thu 11/17/11 Wed 2/1/12 Mon 4/18/11 Mon 4/18/11 Tue 6/14/11 Thu 10/6/11 Mon 4/18/11 Mon 4/18/11 Tue 6/14/11 Thu 10/6/11 Tue 4/12/11 Tue 4/12/11 Tue 4/19/11 Tue 4/12/11 Thu 10/25/12 Thu 10/25/12 Wed 8/31/11 Wed 8/31/11 Wed 8/31/11 Thu 8/23/12 Mon 10/24/11 Mon 10/24/11 Mon 10/24/11 Wed 2/22/12 Fri 4/13/12 Up Task Rolled Up Split Rolled Up Milestone Rolled Up Progress External Tasks Finish Jun Tue 4/5/11 Tue 5/3/11 Tue 7/12/11 Tue 7/26/11 Tue 8/23/11 Wed 9/7/11 Wed 10/5/11 Wed 10/19/11 Wed 2/1/12 Wed 2/1/12 Wed 11/16/11 Fri 12/16/11 Wed 2/1/12 Wed 2/29/12 Mon 6/13/11 Wed 10/5/11 Wed 2/29/12 Wed 3/28/12 Mon 6/13/11 Wed 10/5/11 Wed 3/28/12 Thu 4/18/13 Mon 5/23/11 Mon 5/23/11 Mon 5/9/11 Thu 4/18/13 Thu 4/18/13 Thu 8/23/12 Thu 8/23/12 Wed 8/31/11 Thu 8/23/12 Wed 10/24/12 Wed 5/30/12 Mon 12/19/11 Wed 5/30/12 Wed 10/24/12 i.1. II II II .. 1.11' 2nd Half Jul I Aua I Sep I Oct I Nov I Dec Project Summary T External Milestone Deadline 1st Half Jan I Feb I Mar I Apr Page 2 ID Task Name Duration Start Finish 73 _ Coordination 105 days Thu 5/31/12 Wed 10/24/12 74 Utilities Complete 0 days Fri 4/13/12 Fri 4/13/12 75 Construction 347 days Mon 2/13/12 Wed 6/12/13 76 Project Management 283 days Tue 2/14/12 Thu 3/14/13 77 __f Construction Project Management 283 days Tue 2/14/12 Thu 3/14/13 78 Construction Advertisement 347 days Mon 2/13/12 Wed 6/12/13 79 Advertisement Period 41 days Mon 2/13/12 Tue 4/10/12 80 Start Advertisement 0 days Mon 2/13/12 Mon 2/13/12 81 Advertisement Period 19 days Tue 2/14/12 Fri 3/9/12 82 LE Hold Pre -Bid Meeting 1 day Fri 2/17/12 Fri 2/17/12 83 Issue Addenda (As needed) 16 days Mon 3/12/12 Mon 4/2/12 84 ni Bid Opening 1 day Tue 3/13/12 Tue 3/13/12 85 n Review Bids - Bid Tabulations and Select Contra( 6 days Tue 4/3/12 Tue 4/10/12 86 MWBE Documentation 14 days Wed 3/21/12 Mon 4/9/12 87 Submit MWBE Compliance Documents 5 days Tue 4/3/12 Mon 4/9/12 88 1 Review and Approve MWBE Compliance Documi 10 days Wed 3/21/12 Tue 4/3/12 89 M and C Process 54 days Wed 4/4/12 Mon 6/18/12 90 n Start M&C Process - Construction 0 days Mon 4/9/12 Mon 4/9/12 91 M&C Process 54 days Wed 4/4/12 Mon 6/18/12 92 Contract Execution 21 days Tue 6/19/12 Tue 7/17/12 93 ;i Execute Contract Documents (Contractor) 10 days Tue 6/19/12 Mon 7/2/12 94 Execute Contract Documents (CFW) 11 days Tue 7/3/12 Tue 7/17/12 95 Pre -Construction Activities 29 days Wed 7/18/12 Mon 8/27/12 96 S Distribute Executed Contract Documents to Cons 5 days Wed 7/18/12 Tue 7/24/12 97r"' Construction to Schedule Pre -Con Meeting 14 days Wed 7/25/12 Mon 8/13/12 98A Hold Pre -Construction Meeting with Contractor 1 day Thu 8/16/12 Thu 8/16/12 99 [] Submittals and Approvals 10 days Tue 8/14/12 Mon 8/27/12 100 Construction Contract 129 days Tue 8/28/12 Fri 2/22/13 101 0. Construction Phase Start 0 days Wed 10/24/12 Wed 10/24/12 102 Construction 129 days Tue 8/28/12 Fri 2/22/13 103 Material/Soil Testing 126 days Thu 10/25/12 Thu 4/18/13 104 ,__J Material and Soil Testing 126 days Thu 10/25/12 Thu 4/18/13 105 Inspection 165 days Thu 10/25/12 Wed 6/12/13 106 Inspections 126 days Thu 10/25/12 Thu 4/18/13 107 _I Final Inspection 15 days Thu 5/23/13 Wed 6/12/13 108 J Construction Phase Complete 0 days Tue 4/23/13 Tue 4/23/13 Project: Sewer Rehab Contract 82 Date: Tue 1/18/11 Task Split Progress Milestone Summary • Jun 2nd Half Jul I Aua 1 Sep I Oct I Nov I Dec Rolled Up Task Project Summary Rolled Up Split External Milestone Rolled Up Milestone O Deadline Rolled Up Progress External Tasks 1st Half Jan I Feb I Mar 1 Apr Page 3 ID 109 110 111 112 115 116 117 i Task Name Landscaping Landscaping Closeout Closeout Report and Review Closeout Review Project Complete Acceptance Project Acceptance Project Acceptance Project: Sewer Rehab Contract 82 Date: Tue 1/18/11 Task Split Progress Milestone Summary Duration • II 11111 III . .. II 1 II I III II 50 days 50 days 36 days 36 days 31 days 0 days 0 days 0 days 0 days Start Thu 3/14/13 Thu 3/14/13 Wed 6/5/13 Wed 6/5/13 Thu 6/13/13 Wed 6/5/13 Thu 9/5/13 Thu 9/5/13 Thu 9/5/13 Rolled Up Task Rolled Up Split Finish Jun Wed 5/22/13 Wed 5/22/13 Thu 7/25/13 Thu 7/25/13 Thu 7/25/13 Wed 6/5/13 Thu 9/5/13 Thu 9/5/13 Thu 9/5/13 Rolled Up Milestone O Rolled Up Progress External Tasks 2nd Half Jul 1 Aua 1 Sea I Oct I Nov I Dec 1st Half Jan I Feb I Mar I Apr I Project Summary External Milestone Deadline • • • • • • • • • • • • • • • • • • Page 4 IMMO ATTACHMENT E FORT WORTH o M EACHAM AIRPORT L VICINITY MAP N rs. 1 N 1,000' t ,000' fe oem Baird, Hampton & Brown, inc. 0;sr.')Eng neering & Surveying 6300 R.4eo Pioce. 6o{e 700. rut MUU, 7c 6116 to (817)338-1177 (o (817)338 9715 (-wamo(X,X;,ceom TOPE FIRM #44 FORT WORTH M EACHAM AIRPORT 7 J 3 4 TH I W LONG AVE CITY OF FORT WORTH WATER DEPARTMENT SANITARY SEWER R EH AB ILITATIO N CONTRACT 82 13,340 LF SANITARY SEWER REHABILITATION MAPSCO PAGE 48 COUNCIL DISTRICT 2 SANITARY SEWER LATERALS TO BE REHABILITATED TERMINAL RO 38TH 37rH 36TH- et ti kj 34 TH- Official site of the City of Fort Worth, Texas CITY COUNCIL AGENDA • COUNCIL ACTION: Approved on 4/5/2011 n Ord. No. 19637..04.2011 FORT WORTH • I I I d _ .. Jt • i 1 • _1 DATE: 4/5/2011 REFERENCE MO.: **C-24831 LOG NARVII: 60SS82-BHB CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Authorize I--xecution of an Engineering Agreement in the Amount of $197,608.00 with Baird, Hampton & Brown, Inc., for Sanitary Sewer Replacement Contract 82 and Adopt Appropriation Ordinance (COUNCIL DISTRICT 2) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the City Manager to execute a contract in the amount of $197,608.00 with Baird, Hampton & Brown, Inc., for Sanitary Sewer Rehabilitation Contract 82; 2. Authorize the transfer of $212,608.00 from the Water and Sewer Fund to the Sewer Capital Projects Fund; and 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Projects Fund by $212,608.00. DISCUSSION: This project consists of the preparation of plans and specifications for the rehabilitation of deteriorated sewer mains in an area that is generally bound on the north and west by Meacham International Airport, on the south by Long Avenue and on the east by North Main Street. Baird, Hampton & Brown, Inc., proposes to perform the design work for a lump sum fee of $197,608.00 City staff considers this fee to be fair and reasonable for the scope of services proposed. M/WBE — Baird, Hampton & Brown, Inc., is in compliance with City's MIWBE ordinance by committing to 24 percent M/WBE participation. The City's goal on this project is 23 percent. In addition to the contract amount, $15,000.00 is required for project management, real property acquisition and utility coordination. The project is located in COUNCIL DISTRICT 2. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations, and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Water and Sewer Fund and the Sewer Capital Projects Fund. TO Fund/Account/Centers 1&2) P258 476045 7021701501ZZ 2) P258 531200 702170150131 $212,608.00 $45, 729.00 FROM Fund/Account/Centers 1) PE45 538040 079020 $212,608.00 3) P258 531200 702170150131 $45,729.00 3) P258 531200 702170150132 $91,457.00 Logname: 6040610C01-SJLOUIS Page 1 of 2 2) P258 531200 702170150132 2) P258 531200 702170150133 2) P258 541100 702170150141 2) P258 531350 702170150142 2) P258 531350 702170150173 2) P258 511010 702170150130 2) P258 531200 702170150151 $91,457.00 $15,242.00 $2,000.00 $2, 000.00 $1, 000.00 $10, 000.00 $45,180.00 Submitted for City Rilanaaer's Office bv: Oriainatina Department Head: Additional Information Contact: ATTACHMENTS 60SS82-BH B MAP.pdf 60SS82-BHBREV AO doc 3) P258 531200 702170150133 $15,242.00 3) P258 531200 702170150151 $451180.00 Fernando Costa (6122) S. Frank Crumb (8207) Liam Conlon (6824) Logname: 604061 OCO 1-SJLOUIS Page 2 of 2